mobile aasf #3 act of nature (aon) repairs

13
MOBILE AASF #3 ACT of NATURE (AoN) REPAIR MOBILE, ALABAMA VICINITY MAP PROJECT INFORMATION GENERAL NOTES 1. DRAWINGS AND SPECIFICATIONS OF ALL DISCIPLINES INCLUDED HEREIN ARE GRAPHIC AND TEXT REPRESENTATIONS INTENDED TO ESTABLISH THE FULL SCOPE OF THIS PROJECT AND THE FULL CONTRACTUAL OBLIGATION OF THE GENERAL CONTRACTOR TO COMPLETE THE WORK SHOWN, IMPLIED, AND SPECIFIED. IT SHALL BE THE GENERAL CONTRACTOR'S ULTIMATE RESPONSIBILITY TO COORDINATE THE PROPOSALS AND WORK OF ALL TRADES TO ENSURE ALL MATERIALS AND WORK REQUIRED BY THE CONTRACT DOCUMENTS ARE INCLUDED IN THE GENERAL CONTRACTOR'S PROPOSAL AND ARE ULTIMATELY FURNISHED AND INSTALLED IN THE FINISHED PRODUCT, WHETHER EXPLICIT OR IMPLIED BY THESE DOCUMENTS. 2. THE FOLLOWING PRIORITIES ARE ESTABLISHED WITH REFERENCE TO DISCIPLINE COORDINATION: A. ALL PLUMBING WORK AND INSTALLATION SHALL BE COORDINATED FULLY TO AVOID CONFLICTS. B. NO TRADE WILL TAKE UNNECESSARY ADVANTAGE OF AVAILABLE PLENUM SPACE OVER OTHER TRADES. RELOCATION OF ANY ITEMS VIOLATING THIS PRINCIPLE SHALL BE AT THE TRADES' EXPENSE. C. ALL STRUCTURAL DESIGN & DETAILING SHALL GOVERN OVER ARCHITECTURAL GRAPHIC REPRESENTATION WHERE APPLICABLE. 3. COORDINATE PIPING WITH STRUCTURAL AND PLUMBING. MAKE OFFSETS AND TRANSITIONS TO COORDINATE WITH OTHER TRADES WITHOUT ADDITIONAL EXPENSE TO THE OWNER. COORDINATE ALL PIPING AND SERVICES WITH FOUNDATION, STRUCTURAL, ETC. 4. COORDINATE ALL REVIEWS OF WORK IN PLACE PRIOR TO CONCEALMENT OF ALL: INTERIORS, ENGINEERING & LAYOUT ASSETS, AND EXTERIOR WORK W/ A/E. 5. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO BECOME FAMILIAR WITH THE CONTRACT DOCUMENTS APPLICABLE TO THIS PROJECT PRIOR TO CONSTRUCTION. THE DRAWINGS AND SPECIFICATIONS ARE COMPLIMENTARY AND BOTH DOCUMENTS SHALL BE BINDING. 6. THE CONTRACTOR IS TO MAINTAIN A COMPLETE SET OF AS-BUILT DRAWINGS AT THE JOB SITE. AS-BUILTS SHALL BE AVAILABLE FOR FIELD OBSERVATION BY THE ARCHITECT, ENGINEER AND OWNER. 7. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS, PROCEDURES, OR METHODS OF CONSTRUCTION. IT IS INTENDED THAT A COMPLETE BUILDING BE PROVIDED WITH ALL NECESSARY EQUIPMENT, APPURTENANCES, CONTROLS AND COMPLETELY COORDINATED WITH ALL DISCIPLINES. ALL PARAMETERS GIVEN IN THESE DOCUMENTS SHALL BE STRICTLY CONFORMED WITH ANY ITEMS AND LABOR REQUIRED FOR A COMPLETE RE-ROOFING & REPAIR IN ACCORDANCE WITH ALL APPLICABLE CODES, STANDARDS, AND THESE CONTRACT DOCUMENTS. ALL ITEMS, SYSTEMS, ETC. OUTLINED HEREIN SHALL BE FURNISHED WITHOUT INCURRING ANY ADDITIONAL COST TO THE CONTRACT. CAREFULLY REVIEW ALL CONTRACT DOCUMENTS AND THE DESIGN OF OTHER TRADES BEFORE PREPARING SHOP DRAWINGS. 8. THE CONTRACTOR SHALL VERIFY ON THE SITE ALL DIMENSIONS. EQUIPMENT LOCATIONS AND EXISTING CONDITIONS. NOTIFY THE ARCHITECT PROMPTLY, IN WRITING, IN THE EVENT OF ANY DISCREPANCIES. CONTRACTOR SHALL CHECK AND COORDINATE ALL DIMENSIONS PRIOR TO PROJECT LAYOUT. CONFIRM EXISTING CONDITIONS WILL ACCOMMODATE DIMENSIONAL CRITERIA INDICATED FOR NEW WORK, CONSTRUCTION, AND INSTALLATION. THIS CONFIRMATION SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 9. DIMENSIONS SHOWN ON THE FLOOR PLANS ARE TO FACE OF STUD AT INTERIOR STUD WALLS, TO FACE OF CONCRETE OR MASONRY WALLS AT EXISTING EXTERIOR WALLS, TO THE CENTERLINE OF COLUMNS AND FACE OF COLUMN FINISH, UNLESS OTHERWISE NOTED. NOTATION ON PLANS TO PROVIDE A "CLEAR" MINIMUM DIMENSION SHALL INCORPORATE THE FINAL FINISH THICKNESS. 10.DO NOT SCALE DRAWINGS IF DIMENSIONS ARE IN QUESTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING CLARIFICATION FROM THE ARCHITECT BEFORE CONTINUING WITH WORK. 11. THE CONTRACTOR IS REQUIRED TO REVIEW THE ENTIRE SET OF CONTRACT DOCUMENTS TO NOTE AREAS OF WORK IN THE TRADE ON SHEETS TRADITIONALLY NOTED AS WORK OF OTHER TRADES, I.E. THE REQUIREMENT OF PROVIDING POWER TO MECHANICAL OR OTHER EQUIPMENT SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS AND NOT ON THE ELECTRICAL DRAWINGS. THE ARCHITECT IS AVAILABLE TO ASSIST IN COORDINATING THESE ITEMS. 12. SHOULD CONFLICT OCCUR IN OR BETWEEN DRAWINGS(S) AND OR SPECIFICATION(S) OR SHOULD CONFLICTING INFORMATION BE FOUND THEREIN, THE CONTRACTOR WILL BE DEEMED TO HAVE ESTIMATED ON THE MORE EXPENSIVE WAY OF DOING THE WORK INVOLVED UNLESS HE SHALL HAVE ASKED FOR AND OBTAINED THE WRITTEN DECISION OF THE ARCHITECT, BEFORE SUBMISSION OF HIS BID, AS TO METHOD, MATERIALS, OR EQUIPMENT REQUIRED. 13. CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUBCONTRACTORS WITH COMPLETE DOCUMENTS INDICATING ALL REQUIREMENTS OF THEIR TRADE. 14. SMOKING SHALL NOT BE ALLOWED IN ANY OF THE BUILDINGS FOR THE ENTIRE PROJECT. 15. THE LOCATION(S) OF CONTRACTOR(S) JOB TRAILERS, TEMPORARY OFFICES, STORAGE CONTAINERS, LAY-DOWN AREAS, ETC. MUST BE APPROVED BY THE OWNER PRIOR TO STARTING CONSTRUCTION. STD STANDARD KPL KICKPLATE TREAD SQUARE SHEAR WALL TROWELED CONTROL JOINT SUSPENDED TEMPERED (GLASS) TO BE DETERMINED TOWEL BAR STORAGE STRUCTURAL TERRA COTTA TYPICAL TRANSOM UNLESS NOTED OTHERWISE UNDERCUT TOILET PAPER HOLDER VANITY BASE WIDTH VAPOR BARRIER TELEVISION OUTLET VANITY BASE VERTICAL TOP OF WINDOW TOP OF MASONRY TOP OF FOUNDATION THRESHOLD TOP OF CONCRETE TELEPHONE THICK(NESS) UNFINISHED TONGUE & GROOVE WINDOW WIDE OR WASHING MACHINE WIDE FLANGE WALK-IN CLOSET WATER HEATER WATERPROOF WATER RESISTANT WAINSCOT WALL TO WALL WALL HUNG WATER CLOSET WELDED WIRE MESH WROUGHT IRON WATER SOFTENER WITH OR WITHOUT VINYL COMPOSITION TILE VEGTABLE SINK VINYL(SHEET) N.G.V.D. NAT. GEODETIC VERTICAL DATOM OA OBS O.C. OH OPT OSB O.G.D. O.D. OHC OPNG O OVERHEAD GARAGE DOOR ORIENTED STRAND BOARD OPTIONAL OVERHEAD CABINET OUTSIDE DIAMETER ON CENTER OBSCURE (GLASS) OVERHEAD OVERALL OPENING W.S. WWM W.T.W. WSCT WF WH W.H. WI WP WIN W/ W/O W.R. WIC K/S MH MIN MM MT MMB M.O. MISC MLD MTL MOD MIR MRB N.I.C. N/A N.T.S. NOM MULL NL N MOUNTED(ING) NAILABLE NOT TO SCALE NOT APPLICABLE NOT IN CONTRACT MULLION OR MULLED MARBLE METAL NOMINAL MANHOLE MODULAR MOULDING MISCELLANEOUS MASONRY OPENING MMB MEMBRANE MILLIMETER MINIMUM MIRROR VB V W VERT V.B. VB# WC W V.S. V.C.T. VIN U TV TP TR T.O.W. UC UNF TYP U.N.O. KNEE SPACE TC TEMP. T.C.J. THK TEL T.O.C. THR T.O.F. T.O.M. T&G T STR STL STOR SQ T T.B. T.B.D. SUS S.W. RAILING SIMILAR SECTION SHEATHING SCHEDULE ROD AND SHELF(S) SMOKE DETECTOR SQUARE FEET SINGLE HUNG OR SHELF SLIDING GLASS DOOR (DRAWING) SHEET REINFORCED JUNCTION BOX RANGE W/ MICROWAVE ROUGH OPENING RIGHT OF WAY SOLID CORE SAFETY GLASS ROOFING SPACER SIDELIGHT OR SLEEVE SEALANT STAINLESS STEEL SPEAKER SPECIFICATIONS SKYLIGHT G B GA G.B. GD GFI GL HB G.I. GT G.D.O. GL.BK. G.C. HD HT HR H.D. H.M. HDW H.R. HORZ H.C. HDR I.M. HVAC HWD HTG I.L.O. INS / INSUL HS KD KO KIT JST INT CABINET C CAB CLOSET OR CENTER LINE CALK(ING) CAULK(ING) CATCH BASIN CAST-IN-PLACE CONC. CIRCUMFERENCE CUBIC FOOT CONTROL JOINT CLEAR(ANCE) CENTIMETER(S) CONCRETE MASONRY