Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010 • Fiscal Year 2010
Monthly Board ReportOperating • CapitalService • Performance
September 2010
METRO
Fiscal Year 2010 Monthly Board Report
Operating • Capital • Service • Performance
September 2010
This report is based on a preliminary closing of the year-end financials for FY2010
10/15/2010
Section A Operating BudgetSeptember 2010 budget vs. actualFY 2010 YTD budget vs. actualFY 2010 YTD budget vs. actual detail / Key Areas of Focus
Section B Ridership ComparisonRidership Trends
1. Local Bus 2. Park & Ride Bus 3. METRORail 4. METROLift 5. METRO STAR Vanpool 6. HOV Carpool, Vanpool & Non-METRO Buses 7. Ridership by Service Category
Section C Sales Tax & Fare Revenues
Section D Operating Ratio Statistics
Section E Service Performance Statistics
Section F Capital Budget
Section G General Mobility Budget
Section H Debt Service
Section I Capital Improvement and METRO Rail Expansion Program
September 2010MONTHLY BOARD REPORT
Table of Contents
A. OPERATING BUDGET
A-1. Comparison of Budget to Actual for the Month (September 2010)
FY2010 FY2010September September $ Variance
Budget ActualLabor & Fringe Benefits 21,829,224 19,160,453 (2,668,771) -12.23%Materials and Services 14,690,130 20,902,775 6,212,645 42.29%Contingency 5,733,358 - (5,733,358) -100.00%
Total Operating Expenses 42,252,712 40,063,228 (2,189,484) -5.18%Reimbursements (8,551,241) 1,204,086 9,755,327 114.08%
Operating Budget 33,701,471 41,267,314 7,565,843 22.45%
A-2. Comparison of Budget to Actual Year-to-Date (12 Months)
FY2010 FY2010Year-to-date Year-to-date $ Variance
Budget ActualLabor & Fringe Benefits 261,665,981 253,707,821 (7,958,160) -3.04%Materials and Services 164,879,734 163,189,045 (1,690,689) -1.03%Contingency 5,733,358 - (5,733,358) -100.00%
Total Operating Expenses 432,279,073 416,896,866 (15,382,207) -3.56%Reimbursements (102,279,073) (90,614,798) 11,664,275 11.40%
Operating Budget 330,000,000 326,282,068 (3,717,932) -1.13%
Variance %
Variance %
(favorable)/unfavorable
(favorable)/unfavorable
Section A Page 1
A-3. Comparison of Budget to Actual - September 2010 Year-to-Date (12 Months)
Year-to-Date Year-to-Date $ Variance %
VarianceExpense Category Budget Expenses Wages 100,097,409 96,903,023 (3,194,386) -3.2%Union Fringe Benefits 51,734,062 50,811,068 (922,994) -1.8%Total Union Labor 151,831,471 147,714,091 (4,117,380) -2.7%
Salaries and Non-Union Wages 73,618,955 71,391,447 (2,227,508) -3.0%Non-Union Fringe Benefits 36,215,555 34,602,283 (1,613,272) -4.5%Total Non-Union Labor 109,834,510 105,993,730 (3,840,780) -3.5%
Total Labor and Fringe Benefits 261,665,981 253,707,821 (7,958,160) -3.0%
