10. Mobilisation and Client Leverage

Page 2: Mobilisation gsw

- 2 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Section Objectives

• Introduce the basic concepts of mobilisation and leverage.

• Introduce the mobilisation building blocks and how they relate to more traditional practice approaches:

– Mobilisation events.

– Town meetings.

– Change agents.

– Action Learning Teams.

• Suggest how mobilisation building blocks can be used on projects.

Page 3: Mobilisation gsw

- 3 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Mobilisation and leverage interventions

• Generating involvement, ownership and buy-in.

• Creating momentum, energy, and focused action.

• Leveraging consulting resource.

• Leveraging organisation skills and knowledge.

• Communicating widely and quickly.

“Move an organisation towards a purpose while achieving

How They WorkObjective of Mobilisation andLeverage Interventions

OBJECTIVES OF MOBILISATION AND LEVERAGE

Page 4: Mobilisation gsw

- 4 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Three key components of change deliver lasting improvement in business performance

• Identify opportunities to improve performance, and implement changes to achieve them, e.g.:

– Strategy

– Process improvement

– Process re-engineering

– Cost reduction

– Information Management

• Mobilise and leverage the appropriate parts of the organisation to support the changes

• Build the capability to sustain the changes and continue to improve, e.g.:

– Business planning processes

– Key performance indicators

– Management development

– Personal performance management and development systems

“Improve” “Mobilise” “Sustain”

MOBILISATION AND LEVERAGE IN RESULTS DELIVERY

Mobilisation supports the changes needed to improve and sustain the business.

Mobilisation supports the changes needed to improve and sustain the business.

Page 5: Mobilisation gsw

- 5 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

What is the business case for mobilisation and leverage?

• The primary benefit is as an enabler of sustainable change, not a deliverable in its own right:

– A large amount of energy and emotion is released, which can be harnessed to drive the project forward.

• Benefit derives from the deliverables for the project and workstreams:

– Mobilisation can accelerate, giving a cash-flow impact.

– Mobilisation can spread best practice, multiplying the effect.

– Mobilisation involves and empowers, increasing support and lowering resistance to change.

– Mobilisation provides context, and creates an alignment of activity with the organisational goals.

– Mobilisation can touch sufficient people to get a critical mass of support.

– Mobilisation can reframe thinking and create breakthrough solutions.

MOBILISATION AND LEVERAGE IN RESULTS DELIVERY

Page 6: Mobilisation gsw

- 6 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Many longstanding Gemini approaches include elements of mobilisation and leverage

MOBILISATION AND LEVERAGE IN RESULTS DELIVERY

• Most project designs include streams designed to:

– Communicate effectively across the organisation:• Launch• Newsletter• Helpline• Suggestion scheme• Roadshows, etc.

– Gain organisational buy-in and alignment:• Executive/top management off-sites• Workshops• “Coaching” (especially in change skills)

• The typical project process includes:

– Cross-functional team building/problem solving (NWTs, Joint Team).

– Involvement/validation by those affected by change (Brown/White Paper Fairs).

• Additionally, Gemini has strong process and facilitation skills.

See also “Communications” section.

Page 7: Mobilisation gsw

- 7 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

However, these approaches can have limitations, if used in isolation

• Joint Team, NWT members and clients touched are not always sufficient to achieve critical mass.

• Can get “boxed in” organisationally, working in one part of the business, reducing transformation impact.

• Communications streams often use passive media, such as newsletters.

• Too slow!

• Can generate only incremental, rather than framebreaking change.

The limitations are becoming more significant as our clients become bigger, more complex, and expect more consultant leverage.

The limitations are becoming more significant as our clients become bigger, more complex, and expect more consultant leverage.

• Can reach many more people than before, helping to achieve critical mass.

• Can touch other parts of the organisation, broadening the transformation and awareness of Gemini.

• Powerfully engages people around the change objectives.

• Can cycle compress implementation.

• Can be used to achieve radical change and stretch targets.

Limitations of Approaches Used in Isolation

Benefits of Using WithMobilisation Tools

MOBILISATION AND LEVERAGE IN RESULTS DELIVERY

Page 8: Mobilisation gsw

Mobilisation Building Blocks

Page 9: Mobilisation gsw

- 9 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

There are four basic mobilisation and leverage building blocks

• Large groups, usually cross-functional, multi-level—which have a role to play in, or are affected by, specific sets of changes in the way they do business.