UNIT CLOSURE OR CLOSER CK CL CLG CM CLS CMU CLR CEILING CHAM CIRC C.I.P. CONC. CEM C.B. C.J. CF C.I. CIR CER CEMENT CHAMFER CIRCLE CERAMIC CAST IRON JT J K I.B. I.D. I 36" WIDE BASE CAB. BI-FOLD (DOOR) BI-PASS (DOOR) BLOCK (CMUs) BITUMINOUS BENCH MARK BOTH SIDES BOTH WAYS BP BSMT BTWN BRK BRG B.W. BVL B.S. BOT BEARING BRICK BEVELED BOTTOM BETWEEN BASEMENT BLKG BLDG BLKG BD B36 BM B.M. BIT. BLK BF BOARD BUILDING BEAM BLOCKING BLOCKING H H R.O.W. HORIZONTAL HEATING/VENTILATING/AIR COND. INSULATED(TION) INSULATED METAL KNOCKOUT KNOCKDOWN JOINT KITCHEN JOIST INTERIOR HARDWOOD INSIDE DIAMETER HORIZONTAL SLIDER HALF ROUND IRONING BOARD IN LIEU OF HOUR HEATING SIM SHT SHTHG SL SPEC SPK S.ST. SNT SPC SKL S SC R&S SH S.F. SD SF.GL. SEC S.G.D. SCH GROUND FAULT INTERRUPTER HEAT DETECTOR OR HEAVY DUTY HOSE BIBB HOLLOW CORE HARDWARE HOLLOW METAL HEAD OR HARD HIGH HEADER HEIGHT GLASS BLOCK GALVANIZED IRON GYPSUM BOARD GENERAL CONTRACTOR GLASS OR GLAZING GARAGE DOOR OPENER GRADE OR GRADING GAUGE GROUT RWL RLG R.O. R&M R.J.B. RFG FS FUR FTG A A/C AIR CONDITIONING AIR HANDLING UNIT ACCESS PANEL ALTERNATE AGGREGATE ADJUSTABLE ABOVE FINISH FLOOR AREA DRAIN ACOUSTICAL TILE (CLG) ASPHALT TILE APPROXIMATE AUTOMATIC ARCHITECT(URAL) ALT ALUM ARCH. ASPH AUTO. AWNG A.P. A.T. AVG APX ALUMINUM AVERAGE AWNING ASPHALT ACC AGG A.H.U. AC.T. AFF A.D. ADD ADH ADJ ACCESS ADHESIVE ADDENDUM ANCHOR BOLT ABV A.B. ABOVE FULL SIZE FURRED(ING) FOOTING ROOF WATER LEADER F.V. FIELD VERIFY E ELECTRIC WATER COOLER ELECTRIC(AL) ELECTRICAL PANEL EACH FACE EXPANSION JOINT EXT EXTERIOR E.W.C. ELEC E.J. EL E.F. EQ E.P. EXH EXG EST ESTIMATE EXISTING EXHAUST EQUAL ELEVATION DAMP-PROOFING DRAWER STACK DRYER MACHINE DOWNSPOUT DRINKING FOUNTAIN DEAD LOAD DOUBLE HUNG DEPRESSED DISH WASHER DRY DWG DS D/S EA DW EB DWR DTL D.T. DETAIL DRAWING DRAWER EYEBROW EACH DRAIN TILE DIAM D.F. DEP DET DN DR DIM D.L. D.P. DH DETAIL DOWN DOOR DIMENSION DIAMETER CORRUGATED CERAMIC TILE CONNEXTION CENTER OR COUNTER CONTRACTOR CAST STONE CUBIC YARD DECORATIVE DRYER, OR DRAIN DEMOLISH, DEMOLITION C.ST. DECO CX C.T. CTR D CY D DEM DBL 12"D 12" DEEP DOUBLE CONTR CSMT C OR CPT CORR CPR CRS CARPET COPPER CASEMENT COURSE(S) F.D. F.B. F.B.O. FAS F.E. F FURNISHED BY OTHERS FIRE EXTINGUISHER FLOOR DRAIN FASTEN(ER) FACE BRICK DESIGN TEAM CONTACTS OWNER : ARMORY COMMISSION OF ALABAMA MONTGOMERY, ALABAMA CFMO POINT OF CONTACT ERIC HOLT FACILITY MOBILE ARMY AVIATION ADDRESS: SUPPORT FACILITY (AASF) #3 9055 TANNER WILLIAMS ROAD MOBILE, AL 36615 CONC CONCRETE (AC) CONDENSER CONTINUOUS CONSTRUCTION CONST COND CONT CASED OPENING COMBINATION COMB COL C.O. COLUMN F.G. FN FIN F.F. FGL FLUR FND FLR F.O. FLG FP FR FP FPHB FENCE FOUNDATION FIRE PROOF FIREPLACE FIRE PROOF HOSE BIBB FACE OF FRAME FLASHING FLOURESCENT FIBERGLASS FINISH FLOOR FIXED GLASS FLOOR FINISH L.L. L.T. L.P. LVL L.B.O. LAV LTL LIV LAM. MC MATL MECH MFR. MAS MAX LVR M M LT L MECHANICAL MANUFACTURER LAUNDRY TUB VENNER LUMBER MATERIAL MASONRY MEDICINE CABINET LINTEL METER(S) MAXIMUM LOUVER LAMINATE(D) LAVATORY LOCATION BY OTHERS LIVE LOAD LAMINATED PLASTIC LIGHT LIVING RADIUS RUBBLE RISER ROOF DRAIN REQUIRED RESILIENT REFRIGERATOR REVISION, REVISED QUARRY TILE RETURN AIR RUBBER BASE REINFORCED(ING) REQ REV RES REINF Q R Q.T. R R.B. R/A RBL REF RAD R.D. ABBREVIATIONS DOOR MARK WINDOW MARK ROOM FINISH MARK LOUVER MARK DETAIL INTERIOR ELEVATION SECTION MARKER BRACKET MOUNTED FIRE EXTINGUISHER LARGE SCALE PLAN OR DETAIL ENLARGEMENT FINISH FLOOR ELEVATION FINISH GRADE ELEVATION BEARING ELEVATION DETAIL NO. DWG. NO. ELEV. NO. DWG. NO. SECT. NO. DWG. NO. B.F.E. F.F.= F.E.C. ARCHITECTURAL SYMBOLS FIRE EXTINGUISHER CABINET PLATE PARALLEL PERIMETER PEDESTAL (SINK) PARTICLE BOARD PLASTER PLASTIC LAMINATE PARKING PORCELAIN ENAMEL PRECAST CONCRETE P P.BD. P.E. PCC. PL PERI PLAS P.LAM. PKG PED PAR PAIR PAINT PANEL POUNDS PER SQUARE FOOT PREFABRICATED PAVE(D) OR PAVING PLYWOOD PARTITION PRESSURE TREATED POLYVINYL CHLORIDE (PIPE) PAVEMENT POUNDS PER SQUARE INCH PSF PREFAB PR PV PVMT PVC PWD PTN P.T. PSI PNL PNT PORCELAIN TILE P. TILE STEEL INDEX OF DRAWINGS SEQ. NO. DWG. NO SHEET TITLE 1 T1.1 COVER, INDEX, LEGENDS, & NOTES BID ITEM A - HANGAR BUILDING 2 BI.A/A1.1 HANGAR FLOOR PLAN 3 BI.A/A2.1 HANGAR EXTERIOR ELEVATIONS 4 BI.A/A3.1 HANGAR REFLECTED CEILING PLAN 5 BI.A/A4.1 HANGAR ROOF PLAN 6 BI.A/A5.1 HANGAR DETAILS 7 BI.A/A5.2 HANGAR DETAILS 8 BI.A/MP1.1 HANGAR HVAC & PLUMBING ROOF PLAN BID ITEM B - OPERATIONS BUILDING 9 BI.B/A1.1 OPERATIONS BUILDING FLOOR PLAN 10 BI.B/A2.1 OPERATIONS BUILDING EXTERIOR ELEVATIONS 11 BI.B/A3.1 OPERATIONS BUILDING REFLECTED CEILING PLAN 12 BI.B/A4.1 OPERATIONS BUILDING ROOF PLAN 13 BI.B/MP1.1 OPERATIONS BUILDING HVAC & PLUMBING ROOF PLAN 16.CONTRACTOR SHALL PROTECT TO THE GREATEST EXTENT POSSIBLE EXISTING ITEMS TO REMAIN FROM DAMAGE THROUGHOUT THE ENTIRE DURATION OF THE PROJECT. 17. THE CONTRACTOR SHALL VERIFY ON THE SITE ALL EQUIPMENT LOCATIONS AND EXISTING CONDITIONS. NOTIFY THE ARCHITECT PROMPTLY, IN WRITING, IN THE EVENT OF ANY DISCREPANCIES. 18.THE CONTRACTOR IS REQUIRED TO REVIEW THE ENTIRE SET OF CONTRACT DOCUMENTS TO NOTE AREAS OF WORK AND COORDINATE DEMOLITION REQUIREMENTS WITH ALL TRADES. 19.THE CONTRACTOR SHALL MAINTAIN SAFE WORKSITE CONDITIONS AND METHODS OF EGRESS AND CIRCULATION DURING ENTIRE PROJECT. 20. DISCONNECT ALL UTILITIES AS INDICATED ON PLANS AND PER DEMOLITION NOTES . 21. OWNER WILL NOT RETAIN SALVAGEABLE MATERIAL. SUCH MATERIAL SHALL BE RECYCLED AT THE DISCRETION OF THE GENERAL CONTRACTOR AND INCORPORATED INTO BASE BID. ARCHITECT: JMR+H ARCHITECTURE, P.C. 445 DEXTER AVENUE SUITE 5050 MONTGOMERY, AL 36104 T: (334) 420-5672 F: (334) 420-5692 CONTACT: MIKE RUTLAND, AIA ROBERT GARRIS, AIA * SITE ORDER OF BID ITEMS BID ITEM - A: COMPLETE INSTALLATION OF ROOFING & REPAIRS TO BUILDING ENVELOPE OF THE HANGAR BUILDING AT AASF#3 PER THE DRAWINGS & SPECIFICATIONS ALTERNATE A1: COMPLETE INSTALLATION OF VERTICALLY MOUNTED PRE-FINISHED METAL WALL PANELS AT THE HANGAR BUILDING OF AASF#3 ON THE EAST AND WEST SIDES ONLY PER THE DRAWINGS & SPECIFICATIONS BID ITEM - B: COMPLETE INSTALLATION OF ROOFING & REPAIRS TO THE OPERATIONS BUILDING @ AASF#3 PER DRAWINGS & SPECIFICATIONS. PLUMBING & MECHANICAL:WHORTON ENGINEERING, INC. 25 SUMMERALL GATE ROAD, BLDG. 2120 ANNISTON, AL 36205 COVER, INDEX, LEGENDS, & NOTES T1.1 1 Project Number: OF Sheet Description Revisions: Date: Sheet Number DOCUMENTS 445 Dexter Avenue Suite 5050 Montgomery, Al 36104 Phone: (334) 420-5672 Fax: (334) 420-5692 JMR+H A r c h i t e c t u r e , P C PRINTED: 8/5/2021 @ 1:34PM FILE NAME: W:\JMRH Projects 2021\21-1089 Mobile AASF #3 Act of Nature (AoN) Repairs\T1.1 TITLE SHEET.dwg S T A T E O F A L A B A M A R E G I S T E R E D A R C H I T E C T J.MICHAEL RUTLAND 2149 TIMOTHY R. HOLMES 3188 13 MOBILE ALABAMA MOBILE AASF #3 ACT of NATURE (AoN) REPAIRS IFB#: AC-21-B-0025-S 21-1089 4 AUGUST 2021 CONSTRUCTION