Services 18,373,664 24,429,676 6,056,012 33.0%Materials and Supplies 19,081,797 18,211,521 (870,276) -4.6%Fuel & Utilities 49,057,729 47,163,946 (1,893,783) -3.9%Casualty and Liability 2,614,230 (95,086) (2,709,316) -103.6%Purchased Transportation 72,833,365 70,972,584 (1,860,781) -2.6%Leases, Rentals and Miscellaneous 2,918,949 2,506,404 (412,545) -14.1%Total Non-Labor 164,879,734 163,189,045 (1,690,689) -1.0%
Total Labor and Non-Labor 426,545,715 416,896,866 (9,648,849) -2.3%
Cost Recovery (7,839,775) (7,193,868) 645,907 8.2%Contingency 5,733,358 - (5,733,358) -100.0%
Total Operating Expenses 424,439,298 409,702,998 (14,736,300) -3.5%
Capitalized Operating Expenses (53,811,936) (59,038,262) (5,226,326) 9.7%Allocation to Capital & GMP (40,627,362) (24,382,668) 16,244,694 40.0%Total Allocation to Capital (94,439,298) (83,420,930) 11,018,368 11.7%
OPERATING BUDGET 330,000,000 326,282,068 (3,717,932) -1.1%
(favorable) / unfavorable
Section A Page 2
A-4. Key Areas of Focus (Non-Labor Expenses):
September 2010 Year-to-Date $ VarianceExpense Type (favorable) / unfavorable
Services $6,056,012 Advertising Fees ($432,000)Park & Ride communications equipment servicing ($400,000)METRO Q® Fare Card Support (lagging invoice) ($291,000)Less Hiring Related Services ($250,000)"Mystery Rider" program not implemented ($240,000)Printing Fees ($223,000)Stricter Accounting Standards on IT items $5,500,000 Legal Fees $1,300,000 1900 Main St. Repair (fire) $944,000 1900 Main St. Repairs (windows damaged in hurricane) $762,000
Leases, Rentals and Miscellaneous ($412,545)"Soft Items" (Travel, Memberships, Subscriptions) ($278,000)Small Non-Capitalized Equipment ($141,000)
Section A Page 3
B. RIDERSHIP
4,000
6,000
8,000
B-1 Local Bus Service Ridership 12 Month Rolling AverageBoardings (,000)
5,225 5,157
3,000
4,500
6,000
7,500
FY2009 FY2010
September
B-1 Local Bus ServiceBoardings (,000)
‐1.3%
63,80658,553
40,000
50,000
60,000
70,000
FY2009 FY2010
Year‐to‐Date
B-1 Local Bus ServiceBoardings (,000)
‐8.2%
Section B Page 4
2,000Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10
400
500
600
700
800
Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10
B-2 Park & Ride Bus Service Ridership 12 Month Rolling AverageBoardings (,000)
751 690
400
600
800
1,000
FY2009 FY2010
September
B-2 Park & Ride Bus ServiceBoardings (,000)
‐8.2%
8,9897,986
6,500
7,500
8,500
9,500
FY2009 FY2010
Year‐to‐Date
B-2 Park & Ride Bus ServiceBoardings (,000)
‐11.2%
Section B Page 4
400
800
1,200
1,600
B-3 METRORail Ridership 12 Month Rolling AverageBoardings (,000)
952 932
600
800
1,000
1,200
FY2009 FY2010
September
B-3 METRORail ServiceBoardings (,000)
‐2.0%
11,614 10,627
6,500
8,500
10,500
12,500
FY2009 FY2010
Year‐to‐Date
B-3 METRORail ServiceBoardings (,000)
‐8.5%
Section B Page 5
Note: Fixed route ridership shown here is from the data reported to the National Transit Database (NTD).
Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10
Section B Page 5
50
100
150
200
B-4 METROLift Service Ridership 12 Month Rolling AverageBoardings (,000)
128 140
50
100
150
200
FY2009 FY2010
September
B-4 METROLift ServiceBoardings (,000)
9.0%
1,483 1,573
1,000
1,300
1,600
1,900
FY2009 FY2010
Year‐to‐Date
B-4 METROLift ServiceBoardings (,000)
6.1%
Section B Page 6
Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10
75
150
225
300
Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10
B-5 METRO STAR Vanpool Ridership 12 Month Rolling AverageBoardings (,000)
218 206
75
150
225
300
FY2009 FY2010
September
B-5 METRO STAR Vanpool ServiceBoardings (,000)
‐5.5%
2,6372,461
2,200
2,400
2,600
2,800
FY2009 FY2010
Year‐to‐Date
B-5 METRO STAR Vanpool ServiceBoardings (,000)
‐6.7%
Section B Page 6
1,500
2,250
3,000
B-6 HOV, Carpools, Vanpools & Non-METRO Buses Ridership 12 Month Rolling Average - Boardings (,000)
2,0251,839
1,500
1,750
2,000
2,250
FY2009 FY2010
September
B-6 HOV ServiceBoardings (,000)
‐9.2%
24,112 23,761
20,000
22,000
24,000
26,000
FY2009 FY2010
Year‐to‐Date
B-6 HOV ServiceBoardings (,000)
‐1.5%
Section B Page 7
750Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10
Section B Page 7
B-7. RIDERSHIP BY SERVICE CATEGORY
% Change YTD % ChangeSep-10 Sep-10 Sep-10
Sep-10 vs. YTD vs.Boardings Sep-09 Boardings Sep-09
Fixed Route Bus ServicesLocal 5,157,027 -1.3% 58,553,039 -8.2%Park & Ride 689,539 -8.2% 7,985,851 -11.2%Total Fixed Route Bus Services 5,846,566 -2.2% 66,538,890 -8.6%METRORail 932,465 -2.0% 10,627,331 -8.5%Total Fixed Route Services 6,779,031 -2.1% 77,166,221 -8.6%
Special Bus ServicesMETROLift 139,875 9.0% 1,573,288 6.1%METRO STAR Vanpool 206,317 -5.5% 2,460,730 -6.7%Internal Service 3,632 2901.7% 7,700 10.9%Total Special Bus Services 349,824 0.9% 4,041,718 -2.1%Total Bus and Rail Services 7,128,855 -2.0% 81,207,939 -8.3%HOV Carpools, Vanpools, and Non-METRO Buses 1,839,495 -9.2% 23,761,231 -1.5%TOTAL SYSTEM RIDERSHIP 8,968,350 -3.6% 104,969,170 -6.8%
RIDERSHIP DATA(Fixed route ridership shown here is from the data reported to the National Transit Database)
Section B Page 8
C. SALES TAX & FARE REVENUES
Budget Actual YTD Budget YTD ActualSep-10 Sep-10 Sep-10 Sep-10
Sales Tax (Cash Basis) 40.110 36.929 -7.9% 481.721 484.420 0.6%
Actual Actual YTD Actual YTD ActualSep-09 Sep-10 Sep-09 Sep-10
Sales Tax (Cash Basis) 36.969 36.929 -0.1% 523.492 484.420 -7.5%
Budget Actual YTD Budget YTD ActualSep-10 Sep-10 Sep-10 Sep-10
Fares 5.586 5.320 -4.8% 67.941 62.599 -7.9%
Actual Actual YTD Actual YTD ActualSep-09 Sep-10 Sep-09 Sep-10
Fares 5.381 5.320 -1.1% 65.658 62.599 -4.7%
Month Year-to-Date
Sales Tax Revenue vs. Budget($ millions)
Month Year-to-Date
Variance VarianceSeptember
Sales Tax Revenue vs. Prior Year($ millions)
Variance VarianceSeptember
Fares vs. Budget($ millions)
Month Year-to-Date
Variance VarianceSeptember
Fares vs. Prior Year($ millions)
Month Year-to-Date
Variance VarianceSeptember
Section C Page 9
D. OPERATING RATIO STATISTICS
Operating Ratio -14%
COST EFFECTIVENESS PERFORMANCE GOALSSeptember 2010
YTD % Annual THIS FY2010 FY2010 VARIANCE
FROM GOAL20% 12% 18% 21%
GOALFY2009 MONTH YTD
Total Fares plus Cost RecoveryTotal Transit Cost
Section D Page 10
E. SERVICE PERFORMANCE STATISTICS
THIS FY2010 FY2010 MONTH YTD GOAL Bus On-Time Performance (1) *
Local 69% 67% 66% Park & Ride 77% 77% 70% Weighted Average 71% 70% 67%