• Forums for large groups of employees, usually multi-level, to address questions to, and get answers from, senior management concerning any aspect of the business:

• Can be component parts of Mobilisation Events.

• Client teams, usually led by a Change Agent, which create opportunities for radically different ways of improving and behaving through a process of discovery.

• Clients who are trained by Gemini to coach and deliver mobilisation and leverage interventions.

Building Block Description

MOBILISATION BUILDING BLOCKS

• Mobilisation Events

• Town Meetings

• Action Learning Teams

• Change Agents

Page 10: Mobilisation gsw

- 10 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Mobilisation Events are not one-off, isolated occasions

• They must have a clear purpose within the Project Design:

– Clear objectives, e.g. generate To-Be process.

– Clearly defined inputs, outputs and next steps e.g. NWTs, RATs, ATs.

• The participant list should be driven by the objectives, but is usually:

– Cross functional.

– Large (400 is the largest so far).

– Mixed levels.

• The ground rules for behaviour model other Gemini interventions, including Town Meetings.

• To reinforce commitment, they should always generate actions:

– Fully-fledged workstreams.

– Action Learning projects.

– Personal action plans.

MOBILISATION BUILDING BLOCKS: MOBILISATION EVENTS

Page 11: Mobilisation gsw

- 11 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

During successful Mobilisation Events, participants experience a predictable mindset change cycle

Engage

Break currentframe

Create newframe

Overcome obstacles tochange

StrongPositive

Neutral

StrongNegative

• Prepare to suspend normal prejudices/be objective

• Recognise existing feelings as legitimate

• See business issues from a new perspective

• Feel demoralized/ angry about the status quo

• Feel need to change

• Begin to accept validity of new business perspective and goal set: global competition, shared aspirations, leveraging resources, winning

• Begin to want to change, but don’t know how; angry that recipe not given

• Explicitly raise and address personal and organizational obstacles to change

• Define actions and workstreams; shift to line manager ownership

• Begin to feel change is within their grasp/first steps are

clear

MindsetChangeCycle

IntellectualCycle

EmotionalCycle

The design of the Event must ensure that participants are not at the emotional low when it finishes.

The design of the Event must ensure that participants are not at the emotional low when it finishes.

MOBILISATION BUILDING BLOCKS: MOBILISATION EVENTS

Page 12: Mobilisation gsw

- 12 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Mobilisation Events have been used to initiate actions and projects to fix the Product Creation Process

• Example: Electronics Company

MOBILISATION BUILDING BLOCKS: MOBILISATION EVENTS

Agenda (2 days)

Evening• MD Welcome• Outside speaker:

–Business Transformation Case Study (Plenary)

Day 1• Introduction to Business Processes

(Plenary)• Examples of PCP failures

(Plenary)• Idea generation for Development

Processes; As-Is mapping of marketing processes, and idea generation(small group work)

• Report back(Plenary)

• Prioritisation of PCP improvements(small group work)

• Report back(Plenary)

Morning 2• Action planning (small group work)• Report back

(Plenary)• Close

• Attendees:

– Top 50 managers.

• Objectives:

– Identify key breakdowns in Product Creation and associated processes.

– Develop possible solutions to Product Creation Process (PCP) problems.

– Gain commitment to launch and support projects to fix PCP and related processes.

Page 13: Mobilisation gsw

- 13 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

The Event agenda must reflect the mindset change cycle

Typical Agenda:

Engage

Break currentframe

Create newframe

Overcome obstacles tochange

StrongPositive

Neutral

StrongNegative

Introduction

Background

Scene setting

Injectionof data

Small groupwork to identifyways forward

Report backto whole

group

Small groupwork torefine

solutions

Reportback towholegroup

• Each session needs to be clearly defined:– Objectives

– Inputs

– Outputs

MOBILISATION BUILDING BLOCKS: MOBILISATION EVENTS

As a stream progresses, the low point in the cycle will not be so marked.As a stream progresses, the low point in the cycle will not be so marked.