Upload: others

Post on 03-Nov-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

MOBILE AASF #3 ACT of NATURE (AoN) REPAIRS

MOBILE, ALABAMA

VICINITY MAP

PROJECT INFORMATION

GENERAL NOTES

1. DRAWINGS AND SPECIFICATIONS OF ALL DISCIPLINES INCLUDED HEREIN ARE

GRAPHIC AND TEXT REPRESENTATIONS INTENDED TO ESTABLISH THE FULL

SCOPE OF THIS PROJECT AND THE FULL CONTRACTUAL OBLIGATION OF THE

GENERAL CONTRACTOR TO COMPLETE THE WORK SHOWN, IMPLIED, AND

SPECIFIED. IT SHALL BE THE GENERAL CONTRACTOR'S ULTIMATE

RESPONSIBILITY TO COORDINATE THE PROPOSALS AND WORK OF ALL TRADES

TO ENSURE ALL MATERIALS AND WORK REQUIRED BY THE CONTRACT

DOCUMENTS ARE INCLUDED IN THE GENERAL CONTRACTOR'S PROPOSAL AND

ARE ULTIMATELY FURNISHED AND INSTALLED IN THE FINISHED PRODUCT,

WHETHER EXPLICIT OR IMPLIED BY THESE DOCUMENTS.

2. THE FOLLOWING PRIORITIES ARE ESTABLISHED WITH REFERENCE TO DISCIPLINE

COORDINATION:

A. ALL PLUMBING WORK AND INSTALLATION SHALL BE COORDINATED FULLY TO

AVOID CONFLICTS.

B. NO TRADE WILL TAKE UNNECESSARY ADVANTAGE OF AVAILABLE PLENUM

SPACE OVER OTHER TRADES. RELOCATION OF ANY ITEMS VIOLATING THIS

PRINCIPLE SHALL BE AT THE TRADES' EXPENSE.

C. ALL STRUCTURAL DESIGN & DETAILING SHALL GOVERN OVER

ARCHITECTURAL GRAPHIC REPRESENTATION WHERE APPLICABLE.

3. COORDINATE PIPING WITH STRUCTURAL AND PLUMBING. MAKE OFFSETS AND

TRANSITIONS TO COORDINATE WITH OTHER TRADES WITHOUT ADDITIONAL

EXPENSE TO THE OWNER. COORDINATE ALL PIPING AND SERVICES WITH

FOUNDATION, STRUCTURAL, ETC.

4. COORDINATE ALL REVIEWS OF WORK IN PLACE PRIOR TO CONCEALMENT OF

ALL: INTERIORS, ENGINEERING & LAYOUT ASSETS, AND EXTERIOR WORK W/ A/E.

5. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO BECOME FAMILIAR

WITH THE CONTRACT DOCUMENTS APPLICABLE TO THIS PROJECT PRIOR TO

CONSTRUCTION. THE DRAWINGS AND SPECIFICATIONS ARE COMPLIMENTARY

AND BOTH DOCUMENTS SHALL BE BINDING.

6. THE CONTRACTOR IS TO MAINTAIN A COMPLETE SET OF AS-BUILT DRAWINGS AT

THE JOB SITE. AS-BUILTS SHALL BE AVAILABLE FOR FIELD OBSERVATION BY THE

ARCHITECT, ENGINEER AND OWNER.

7. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND NOT INTENDED TO SHOW

ALL POSSIBLE CONDITIONS, PROCEDURES, OR METHODS OF CONSTRUCTION. IT

IS INTENDED THAT A COMPLETE BUILDING BE PROVIDED WITH ALL NECESSARY

EQUIPMENT, APPURTENANCES, CONTROLS AND COMPLETELY COORDINATED

WITH ALL DISCIPLINES. ALL PARAMETERS GIVEN IN THESE DOCUMENTS SHALL

BE STRICTLY CONFORMED WITH ANY ITEMS AND LABOR REQUIRED FOR A

COMPLETE RE-ROOFING & REPAIR IN ACCORDANCE WITH ALL APPLICABLE

CODES, STANDARDS, AND THESE CONTRACT DOCUMENTS. ALL ITEMS,

SYSTEMS, ETC. OUTLINED HEREIN SHALL BE FURNISHED WITHOUT INCURRING

ANY ADDITIONAL COST TO THE CONTRACT. CAREFULLY REVIEW ALL CONTRACT

DOCUMENTS AND THE DESIGN OF OTHER TRADES BEFORE PREPARING SHOP

DRAWINGS.

8. THE CONTRACTOR SHALL VERIFY ON THE SITE ALL DIMENSIONS. EQUIPMENT

LOCATIONS AND EXISTING CONDITIONS. NOTIFY THE ARCHITECT PROMPTLY, IN

WRITING, IN THE EVENT OF ANY DISCREPANCIES. CONTRACTOR SHALL CHECK

AND COORDINATE ALL DIMENSIONS PRIOR TO PROJECT LAYOUT. CONFIRM

EXISTING CONDITIONS WILL ACCOMMODATE DIMENSIONAL CRITERIA INDICATED

FOR NEW WORK, CONSTRUCTION, AND INSTALLATION. THIS CONFIRMATION

SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR.

9. DIMENSIONS SHOWN ON THE FLOOR PLANS ARE TO FACE OF STUD AT INTERIOR

STUD WALLS, TO FACE OF CONCRETE OR MASONRY WALLS AT EXISTING

EXTERIOR WALLS, TO THE CENTERLINE OF COLUMNS AND FACE OF COLUMN

FINISH, UNLESS OTHERWISE NOTED. NOTATION ON PLANS TO PROVIDE A

"CLEAR" MINIMUM DIMENSION SHALL INCORPORATE THE FINAL FINISH

THICKNESS.

10.DO NOT SCALE DRAWINGS IF DIMENSIONS ARE IN QUESTION. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING CLARIFICATION FROM

THE ARCHITECT BEFORE CONTINUING WITH WORK.

11.THE CONTRACTOR IS REQUIRED TO REVIEW THE ENTIRE SET OF CONTRACT

DOCUMENTS TO NOTE AREAS OF WORK IN THE TRADE ON SHEETS

TRADITIONALLY NOTED AS WORK OF OTHER TRADES, I.E. THE REQUIREMENT

OF PROVIDING POWER TO MECHANICAL OR OTHER EQUIPMENT SHOWN

ELSEWHERE IN THE CONTRACT DOCUMENTS AND NOT ON THE ELECTRICAL

DRAWINGS. THE ARCHITECT IS AVAILABLE TO ASSIST IN COORDINATING THESE

ITEMS.

12.SHOULD CONFLICT OCCUR IN OR BETWEEN DRAWINGS(S) AND OR

SPECIFICATION(S) OR SHOULD CONFLICTING INFORMATION BE FOUND THEREIN,

THE CONTRACTOR WILL BE DEEMED TO HAVE ESTIMATED ON THE MORE

EXPENSIVE WAY OF DOING THE WORK INVOLVED UNLESS HE SHALL HAVE

ASKED FOR AND OBTAINED THE WRITTEN DECISION OF THE ARCHITECT,

BEFORE SUBMISSION OF HIS BID, AS TO METHOD, MATERIALS, OR EQUIPMENT

REQUIRED.

13.CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUBCONTRACTORS WITH

COMPLETE DOCUMENTS INDICATING ALL REQUIREMENTS OF THEIR TRADE.