Rail On-Time Performance (1) 97.2% 97.4% 96%
Mean Distance Between Mechanical Failures (All buses) (2) 8,469 7,848 6,350
Additional information on MDBF:Buses Age 0 - 3 Years (≈ 23% of fleet) 9,335 10,842 6,350Buses Age 4 - 8 Years (≈ 14% of fleet) 14,947 9,338 6,350Buses Age 9 - 12 Years (≈ 59% of fleet) 7,507 6,077 6,350Buses Age 13+ Years (≈ 4% of fleet) 9,438 5,679 6,350
YTDTHIS FY2010 FY2010
MONTH YTD GOAL Bus Accidents - absolute number (3) 40 502 552 - per 100,000 vehicle miles 0.71 0.74 0.84
Rail Accidents - absolute number (4) 0 30 41 - per 100,000 vehicle miles 0.00 3.20 5.35
Complaint Calls - absolute number 1,768 17,919 20,088 - as a % of boardings 0.0248 0.0221 0.0221 Major Security Incidents - total (5) 28 340 600 - per 100,000 boardings 0.393 0.419 0.659
Major Security Incidents - METRO properties (6) 14 197 384 - per 100,000 boardings 0.196 0.243 0.422
-9.1%
-26.8%
-10.8%
-43.3%
-48.7%
23.6%
70.7%47.1%-4.3%
-10.6%
(6) Major Security Incidents at METRO-controlled properties are defined as incidents that occur at Park & Ride lots, transit centers, on board buses & trainsand on LRV platforms.
(3) This indicator is for the bus system and includes METROLift.(4) Rail Accidents reflect collisions between METRORail and vehicles.(5) Total Major Security Incidents are based on two industry standards: the FBI Uniform Crime Report and the National Transit Database Report issued bythe Federal Transit Administration. The 8 categories included are: homicide, forcible rape, robbery, aggravated assault, burglary, larceny and theft, motorvehicle theft and arson.
SYSTEM QUALITY PERFORMANCE GOALSSeptember 2010
YTD %VARIANCE
(Green = Better Than Goal)
(1) A local or express bus is considered on-time if it does not leave early and is less than 5 minutes late. A Park & Ride bus is considered on-time if it doesnot depart early (except in the morning when a bus can leave from a Park & Ride lot when full) and is less than 5 minutes late - measurements are forpeak hours. OTP is measured by IVOMS which calculates data to the second. Effective FY2009, the 5 minute window is defined as anything less than 6minutes. Rail OTP is based on automated actual arrival and departure times at the terminal stations. A train is considered on-time if it departs a terminalstation less than 5 minutes late or arrives at a terminal station less than 5 minutes past the scheduled arrival time.
(2) Effective October 2006, MDBF Mechanical roadcalls are defined as any mechanical issue encountered during operation of the vehicle in revenueservice that requires a maintenance action resulting from a mechanical failure. Mechanical failures include warranty and fleet defects but excludeaccidents. This indicator is for the bus system but excludes METROLift.
YTD %VARIANCE
(Green = Better Than Goal)
1.5%10.0%4.5%1.5%
Section E Page 11
E. SERVICE PERFORMANCE STATISTICS
Mean Distance Between Mechanical Failures (All buses) (2)
Additional information on MDBF:
91% 92% 95% 93% 92% 92% 93% 90% 89% 89% 87% 85%
191
354
99
0
12
24
36
48
60
72
84
96
108
0
50
100
150
200
250
300
350
400
450
Aver
age
Wai
t Tim
e (s
econ
ds)
Goa
l = 6
0 Se
cond
s
Tota
l Cal
ls/ R
oute
d C
alls
(000
's)
Serv
ice
Leve
l (%
)
Customer Information Center Key Indicators
IVR and Web Trip Planner Implemented September 30, 2005
Total Calls includes total calls routed to agents plus total number of automated schedule lookups.