Page 14: Mobilisation gsw

- 14 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Properly planned, Mobilisation Events can create leverage

• Events, although time consuming, can be time effective:

– Usually can get more senior management time to work issues.

– Gathers all key players together.

– Forces pace in terms of decision-making.

– Much more effective use of “part time” resource.

– Emotional and intellectual energy can create breakthrough results.

• Consultants can use Events to cycle compress and manage time:

– Gains greater understanding and commitment faster.

– An alternative to NWTs as an approach to managing streams of work: for example at a retail client:

• 1 Consultant and 1 Joint Team member manage 3–5 streams.

• Normal NWT approach might suggest 2–3 consultants and 5–7 Joint Team members.

MOBILISATION BUILDING BLOCKS: MOBILISATION EVENTS

Page 15: Mobilisation gsw

- 15 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Mobilisation Events can be organised as a vertical cascade down the organisation

MOBILISATION BUILDING BLOCKS: MOBILISATION EVENTS

Town Meetings can be similarly used to cascade messages through an organisation rapidly.

Town Meetings can be similarly used to cascade messages through an organisation rapidly.

CASCADE

• Participants in one Event lead the cascade Events lower down, as appropriate

Example Event Description

• Corporate and senior business managers generate Corporate initiatives, set targets and track progress.

• Senior business managers and middle management clarify implications of corporate initiatives, and generate projects to meet targets.

• Cross functional senior, middle and junior management use mobilisation Events as part of project architecture.

• Analysis and data are carried from one session to another to build learning and capabilities.

Page 16: Mobilisation gsw

- 16 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

There are some clear CSFs for Mobilisation Events• Clear objectives and required outputs from the Event.

• Commitment and support from the owner of the Event.

• Carefully prepared input (garbage in, garbage out):– May have taken weeks or even months:

• Brown papers.

• Focus interviews/executive interviews.

• Other analysis.

• Carefully design the agenda:– Clear objectives and outputs from each session.

– Manage the mindset change cycle.

– Actively involve all participants as much as possible:

• Minimise the lecturing.

– Vary the nature of the sessions to avoid boredom.

• Sufficient facilitators and floating resources to cope with the unexpected.

• Facilitators well briefed on the content and outputs for each session.

• Good logistics management during the Event.

• Clear, unambiguous RACI.

MOBILISATION BUILDING BLOCKS: MOBILISATION EVENTS

Page 17: Mobilisation gsw

- 17 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Do not underestimate the resources needed for an Event

• Cost:

– The cash cost will clearly vary depending on the scale of the Event, the location, and the sophistication.

– The hidden cost is having a large number of managers out of the business for the duration, including travelling time.

– Mobilisation events are now priced seperately on the Gemini pricing sheet.

• Manpower for:

Preparation During the Event Follow-up

• Event and venue logistics, including invitations.

• Agenda design and specification of session outputs.

• Injections of data.

• Facilitator training.

• Briefing the owner.

• One facilitator per small working group (typically 10–12 people).

• One overall Event facilitator.

• One floating facilitator per 7 or 8 small working groups.

• Secretarial/Mac resource.

• Debrief with the owner.

• Send out copies of the output (if not done at the Event).

• Plan how commitments and action plans will be followed up.

MOBILISATION BUILDING BLOCKS: MOBILISATION EVENTS

Page 18: Mobilisation gsw

- 18 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

A successful Town Meeting requires careful planning and management

• Preparation:– Coach senior management group about their role.

– Plan how questions will be collected and asked.

– Facilitator should understand the “big issues” that are likely to arise.

– Manage invitation and venue logistics.

• During the Town Meeting:– Manage the nature of the questions according to the emotional level of the meeting.

– Senior management answer questions, not give lectures.

– Senior management should take decisions, rather than just give information, if the decision demands.

– Focus on the issues—not the emotions and personalities.

– Check that questions have been answered satisfactorily.

– Record all commitments and questions that are deferred for lack of information.

• Follow-up:– Debrief senior management.

– Distribute meeting summary and next steps.

– Ensure outstanding questions are answered, and decisions implemented.

