montagehandleiding carport nagoya
TRANSCRIPT
-
8/19/2019 Montagehandleiding Carport Nagoya
1/30
D411_200804C
1
D411
MY
NAGOYA - TAMPICO
Installation manual Single / Extended / J/ M / Y-Connection
Thank you for purchasing an AluPort carport.
Please follow the instructions of the manual before assembly for proper installation.
The following symbols are used in this manual
Safety Sign Meaning
CautionDanger in case of wrong installation
Notes for a trouble free installtionRules and advices to follow to help preventing damages and support a
set-up properly
General information sign
Point
Advice
Notes for a trouble free installtion
Additional information
Additional information for your convenience
Please note the following cautions to prevent damages and harms to persons or the product.
1. This product is a simple garage. Please do not remodel or change it.
2. The carport is constructed for areas with 20 cm snowfall. Please remove the snow before it exceeds 20
cm to prevent damages at your carport.
3. Install the carport in a location where snow from the building to
the roof does not fall directly. Falling snow may damage the
carport.
4. The product is designed to be installed on the ground floor.
Please do not install it on the second floor or higher.It might be blown over by the wind.
5. Please make sure that all measures of the installation places are correct.6. Do not install the carport in areas with direct contact to exhaust gas. The paint may start to flake.
7. Do not install the carport on a slope.
1. The size of concrete for the foundation and the foundation size itself changes depending on the soil
condition.
2. Place crushers on the ground to aviod frost damages.
3. Using sea sand and chloline and strong alkaline mixtured materials for concrete as mortar or cocrete may
cause corrosion to your carport due to the high salt content. Please wash it properly before using it as
mortar.
4. The extract liqiud of mortar or concrete containing strong alkaline may cause corrosion and bad
appearance to your carport
5. Please drill a drainage hole into the post.
6. Mortar or concrete on aluminium or on the product itself must be removed quickly.
Caution
-
8/19/2019 Montagehandleiding Carport Nagoya
2/30
1. In case of moving the posts, please follow the instructions in this manual.
2. Please be carefull to not cover the caution stickers when installing the rainwater pipe.
3. Check for all screws and bolts beeing tightend up properly.
4. Note that the aluminium does not directly contact other metals except zinc and stainless steel.
5. Please do not drill other holes than instructed.
6. Please caulk all places properly as shown.
7. Using silicone caulkikng material may cause damages to the polycarbonate roof panels. Use alcohol-free
caulking materials.
1. Please check for all screws and bolts beeing tighted up properly.
2. Please return the manual to the product owner.
Caution
-
8/19/2019 Montagehandleiding Carport Nagoya
3/30
1. Package list
2. Dimensional drawings and part discription 1.Part discription
2.General measures
3. Installing the basic unit
1.Foundation preperation
2.Installing the posts and the rising beams
3.Installing the front frame, roof purlins and the rear frame
4.Installing the side frames and the roof rafters
5.Installing the roof panels
6.Installing the rainwater pipe4. Installing the M-Connection
1.Foundation preperation
2.Installing the main unit
5. Installing the Y-Connection
1.Foundation preperation
2.Installing the main unit
6. Installing the J-Connection
1.Foundation preperation
2.Installing the main unit
3.J-connection on M/Y-connection
4
8 8
9
14
14
15
16
18
19
2122
22
23
24
24
25
26
26
28
30
-
8/19/2019 Montagehandleiding Carport Nagoya
4/30
Name Image
QTY
Front frame
corner cap R
Front frame
corner cap L
Rear frame
corner cap R
Rear framecorner cap L
Rising beam cap L
Joint cover R
Joint cover L
Anchor stick
Caulking material
Hole cover
Rainwater pipe
attachment
Drainage
hole cover
Rainwater pipe
packing
Drain elbow
*Please check the content of the component boxes shown below.Package lists
Parts set
Rising beam packing
Mini Basic
