Former NAS Moffett Field Hangar 1 Removal Action Update Hangar 1 Removal Action Update Bryce Bartelma, PG Navy BRAC PMO West September 8, 2011 RAB Meeting RAB Meeting 1

Upload: steve-williams

Post on 17-May-2015

3.720 views

Category:

Technology


1 download

TRANSCRIPT

Page 1: Moffett Hangar One Update to the Restoration Advisory Board

Former NAS Moffett Field

Hangar 1 Removal Action UpdateHangar 1 Removal Action Update

Bryce Bartelma, PGNavy BRAC PMO Westy

September 8, 2011RAB MeetingRAB Meeting

1

Page 2: Moffett Hangar One Update to the Restoration Advisory Board

Presentation Overview

P j t Obj ti• Project Objective• Progress Update

Continued Monitoring Roof Redwood Siding & Continued Monitoring and Protection Measures

Historic Mitigation/CARP

Roof, Redwood, Siding & Window Removal

Coating Inspections & Touch-ups Historic Mitigation/CARP

Scaffolding Installation

• Schedule

Touch ups Moving Scaffolding

• Questions

2

Page 3: Moffett Hangar One Update to the Restoration Advisory Board

Project Objective

• Control release of PCBs from Hangar 1 in accordance with EE/CA (July 2008) and Action Memorandum (December 2008)(December 2008)Demolition of interior structuresRemoval of contaminated sidingRemoval of contaminated sidingApplication of weather-resistant coating to steel frame

3

Page 4: Moffett Hangar One Update to the Restoration Advisory Board

Continued Monitoring and Protection Measures

• No observed impacts to biological activityactivity

• Continued storm water and ground surface protectionp

• Navy and NASA air monitoring data demonstrates control of air emissions

4

Page 5: Moffett Hangar One Update to the Restoration Advisory Board

Historic Mitigation

5

Salvaging Corrugated Windows (up to 25)

Page 6: Moffett Hangar One Update to the Restoration Advisory Board

Hangar 1 Interactive CD

• Currently in final production with copies to be made available in September!available in September!

6

Page 7: Moffett Hangar One Update to the Restoration Advisory Board

NASA HQs & Contractor VisitsNASA HQs & Contractor Visits

• NASA’s Condition Assessment and Rehabilitation Plan (CARP)

• Multiple visits in July & August to inspect hangar constructionto inspect hangar construction and observe removal action

7

Page 8: Moffett Hangar One Update to the Restoration Advisory Board

Scaffolding InstallationScaffolding Installation

8

Page 9: Moffett Hangar One Update to the Restoration Advisory Board

Mansard Panel RemovalMansard Panel Removal

9

Page 10: Moffett Hangar One Update to the Restoration Advisory Board

Redwood RemovalRedwood Removal

10

Page 11: Moffett Hangar One Update to the Restoration Advisory Board

Silver Siding RemovalSilver Siding Removal(Robertson Protected Metal)(Robertson Protected Metal)( )( )

11

Page 12: Moffett Hangar One Update to the Restoration Advisory Board

Window RemovalWindow Removal

12

Page 13: Moffett Hangar One Update to the Restoration Advisory Board

Coating Inspections & TouchCoating Inspections & Touch--upsups

13

Page 14: Moffett Hangar One Update to the Restoration Advisory Board

Moving ScaffoldingMoving Scaffolding

14

Page 15: Moffett Hangar One Update to the Restoration Advisory Board

Moving ScaffoldingMoving Scaffolding

15

Page 16: Moffett Hangar One Update to the Restoration Advisory Board

Inside ViewInside View

16

Page 17: Moffett Hangar One Update to the Restoration Advisory Board

Inside ViewInside View

17

Page 18: Moffett Hangar One Update to the Restoration Advisory Board

Zone 1 ProgressZone 1 Progress

18

Page 19: Moffett Hangar One Update to the Restoration Advisory Board

ScheduleSchedule

• Fieldwork in zones 1 – 6 OngoingC l t fi ld k• Complete fieldwork, confirmation sampling and demobilize Spring 20122012

• Submit After Action Completion Report p pSummer 2012

19

Page 20: Moffett Hangar One Update to the Restoration Advisory Board

Questions?

Point of Contact:

Scott AndersonBRAC EnvironmentalBRAC Environmental

Coordinator(619) 532-0938( )