MOBILISATION BUILDING BLOCKS: TOWN MEETINGS

Page 19: Mobilisation gsw

- 19 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Change Agents are the key to real leverage

• Change Agents should be:– High fliers.– Well respected in the organisation.– Able to influence people.

• Change Agents need training to deliver Mobilisation Events and Town Meetings, and lead Action Learning Teams:

– Change Management skills.– Project design management skills.– Team building skills.

• Change Agents need support:– Senior management mentors:

• To guide the Change Agents.• To help them overcome obstacles.

– Offline coaching:• Day-to-day project management issues.

– Network of other Change Agents where possible.

Change Agents also need a clear mandate from senior management if they are to be effective.

Change Agents also need a clear mandate from senior management if they are to be effective.

MOBILISATION BUILDING BLOCKS: CHANGE AGENTS

Page 20: Mobilisation gsw

- 20 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Gemini needs to create the conditions for Action Learning Teams to succeed

• Action Learning Teams are:

– Usually led by Change Agents.

– Usually part time.

– Charged with solving a specific problem.

– Temporary.

• The CSFs are:

– Charter requires a “Breakthrough”.

– Change Agent selection and training.

– Visible senior management support and commitment.

– Explicit commitment of superiors to the time contract of team members for regular role and ALT role.

– Mentoring role of senior managers with Change Agents.

– Clear date for reporting back achievements to senior management.

– Regular support, coaching and progress checking by Gemini/project office with Change Agents.

MOBILISATION BUILDING BLOCKS: ACTION LEARNING TEAMS

Page 21: Mobilisation gsw

- 21 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Action Learning Teams are the highest form of leverage, both of the organisation and consultants

• Medium learning• Medium leverage• High control• Strong deliverables

NWT

AnalysisTeam

ActionLearning

Team• High learning• High leverage• Low control: higher failure rate• Patchy deliverables

• Action Learning Teams tend not to be as driven by established procedures or skills as a Gemini NWT or Analysis Team, but offer much more leverage.

• Action Learning Teams provide the opportunity for invention and reflection, creating the environment for the client to develop breakthroughs in performance.

MOBILISATION BUILDING BLOCKS: ACTION LEARNING TEAMS

See also “Task-based Teams” section for other types of teams on projects.

• Patchy learning• Low leverage• High control• Very strong deliverables

High leverage models contrast strongly with other Gemini approaches in terms of the control that can be exercised.

High leverage models contrast strongly with other Gemini approaches in terms of the control that can be exercised.

Page 22: Mobilisation gsw

- 22 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Client expectations need to be very carefully managed when using mobilisation building blocks

• Mobilisation Events are costly and high profile:

– Clients need to understand why we are doing them and where they fit in, so that they can support or defend them.

• Town meetings need careful preparation, time and personal investment from senior management

– Higher potential return in mobilisation but higher related risk in managing process and outcomes.

• Action Learning Teams are “high leverage, low control”:

– Clients need to understand why we are doing them, and what to expect in terms of benefits and deliverables, compared with other consulting approaches.

– Mobilisation benefits are primarily in terms of enhancing other outcomes and benefits:

– Seldom directly quantifiable.

MOBILISATION BUILDING BLOCKS

Page 23: Mobilisation gsw

Mobilisation in Projects

Page 24: Mobilisation gsw

- 24 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

There are two different levels of mobilisation

• Transformation mobilisation:

Mobilisation should never be a separate stream, but an integral part of the way we deliver projects.

Mobilisation should never be a separate stream, but an integral part of the way we deliver projects.

MOBILISATION IN PROJECTS

• Stream mobilisation:

See also “Project Design” section.

Mobilise the entire organisation around the transformation.

Mobilise the affected parts of the organisation around the stream:

– This is appropriate in transformation and non-transformation projects.

Page 25: Mobilisation gsw

- 25 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

What does a mobilised organisation look like?

• Vision and values are clear and understood.

• Vision translated to every job—employees know how they contribute.

• Individuals feel a sense of ownership of the company’s performance.

• Forums exist for individuals at all levels to contribute to defining how the vision will be implemented.

• Communication is fast and fluid and a by-product of involvement:

– Understanding and knowledge are sources of competitive advantage for the organisation, not individuals.

