![Page 1: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/1.jpg)
Mobile Computing / ArcPad 8.0
ISMR ConferenceJasper, IN
U.S. Department of the Interior Office of Surface Mining Reclamation and EnforcementMid – Continent Region
![Page 2: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/2.jpg)
Early Mobile Computing prototype
![Page 3: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/3.jpg)
Mobile Computing Now
![Page 4: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/4.jpg)
Mobile Computing – Integration of Four Technologies
►Geographic Information Systems (GIS)
► Lightweight Hardware►Global Positioning
System (GPS)►Wireless “unthethered”
Communication (Bluetooth)
![Page 5: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/5.jpg)
Mobile Computing
►Next step beyond basic GPS data collection
► Field CAD and GIS Solutions
►Real time mobile mapping and data collection
► Integrates GPS with mobile GIS
![Page 6: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/6.jpg)
Navigation
![Page 7: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/7.jpg)
Pre-Plan Site Visits Using Existing GIS and CAD Data
![Page 8: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/8.jpg)
Collect Points, Polylines, and Polygons
![Page 9: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/9.jpg)
Create a New Layer – Adding Fields
![Page 10: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/10.jpg)
Capture New Features -GPS
![Page 11: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/11.jpg)
Collecting Attribute Data
![Page 12: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/12.jpg)
Collecting Attribute Data – Customized Form
![Page 13: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/13.jpg)
Associate Photos with ArcPad 7.0
![Page 14: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/14.jpg)
GIS Interface
►Use existing mapping and software systems►Support raster and vector data►Check in and check out spatial data ►Update and leverage geographic databases►Create custom solutions ►Clip data from desktop GIS applications
![Page 16: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/16.jpg)
Software
►ArcPad v. 8.0 by ESRI►ArcMap by ESRI►Terrasync by Trimble►Pathfinder Office by Trimble►GPS Correct and GPS Analyst by Trimble►Carlson Software Field Running on Autodesk
Map and Field Viewer
![Page 17: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/17.jpg)
Case Study 1Wildlife Habitat Assessment
► Evaluate effects of KY-31 Tall Fescue at AECI Prairie Hill Mine
► 10 Parcels of wildlife habitat (133.75 acres) was inadvertently seeded with a fescue ground cover
► Permit revision with the State of Missouri
► AECI wildlife mitigation areas► Several tools utilized to assess
reclaimed wildlife habitat:GIS, ArcPad, Mobile Computing, and Wildlife Habitat Models
![Page 18: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/18.jpg)
Mobile Computing► Field data was captured using
Bluetooth GPS Technology► Wildlife models were digitally
created using the ArcPad Form Builder and Application Builder
► ArcPad software along with the digital models were downloaded to an iPAQ Pocket PC
► Land Use Lines, Permit Boundaries, and Digital Aerial Photos were also downloaded
![Page 19: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/19.jpg)
Mobile Computing► Shapefiles projected and
created using ArcGIS Desktop► Tabular fields (wildlife quality
factors) created in ArcGIS for form customization
► Downloaded to ArcPad ► Application Builder and Quick
Form Applet► Quality factor variables and
scoring system created in ArcPad Form
► Imported to iPAQ for field data collection
![Page 20: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/20.jpg)
ArcPad Wildlife Models
![Page 21: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/21.jpg)
Case Study 2Kansas Wetland Determination
►AML Project► Extensive project site
with open water, stream, and wetland impacts
►Mobile computing assisted with Wetland and Stream Mapping
►ArcGIS Interface for site analysis and 404 permit submittal to USACE
![Page 22: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/22.jpg)
iPAQ and xplore iX104
![Page 23: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/23.jpg)
Wetland Transects► Wetland Points were
taken at specific length intervals
► Wetland Delineation Forms – Vegetation, Soils, Hydrology
► Wetland boundaries and stream courses were mapped
► GIS Interface to quantify impacts to waters of the US
► Assisted in Section 404 Permit Application with USACE
![Page 24: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/24.jpg)
Case Study 3 Big Sky Mine Montana
►ArcPad QuickForm used to collect soil probe data► Soil probe data points taken in the field► Soil depths recorded►Vegetation noted ► Land use►ArcPad data imported into ArcMap for further
analysis►Aided in bond release
![Page 25: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/25.jpg)
Big Sky Mine Montana
![Page 26: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/26.jpg)
Case Study 4AECI Vegetation Assessment for Bond
Release►Assess validity of Phase 3 Bond Release Requests
on 10,000 acres► Permits as old as 1982►Compare veg. sample data to actual on-ground
conditions►Data was developed in AutoCAD►Opened .dwg in ArcMap►Converted to Shapefiles and exported for ArcPad
![Page 27: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/27.jpg)
AECI Vegetation Analysis
![Page 28: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/28.jpg)
Cost Savings► Resource Analysis:
With Mobile Computing Technologies:-- 2 days for various resource professionals to conduct field data collection-- 10 days for various GIS data collection and analysis
Total = 12 daysWith Traditional Existing Methods:-- 60 days for GPS/Survey specialists to flag and orient maps for
resource professionals-- 10 days for resource professionals to conduct field data collection-- 15 days for GIS data input and analysis
Total = 85 days
Net result with Mobile Computing Technologies is 85% less time and resources needed to complete this task.
![Page 29: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/29.jpg)
AutoCad (Field Module) Case Study 5: RTK GPS Surveying
• MCR and Missouri staff surveyed 700 acre bond forfeiture site.• Goal – To obtain a topographic survey and
document bare spots, slides, gullies, etc. to be used to prepare reclamation designs.
• Equipment used – Leica SR 530 RTK GPS base station and rover, Fujitsu Stylistic 3500R computer, John Deere Gator 4x6 vehicle
![Page 30: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/30.jpg)
Equipment
![Page 31: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/31.jpg)
Survey Data Collection
• 2 person crew• One person drove the gator while the other
rode in the passenger seat to operate the computer and hold the pole steady.
• Used the Auto-Points feature to collect points every 25 feet horizontally or 1 foot vertically.
• Collected topo shots from the Gator. When other features were encountered, the crew got off of the gator and mapped the features
![Page 32: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/32.jpg)
Field Results
![Page 33: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/33.jpg)
Field Analysis
![Page 34: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/34.jpg)
TIPS
TechnicalAssistance
Applied Sciences
SoftwareHardware
Technical Innovation
Professional Services
Training
![Page 35: Mobile Computing / ArcPad 8Case Study 4 AECI Vegetation Assessment for Bond Release Assess validity of Phase 3 Bond Release Requests on 10,000 acres Permits as old as 1982 Compare](https://reader034.vdocuments.site/reader034/viewer/2022051606/60183ef3ad43077e8e0ce0a6/html5/thumbnails/35.jpg)
One of those moments when mobile computing comes in handy
Questions???