Service Level = Calls answered by Customer Information Specialists (CIS)/Calls Offered to CIS.
Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10
Service Level (%) Calls Received and Routed to Customer Service (000's) Total Calls Average Wait Time (sec)
Section EPage 12
F. CAPITAL BUDGET
METRO Rail Expansion 112.956 53.770 498.221 268.452 (229.769) -46.1%
Capital Improvement Program 61.332 -3.247 185.017 71.109 (113.908) -61.6%
Total Capital Budget ($ millions)
174.288 50.523 683.238 339.561 (343.677) -50.3%
G. GENERAL MOBILITY PROGRAM
Total General Mobility ($ millions)
12.644 2.266 151.694 140.762 (10.932) -7.2%
H. DEBT SERVICE
Total Debt Service ($ millions)
14.181 2.197 99.000 30.492 (68.508) -69.2%
Notes:
Effective December 2009, Debt Service is reported on an accrual basis.
METRO Rail Expansion actual expenses include $356,000 for CIP programs. This amount will be reclassified to go into the CIPcategory by next month.
YTD FY2010 Variance
SeptemberFY2010 Budget
SeptemberFY2009 Actuals
YTD FY2010 Budget
YTD FY2010 Actuals
YTD FY2010 Variance
SeptemberFY2010 Budget
SeptemberFY2010 Actuals
YTD FY2010 Budget
YTD FY2010 Actuals
YTD FY2010 Variance
YTD FY2010 Budget
YTD FY2010 Actuals
SeptemberFY2010 Budget
SeptemberFY2010 Actuals
Sections F, G and H Page 13
Capital Improvement Program &
METRO Rail Expansion
MONTHLY PROGRESS REPORT
(Period Ended September 30, 2010)
Section I Page 14
I-1. PROGRAM RELATED
Small Business – Light Rail Construction Project
Facility Provider Committed / Awarded to SBE/DBE
Facility Provider Overall Base SBE/DBE Goal $335,000,000 SBE/DBE Base Level
Sub-Contracting Goal
Overall Base SBE/DBE Goal $ 335,000,000
HRT Committed/Awarded to SBE/DBE $ 92,447,824 30.8%
Other Committed/Awarded to SBE/DBE $ 10,800,000
Section I Page 15
I-2. COMMUNITY OUTREACH
Business Assistance Fund (BAF) At-A-Glance Business
Assistance Fund
Total Businesses
Business Outreach 1
Pending Registrations 2
Registered Businesses
Award Requests Awards
East End Line 167 167 22 29 10 8 North Line 177 177 15 27 15 9
Southeast Line 129 129 12 33 6 4 Total 3 473 473 (+20) 49 (-8) 89 (+25) 31 (+9) 21 (+1)
Note: Award disbursements to date is $277,820.85 (April 2010 – September 2010). 1 This represents face to face meetings with businesses where registration packets have been explained and dropped off. All
businesses have received mailed postcards introducing them to the program. 2 Pending registrations are completed registration packets currently under review by Unity National Bank. 3 ( ) reflects the increase/decrease in the total activity over last month.
Construction Related Issues Received for September 2010
CURRENT MONTH BREAKDOWN OF MITIGATION PLANS TO DATE
TOTAL ISSUES
RECEIVED
TOTAL ISSUES CLOSED
Closed within
48 Hours
Closed After 48 Hours
Mitigation Plan in Place
within 48 hours
Previous Month
Mitigation Plan
Resolutions Pending
Mitigation Plan
Resolved During the
Month
Mitigation Plan
Resolutions Pending *
North Line 10 10 0 0 0 1 0
Southeast Line 13 12 0 1 1 2 2
East End Line 3 1 0 2 0 0 2
Uptown Line 0 0 0 0 0 0 0
TOTAL 26 23 0 3 1 3 4
Note: “Total” represents construction related issues only and does not include questions or notifications.