14.SMOKING SHALL NOT BE ALLOWED IN ANY OF THE BUILDINGS FOR THE ENTIRE

PROJECT.

15.THE LOCATION(S) OF CONTRACTOR(S) JOB TRAILERS, TEMPORARY OFFICES,

STORAGE CONTAINERS, LAY-DOWN AREAS, ETC. MUST BE APPROVED BY THE

OWNER PRIOR TO STARTING CONSTRUCTION.

STD STANDARD

KPL KICKPLATE

TREAD

SQUARE

SHEAR WALL

TROWELED CONTROL JOINT

SUSPENDED

TEMPERED (GLASS)

TO BE DETERMINED

TOWEL BAR

STORAGE

STRUCTURAL

TERRA COTTA

TYPICAL

TRANSOM

UNLESS NOTED OTHERWISE

UNDERCUT

TOILET PAPER HOLDER

VANITY BASE WIDTH

VAPOR BARRIER

TELEVISION OUTLET

VANITY BASE

VERTICAL

TOP OF WINDOW

TOP OF MASONRY

TOP OF FOUNDATION

THRESHOLD

TOP OF CONCRETE

TELEPHONE

THICK(NESS)

UNFINISHED

TONGUE & GROOVE

WINDOW

WIDE OR WASHING MACHINE

WIDE FLANGE

WALK-IN CLOSET

WATER HEATER

WATERPROOF

WATER RESISTANT

WAINSCOT

WALL TO WALL

WALL HUNG

WATER CLOSET

WELDED WIRE MESH

WROUGHT IRON

WATER SOFTENER

WITH OR WITHOUT

VINYL COMPOSITION TILE

VEGTABLE SINK

VINYL(SHEET)

N.G.V.D. NAT. GEODETIC VERTICAL DATOM

OA

OBS

O.C.

OH

OPT

OSB

O.G.D.

O.D.

OHC

OPNG

O

OVERHEAD GARAGE DOOR

ORIENTED STRAND BOARD

OPTIONAL

OVERHEAD CABINET

OUTSIDE DIAMETER

ON CENTER

OBSCURE (GLASS)

OVERHEAD

OVERALL

OPENING

W.S.

WWM

W.T.W.

WSCT

WF

WH

W.H.

WI

WP

WIN

W/ W/O

W.R.

WIC

K/S

MH

MIN

MM

MT

MMB

M.O.

MISC

MLD

MTL

MOD

MIR

MRB

N.I.C.

N/A

N.T.S.

NOM

MULL

NL

N

MOUNTED(ING)

NAILABLE

NOT TO SCALE

NOT APPLICABLE

NOT IN CONTRACT

MULLION OR MULLED

MARBLE

METAL

NOMINAL

MANHOLE

MODULAR

MOULDING

MISCELLANEOUS

MASONRY OPENING

MMB MEMBRANE

MILLIMETER

MINIMUM

MIRROR

VB

V

W

VERT

V.B.

VB#

WC

W

V.S.

V.C.T.

VIN

U

TV

TP

TR

T.O.W.

UC

UNF

TYP

U.N.O.

KNEE SPACE

TC

TEMP.

T.C.J.

THK

TEL

T.O.C.

THR

T.O.F.

T.O.M.

T&G

T

STR

STL

STOR

SQ

T

T.B.

T.B.D.

SUS

S.W.

RAILING

SIMILAR

SECTION

SHEATHING

SCHEDULE

ROD AND SHELF(S)

SMOKE DETECTOR

SQUARE FEET

SINGLE HUNG OR SHELF

SLIDING GLASS DOOR

(DRAWING) SHEET

REINFORCED JUNCTION BOX

RANGE W/ MICROWAVE

ROUGH OPENING

RIGHT OF WAY

SOLID CORE

SAFETY GLASS

ROOFING

SPACER

SIDELIGHT OR SLEEVE

SEALANT

STAINLESS STEEL

SPEAKER

SPECIFICATIONS

SKYLIGHT

G

BGA

G.B.

GD

GFI

GL

HB

G.I.

GT

G.D.O.

GL.BK.

G.C.

HD

HT

HR

H.D.

H.M.

HDW

H.R.

HORZ

H.C.

HDR

I.M.

HVAC

HWD

HTG

I.L.O.

INS / INSUL

HS

KD

KO

KIT

JST

INT

CABINET

C

CAB

CLOSET OR CENTER LINE

CALK(ING) CAULK(ING)

CATCH BASIN

CAST-IN-PLACE CONC.

CIRCUMFERENCE

CUBIC FOOT

CONTROL JOINT

CLEAR(ANCE)

CENTIMETER(S)

CONCRETE MASONRY UNIT

CLOSURE OR CLOSER

CK

CL

CLG

CM

CLS

CMU

CLR

CEILING

CHAM

CIRC

C.I.P. CONC.

CEM

C.B.

C.J.

CF

C.I.

CIR

CER

CEMENT

CHAMFER

CIRCLE

CERAMIC

CAST IRON

JT

J

K

I.B.

I.D.

I

36" WIDE BASE CAB.

BI-FOLD (DOOR)

BI-PASS (DOOR)

BLOCK (CMUs)

BITUMINOUS

BENCH MARK

BOTH SIDES

BOTH WAYS

BP

BSMT

BTWN

BRK

BRG

B.W.

BVL

B.S.

BOT

BEARING

BRICK

BEVELED

BOTTOM

BETWEEN

BASEMENT

BLKG

BLDG

BLKG

BD

B36

BM

B.M.

BIT.

BLK

BF

BOARD

BUILDING

BEAM

BLOCKING

BLOCKING

H

H

R.O.W.

HORIZONTAL

HEATING/VENTILATING/AIR COND.

INSULATED(TION)

INSULATED METAL

KNOCKOUT

KNOCKDOWN

JOINT

KITCHEN

JOIST

INTERIOR

HARDWOOD

INSIDE DIAMETER

HORIZONTAL SLIDER

HALF ROUND

IRONING BOARD

IN LIEU OF

HOUR

HEATING

SIM

SHT

SHTHG

SL

SPEC

SPK

S.ST.

SNT

SPC

SKL

S

SC

R&S

SH

S.F.

SD

SF.GL.

SEC

S.G.D.

SCH

GROUND FAULT INTERRUPTER

HEAT DETECTOR OR HEAVY DUTY

HOSE BIBB

HOLLOW CORE

HARDWARE

HOLLOW METAL

HEAD OR HARD

HIGH

HEADER

HEIGHT

GLASS BLOCK

GALVANIZED IRON

GYPSUM BOARD

GENERAL CONTRACTOR

GLASS OR GLAZING

GARAGE DOOR OPENER

GRADE OR GRADING

GAUGE

GROUT

RWL

RLG

R.O.

R&M

R.J.B.

RFG

FS

FUR

FTG

A

A/C AIR CONDITIONING

AIR HANDLING UNIT

ACCESS PANEL

ALTERNATE

AGGREGATE

ADJUSTABLE

ABOVE FINISH FLOOR

AREA DRAIN

ACOUSTICAL TILE (CLG)

ASPHALT TILE

APPROXIMATE

AUTOMATIC

ARCHITECT(URAL)

ALT

ALUM

ARCH.

ASPH

AUTO.

AWNG

A.P.

A.T.

AVG

APX

ALUMINUM

AVERAGE

AWNING

ASPHALT

ACC

AGG

A.H.U.

AC.T.

AFF

A.D.

ADD

ADH

ADJ

ACCESS

ADHESIVE

ADDENDUM

ANCHOR BOLT

ABV

A.B.

ABOVE

FULL SIZE

FURRED(ING)

FOOTING

ROOF WATER LEADER

F.V. FIELD VERIFY

E

ELECTRIC WATER COOLER

ELECTRIC(AL)

ELECTRICAL PANEL

EACH FACE

EXPANSION JOINT

EXT EXTERIOR

E.W.C.

ELEC

E.J.

EL

E.F.

EQ

E.P.

EXH

EXG

EST ESTIMATE

EXISTING

EXHAUST

EQUAL

ELEVATION

DAMP-PROOFING

DRAWER STACK

DRYER MACHINE

DOWNSPOUT

DRINKING FOUNTAIN

DEAD LOAD

DOUBLE HUNG

DEPRESSED

DISH WASHER

DRY

DWG

DS

D/S

EA

DW

EB

DWR

DTL

D.T.

DETAIL

DRAWING

DRAWER

EYEBROW

EACH

DRAIN TILE

DIAM

D.F.

DEP

DET

DN

DR

DIM

D.L.

D.P.

DH

DETAIL

DOWN

DOOR

DIMENSION

DIAMETER

CORRUGATED

CERAMIC TILE

CONNEXTION

CENTER OR COUNTER

CONTRACTOR

CAST STONE

CUBIC YARD

DECORATIVE

DRYER, OR DRAIN

DEMOLISH, DEMOLITION

C.ST.

DECO

CX

C.T.

CTR

D

CY

D

DEM

DBL

12"D 12" DEEP

DOUBLE

CONTR

CSMT

C OR CPT

CORR

CPR

CRS

CARPET

COPPER

CASEMENT

COURSE(S)

F.D.

F.B.

F.B.O.

FAS

F.E.

F

FURNISHED BY OTHERS

FIRE EXTINGUISHER

FLOOR DRAIN

FASTEN(ER)

FACE BRICK

DESIGN TEAM CONTACTS

OWNER : ARMORY COMMISSION OF ALABAMA

MONTGOMERY, ALABAMA

CFMO POINT OF CONTACT

ERIC HOLT

FACILITY MOBILE ARMY AVIATION

ADDRESS: SUPPORT FACILITY (AASF) #3

9055 TANNER WILLIAMS ROAD

MOBILE, AL 36615

CONC CONCRETE

(AC) CONDENSER

CONTINUOUS

CONSTRUCTIONCONST

COND

CONT

CASED OPENING

COMBINATIONCOMB

COL

C.O.

COLUMN

F.G.

FN

FIN

F.F.

FGL

FLUR

FND

FLR

F.O.