• Improvement initiatives are ambitions, focused top-down and driven bottom-up, and encounter little resistance (there are few surprises; the whole organisation is actively engaged).

• Once a direction is chosen or decision is made, it moves fast:

– Faster than competitors because of an aligned and committed workforce.

Since Transformation requires a business to work with new paradigms, mobilisation needs to be part of the project design.

Since Transformation requires a business to work with new paradigms, mobilisation needs to be part of the project design.

MOBILISATION IN PROJECTS: TRANSFORMATION MOBILISATION

Page 26: Mobilisation gsw

- 26 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Over time at the Electronics client, a model of horizontal cascades developed

MOBILISATION BUILDING BLOCKS; MOBILISATION EVENTS

Analysis and data are carried from one session to another to build learningand capabilities.

Analysis and data are carried from one session to another to build learningand capabilities.

CII

CII

FUa(2) CII

FU(3)

CII

FU(4)

ChangeAgent

Training

ChangeManagementProgramme

OEMCenturion

BusinessPlanningCenturion

CII

FU(5)

Projectsto

fix PCP

• PCP focus

• Focus on Development Resource Allocation Process

• Focus on quotation process• Allow priorities to be set

• Focus on strategic planning process

Project facilitation

a. FU = follow up.

• Train Change Agents for PCP projects

• Review achievements

Page 27: Mobilisation gsw

- 27 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

The mobilisation building blocks complement other Gemini technologies

• Mobilisation Events can be combined with NWTs, RATs and Analysis Teams in many ways, e.g.:

MOBILISATION BUILDING BLOCKS

Process re-engineering

Quick hit improvements

Develop strategic intent Event EventAT AT

• Launch• Review current

strategy, emerging issues

• Review initial findings

Event

• Develop outline strategic options

AT

Event EventNWT NWT

• Launch• Review charter• Initial idea generation

• Generate To-Be from As-Is

Event EventRATs

• Launch• Identify quick hits

• Report back on achievement

Page 28: Mobilisation gsw

- 28 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

The mobilisation building blocks complement other Gemini technologies (cont.)

• Facilitation skills are important for all the building blocks:

– Mobilisation Events require challenging facilitation to deliver the outputs.

– Good facilitation is key to the success of Town Meetings.

– Change Agents need to be trained in facilitation.

• PS/TB is equally a core requirement:

– This is at the heart of the small group work sessions in Mobilisation Events.

– Again, a core skill for Change Agents to use with their teams.

• Joint Teams can be involved in preparing and running Mobilisation Events and Town Meetings.

• Executive Steering Groups are just as relevant to managing the project when using mobilisation and leverage building blocks.

• Client communications and newsletters are still necessary, reaching even larger audiences and informing them of the projects, progress and changes.

MOBILISATION BUILDING BLOCKS

See also “Client Communications” section.

Page 29: Mobilisation gsw

- 29 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

The initial mobilisation architecture should be developed at the Project Design stage

• The data needed would usually be collected during the Scoping phase.

• The project design should consider the three key dimensions:

• The top clients should be involved as early as possible to create additional ownership and gather further insights:

– The Transformation Map is a powerful tool for this.

– Not every population should be targeted

Improve Mobilise Sustain

MOBILISATION IN PROJECTS: TRANSFORMATION MOBILISATION

See also “Transformation Mapping” section.

Page 30: Mobilisation gsw

- 30 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

The mobilisation imperatives are the gap between the As-Is and the mobilised To-Be organisation

Internal (Executive & Focus Interviews)

• Industry

• Their issues

• Skills

• Who they admire

• What do they think needs to be done?

• What are they doing?

• What has been tried?