29/50 Type 57 Type 14 Type 50 Type 50 Type 14 Type
-
8/19/2019 Montagehandleiding Carport Nagoya
5/30
92° drain elbow
Pipe holder
Adhesive
Hex bolt (SW+PW)
Name Image
QTYMINI Basic
Parts set
Installation manual
Post set
Name Image
Image
Regular post H18
Long post H23
High Long post H28
Name Image
Joint
QTY
2 pieces
QTYMini Basic
57 Type29/50 Type 14 Type 50 Type 57 Type 14 Type
Panel cushion
Tapping screw
Screw
Washer head screw
Driling screw
1 pieceLong post
2 pieces
Long post
1 piece
H28
1 piece
Installation manual
Rainwater pipe
Content is for the width 30 type
NameQTY
2 pieces 1 piece 2 pieces 1 piece
Joint
-
8/19/2019 Montagehandleiding Carport Nagoya
6/30
Side frame R
Side frame L
Side frame cover
Roof rafter
Roof rafter cover
NameName Image Image
Name Image Name Image
Frant/Rear frame set
Front frame
Rear frame
Roof purline
Rainwater pipe
NameName
M-connection
cover (Lower plate)
M-connection
cap
Rising beam
connecting bracket
ImageImage
Side frame set Side frame set
Package lists
QTY
50 type 57 type 29 type 50 type 29 type57 type
QTY
QTY3 pieces 4 pieces 2 pieces 1 piece
QTY
PC roof panel Rising beam
Roof panel set Rising beam set
Name Image
QTY
M-connection set M-connection set
50 type 57 type 14 type 29 type
2 pieces
QTY QTY
3 pieces 3 pieces 3 pieces 3 pieces 3 pieces 3 pieces 3 pieces 3 pieces 3 pieces
Hex bolt
Ø 4x13
Drilling screw
Plain washer
Spring washer
Cap nut
50 type50 type 57 type 14 type14 type57 type
-
8/19/2019 Montagehandleiding Carport Nagoya
7/30
Y-Connection set J-parts for M-connection set
Name ImageQTY Name Image QTY
Y-connetion cover
(lower plate)
Y-connetion cap
Y-connetion
post bracket
(10-1) Ø 4x13
Drilling screw
J-connection cover for M/Y(upper)
(11-1) Ø 4x13 Drilling screw
M/Y-Connection beam set J-parts set
J-parts for Y-connection set
57 type 57 type 57 type
50 type 57 type 14 type
18-27 type 30 type
57 typeName Image
M/Y-connection
beam
Roof rafter
Roof rafter cover
Front frame
sleeve
Rear frame
sleeve
Roof purlin sleeve
Roof holder
Roof holder spacer
Name
Roof purlin enforcement set
(L=1500)
Name Image QTY
Name ImageQTY
Name Image
QTY
Name ImageQTY
J-roof rafter set
Roof material holder set Optional Optional
(12-1) Ø 4x13 Drilling screw
(15-1) Ø 4x13
Drilling screw
Roof purlin enforcement set
Image QTY7 pieces(50 type)
8 pieces(57 type)
2 pieces(14 type)
(17-1) Ø 4x13 Drilling screw
(17-2) Ø 4x13 Drilling screw
(16-1) Ø 5x13 Drilling screw
Instruction manual
Instruction manual (MAL-442A/D428)
For enformcement purposes such as windy places
J-connection cover for M
(lower)
J-connection cover for M/Y
(upper)
J-connection cover for Y
(lower)
-
8/19/2019 Montagehandleiding Carport Nagoya
8/30
Dimensional drawings and parts discription
Side frame cover
Part discription
Ø 4x13 Drilling screw
Front frame corner cap
PC Roof panel
Roof rafter cover
Ø 4x10 Washer head screwRoof rafter
Ø 4x13 Drilling screw
Front frame
(1-4) Ø 4x10
washer head screw
Ø 4x10
washer head screw
M8X25 hexbolt
Joint
Joint cover
Post
Rising beam cap
Side frame cover
Side frame(Note the left and right side)
Panel holder
Foundation
Roof purline
Rear frame corner cap
Rising beam
Rear
frame
Ø 6 drainage hole Ø 4x13 Drilling screw
Ø 5x14 Screw
Tapping screw
M8x25
Hexbolt
-
8/19/2019 Montagehandleiding Carport Nagoya
9/30
Dimensional drawing * basic version. ( ) size in this brackets is for long post, [ ] 28H
Width R type
Diagram 2-1
Diagram 2-1 18-21 Size Diagram 2-2 24-30 Size
Foundation concrete
Crushed stones
160-24 - 27 size
Width a: 50 Type a: 57 Type
Width F type
Diagram 2-3 18-21 Size Diagram 2-4 24-30 Size
Foundation concrete
Crushed stones
a : 50 Type a : 57 TypeWidth
Diagram 2-2
-
8/19/2019 Montagehandleiding Carport Nagoya
10/30
Dimensional drawing *basic version. ( ) size in this brackets is for long post, [ ] 28H
50 type depth *moving range is 100 mm
57 type depth *moving range is 100 mm
Size
Size
28 type depth *No moving range
Joint cover
Rainwater pipe
Foundation concrete
Crushed stones
Foundation concrete
Crushed stones
-
8/19/2019 Montagehandleiding Carport Nagoya
11/30
14 depth type*moving range is 100 mm. Type in this brackets < > is 57 depth type.