FLG

FP

FR

FP

FPHB

FENCE

FOUNDATION

FIRE PROOF

FIREPLACE

FIRE PROOF HOSE BIBB

FACE OF

FRAME

FLASHING

FLOURESCENT

FIBERGLASS

FINISH FLOOR

FIXED GLASS

FLOOR

FINISH

L.L.

L.T.

L.P.

LVL

L.B.O.

LAV

LTL

LIV

LAM.

MC

MATL

MECH

MFR.

MAS

MAX

LVR

M

M

LT

L

MECHANICAL

MANUFACTURER

LAUNDRY TUB

VENNER LUMBER

MATERIAL

MASONRY

MEDICINE CABINET

LINTEL

METER(S)

MAXIMUM

LOUVER

LAMINATE(D)

LAVATORY

LOCATION BY OTHERS

LIVE LOAD

LAMINATED PLASTIC

LIGHT

LIVING

RADIUS

RUBBLE

RISER

ROOF DRAIN

REQUIRED

RESILIENT

REFRIGERATOR

REVISION, REVISED

QUARRY TILE

RETURN AIR

RUBBER BASE

REINFORCED(ING)

REQ

REV

RES

REINF

Q

R

Q.T.

R

R.B.

R/A

RBL

REF

RAD

R.D.

ABBREVIATIONS

DOOR MARK

WINDOW MARK

ROOM FINISH MARK

LOUVER MARK

DETAIL

INTERIOR

ELEVATION

SECTION

MARKER

BRACKET MOUNTED

FIRE EXTINGUISHER

LARGE SCALE PLAN OR

DETAIL ENLARGEMENT

FINISH FLOOR

ELEVATION

FINISH GRADE

ELEVATION

BEARING

ELEVATION

DETAIL NO.

DWG. NO.

ELEV. NO.

DWG. NO.

SECT. NO.

DWG. NO.

B.F.E.

F.F.=

F.E.C.

ARCHITECTURAL SYMBOLS

FIRE EXTINGUISHER

CABINET

PLATE

PARALLEL

PERIMETER

PEDESTAL (SINK)

PARTICLE BOARD

PLASTER

PLASTIC LAMINATE

PARKING

PORCELAIN ENAMEL

PRECAST CONCRETE

P

P.BD.

P.E.

PCC.

PL

PERI

PLAS

P.LAM.

PKG

PED

PAR

PAIR

PAINT

PANEL

POUNDS PER SQUARE FOOT

PREFABRICATED

PAVE(D) OR PAVING

PLYWOOD

PARTITION

PRESSURE TREATED

POLYVINYL CHLORIDE (PIPE)

PAVEMENT

POUNDS PER SQUARE INCH

PSF

PREFAB

PR

PV

PVMT

PVC

PWD

PTN

P.T.

PSI

PNL

PNT

PORCELAIN TILEP. TILE

STEEL

INDEX OF DRAWINGSSEQ.

NO.

DWG. NO SHEET TITLE

1 T1.1COVER, INDEX, LEGENDS, & NOTES

BID ITEM A - HANGAR BUILDING

2 BI.A/A1.1

HANGAR FLOOR PLAN

3 BI.A/A2.1

HANGAR EXTERIOR ELEVATIONS

4 BI.A/A3.1

HANGAR REFLECTED CEILING PLAN

5 BI.A/A4.1

HANGAR ROOF PLAN

6 BI.A/A5.1

HANGAR DETAILS

7 BI.A/A5.2

HANGAR DETAILS

8 BI.A/MP1.1

HANGAR HVAC & PLUMBING ROOF PLAN

BID ITEM B - OPERATIONS BUILDING

9 BI.B/A1.1

OPERATIONS BUILDING FLOOR PLAN

10 BI.B/A2.1

OPERATIONS BUILDING EXTERIOR ELEVATIONS

11 BI.B/A3.1

OPERATIONS BUILDING REFLECTED CEILING PLAN

12 BI.B/A4.1

OPERATIONS BUILDING ROOF PLAN

13 BI.B/MP1.1

OPERATIONS BUILDING HVAC & PLUMBING ROOF PLAN

16.CONTRACTOR SHALL PROTECT TO THE GREATEST EXTENT POSSIBLE EXISTING

ITEMS TO REMAIN FROM DAMAGE THROUGHOUT THE ENTIRE DURATION OF THE

PROJECT.

17.THE CONTRACTOR SHALL VERIFY ON THE SITE ALL EQUIPMENT LOCATIONS

AND EXISTING CONDITIONS. NOTIFY THE ARCHITECT PROMPTLY, IN WRITING, IN

THE EVENT OF ANY DISCREPANCIES.

18.THE CONTRACTOR IS REQUIRED TO REVIEW THE ENTIRE SET OF CONTRACT

DOCUMENTS TO NOTE AREAS OF WORK AND COORDINATE DEMOLITION

REQUIREMENTS WITH ALL TRADES.

19.THE CONTRACTOR SHALL MAINTAIN SAFE WORKSITE CONDITIONS AND

METHODS OF EGRESS AND CIRCULATION DURING ENTIRE PROJECT.

20. DISCONNECT ALL UTILITIES AS INDICATED ON PLANS AND PER DEMOLITION

NOTES .

21. OWNER WILL NOT RETAIN SALVAGEABLE MATERIAL. SUCH MATERIAL SHALL BE

RECYCLED AT THE DISCRETION OF THE GENERAL CONTRACTOR AND

INCORPORATED INTO BASE BID.

ARCHITECT: JMR+H ARCHITECTURE, P.C.

445 DEXTER AVENUE

SUITE 5050

MONTGOMERY, AL 36104

T: (334) 420-5672

F: (334) 420-5692

CONTACT: MIKE RUTLAND, AIA

ROBERT GARRIS, AIA

*

SITE

ORDER OF BID ITEMS

BID ITEM - A: COMPLETE INSTALLATION OF ROOFING & REPAIRS TO BUILDING

ENVELOPE OF THE HANGAR BUILDING AT AASF#3 PER THE

DRAWINGS & SPECIFICATIONS

ALTERNATE A1: COMPLETE INSTALLATION OF VERTICALLY MOUNTED PRE-FINISHED

METAL WALL PANELS AT THE HANGAR BUILDING OF AASF#3 ON THE

EAST AND WEST SIDES ONLY PER THE DRAWINGS &

SPECIFICATIONS

BID ITEM - B: COMPLETE INSTALLATION OF ROOFING & REPAIRS TO THE

OPERATIONS BUILDING @ AASF#3 PER DRAWINGS &

SPECIFICATIONS.

PLUMBING &

MECHANICAL:WHORTON ENGINEERING, INC.

25 SUMMERALL GATE ROAD,

BLDG. 2120

ANNISTON, AL 36205

COVER, INDEX,

LEGENDS, &

NOTES

T1.1

1

Project Number:

OF

Sheet Description

Revisions:

Date:

Sheet Number

DOCUMENTS

445 Dexter Avenue

Suite 5050

Montgomery, Al 36104

Phone: (334) 420-5672

Fax: (334) 420-5692

JMR+H

A r c h i t e c t u r e , P C

PR

IN

TE

D: 8

/5

/2

02

1 @

1

:3

4P

MF

IL

E N

AM

E: W

:\JM

RH

P

ro

je

cts 2

02

1\2

1-1

08

9 M

ob

ile

A

AS

F #

3 A

ct o

f N

atu

re

(A

oN

) R

ep

airs\T

1.1

T

IT

LE

S

HE

ET

.d

wg

S TAT E OF A LABAMA

REG I S T ERED ARCH I T ECT

J.MICHAELRUTLAND

2149

TIMOTHY R.HOLMES

3188

13

MOBILE ALABAMA

MOBILE AASF #3

ACT of NATURE

(AoN) REPAIRS

IFB#: AC-21-B-0025-S

21-1089

4 AUGUST 2021

CONSTRUCTION

AutoCAD SHX Text
A
AutoCAD SHX Text
A2.1
AutoCAD SHX Text
A
AutoCAD SHX Text
10
AutoCAD SHX Text
205
AutoCAD SHX Text
A

DOOR POCKET

STORAGE

CORRIDOR

CRASH

RESCUE VEHICLE

COMPONENT

CLEANING

AREA

ARMAMENT

SUBSYSTEM

SHOP

ARMS

VAULT

MECH/ ELEC.

ROOM

CORRIDOR

NIGHT VISION

SHOP

JANITOR

NICAD

BATTERY

ROOM

ELECTRICAL

SHOP

FLOAT

SHOP

DOOR POCKET

STORAGE

DOOR POCKET

STORAGE

DOOR POCKET

STORAGE

PROP &

ROTOR SHOP

MECH/ ELECT.

EQUIPMENT

ENGINE INSPECTION

& REPAIR

HYDRAULICS

SHOP

NON-DESTRUCTIVE

INSPECTION

CORRIDOR

SUPPLY TECH.

SUPERVISOR

REPAIR PARTS/

SPECIAL TOOLS

LOADING

DOCK

MENS

TOILET

MENS

SHOWER

MENS

LOCKER

BREAK

ROOM

CORRIDOR

CO

RR

ID

OR

JAN.

WOMENS

TLT./ SHWR

WOMENS

LOCKERSMECH.

ELECT.

TECHNICAL

PUBLICATIONS

FIRE EQUIP.

PUMP ROOM

FAC. MAINT.

STORAGE

RCAS SUPPORT/

AUTOMATION

CLERK

CORRIDOR

A/C MECH.

SUPERVISOR

MAINT.

TEST PILOT

ENTRY

LOBBY

PRODUCTION

CONTROLLER

SCALE:3/32"=1'-0"

HANGAR FLOOR PLAN

N

1

2

3

4

HANGAR

BAY

ACCESSORY

EQUIPMENT

101

FLAMMABLE STORAGE/

BULK STORAGE

105

PAINT

SHOP

106

SUPER. MAINT.