• History: Background, training; mobilisation, initiatives, change programmes

External Benchmarks

Including:• Industry leaders

• Technology trends

• Customer trends

• Competitor actions

• Different geographic markets

Mobilisation Imperatives• Power balances

• Connected

• Power imbalances

• Disconnected

Organisation As-Is Organisation To-Be

MOBILISATION IN PROJECTS: TRANSFORMATION MOBILISATION

Page 31: Mobilisation gsw

- 31 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

The mobilisation architecture—the plan to move the organisation—can be developed based on the imperatives

• Example: European Retailer (process took about 1 month)

• CEO/Division divide

• Financial underperformance

• Buying and merchandising

• CEO/Divisional MD team

• Strong financial returns

• World class retailer

• Customer driven

• Entrepreneurial culture

• Empowered store managers

• Respected management capability

• Staff identify with divisions and corporate

• Partnership between Retail Operations and Buying & Merchandising

• Raise management competence

• Standards set and maintained in basic

• Large (300 person) Events focused on store manager, with CEO, MDs and other executives present

• Event for top 130 to develop the vision

• Develop Executive Group (CEO & MDs)

• Cross corporation management, store managers and sales staff development workshops

• NWTs to engage middle management on supply chain and retail best practice

Organisation As-Is Organisation To-Be

Mobilisation Architecture

Mobilisation Imperatives

MOBILISATION IN PROJECTS: TRANSFORMATION MOBILISATION

Page 32: Mobilisation gsw

- 32 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Mobilisation building blocks are valuable within individual streams too

• The same three key dimensions are relevant to the stream design:

• Mobilisation seeks to create shared ownership and momentum for problems and their solution through involvement.

• The benefits can include:

– Gain a critical mass of support for the change.

– Reduce resistance to change.

– Compress the time to implement change.

– Leverage the organisation’s knowledge and experience.

– Leverage the consulting resource.

– Embed learning so efforts are sustaining.

Improve Mobilise Sustain

MOBILISATION IN PROJECTS: STREAM MOBILISATION

Page 33: Mobilisation gsw

- 33 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Small scale Mobilisation Events have been used to develop shared visions and business plans

• Example: Chemicals Company (6 months):Understand

implications of corporate history

AT AT

• Review of market, customers, competitors and costs

• Additional analysis

• Develop draft restructuring plan

AT

How well are we performing?

What are our core competences and

improvement opportunities?

What are the options for the business in

the future?

Develop shared vision

• Action Learning Team of high-potential middle managers supports leadership by preparing high-quality analyses, insights, and recommendations.

• Action Learning Team members later used to lead projects to begin making the vision happen.

AT AT

• Revise restructuring plan

• Analysis of new markets, industry trends

• Additional analysis• Product range

requirements• Draft Business Plan

• Revise Business Plan, add action plans

• Agree process• Surface initial

concerns

• Review findings• Raise issues

• Review draft restructuring plan

• Raise issues

• Agree restructuring plan

• Review analysis• Raise issues

• Review Business Plan

• Raise issues

• Finalise Business Plan

• Example: Electronics Company (2 months):

MOBILISATION IN PROJECTS: STREAM MOBILISATION

Leadership Group Events:

Launch initiatives

and deploy resources

Page 34: Mobilisation gsw

- 34 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

A combination of Analysis Team, mobilisation Events and coaching have been used to drive project workstreams from the Strategy and Operating Plan

The Managing Director was very pleased with the level of commitment to the operating plan and project workstreams.

The Managing Director was very pleased with the level of commitment to the operating plan and project workstreams.

MOBILISATION IN PROJECTS: STREAM MOBILISATION

AT

Operating PlanningEvent 1

(50 people)

Operating PlanningEvent 2

(80 people)

Coached OperatingPlan Development Project

Workstreams

NWT

NWT

NWT

NWT

CEOPresent-

ationBoard

ReviewBoard

Review

Strategy Development

Page 35: Mobilisation gsw

- 35 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

A two day, 100-person Event kicked off five major streams, identified training needs, and highlighted the need to “just do” other things

MOBILISATION IN PROJECTS: STREAM MOBILISATION

Productivity

Sales Staff Dev

Branch Mgr Dev

Performance Mgmt

TM

HR Change Skills Training

Specific Action Plans• Equal opportunities• Cross-division job opportunities

Workshops for over 100 HR professionals

10–15 workshops for 25–40 people each

• All of these streams will use NWT members from the Kick-off Event, and will use mobilisation tools to pilot cross-divisional processes in lead divisions

• Led by 1 Gemini consultant and 1 joint team member

HR Kick-off Event

Management Capability

Steering Group

The kick-off Event was key to setting priorities and gaining commitment.The kick-off Event was key to setting priorities and gaining commitment.

