moderator robert f. gair principal in rsmeans business solutions 20+ years joc and cost modeling...
DESCRIPTION
Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC Government Sector Specialist. Before We Begin..…. Technical issues Try F5 on your keyboard Q&A Session - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/1.jpg)
![Page 2: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/2.jpg)
Moderator
Robert F. Gair Principal in RSMeans Business
Solutions
• 20+ years JOC and Cost Modeling experience
• Member APPA, SAME, NASFA, FMOC
• Government Sector Specialist
![Page 3: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/3.jpg)
Before We Begin..… Technical issues
– Try F5 on your keyboard
Q&A Session– To send in questions, enter your text in the ASK A QUESTION box
and click ASK– Speakers will answer as many questions as they can in the allotted
time
Enlarge Slides– Click the Full Screen link in the upper right corner of the screen to
view an expanded presentation screen Presentations
– Click the PRESENTATION ASSETS button on the left-hand side of your screen to download a PDF copy of the presentation
![Page 4: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/4.jpg)
Speaker
Michael E. Brown President, Chief Software Architect
4Clicks Solutions, LLC
• 20+ years industry experience
• USAF experience in JOC project management and cost estimating
• Development Specialist in SABER/JOC/IDIQ
![Page 5: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/5.jpg)
1. Proven, Rapidly Expanding Construction Delivery Method1
2. Collaborative, Long-term Relationships
3. Supported by Technology, Easily Scalable
1 (vs. traditional design-bid-build, design-build, CM@Risk, etc.)
Job Order Contracting JOC
![Page 6: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/6.jpg)
Long-term (3-5 years) Indefinite Quantity Contract Multiple On-Call Construction Projects
Contract Bids a Coefficient Applied to a Unit Price Book (UPB)
Best Suited for Renovation, Repair, Sustainability, and Minor New Construction
JOC Basics
![Page 7: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/7.jpg)
OWNERS Prepare RFQs, Award Projects & Manage Projects with Significantly-improved Efficiency and Performance
Contractors/AEs Rapidly create Accurate, Detailed Estimates; Increase Win-ratios; Longer-term Profitable Owner Relationships
JOC Benefits
Reduce maintenance backlog; faster response to user needs; cost transparency; lower upfront costs; more $ allocated to projects; lower administrative costs; 10-20% design/engineering savings; virtually eliminate change orders and litigation …
Focus upon performance, not low bid Reward for fast responsive, responsible, high quality work with fair, known pricing
![Page 8: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/8.jpg)
Rapid ImplementationSingle seat to Network/INTERNET deployment
Consistent UsageOrganization’s JOC procedures embedded in software
TransparencySystem-wide standard price book (Unit Price Book/UPB)
CollaborationBuilt-in estimate/project/contract management
Performance GainsEstimate reuse; Shorter project timelines
JOC Technology Benefits
![Page 9: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/9.jpg)
Airports
County/State/Local Government
Federal Government – DOD/Non-DOD
Healthcare
Higher Education
K12 School Districts
Thousands of Contractors, Subcontractors, A/Es
JOC Technology & Service Users
![Page 10: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/10.jpg)
Estimate, Project, Contract, Contract Management
Localized and Standardized Costs (UPB)
Visual Estimating
Document Management
JOC Technology Overview
![Page 11: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/11.jpg)
EstimatesCreate Detailed/Accurate Estimates
Paperless Estimating
Direct Access to UPB, References …
Create/Maintain/Reuse Multiple Estimates/Projects Coefficients
![Page 12: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/12.jpg)
Estimate Line ItemsDisplay Crew, Output, Material, Labor & Equipment Costs
View Source Data at a Glance
Sort/Filter Estimates
Include Notes and Engineering Calculations at Line Item Level
![Page 13: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/13.jpg)
Document and Manage Projects
Link Estimates to Specifications
Project Reporting Tools
Project ManagementShare Quick Access with Team Members
![Page 14: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/14.jpg)
UPB – Unit Price Book
![Page 15: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/15.jpg)
Visual Estimating
Trace electronic drawings to determine quantities
Increase estimating efficiency and accuracy
Quantity take-off directly from PDF, TIFF, DWG
Dynamically linked to your estimate
![Page 16: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/16.jpg)
Pattern Search
![Page 17: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/17.jpg)
Document Management
![Page 18: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/18.jpg)
Technology/Software Only
Software and Implementation ServicesTraining, On-site Personnel, Program Monitoring
Localized/Custom UPB
Final ConsiderationsWhat Your Organization May Need to Succeed
![Page 19: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/19.jpg)
Speaker
Robert G. Rives Manager of Facility Services,
City of Kansas City, Missouri
• 20 years Facility Management Experience
• Oversees Operation and Maintenance of 160+ assets
• Certification from International Facility Managers Association