TEST PILOT

102

AVIONICS &

INSTRUMENT

SHOP

103

WELDING

SHOP

104

1

2

22

2 2

1

2

1

1

1

1

1

2

1

2

1

2

1

3

2

5

4

1

2

2

1

1

2

2

A

6

A

SCALE:

A

A1.1

3"=1'-0"

ALTERNATE HEAD DETAIL EAST & WEST SIDES ONLY

SCALE:

B

A1.1

3"=1'-0"

ALTERNATE SILL DETAIL EAST & WEST SIDES ONLY

EXISTING METAL PANEL TO

REMAIN

NEW 2" PRE-FINISHED

INSULATED METAL WALL

PANELS

EXISTING METAL FRAMING

TO REMAIN

PRE-FINISHED METAL

FLASHING

NEW 2" PRE-FINISHED

INSULATED METAL WALL

PANELS

PRE-FINISHED METAL

FLASHING

EXISTING METAL PANEL TO

REMAIN

EXISTING WINDOW TO REMAIN

SEALANT

EXISTING METAL PANEL TO

REMAIN

NEW 2" PRE-FINISHED

INSULATED METAL WALL

PANELS

EXISTING METAL FRAMING

TO REMAIN

EXISTING WINDOW TO REMAIN

PRE-FINISHED METAL

FLASHING/TRIM

EXISTING METAL

FLASHING/TRIM

HANGAR

FLOOR PLAN

BI.A/A1.1

2

Project Number:

OF

Sheet Description

Revisions:

Date:

Sheet Number

DOCUMENTS

445 Dexter Avenue

Suite 5050

Montgomery, Al 36104

Phone: (334) 420-5672

Fax: (334) 420-5692

JMR+H

A r c h i t e c t u r e , P C

PR

IN

TE

D: 8

/4

/2

02

1 @

1

1:4

0A

MF

IL

E N

AM

E: W

:\JM

RH

P

ro

je

cts 2

02

1\2

1-1

08

9 M

ob

ile

A

AS

F #

3 A

ct o

f N

atu

re

(A

oN

) R

ep

airs\B

I.A

A

1.1

H

an

ga

r F

lo

or P

la

n.d

wg

S TAT E OF A LABAMA

REG I S T ERED ARCH I T ECT

J.MICHAELRUTLAND

2149

TIMOTHY R.HOLMES

3188

13

MOBILE ALABAMA

MOBILE AASF #3

ACT of NATURE

(AoN) REPAIRS

IFB#: AC-21-B-0025-S

21-1089

4 AUGUST 2021

CONSTRUCTION

WORK SCHEDULE

1. SCRAPE, WIRE BRUSH, CLEAN, REMOVE ALL RUST AND

SCALE FROM EXISTING STEEL DECKING AND

STRUCTURAL STEEL SUPPORT MEMBERS, PREP AND

PRIME THESE ITEMS AND APPLY NEW PAINT FINISH TO

MATCH SURROUNDING AREA.

2. SCRAPE, CLEAN, REMOVE ALL RUST AND STAINS

FROM EXISTING MASONRY WALL IN THIS AREA. PREP

AND PRIME MASONRY AND APPLY NEW PAINT FINISH

TO ENTIRE WALL TO MATCH SURROUNDING AREA.

3. CLEAN AND PREPARE ALL EXISTING EXTERIOR METAL

WALL PANELS TO RECEIVE NEW ELASTOMERIC

COATING PER THE DETAILS AND SPECIFICATIONS.

4. INSTALL NEW INFILL, SUPPORTING ITEMS, FLASHINGS,

ROOFING MEMBRANE, ETC. IN ACCORDANCE WITH

NEW DETAILS WHERE PORTIONS OF EXISTING METAL

WALL PANEL AND ASSOCIATED FLASHINGS HAVE BEEN

REMOVED. PROTECT TEMPORARY OPENING FROM

MOISTURE INTRUSION FOR THE DURATION OF THE

PROJECT.

5. PRESSURE WASH AND CLEAN EXISTING ALUMINUM

CANOPY.

PLAN LEGEND

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS AND DIMENSIONS PRIOR TO BEGINNING

ANY WORK. NOTIFY A/E OF ANY DISCREPANCIES FOUND

PRIOR TO ORDERING MATERIALS AND BEGINNING ANY

WORK.

2. AT ALL EXTERIOR METAL WALL PANELS - CLEAN,

RE-SEAL, AND APPLY NEW ELASTOMERIC COATING - SEE

DETAILS AND SPECIFICATIONS.

3. ALL AREAS AFFECTED BY DEMOLITION OR

CONSTRUCTION ACTIVITIES NOT INDICATED TO RECEIVE

NEW FINISHES ARE TO BE PATCHED & REPAIRED TO

MATCH ADJACENT SURFACES.

4. DIMENSIONS SHOWN ARE TO THE FACE OF STUD OR

MASONRY WALL UNLESS OTHERWISE NOTED.

5. REFER TO PLANS, DETAILS, SECTIONS, AND SCHEDULES

FOR FURTHER CLARIFICATION OF INTERIOR FINISHES.

6. REFER TO REFLECTED CEILING PLAN (RCP) FOR

SPECIFIC CEILING TYPE(S) AND HEIGHTS.

7. ALL PAINT, ELASTOMERIC, AND FINISH COLORS MUST BE

APPROVED BY THE OWNER AND ARCHITECT PRIOR TO

BEGINNING INSTALLATION.

GENERAL WORK NOTES

DETAIL KEY

ROOM FINISH MARK

2

WORK NOTE MARK

A

ROOF WORK NOTE MARK.

SEE ROOF PLAN

1PHOTO KEY

ROOF WORK SCHEDULE

A CLEAN AND PREPARE ALL EXISTING METAL ROOFING PANELS

AND INSTALL NEW SINGLE-PLY MEMBRANE ROOFING SYSTEM

PER THE DETAILS AND SPECIFICATIONS

B INFILL EXISTING OPENING IN ROOF WHERE MECHANICAL UNIT

WAS REMOVED. SEE DETAILS.

C RELOCATE EXISTING MECHANICAL UNIT AND CURB. EXTEND

CURB PER THE DETAILS. SEE MECHANICAL DRAWINGS.

D FURNISH AND INSTALL NEW ALUMINUM HOUSING TO MATCH

EXISTING FOR MECHANICAL EXHAUST FAN.

E REMOVE AND DISCARD EXISTING METAL GUTTER,

DOWNSPOUTS AND CONCRETE SPLASH BLOCKS. FURNISH

AND INSTALL NEW PRE-FINISHED GUTTERS AND

DOWNSPOUTS. NEW DOWNSPOUTS SHALL ALIGN WITH

EXISTING ALUMINUM CANOPY COLUMNS AND RUN DOWN TOP

OF CANOPY AND DOWN COLUMNS. FURNISH AND INSTALL

NEW CONCRETE SPLASH BLOCKS AT ALL DOWNSPOUTS.

F TEMPORARILY REMOVE EXISTING MECHANICAL UNIT AND

EXTEND EXISTING THROUGH NEW ROOFING PER DETAILS AND

SPECIFICATIONS.

G PRESSURE WASH AND CLEAN EXISTING ALUMINUM CANOPY.

H REMOVE AND DISCARD EXISTING RAKE TRIM AND REPLACE

WITH NEW P.T. WOOD FASCIA BLOCKING. SEE DETAILS.

J REMOVE EXISTING CAPPED OFF ROOF CURB. PATCH EXISTING

OPENING AND INSTALL NEW ROOFING SYSTEM. SEE DETAILS.

AutoCAD SHX Text
EWC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
PAINT BOOTH
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
205
AutoCAD SHX Text
A
AutoCAD SHX Text
A2.1

SCALE:

EAST ELEVATION

1/8"=1'-0"

E

E E E E E

G

E

E

GG G G

E

E

A A

A

A

AA

3

3

3

3

3

3

3

3

3

3

33

3

4

3

4

3

4

3

4

3

4

3

4

3

4

3

4

3

4

3

4

E E E E

EE

A1.1

A

ALT. TYP

A1.1

B

ALT. TYP

A5.1

B-1

ALT. TYP

TPO MEMBRANE. SEE

SPECS AND DETAILS

TPO MEMBRANE. SEE

SPECS AND DETAILS

SCALE:

NORTH ELEVATION

1/8"=1'-0"

E

E

E

E

E

3 3

3

3

3

3

3 3 3 3

3

3

4

3

4

A5.2

N

A5.1

C

A5.1

G

A5.1

G

A5.1

D,E

TPO MEMBRANE. SEE

SPECS AND DETAILS

TPO MEMBRANE. SEE

SPECS AND DETAILS

TPO MEMBRANE. SEE

SPECS AND DETAILS

SCALE:

WEST ELEVATION

1/8"=1'-0"

E E E E E

EEEE

E

E

E

E

E

A

A A

A

A

3

3

3

3

3

3

3

3

3

3

3 3

3

4

3

4

3

4

3

4

3

4

3

4

3

4

3

4

3

4

A5.1

B

A5.1

A

A5.2

H

A1.1

A

ALT. TYP

A1.1

B

ALT. TYP

A5.1

B-1

ALT. TYP

TPO MEMBRANE. SEE

SPECS AND DETAILS

TPO MEMBRANE. SEE

SPECS AND DETAILS

SCALE:

SOUTH ELEVATION

1/8"=1'-0"

E

E

E

E

3 3

33

3

33

3 3

3

3

3

4

3

4

A5.2

N

A5.1

G

A5.1

G

A5.1

C

TPO MEMBRANE. SEE

SPECS AND DETAILS

TPO MEMBRANE. SEE

SPECS AND DETAILS

TPO MEMBRANE. SEE

SPECS AND DETAILS HANGAR

EXTERIOR

ELEVATIONS

BI.A/A2.1

3

Project Number:

OF

Sheet Description

Revisions:

Date:

Sheet Number

DOCUMENTS

445 Dexter Avenue

Suite 5050

Montgomery, Al 36104

Phone: (334) 420-5672

Fax: (334) 420-5692

JMR+H

A r c h i t e c t u r e , P C

PR

IN

TE

D: 8

/4

/2

02

1 @

1

:1

5P

MF

IL

E N

AM

E: W

:\JM

RH

P

ro

je

cts 2

02

1\2

1-1

08

9 M

ob

ile

A

AS

F #

3 A

ct o

f N

atu

re

(A

oN

) R

ep

airs\B

I.A

A

2.1

H

an

ga

r E

le

va

tio

ns.d

wg

S TAT E OF A LABAMA

REG I S T ERED ARCH I T ECT

J.MICHAELRUTLAND

2149

TIMOTHY R.HOLMES

3188

13

MOBILE ALABAMA

MOBILE AASF #3

ACT of NATURE

(AoN) REPAIRS

IFB#: AC-21-B-0025-S

21-1089

4 AUGUST 2021

CONSTRUCTION

WORK SCHEDULE

1. SCRAPE, WIRE BRUSH, CLEAN, REMOVE ALL RUST AND

SCALE FROM EXISTING STEEL DECKING AND

STRUCTURAL STEEL SUPPORT MEMBERS, PREP AND

PRIME THESE ITEMS AND APPLY NEW PAINT FINISH TO

MATCH SURROUNDING AREA.

