moef’s support for solid waste management implementation in … · 2021. 1. 15. ·...
TRANSCRIPT
MoEF’s Support for Solid Waste Management Implementation in Citarum Watershed, West Java
Sayid MuhadharSecretary to Directorate General of Solid Waste, Hazardous Waste and Hazardous Substance ManagementJakarta, 15th January 2021
Ministry of Environment and Forestry
Upstream of Citarum River
CITARUM RIVER PROFILE
01REGULATION
BASIS
02
ACHIEVEMENTS IN 2018 – 2020
03PLAN IN 2021
04
PRESENTATION OUTLINE
FUTURE COOPERATION OFFERED
05
CITARUM RIVER PROFILE
01
Kabupaten Bandung
Geographically, Citarum River lies on
106° 51’36” - 107° 51’ Long and 7° 19’ -
6° 24’ Lat, with area of ±11.323 Km².
Kabupaten Bandung Barat
Kota Bandung
Kabupaten Cianjur
Kabupaten Subang
Kabupaten Sumedang
Kabupaten Purwakarta
Kabupaten Bogor
Kabupaten Karawang
Kabupaten Indramayu
Kota Cimahi
Kota Bekasi
Kabupaten Bekasi
Citarum River is the biggest and longest river
in West Java Province. With the upstream in
Wayang Mountain (Kabupaten Bandung),
Citarum flows across 297 kilometers up to the
downstream in Tanjung Area (Kabupaten
Karawang).
REGULATION BASIS
02
President Regulation Number 15 Year 2018 about
Acceleration of Pollution and Damage Control of
Citarum Watershed
Article 12, Letter i, Number 4:
In order to control pollution and damage of Citarum
Watershed, the Task Force shall:
i. Ministry of Environment and Forestry
4. Support the Provision of Solid Waste Management
Facilities
National Medium Term Development Plan (RPJMN) 2020 –
2024:
National Policy on Solid Waste Management:
Implementation of Circular Economy to improve People
Wealth
SW Handling Target
SW Reduction Target
Projection of SW
Generation
50,8 Mio ton (75%)
14 Mio ton (22%)
67,8 Mio Ton
2020
TA
RG
ET
2025
TA
RG
ET
49,9 Mio ton (70%)
20.9 Mio ton (30%)
70,8 Mio TonNATIONAL
POLICY AND
STRATEGY
(JAKSTRANAS)
Aligning with:
To Support the achievement of:
Provide Solid Waste
Treatment Facilities
that support the
implementation of 3Rs
and Circular Economy
ACHIEVEMENT IN 2018 – 2020
03
REALIZATION 91.92%
2018
2019
2020
BUDGET
10,822,55…
12,700,0…
7,661,2…
2018 2019 2020
%
Budget and Realization Year 2018-2020
10.822.555.000
12.700.000.000
7.661.221.000
2018
2019
2020
10.186.004.070
11.674.405.972
7.612.211.200
94,12%
91,92%
99,36%
YEAR BUDGET (Rp.) REALIZATION (Rp.) (%)
SOLID WASTE TREATMENT FACILITIES
CITARUM WATERSHED 2018BANK SAMPAH INDUK (BSI)
SW BANK CENTERCapacity: 1 Ton/day
1. Kab. Subang
2. Kota Bandung
3. Kab. Bandung
4. Kota Cimahi
5. Kab. Bekasi
6. Kab. Karawang
PUSAT DAUR ULANG (PDU)
RECYCLING CENTERCapacity: 10 Ton/day
1. Kota Bandung
2. Kota Cimahi
3. Kab. Bandung
SOLID WASTE TREATMENT FACILITIES
PUSAT DAUR ULANG (PDU 4 Unit)
BIODIGESTER(1 Unit)
BANK SAMPAH INDUK(BSI 1 Unit)
Kab. Bogor, Kab. Bekasi, Kab. Indramayu, Kab. Subang
Kab. Bekasi
Kab. Indramayu, Kab. Purwakarta, Kab. Sumedang
2019YEA RCITARUM WATERSHED
SOLID WASTE TREATMENT FACILITIES
2020
Capacity: 2 Ton/day
COMPOSTING HOUSE
CITARUM WATERSHED
1. Kab. Cianjur
2. Kab. Purwakarta
BIODIGESTER
1. Kab. Cianjur
2. Kab. Sumedang
Capacity: 1 Ton/dayi
POTENTIAL OUTCOMES FROM THE ACTIVITIES
2018 20202019
12.960 ton/year 2.160 ton/year15.840 ton/year
3.702.857 HH/year 4.525.714 HH/year 617.143 HH/year
78 people 72 people 26 people
Potencies of SW
Reduction
Number of
Households Served
Potencies of People
Employed
PLAN IN 2021
04
ACTIVITIES PLAN
2021
Solid Waste Treatment Facilities Provision in Citarum
Watershed
Budget Allocation: Rp. 5.100.000.000,- (five billion and one hundred million rupiah).