Foundation concrete
Crushed stones Size
J-connection *moving range is 100 mm. Type in this brackets < > is 57 depth type.
Foundation concrete
Crushed stones
Size
-
8/19/2019 Montagehandleiding Carport Nagoya
12/30
Width M-connection R type
Diagram 2-3
14 depth type *moving range is 100 mm. Type in this brackets < > is 57 depth type.
Width M-connection F type
SizeSize
Size
Width a:50 type a:57 type B
SizeSize
Size
Diagram 2-4Width a:50 type a:57 type B
-
8/19/2019 Montagehandleiding Carport Nagoya
13/30
Width Y-connection R type
Diagram 2-5
Size
Size
Size
Width Y-connection F type
Diagram 2-6
Size
SizeSize
Width a:50 type a:57 type
a:50 type a:57 type
-
8/19/2019 Montagehandleiding Carport Nagoya
14/30
Installing the basic unit
Foundation preparation
Foundation praparation
Carport outer line Carport outer line
Diagram 1-1 29 Size
Diagram 1-2 50 Size
Carport outer line
Diagram 1-3 57 Size
Diagram 1-1
Advice
Size
Post moving range is up to 100 mm in total.
There is no moving range for the 29 size.
The width for the 29 size is only 18,21.
Prepare the foundation after determining the positions for the posts.
Without concrete slab Without concrete slabWith concrete slab With concrete slab
-
8/19/2019 Montagehandleiding Carport Nagoya
15/30
Foundation preparation *For Y-connection with concrete slab on grade
Concrete slab
Post200 mm
1 0 0 mm
Concrete foundation
Reinforcing
steel (*2)
Crushed stones
Front frame
direction
Diagram 1-5 For Y-connection
Diagram 1-4 For concrete slab on grade
Size
Basic / M-connection Y-connection
The distance of the outside edge between the foundation and the concrete slab has to be 200 mm. (*1)
Please install reinforcing steel in the concrete slab. (*2)
Point
M8x25 hex bolt
Joint
Joint cover R
Joint cover L
Rising beam
Tapping screw
Caulking material
Caulking
Rising beam capDrainage hole (*1)
Anchor stick
M8x25
Hex bolt
Post
(*1)
Installing the posts and rising beams
Caution
Do not install the rainwater
pipe on the "precautions"
sticker side. Attach it to the
side without sticker.
A part Diagram 2-1
Sealing
1. Insert the anchor stick into the post.
2. Attach the joint (1-1) to the post.
3. Attach the rising beam to the joint.
4. Attach the joint cover R and L.
5. Apply caulking material into the rising
beam cap and attach it to the rising
beam. (Diagram 2-1 )
Drill a drainge hole into the post
close to the ground line (G.L.), (*1).
Rising beam
cap
-
8/19/2019 Montagehandleiding Carport Nagoya
16/30
Installing the front frame, roof purlins, rear frame
Installing the front frame, roof purlins and the rear frame
Ø 5x14 Screw
PC Panel holder
Rear frame
Washer head screw
Panel cushion
Joint cover
Post
Roof purlin
Notch
Rising beam
After moving the posts, adjust the front
and brack frame and the roof purlin tothe rising beam and drill Ø 5,5 hole in to
the back and Ø 4,5 holes into the front
frame and into the roof purlin.