2. SCRAPE, CLEAN, REMOVE ALL RUST AND STAINS

FROM EXISTING MASONRY WALL IN THIS AREA. PREP

AND PRIME MASONRY AND APPLY NEW PAINT FINISH

TO ENTIRE WALL TO MATCH SURROUNDING AREA.

3. CLEAN AND PREPARE ALL EXISTING EXTERIOR METAL

WALL PANELS TO RECEIVE NEW ELASTOMERIC

COATING PER THE DETAILS AND SPECIFICATIONS.

4. INSTALL NEW INFILL, SUPPORTING ITEMS, FLASHINGS,

ROOFING MEMBRANE, ETC. IN ACCORDANCE WITH

NEW DETAILS WHERE PORTIONS OF EXISTING METAL

WALL PANEL AND ASSOCIATED FLASHINGS HAVE BEEN

REMOVED. PROTECT TEMPORARY OPENING FROM

MOISTURE INTRUSION FOR THE DURATION OF THE

PROJECT.

5. PRESSURE WASH AND CLEAN EXISTING ALUMINUM

CANOPY.

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS AND DIMENSIONS PRIOR TO BEGINNING

ANY WORK. NOTIFY A/E OF ANY DISCREPANCIES FOUND

PRIOR TO ORDERING MATERIALS AND BEGINNING ANY

WORK.

2. AT ALL EXTERIOR METAL WALL PANELS - CLEAN,

RE-SEAL, AND APPLY NEW ELASTOMERIC COATING - SEE

DETAILS AND SPECIFICATIONS.

3. ALL AREAS AFFECTED BY DEMOLITION OR

CONSTRUCTION ACTIVITIES NOT INDICATED TO RECEIVE

NEW FINISHES ARE TO BE PATCHED & REPAIRED TO

MATCH ADJACENT SURFACES.

4. DIMENSIONS SHOWN ARE TO THE FACE OF STUD OR

MASONRY WALL UNLESS OTHERWISE NOTED.

5. REFER TO PLANS, DETAILS, SECTIONS, AND SCHEDULES

FOR FURTHER CLARIFICATION OF INTERIOR FINISHES.

6. REFER TO REFLECTED CEILING PLAN (RCP) FOR

SPECIFIC CEILING TYPE(S) AND HEIGHTS.

7. ALL PAINT, ELASTOMERIC, AND FINISH COLORS MUST BE

APPROVED BY THE OWNER AND ARCHITECT PRIOR TO

BEGINNING INSTALLATION.

GENERAL WORK NOTES

EXISTING TO REMAIN

1

DENOTES DEMOLITION WORK

SCHEDULE NOTE KEY

EXISTING TO BE REMOVED

GENERAL DEMOLITION NOTES

DEMOLITION LEGEND

DEMOLITION SCHEDULE

1. REMOVE AND DISCARD EXISTING STAINED / DAMAGED

CEILING TILES FROM THIS AREA. FURNISH AND INSTALL NEW

CEILING TILES TO MATCH EXISTING. SEE REFLECTED

CEILING PLAN.

2. REMOVE EXISTING ABANDONED MECHANICAL UNIT ROOFING

CURB AND PREPARE THE OPENING TO BE INFILLED PER THE

DETAILS. SEE ROOF PLAN

3. SAWCUT AND REMOVE THIS PORTION OF EXISTING METAL

WALL PANEL AND ASSOCIATED FLASHING. PROTECT

TEMPORARY OPENING FROM MOISTURE INTRUSION FOR

THE DURATION OF THE PROJECT. INSTALL NEW INFILL,

SUPPORTING ITEMS, FLASHINGS, ROOFING MEMBRANE, ETC.

IN ACCORDANCE WITH NEW DETAILS. SEE ELEVATIONS

1. THE CONTRACTOR AND ALL SUB-CONTRACTORS SHALL MAKE A

DETAILED INVESTIGATION OF THE SITE PRIOR TO STARTING WORK

TO ENSURE THAT THE FULL SCOPE FOR THE DEMOLITION IS

DOCUMENTED. THE ELEMENTS OUTLINED AND IDENTIFIED ON THE

DEMOLITION DRAWINGS (ALL DISCIPLINES) ARE GENERAL IN NATURE

& ARE NOT INTENDED TO ESTABLISH OR IMPLY THE COMPLETE

DEMOLITION SCOPE. ALL NECESSARY PROCEDURES, TECHNIQUES,

MATERIALS AND PRODUCTS TO COMPLETE ALL DEMOLITION

REQUIRED TO ACCOMMODATE ALL NEW CONSTRUCTION SHALL BE A

PART OF THIS CONTRACT. ALL MECHANICAL, PLUMBING &

ELECTRICAL DEMOLITION SHALL BE INCLUDED IN THEIR RESPECTIVE

SCOPE OR AS COORDINATED FOR COMPLETION BY THE

CONTRACTOR IN THE GENERAL PROJECT SCOPE.

2. GENERAL CONTRACTOR SHALL DISPOSE OF AND OR SALVAGE ALL

EXISTING DEMOLISHED MATERIALS, EQUIPMENT, FIXTURES, ETC.

CONTRACTOR SHALL BE RESPONSIBLE FOR THE FINAL DISPOSITION

OF ANY DEMOLISHED, SALVAGED ITEM. NO ITEM IS TO REMAIN ON

THE SITE. ANY AND ALL DEMOLISHED OR SALVAGED ITEMS

REQUIRING SENSITIVE DISPOSAL SHALL BE THE RESPONSIBILITY OF

THE CONTRACTOR. FINAL VERIFICATION WITH OWNERS

REPRESENTATIVE AT PRE-BID CONFERENCE PRIOR TO REMOVAL AS

TO WHICH MIGHT BE REQUIRED TO BE SALVAGED TO OWNER.

3. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PATCHING AND

REPAIR OF ANY FINISHES OR BUILDING COMPONENTS INCLUDING

BUT NOT LIMITED TO WALLS, CEILINGS, TRIM, FLOORS ETC. DAMAGED

BY THE CONTRACTOR OR HIS SUBS DURING THE PROCESS OF THE

WORK. THE CONTRACTOR AND HIS SUBCONTRACTORS SHALL

BECOME FULLY AWARE OF THE SCOPE OF DEMOLITION AND ITS

EFFECT ON BUILDING SYSTEMS TO REMAIN OR TO BE CONSTRUCTED

SO AS TO ANTICIPATE ANY PATCHING OR REPAIR REQUIRED TO

COMPLETE THE PROJECT AS OUTLINED IN THE CONSTRUCTION

DOCUMENTS.

4. A DEMOLITION/ CUTTING/ PATCHING PRE-WORK CONFERENCE WILL

BE HELD TO ENSURE THAT ALL DEMOLITION / CUTTING IS

COORDINATED TO ENSURE ALL TRADES MAINTAIN THE INTEGRITY OF

THE EXISTING STRUCTURE AND REPORT TO AND CONSULT WITH THE

ARCHITECT IF ANY DEMOLITION PROCESS APPEARS THAT IT MIGHT

NEGATIVELY AFFECT THE INTEGRITY OF THE EXISTING STRUCTURE.

5. GENERAL CONTRACTOR SHALL BE AWARE THE EXISTING BUILDING IS

TO REMAIN OCCUPIED DURING CONSTRUCTION. IT SHALL BE THE

RESPONSIBILITY OF THE GENERAL CONTRACTOR TO PROTECT ALL

EXISTING MATERIALS AND FINISHES THAT ARE TO REMAIN INCLUDING

BUILDING CONTENTS. MAINTAIN EXISTING BUILDING IN A WEATHER

TIGHT CONDITION AT ALL TIMES. INSURE ALL BUILDING REQUIRED

EXITS ARE PROTECTED AND REMAIN CLEAN AT ALL TIMES.

CONTRACTOR WILL FURNISH OVERHEAD PROTECTION AS REQUIRED.

ROOF WORK SCHEDULE

A CLEAN AND PREPARE ALL EXISTING METAL ROOFING PANELS

AND INSTALL NEW SINGLE-PLY MEMBRANE ROOFING SYSTEM

PER THE DETAILS AND SPECIFICATIONS

B INFILL EXISTING OPENING IN ROOF WHERE MECHANICAL UNIT

WAS REMOVED. SEE DETAILS.

C RELOCATE EXISTING MECHANICAL UNIT AND CURB. EXTEND

CURB PER THE DETAILS. SEE MECHANICAL DRAWINGS.

D FURNISH AND INSTALL NEW ALUMINUM HOUSING TO MATCH

EXISTING FOR MECHANICAL EXHAUST FAN.

E REMOVE AND DISCARD EXISTING METAL GUTTER,

DOWNSPOUTS AND CONCRETE SPLASH BLOCKS. FURNISH

AND INSTALL NEW PRE-FINISHED GUTTERS AND

DOWNSPOUTS. NEW DOWNSPOUTS SHALL ALIGN WITH

EXISTING ALUMINUM CANOPY COLUMNS AND RUN DOWN TOP

OF CANOPY AND DOWN COLUMNS. FURNISH AND INSTALL

NEW CONCRETE SPLASH BLOCKS AT ALL DOWNSPOUTS.