* Of the four (4) MPs pending resolution: a. One (1) MP on the Southeast Line is from August, and b. Two (2) MPs on the East End Line and one (1) MP on the Southeast Line are from September.
Section I Page 16
I-3. PROGRESS REPORTS
East End Line Design
East End Corridor Design Progress
Current Design Percent Complete
Estimated Design Completion
Utility Packages
90% November 2010
Roadway / Guideway Packages
80% November 2010
Station Packages
60% November 2010
Notes: The estimated design completion dates of November 2010 are dependent on the completion of the City of Houston Tunnel/Underpass Study in Segment 1A.
Construction - Utility construction is underway on all 6 segments of the line.
Real Estate
- The East End Line has a total of 135 required parcels. • Parcels in possession = 129
- The project is 3.3 miles in length (17,424 linear feet).
EAST END LINE – PARCELS NOT IN POSSESSION
Property Length of Parcel Facing Project in Linear Feet (LF)
Est. Date Available
1 Residential – Jose Cantu (Future S&I Facility) Nov. 15, 2010 2 Houston Armature Works 334.27 1.92% Dec. 30, 2010 3 Houston Armature Works 14.88 0.09% Dec. 30, 2010 4 Houston Armature Works 14.97 0.09% Dec. 30, 2010 5 Jose Alamos (vacant used car lot) 50.00 0.29% Dec. 30, 2010 6 Union Pacific 79.46 0.46% Dec. 30, 2010 Total LF Not In Possession 493.58 2.83%
Section I Page 17
East End Line Construction Photos
A f 9 20 10AS of 9.20.10
Section I Page 18
North Line Design
North Corridor Design Progress
Current Design Percent Complete
Estimated Design Completion
Utility Packages
95% October 2010
Roadway / Guideway Packages
95% November 2010
Station Packages
95% December 2010
Notes: The estimated design completion dates have been pushed back from September 2010 due to redesign of the Burnett Transit Center providing 80’ ROW as mandated by COH Planning Commission. The November/December design completion dates are also dependent on the resolution of Segment 4B Main Street Bridge design with the COH.
Construction - Utility construction is underway on 7 out of 8 total segments.
Real Estate - The North Line has a total of 113 required parcels and all parcels are in possession.
LONP – Pending FTA - Roadway & structure construction delay impacts pending receipt of LONP:
• Roadway Excavation in Segment 2A was scheduled to start May 31, 2010 (DELAYED). • Concrete Pavement in Segment 3A was scheduled to start July 6, 2010 (DELAYED). • The UPRR Bridge submitted with the LONP for approval is needed by November 9th, 2010
before this work becomes critical. • The Main Street Bridge demolition was scheduled for October 4, 2010 (DELAYED).
- ROC construction delay impacts pending receipt of LONP: • The schedule submitted with LONP 7 showed the start of work, existing parking lot demolition as
June 8, 2010. The revised schedule start date for this activity is July 30, 2010 (DELAYED). • Prevents contract awards and procurement of items requiring shop drawings.
Section I Page 19
North Line Construction Photos
Section I Page 20
Southeast Line
Design
Southeast Line Design Progress
Current Design Percent Complete
Estimated Design Completion
Utility Packages
90% November 2010
Roadway / Guideway Packages
90% November 2010
Station Packages
65% December 2010
Notes: The estimated design completion date for the Downtown Utility package was pushed back from October 2010 to November 2010 due to COH coordination on the utility and street modifications. The estimated design completion date for Segment 1A Station package has been pushed back from November 2010 to December 2010 to allow for architectural design coordination.
Construction
- Pre-utility construction activities are underway on 8 out of 13 total segments.
Note: Total linear feet now includes the expected utility work for the Downtown segments of the line.