Please fix the rear frame to the
joint cover (1-3). (Diagram 3-1)
Please place the PC panel holder
so, that the space between the
two nothes are equal.
Point
Point
Point
Diagram 3-1
Panel cushion
Fin artRoof purlin
Risin beam
Rear frame
Front frame
Ø 4x10 Washer head screw
Front frame
Rising beam
Rising beam packing
Please attach the front frame to the
rising beam with washer head screws.
(Diagram 3-3)
Please cover all pre-drilled holes, with
cover seals.
Please cover all pre-drilled holes, with
cover seals.
Attach the cushioning material in
the center of the two nothes.
Please turn the fin part to the
front frame direction and fix the
roof purlin to the rising beam with
washer head screws.
Washer head screw
-
8/19/2019 Montagehandleiding Carport Nagoya
17/30
Front frame corner cap R
Front frame corner cap L
Cauking material
Side frame R
Side frame L
Front frame
Roof purlin
Risin beam
Rear frame corner cap R
Rear frame corner cap L
Rear frame
Caulking material
Front frame corner cap R
Front frame corner cap L
Rear frame corner cap R
Rear frame corner cap L
Caulking
material
Roof rafterRoof rafter
Caulking
material
Rear frame
Side Frame R
Side frame L
Roof rafter
Notch
Side frame RSide frame L
Point
Point
Advice
Drilling screw
Installing the roof rafters and the side frames
Caulk all the front frame corner
caps and the back frame corner
caps and attach them to the
side frame R and L.
(Diagram 4-1, 4-2)
Drilling screw
Notch
(Diagram 4-1)
Please note the left and right side of
the side frame. Turn the side with
the notch to the rear frame direction.
Adjust the front frame, rear frame and the
roof purlin to the side frame R and L holes
and fix them with washer head screws
Rear frameRear frame
Please note the back and front direction of
the roof rafter. Adjust the front and rear
frame, and the roof purlin to the roof rafter
holes and fix them with washer head screws.
Caulk the space between the roof
rafter and the rear frame before
installing it.
Levelling
Please check:
1. Posts positioning/required interval
2. Rigth angles where appropriate
There are no pre-drilled holes on the
front, rear frame and the roof purlins.
Caulking
material(Diagram 4-2)
(Diagram 4-3)
-
8/19/2019 Montagehandleiding Carport Nagoya
18/30
Installing the roof panels
Cover part
Roof panels
Front frame
Roof panel holder
Rear frame
Cover art
Roof anelRoof panel
Roof rafter cover
Front frame
Side frame
Roof anel
Side frame cover
Rear frame
Roof rafter cover
Caulking material
Front frame
Caulking material
Side frame cover
Point
Point
Diagram 5-1
Diagram 5-2
Diagram 5-3
Installing the side frame and roof purlin
Installing the roof panels
Insert the roof panel into the
rear frame completely.(*1)
Place the roof panels on the
roof rafters properly.
Insert the roof panel into the
front frame and then into the
rear frame.
(*1)
Please attach the roof panels
the right way up, peel off theprotection and install it.
Washer head screw
Please make sure the roof rafter
and the roof rafter cover interlock.
Press the roof rafter cover and the
side frame cover into the front
frame and fix them with screws.
Caulk the space between the
front frame and the roof rafter
cover, the front frame and side
frame before installing them.
Diagram 5-5 Caulking
-
8/19/2019 Montagehandleiding Carport Nagoya
19/30
Drainage hole
Installing the rainwater pipe
Rainwater pipe packing
Rainwater pipe attachment
Drain elbow
Adhesive positon
Drainage hole
Rainwater pipe packing
Drainage hole cover
Pi e holder
Adhesive position
Washer head screw
Rear frame
Caulking material
Rear frame
Adhesive position
Rising beam
Washer head screw
Rainwater pipe
drilling screw
Diagram 6-1 Pipe size adjustment
92° drain elbow
Size
1.Please adjust the pipe size. (Diagram 6-1)
2.Apply adhesive/caulking material to the rear frame drainage holes, rainwater pipe hole packings, rainwater
pipe attachment, drain elbow, 92° drain elbow and the pipe holder and fix them with screws (1-4 and 1-5).3.Close the unused drainage hole with the rainwater pipe packing and drainage hole cover using the washer
head screws (1-4).