![Page 20: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/20.jpg)
Job Order Contracting Kansas City, MO
A Customer’s Perspective
![Page 21: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/21.jpg)
A Customer’s PerspectiveWhere We Were
• Facility Services had Numerous Projects
• Individual Procurements for Each Project– Determine Scope of Work and Estimate Cost– Determine MBE/WBE Goals, if required– Advertise, Receive Bids, Determine Best Value – Create Contract, Bonding– Legal Review– Approve Contract; Council Approval, if required
• Lengthy and Laborious Process needed to be Addressed to Improve Service Levels and Create Efficiencies
![Page 22: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/22.jpg)
A Customer’s Perspective Discovering Job Order Contracting
• RFI issued to Better Understand the Pros and Cons of JOC
• Review of Information to Formulate what was Best for the City– Included Local Building Contractors Group in Discussions
• RFP issued and reviewed• Selected KBR as Contractor
![Page 23: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/23.jpg)
A Customer’s PerspectiveImplementing JOC
• Kickoff Meeting with Project Managers and User Base– Included Procurement, Accounting and Human Relations
Team
• Created Internal and External Processes– Refined Processes as needed
• KBR hosted Contractors Events• Began Processing Job Task Orders
![Page 24: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/24.jpg)
A Customer’s PerspectiveLessons Learned
• JOC is a Good Means to Address Project Type Work• JOC Dramatically Increases the Speed of Project
Delivery• Quality Workmanship• MBE/WBE Utilization is Increased
– Proactive Approach by Contractor– Utilization is at a Lower Dollar Threshold
• Project Managers Understanding is Important– Some see JOC as More Expensive– Don’t Realize Savings in Procurement, Legal and
Administrative Tasks
![Page 25: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/25.jpg)
Speaker
Rick Farrag Director of Operations for On Call
Construction at KBR, Inc., PE, PMP
• 20 years JOC, Engineering, Construction Management Experience
• Master’s degree in Engineering Management
• 2010 CJE Chairman
![Page 26: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/26.jpg)
Controlling Sustainable Projects Costs: Going
“Green” with JOC
Rick Farrag, PE, PMP
Director, On-Call Construction, KBR
![Page 27: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/27.jpg)
Brief History of Sustainability
• First major recognition in 1969• EPA began operations in 1970• Stockholm Conference in 1972• Awareness of “sustainable development”• PCSD in 1993• USGB, Green Advantage and others
![Page 28: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/28.jpg)
Drivers of Sustainability
• Energy cost and energy independence• Financial • Regulatory requirements• Environment responsibility• Public demand• Improved operations• Social responsibility
![Page 29: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/29.jpg)
Statistics
• 700% increase in LEED/Green Advantage professional certificates from 2001 to 2011
• 83% of commercial real estate executives would like to see LEED certification for buildings
• Energy management can lower energy bills by up to 30%
• Electricity costs are 20% of overall energy costs
![Page 30: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/30.jpg)
Green Building
• Also known as Green Construction• Goals of Green Building• Types of projects
– Energy monitoring– Electrical equipment upgrades (lighting, motions
sensors, etc.)– Building envelope enhancement– Water conservation
• Cost and payoff
![Page 31: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/31.jpg)
How Can JOC Help
• Long term relationship• Integrated Project Delivery (IPD)• Knowledge of existing facilities• Trained personnel• Cost control• Cost Transparency • Controlled change order cost• Perfect fit for retrofit• One project at a time• Quick results
![Page 32: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/32.jpg)
Examples of JOC Use for Sustainable Projects
Atlanta Public Schools – Grady Stadium
• Renovation underneath the grandstands at Grady Stadium for ROTC & Athletics
• LEED Silver Certification Requirements
![Page 33: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/33.jpg)
Examples of JOC Use for Sustainable Projects
• Original bleacher system installed in 1939
• Salvaged and reused the wood seating planks instead of dumping them in a landfill – Donated half to Habitat for Humanity in Kansas
City Missouri– Used half as wall covering for new storage areas
in the gymnasium and the wall finish behind the new bleachers
– The hardware was also salvaged and reinstalled to give the look of a folded up set of bleachers
University of MO – Swinney Gym Renovation
![Page 34: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/34.jpg)
Examples of JOC Use for Sustainable Projects
• 4400 square foot cement patio area
• Transformed into a verdant, eco-friendly garden terrace
• Project won the HHS Green Champion Award (FY 2009) for Sustainable Building Design
NIH Building 10 Library
![Page 35: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/35.jpg)
Questions & Answers
![Page 36: Moderator Robert F. Gair Principal in RSMeans Business Solutions 20+ years JOC and Cost Modeling experience Member APPA, SAME, NASFA, FMOC](https://reader035.vdocuments.site/reader035/viewer/2022062815/5681697b550346895de17da1/html5/thumbnails/36.jpg)