NWT

NWT

NWT

NWT

Action Learning Team

Action Learning Team

Page 36: Mobilisation gsw

- 36 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Mobilisation Events were used to accelerate the implementation of performance planning and monitoring systems in a 7-division business

• 60 people:– Mainly from divisions.– 20 positioned as NWT members.

• Inputs: As-Is from A&D.

• Outputs: Strawman To-Be.

• Presentation to CEO and MDs at the end:– Builds.– Sign off.

MOBILISATION IN PROJECTS: STREAM MOBILISATION

• Compressed:– Budget cycle (6 months to 6 weeks).– Capex cycle (9 weeks to 3 weeks).

• Introduced:– Strategic and Operating planning processes.– Key Performance Indicators.

• Reviewed first set of Operating Plans on 15 September.

Achievements:• 60% Gemini consultant.

• 11/2 Joint Team members.

Resources:

June July August September October

NWT: Strategy Planning Process

NWT: Key Performance Indicators

NWT: Budget Process

NWT: Capex

NWT: Operating Planning Process To-Be refinement

Page 37: Mobilisation gsw

- 37 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Mobilisation has been used in a number of A&D’s and is planned to take an increasingly prominent role in scoping transformation

MOBILISATION IN PROJECTS: A&D

Typical timeline (Weeks)

PhaseElements

MobilisationTool

1–2 3–4 5–6 7–8

• Introduction to Business

• Clarifying issue

• Identifying alignment/energy

• Sizing issue

• Creating insights

• Earning right

• Developing way forward

• Project start-up

Board and functional focus interviews

Mobilisation accelerates and deepens client buy-in and can compress the cycle time.

Mobilisation accelerates and deepens client buy-in and can compress the cycle time.

Top management team workshops

Mobilisation events

Town meetings

Page 38: Mobilisation gsw

- 38 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

At a retail client, it was key to consistently developing the Board, and took 4 not 6 weeks as a Scoping phase

MOBILISATION IN PROJECTS: A&D

Mobilisation is not just for the “Masses”.Mobilisation is not just for the “Masses”.

Time Line

PhaseElements

Week 1

GroupWork

TownMeetings

Week 2 Week 3 Week 4

• Developing way forward

• Clarifying issue • Sizing issue/creating insights

• Project start up

Board

Departmental

EI

FI

Board updates

[Some diagnostics]

Board Project Design

Functional Project Design

ESG

ATs

RATs

NWTs

• Upward momentum (after executive & focus interview state)

• Roll out

Page 39: Mobilisation gsw

- 39 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Judgement and timing are key when mobilising within an A&D, but the rewards can be great

MOBILISATION IN PROJECTS: A&D

Board Executive Interviews (EI)

Benefits• Eliminates:

–Many unnecessary hours of individual EIs and feedback–Hours of analysis and panel smithing

• Demonstrates how the Board work together• Facilitates concensus:

–Manages conflict• Builds tremendous springboard into:

–Board updates–Board project design

• Moves the Board on in their understanding of themselves and the Business

• Develops total Board relationship necessary for Results Delivery transition

• Develops consistent/sustainable Board trust

Caveats• Retain a number of 1:1 meetings with key clients to:

–Capture differences/dissent–Handle highly confidential information–Build partner relationship with MD/KIs

Functional Focus Interviews (FI)

• Eliminates unnecessary hours of individual meetings to collect and feed back

• Captures whole department• Depersonalises• “Educates” lower levels within Organisation• Lays foundation for Results Delivery co-operation

• Retain a number of 1:1 meetings with key clients to:–Capture differences/dissent–Handle highly confidential information–Build partner relationships

Town MeetingsDuring weeks 2–5

During weeks 5–8

• Groundswell/approval of need confirmed• Data inputs to Study Design or Project Design• Starts expectation of communication

• Updating mechanism• Roll-out mechanism• Launches format for wider data collection/problem-solving

forums• Can be extended as a vehicle for workstream acceleration

within RD (e.g. leaping from As-Is to To-Be)

• Be clear on type and outputs of meeting• Timing is vital to use outputs correctly