Section I Page 21
Real Estate - The Southeast Line has a total of 133 required parcels.
• Parcels in possession = 127
- The project is 6.56 miles in length (34,640 linear feet).
SOUTHEAST LINE – PARCELS NOT IN POSSESSION
Property Length of Parcel Facing Project in Linear Feet (LF)
Est. Date Available
1 Palm Center – COH 761.41 2.20% Oct. 30, 2010
2 Palm Center – HBDI 497.13 1.44% Oct. 30, 2010
3 TxDOT 115.00 0.33% Oct. 30, 2010
4 TxDOT 79.00 0.23% Oct. 30, 2010
5 George R. Brown Convention Center – COH 130.00 0.38% Nov. 30, 2010
6 University of Houston 3,927.00 11.34% Dec. 30, 2010
Total LF Not In Possession 5,509.54 15.90%
LONP – Pending FTA - Roadway & structure construction delay impacts pending receipt of LONP:
• The schedule submitted with LONP 3 showed the start of roadway work as May 31, 2010. The revised schedule start date for this activity is September 1, 2010 (DELAYED).
• The activities in Segment 1B, 2A and 3B include lime treat sub-grade, asphalt paving grade protection and concrete paving.
• Prevents contract awards and procurement of necessary materials.
Section I Page 22
Southeast Line Construction Photos
Section I Page 23
Uptown Line
Design
Uptown Corridor Design Progress
Current Design Percent Complete Estimated Design
Completion IH-610 Design
(at-grade) Overall Line
Design (excluding IH-610)
Utility Packages
n/a 90% On Hold
Roadway / Guideway Packages
50% 65% On Hold
Station Packages
n/a 35% On Hold
Construction - Utility construction is pending.
Real Estate - The Uptown Line has a total of 29 required parcels.
• Current design efforts have reduced the required parcel count from 31 to 29; • All acquisition activities are pending.
Section I Page 24
I-4. VEHICLE – PROGRESS REPORT
Vehicle Re-Procurement
Procurement Activity Estimated
Completion
LRV Consultant - Solicitation October 2010
LRV Consultant – Contract Executed December 1, 2010
FTA – Task Force Review December 2010 / January 2011
LRV - RFP Posted January 2011
LRV – Technical Proposals Received May 2011
LRV – Identify Technical Qualified Firms June 2011
LRV – Request BAFO from Technical Qualified Firms (Visit sites during the 45 day period and finalize short list of qualified firms) June 2011
LRV – Receive Best & Final Offers July 2011
LRV Vehicle Supplier – Contract Executed August 2011
Section I Page 25
I-5. QUALITY ASSURANCE / QUALITY CONTROL
METRO Audit / Surveillance Update
Conducted
During Sept. 2010
Items Closed in Sept. 2010
Cumulative Total Items Conducted
FY 2010
Cumulative Total Items
Closed FY 2010
Open Items
FY 2010
SURVEILLANCES 14 15 102 94 8
East End Line 0 1 17 13 4 North Line 3 3 28 28 0
Southeast Line 1 0 12 11 1 Uptown Line 1 1 1 1 0
Multiple Lines * 9 10 44 41 3
AUDITS 2 1 6 3 3
Facility Provider 1 1 2 2 0 Design-Builder 1 - 4 1 3
Vehicle - - - - - O&M - - - - -
* Multiple is defined as any surveillance that covers two or more lines Note: The cumulative update is from October 1, 2009 through September 30, 2010 and does not include University.
Buy America Provision
Non-Compliant Material Total Non-Compliant Incidents To Date
Identified During Delivery
Identified During
Installation Closed Open
East End Line 1 6 7 0
North Line 5 2 * 6 1 Southeast Line 2 5 7 0
Uptown Line 0 0 0 0
TOTAL 8 13 20 1
* Includes one (1) identification not counted in August 2010 reporting period.