4.Caulk the screw area properly.
-
8/19/2019 Montagehandleiding Carport Nagoya
20/30
Installing the M-connection
Foundation preperation
Carport outer line
Diagram 1-1 29 Size
Size
Name
Diagram 1-2 50 Size
Diagram 1-3 57 Size
Without mat foundation
With mat foundation
Without mat foundation
With mat foundation
Carport outer line
Diagram 1-1
Prepare the foundation after determining the post positions.
Additional
information
Point
Post moving range is up to 100 mm in total.
There is no moving range for the 29 size.
The width for the 29 size is only 18,21.
The size of the foundation changes depending on the sizes of the width and depth.
Carport outer line
-
8/19/2019 Montagehandleiding Carport Nagoya
21/30
Installing the main unit
M8x75 Hex bolt
M8 Plain washer
Caulking material
M-connection cap
M/Y-connection beam
M8 cap nut
M8 spring washer
M8 Plain washer
Rising beam
M-connection cover
Front frame
Rising beam
Reference position
P ost l en gt h
Front
frame
M/Y-connection beam
Front frame
Rising beam
Rising beam
connecting bracket
Approx. 900
Approx. 1700
Approx. 1500
1. After setting up the rising beam and the posts, remove the roof purlin push button and connect the roof purlins with the
roof purlin connecting bracket. (2-1)
2. Please insert the M/Y-connection beam between the two front frames and fix them with M-connection covers.
3. Apply caulk to the M-connection cap and the M/Y-connection beam and fix the M-connection cap with drilling screws.
(Diagram 2-4)
Approx. 900
Approx. 1700
Approx. 1500
Diagram 2-3
M/Y-connection beam
Side frame
Drilling screw
Diagram 2-5
Drilling screw
P ost l en gt h
M-connection cover M-connection cover installation position
Please make sure that the posts length keep the same height from the reference position (Diagram 2-5)
Point
Advice
To install the main unit please refer to point "3 Installation basic unit".
Please make sure that the space between the both front frames are 14 mm.
In case of depth 57 type, M-connection cover need to be placed at the center of the M/Y-connection beam.(*2)
-
8/19/2019 Montagehandleiding Carport Nagoya
22/30
Installing the Y-connection
Foundation preperation
Carport
outer line
Carport
outer line
Carport
outer line
Diagram 1-1 29 Size
Diagram 1-2 50 Size
Diagram 1-3 57 Size
Size
Name
Make sure to fix the anchor stick to the post.
The moving range of the posts is up to 100 mm in total.
The size 29 has no moving range.
The width for the 29 size is only 18,21.
The foundation size changes depending on the sizes of the width and depth.
Without concrete slab With concete slab
With concrete slab
Prepare the foundation after determining the post position.
Advice
Point
Without concrete slab
-
8/19/2019 Montagehandleiding Carport Nagoya
23/30
Installing the main unit
Joint
Post
Hex boltPost Y-connection bracket
Side frame
M/Y-connection beam
Y-connection cap
Drilling screw
Diagram 2-1
Diagram 2-2
M/Y-connection beam
Rear frame
Y-connection cover
Drillin screwY-connection cap
Post
Y-connection cover installtion position
Advice
Point
Insert the joints into the posts and fix only the front side of the posts.
Fix the screws loosely (1-1) and insert Y-connection post bracket inside and tighten it firmly.
(Diagram 2-1)
The space between the posts is 30 mm.
Please make sure that the posts have the same height.
Y-connection post bracket need to be placed at the lower part of (1-1) hex bolts for fixing the joints.
1.Please put the M/ Y-connection beam into the rear frames and fix it wth the Y-connection cover.
2.Caulk the Y-connection cap and the Y/M-connection beam and fix the Y-connection cap.
To install the main unit please refer to point "3 Installation basic unit".