Page 40: Mobilisation gsw

- 40 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

At a retail client we directed the Board and mobilised the masses

MOBILISATION IN PROJECTS: A&D

MD & KI interview1 : 1

MD & KI interview1 : 1

2 issues:• How to expand to Continent• How to destroy Retail Ops mafia

• Issue identification:–Background–Themes–Prioritisation vs Strategic Intent and Ops plan

–Current initiatives–Reasons for failure

• Business targets vs progress on current initiatives:

–Gap analysis–Study/next steps design

Functional FIs

• Analysis• Findings

Town Meeting

• Feedback

Board Updates

• Confirmation• Sizing• Redirection• Reprioritisation• Decision making

Board Project Design—using Metaplan

(i) Preliminary design data– Internal– External• [inter meeting detail design]

(ii) Ratification of Design and Targets

27 ISSUES!!(all UK based)

2 key issues:• Strategy• LFL decline

Study Planning

Study Findings

We saw hidden issues:• Board weaknesses

–Lack of decision making–Lack of focus–Unused to working together

Board starts to recognise own weaknesses

Creating Board confidence

• Energise• Legitimatizes

Page 41: Mobilisation gsw

- 41 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Although we are still experimenting with what to use when, we can outline some initial ideas

Task

Possible use of mobilisation tools

Mobilisation EventsChange Agent/

Action Learning Team

Town MeetingsPossible other tools

also employed

• Develop strategic intent

• Develop business strategy

• Identify best practice

• Process improvement

• Process re-engineering

• Organisational redesign

• Organisational right-sizing

• Develop intent/strategy with senior management

• Gain commitment of senior/middle management to the intent/strategy

• Bring together practitioners to identify Best Practice

• Bring together practitioners to disseminate

• Generate As-Is• Validate As-Is and

generate To-Be• Validate refined

To-Be

• Different parts of the organisation work through the implications of the new organisation

• Communicate strategy/intent to the whole company

• Communicate activity around Best Practice and surface concerns

• Communicate activity around process improvement/ re-engineering and surface concerns

• Communicate the new organisation, the underlying rationale, and surface concerns

• Codify Best Practice

• Implement Best Practice

• Create new practices

• Construct As-Is• Refine detail of

To-Be• Implement To-

Be

• Analysis Teams to inject data into Events/structure and further develop hypotheses and recommendations discussed at Events

• Analysis Teams to benchmark

• NWT to codify Best Practice

• NWT to implement Best Practice

• NWT to construct As-Is• NWT to refine To-Be• NWT to implement

To-Be• RATs to effect “Easy

Wins”

• Analysis Teams for sensitive organisational design/right-sizing To-Be

• NWTs to map As-Is

MOBILISATION IN PROJECTS

• Evaluate and implement new business opportunities

• Develop intent

• Develop new teams, post the changes

Page 42: Mobilisation gsw

- 42 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Learning from Experience

• Current experience is project based, and only a starting point:

Consumer Mobilisation Events John Bateson 340 3503Electronics Town Meetings Jayne Buxton 340 3196

Change Agents/Action Marc Coladon 441 2047 Learning Teams Gavin Fraser 340 3222

Faith Gibson 340 3100 Joanna Horsfall 340 3245

Mark Harford 340 3235

Retail Mobilisation Events David Barrett 340 3182Town Meetings Carrie Coombs 340 3205

Peter Keuls 340 3262Mary Kennedy 340 3261Harry Steadman 340 3337

Tools UsedClient Key People

MOBILISATION

VMS

Page 43: Mobilisation gsw

- 43 -GDBP Guidelines—Discovery—Mobilisation & Client Leverage

RUNNING HEAD: 10 BOLD ALL CAPS

Proprietary to Gemini Consulting 04/09/23

Learning from Experience (cont.)

FMCG/Drinks Action Learning Teams Peter Keuls 340 3262Faith Gibson 340 3100John Riker 340 3316Chris Tchen 340 3341

Financial Action Learning Teams Faith Gibson 340 3100Services Mobilisation Events Peter Keuls 340 3262

John Riker 340 3316Chris Tchen 340 3341

Mobilisation in A&D’s Gavin Fraser 340 3222

Didier Bonnet 340 3189

Tools UsedClient Key People

VMS