Note: At least once a month, METRO’s Quality Team performs an “in field” verification ensuring compliance with Buy America on installed material.
Section I Page 26
I-6. FINANCIAL STATUS – FP-1 CONTRACTS
Section I Page 27
YTD Actual excludes 16K accounting adjustment for Engineering Studies.
Section I Page 28
I-7. UNIVERSITY LINE – PROGRESS REPORT
University Line
The University Line is approximately 11.3 miles in length and extends eastward from METRO’s existing Hillcroft Transit Center, located at US-59 and Westpark to METRO’s existing Eastwood Transit Center located at IH-45 and Lockwood. There are 19 stations along the alignment. The stations from west to east are Hillcroft, Gulfton, Bellaire, Newcastle, Weslayan, Cummins, Edloe, Kirby, Shepherd, Menil, Montrose, Wheeler, Almeda, Hutchins, TSU, Tierswester, UH Scott, UH Cullen, and Eastwood.
NEPA Status - The FTA issued a Record of Decision (ROD) on July 27, 2010 signifying final approval of the
environmental review process.
Current Activities - Continue design coordination with the City of Houston
- Conduct various community interface meetings – ongoing
- Complete Permit Plan in coordination with City of Houston
- Continue evaluation of various schedule implementation alternatives
- Finalize Value Engineering Report
- Completed modeling evaluation of preliminary operations and maintenance scenarios
- Updates to FTA required management plans - ongoing
Upcoming Activities (SCE design work suspended effective October 1, 2010) - Initiate preliminary relocation planning activities with private utility companies
- Continue traffic analysis coordination with City of Houston
Section I Page 29
I-8. CAPITAL IMPROVEMENT PROGRAM New Service – Major Corridors
Clear Lake / El Dorado Park & Ride Anticipated location is on El Dorado near US-45 South-Gulf Freeway.
- Conducting due diligence in coordination with Texas Historical Commission and US Army Corp of Engineers;
- Examining possible site layouts and continuing preliminary environmental assessment
Brazoria County / SH-288 Park & Ride Anticipated location is in northern Brazoria County to serve the SH-288 (South Freeway) corridor.
- Continuing evaluation of alternative sites to initiate the environmental clearance process
HOV / HOT Lane Conversion The HOV / HOT Lanes Program will install the Automated Reversible Gate Operation (ARGO) equipment, gates and communication backbone along 83 miles of METRO’s HOV lanes network.
- Overall design is approximately 75% complete; final design & TxDOT approval anticipated December 2010
- ARGO construction began on the IH-45 South in August 2010
Bus Shelters Design, purchase and installation of bus shelters throughout the METRO service area.
- Final close-out and acceptance of FY2010 “100 Shelter Initiative” - Began “candidate shelter” site analysis, and 9 shelter locations are designed with COH permit
Main Street Corridor Enhancements Bar Signal Upgrade The Bar Signal Overrun Safety System will report non-complaint LRT stop occurrences.
- Bar signal upgrades from 8 to 12 inch signal heads is complete - Ongoing testing and commissioning of trains, software and field equipment including repairs
Power Track Switch (between Pierce & Gray Streets) Upgrades 4 manual track switches between Pierce & Gray Streets to power track switches allowing remote operation.
- Design is 100% complete - Purchasing long-lead items in preparation of construction scheduled to coincide with the LRT
shutdown in December 2011
Regional Partnership Projects Katy Fort Bend County Road
- METRO providing construction management - NTP for Construction issued October 11, 2010; estimated completion of July 2011
Buffalo Bayou – Harris County Flood Control - Currently engaged in property evaluation with HCFCD; anticipate board action for sell of property
in 2nd Quarter FY2011
Kingsland Park & Ride / Bike & Ride Initiative - Currently negotiating scope of work and roles & responsibilities
Hwy-290 Diamond Lane - Agreement with TxDOT finalized
Section I Page 30