Facilities Planned:
Biodigester Rumah Kompos
Capacity: 1 Ton/hariUnit Number : 2 UnitLocation : Kab. Indramayu, Kab. Subang
Capacity : 2 Ton/hariUnit Number : 2 UnitLocation : Kab. Sumedang, Kab. Karawang
FUTURE COOPERATION OFFERED
05
The New Generation of Recycling Center (PDU):A New Perspective
SOLID WASTE TREATMENTSOLID WASTE TREATMENT
EDUCATION & CAMPAIGN
+
Value Added
Awareness
Note: Beside addition of eduction function, the DED
has basically changed with incorporating diapers
treatment technology
PDU 50 & 20 TONPDU 5 & 10 TON
The New Generation of PDU - 5,10, 20 TON
PDU 50 & 20 TONPDU 5 & 10 TON
The New Generation of PDU – 50 TON
SUMATERA SELATAN• Kota Palembang• Kab. Musi
Banyuasin• Kab. Muara Enim• Kab. Lahat• Kab. OKU
SUMATERA BARAT• Kota Sawahlunto• Kota Padang
KEP. RIAU• Kab. Bintan• Kab. Karimun• Kota Batam
JAWA TIMUR• Kab. Pacitan• Kab. Gresik• Kab. Tuban• Kab. Probolinggo• Kab. Banyuwangi• Kab. Jember
BANTEN• Kab. Pandeglang• Kab. Tangerang• Kota Cilegon• Kota Serang
JAWA BARAT• Kab. Indramayu• Kab. Sukabumi• Kab. Bogor• Kab. Bekasi• Kab. Cirebon
KALIMANTAN SELATAN• Kab. Tanah
Laut*)• Kab.
Kotabaru*)• Kab. Tabalong
*)
BALI• Kab. Buleleng
SUMATERA UTARA• Kab. Labuhan Batu• Kab. Langkat• Kota Medan
NTT• Kab. Ende• Kota Kupang
JAWA TENGAH• Kab. Rembang• Kab. Cilacap• Kab. Banyumas• Kab. Jepara
NTB• Kota Bima• Kab. Lombok
Barat
KEP. BANGKA BELITUNG• Kab. Bangka• Kab. Belitung
SULAWESI SELATAN• Kab. Maros• Kab. Pangkajene
Kepulauan• Kab. Barru• Kab. Jeneponto
PAPUA• Kota Jayapura
Aceh• Kab. Nagan Raya • Kab. Aceh Besar
LAMPUNG• Kab. Lampung
Selatan• Kota Bandar
Lampung
RIAU• Kab. Indragiri
Hilir• Kota Pekanbaru• Kota Dumai
KALIMANTAN TIMUR• Kab. Berau• Kota Balikpapan• Kab. Kutai
Kartanegara
MALUKU• Kota Ambon
MALUKU UTARA• Kota Tidore Kep.
KALIMANTAN TENGAH• Kab. Pulang
Pisau*)
KALIMANTAN BARAT• Kab. Ketapang• Kab. Bengkayang• Kab. Sanggau• Kab. Sintang
SULAWESI UTARA• Kab. Minahasa Selatan• Kab. Bolaang Mongondow• Kab. Kep. Talaud
SULAWESI TENGGARA• Kab. Konawe
Selatan*)
GORONTALO• Kab. Gorontalo Utara
SULAWESI TENGAH• Kab. Tojo Una-Una
PAPUA BARAT• Kab. Manokwari
BENGKULU• Kota Bengkulu
RDF POTENCIES IN INDONESIA(based on Coal Power Plants and Cement Factories Distribution
Majority in Citarum
Watershed Area
RDF Development Plan with Capacity of 300 ton/day
Challenges: Budget sources. Alternatif: KPBU (PPP), Grant, APBN (?)
Thank You
Gedung Manggala Wanabakti Blok IV Lantai 5Jl. Gatot Subroto – Jakarta Pusat
Direktorat Jenderal Pengelolaan Sampah, Limbah
dan B3Kementerian Lingkungan Hidup dan Kehutanan