In case of depth 57 type, Y-connection cover need to be placed at the center of the M/Y-connection beam. (*1)
Rear frame
29: Apporx.900
50: Apporx.170057: A orx.1500
(*1)
29: Apporx.900
50: Apporx.170057: Apporx.1500
-
8/19/2019 Montagehandleiding Carport Nagoya
24/30
Installing the J-connection
Foundation preperation
Depth size 50 + 50Carport
outer line
Diagram 1-1
Size
NameWithout concrete slab
Without concrete slabWith concrete slab With concrete slab
Prepare the foundation after determining the post position.
Advice
Depth size 57 + 57
Carport
outer line
Refer to "2 Dimensional drawings and part dispriction" for preparing the foundation.
The moving range of the posts is up to 100 mm in total.
Prepare the foundation after determining the post position.
Refer to "2 Dimensional drawings and part dispriction" for preparing the foundation.
The moving range of the posts is up to 100 mm in total.
With concrete slab With concrete slabWithout concrete slab Without concrete slab
Advice
-
8/19/2019 Montagehandleiding Carport Nagoya
25/30
Depth size 50 + 14
Carport
outer line
Diagram 1-3
SizeName
Prepare the foundation after determining the post position.
Refer to "2 Dimensional drawings and part dispriction" for preparing the foundation.
The moving range of the posts is up to 100 mm in total.
Carport
outer line
Depth size 57 + 14
Size
Name
Prepare the foundation after determining the post position.
Refer to "2 Dimensional drawings and part dispriction" for preparing the foundation.
The moving range of the posts is up to 100 mm in total.
Without concrete slab Without concrete slabWith concrete slab With concrete slab
Advice
Without concrete slab With concrete slab Without concrete slab With concrete slab
Advice
-
8/19/2019 Montagehandleiding Carport Nagoya
26/30
Installing the main unit
Dimensional drawings J-connection part
Rear frame
Front frame
Roof purlin
Diagram 2-1 Installing the rear frame
Diagram 2-2 Installing the front frame
Diagram 2-3 Installing the roof purline
Refer to the drawings and drill holes into the front and rear frame and into the roof purline.
Point
The holes of the roof purlines need to be drilled to the fin part.
-
8/19/2019 Montagehandleiding Carport Nagoya
27/30
J-connection
Caulking works
Please caulk the rear frame sleeve before attaching it. (*1)Fix the respective sleeves with drilling screws to the front and rear frame and to the roof purlin.
Caulk all the respective places around the drilling screws.
Front frame
Drilling screw
Drilling screw
Rear frame
Roof purlin
Front frame sleeve
Roof rafter
Roof purlin
sleeve
Rear frame
sleeve
Rear frame sleeve
Caulk
Roof purlin sleeve
Caulk
Front frame
sleeve
Caulk
Refer to "3 Installing the basic unit" for setting up the main unit.
(*1)
Caulk all the necessary parts of J-connection.
-
8/19/2019 Montagehandleiding Carport Nagoya
28/30
J-connection on M/Y-connection
Drilling screw
Drilling screw
Fix the J-connection on M/Y connection covers (upper and lower) with drilling (11-1, 12-1) screws to
the connection part of the M/Y-connection beams.
M-connection cover
Y-connection cover (57 only)
Y-connection cover
Front frameRoof rafter
M/Y-connection
beam Roof rafter
In case of the 14-extended length, please refer to diagrams 3-2 and 3-4 for the M/Y-connection positions.
Refer to " 4 Installing the M-connection" and "5 Installing the Y-connection" for the complete installation.
Front frame
Diagram 3-1 J-connection on M-connection
Diagram 3-3 Y-connection
Diagram 3-2 M-connection cover
installation position
Dia ram 3-4 Y-connection cover ositon
M-connection cover (57 only)
Post
Rear frame
Advice
Point
Front frame
M/Y-connection
Beam
Rising beam
J-connection cover for M
(lower)
J-connection cover for M/Y
u er
J-connection cover for M/Y
(upper)
J-connection cover for M (lower)
J-connection cover for M
(lower)
J-connection cover for M/Y(upper) J-connection cover for M/Y(upper)
J-connection cover for Y
(lower)
J-connection cover for Y
(lower)
J-connection cover for Y (lower)
-
8/19/2019 Montagehandleiding Carport Nagoya
29/30
-
8/19/2019 Montagehandleiding Carport Nagoya
30/30