F TEMPORARILY REMOVE EXISTING MECHANICAL UNIT AND

EXTEND EXISTING THROUGH NEW ROOFING PER DETAILS AND

SPECIFICATIONS.

G PRESSURE WASH AND CLEAN EXISTING ALUMINUM CANOPY.

H REMOVE AND DISCARD EXISTING RAKE TRIM AND REPLACE

WITH NEW P.T. WOOD FASCIA BLOCKING. SEE DETAILS.

J REMOVE EXISTING CAPPED OFF ROOF CURB. PATCH EXISTING

OPENING AND INSTALL NEW ROOFING SYSTEM. SEE DETAILS.

DOOR POCKET

STORAGE

CORRIDOR

CRASH

RESCUE VEHICLE

COMPONENT

CLEANING

AREA

ARMAMENT

SUBSYSTEM

SHOP

ARMS

VAULT

MECH/ ELEC.

ROOM

CORRIDOR

NIGHT VISION

SHOP

JANITOR

NICAD

BATTERY

ROOM

ELECTRICAL

SHOP

FLOAT

SHOP

DOOR POCKET

STORAGE

DOOR POCKET

STORAGE

DOOR POCKET

STORAGE

PROP &

ROTOR SHOP

MECH/ ELECT.

EQUIPMENT

ENGINE INSPECTION

& REPAIR

HYDRAULICS

SHOP

NON-DESTRUCTIVE

INSPECTION

CORRIDOR

SUPPLY TECH.

SUPERVISOR

REPAIR PARTS/

SPECIAL TOOLS

LOADING

DOCK

MENS

TOILET

MENS

SHOWER

MENS

LOCKER

BREAK

ROOM

CORRIDOR

CO

RR

ID

OR

JAN.

WOMENS

TLT./ SHWR

WOMENS

LOCKERS

MECH.

ELECT.

TECHNICAL

PUBLICATIONS

FIRE EQUIP.

PUMP ROOM

FAC. MAINT.

STORAGE

RCAS SUPPORT/

AUTOMATION

CLERK

CORRIDOR

A/C MECH.

SUPERVISOR

MAINT.

TEST PILOT

ENTRY

LOBBY

PRODUCTION

CONTROLLER

HANGAR

BAY

ACCESSORY

EQUIPMENT

101

FLAMMABLE STORAGE/

BULK STORAGE

105

PAINT

SHOP

106

SUPER. MAINT.

TEST PILOT

102

AVIONICS &

INSTRUMENT

SHOP

103

WELDING

SHOP

104

1

1

1

1

1

1111 1

SCALE:

HANGAR REFLECTED CEILING PLAN

1/8"=1'-0"

5

HANGAR

REFLECTED

CEILING PLAN

BI.A/A3.1

4

Project Number:

OF

Sheet Description

Revisions:

Date:

Sheet Number

DOCUMENTS

445 Dexter Avenue

Suite 5050

Montgomery, Al 36104

Phone: (334) 420-5672

Fax: (334) 420-5692

JMR+H

A r c h i t e c t u r e , P C

PR

IN

TE

D: 8

/3

/2

02

1 @

3

:4

8P

MF

IL

E N

AM

E: W

:\JM

RH

P

ro

je

cts 2

02

1\2

1-1

08

9 M

ob

ile

A

AS

F #

3 A

ct o

f N

atu

re

(A

oN

) R

ep

airs\B

I.A

A

3.1

H

an

ga

r R

CP

.d

wg

S TAT E OF A LABAMA

REG I S T ERED ARCH I T ECT

J.MICHAELRUTLAND

2149

TIMOTHY R.HOLMES

3188

13

MOBILE ALABAMA

MOBILE AASF #3

ACT of NATURE

(AoN) REPAIRS

IFB#: AC-21-B-0025-S

21-1089

4 AUGUST 2021

CONSTRUCTION

WORK SCHEDULE

1. SCRAPE, WIRE BRUSH, CLEAN, REMOVE ALL RUST AND

SCALE FROM EXISTING STEEL DECKING AND

STRUCTURAL STEEL SUPPORT MEMBERS, PREP AND

PRIME THESE ITEMS AND APPLY NEW PAINT FINISH TO

MATCH SURROUNDING AREA.

2. SCRAPE, CLEAN, REMOVE ALL RUST AND STAINS

FROM EXISTING MASONRY WALL IN THIS AREA. PREP

AND PRIME MASONRY AND APPLY NEW PAINT FINISH

TO ENTIRE WALL TO MATCH SURROUNDING AREA.

3. CLEAN AND PREPARE ALL EXISTING EXTERIOR METAL

WALL PANELS TO RECEIVE NEW ELASTOMERIC

COATING PER THE DETAILS AND SPECIFICATIONS.

4. INSTALL NEW INFILL, SUPPORTING ITEMS, FLASHINGS,

ROOFING MEMBRANE, ETC. IN ACCORDANCE WITH

NEW DETAILS WHERE PORTIONS OF EXISTING METAL

WALL PANEL AND ASSOCIATED FLASHINGS HAVE BEEN

REMOVED. PROTECT TEMPORARY OPENING FROM

MOISTURE INTRUSION FOR THE DURATION OF THE

PROJECT.

5. PRESSURE WASH AND CLEAN EXISTING ALUMINUM

CANOPY.

PLAN LEGEND

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS AND DIMENSIONS PRIOR TO BEGINNING

ANY WORK. NOTIFY A/E OF ANY DISCREPANCIES FOUND

PRIOR TO ORDERING MATERIALS AND BEGINNING ANY

WORK.

2. AT ALL EXTERIOR METAL WALL PANELS - CLEAN,

RE-SEAL, AND APPLY NEW ELASTOMERIC COATING - SEE

DETAILS AND SPECIFICATIONS.

3. ALL AREAS AFFECTED BY DEMOLITION OR

CONSTRUCTION ACTIVITIES NOT INDICATED TO RECEIVE

NEW FINISHES ARE TO BE PATCHED & REPAIRED TO

MATCH ADJACENT SURFACES.

4. DIMENSIONS SHOWN ARE TO THE FACE OF STUD OR

MASONRY WALL UNLESS OTHERWISE NOTED.

5. REFER TO PLANS, DETAILS, SECTIONS, AND SCHEDULES

FOR FURTHER CLARIFICATION OF INTERIOR FINISHES.

6. REFER TO REFLECTED CEILING PLAN (RCP) FOR

SPECIFIC CEILING TYPE(S) AND HEIGHTS.

7. ALL PAINT, ELASTOMERIC, AND FINISH COLORS MUST BE

APPROVED BY THE OWNER AND ARCHITECT PRIOR TO

BEGINNING INSTALLATION.

GENERAL WORK NOTES

DETAIL KEY

ROOM FINISH MARK

2

WORK NOTE MARK

A

ROOF WORK NOTE MARK.

SEE ROOF PLAN

1PHOTO KEY

DEMOLITION SCHEDULE

1. REMOVE AND DISCARD EXISTING STAINED / DAMAGED

CEILING TILES FROM THIS AREA. FURNISH AND INSTALL NEW

CEILING TILES TO MATCH EXISTING. SEE REFLECTED

CEILING PLAN.

2. REMOVE EXISTING ABANDONED MECHANICAL UNIT ROOFING

CURB AND PREPARE THE OPENING TO BE INFILLED PER THE

DETAILS. SEE ROOF PLAN

3. SAWCUT AND REMOVE THIS PORTION OF EXISTING METAL

WALL PANEL AND ASSOCIATED FLASHING. PROTECT

TEMPORARY OPENING FROM MOISTURE INTRUSION FOR

THE DURATION OF THE PROJECT. INSTALL NEW INFILL,

SUPPORTING ITEMS, FLASHINGS, ROOFING MEMBRANE, ETC.

IN ACCORDANCE WITH NEW DETAILS. SEE ELEVATIONS

EXISTING ACOUSTICAL

CEILING TO REMAIN

DAMAGED CEILING TILE

TO BE REMOVED AND

REPLACED

EXISTING STEEL

DECKING / STEEL

SUPPORT MEMBERS

PAINTED

AutoCAD SHX Text
205
AutoCAD SHX Text
A
AutoCAD SHX Text
A2.1

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLO

PE

SLO

PE

SLOPE

SLOPE

SLOPE

SLOPE

SCALE:

HANGAR ROOF PLAN

1/8"=1'-0"

G

G

J

J

J

F

J

F

F

J

F

F

F

F

F

F

F

F

F

F

F

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

AAA

A A A

J

C

C

C

2

D

D

HH

H

H

H

H

H

HH

H

H

H

H

H

5

6

A5.1

C

A5.1

G

A5.1

A

A5.1

B

A5.1

D,E

A5.1

D,E

A5.1

F

A5.1

B

A5.1

A

A5.2

N

C

F

A5.1

E

LOW

E

E

E

A5.1

E

LOW

A5.1

E

LOW

A5.1

E

LOW

A5.1

D

HIGH

J

A5.2

M

TYP.

A5.2

M

TYP.

A5.2

M

TYP.

HIGH

A5.2

H

LOW

A5.2

H

LOW

HIGH

A5.1

G

HIGH

A5.1

C

HIGH

A5.1

C

A5.1

G

A5.1

E

LOW HIGH

A5.1

G

HIGH

A5.1

C

A5.1

D,E

A5.2

N

K

K

K

K

K

K

K

K

HANGAR ROOF

PLAN

BI.A/A4.1

5

Project Number:

OF

Sheet Description

Revisions:

Date:

Sheet Number

DOCUMENTS

445 Dexter Avenue

Suite 5050

Montgomery, Al 36104

Phone: (334) 420-5672

Fax: (334) 420-5692

JMR+H

A r c h i t e c t u r e , P C

PR

IN

TE

D: 8

/4

/2

02

1 @

2

:4

5P

MF

IL

E N

AM

E: W

:\JM

RH

P

ro

je

cts 2

02

1\2

1-1

08

9 M

ob

ile

A

AS

F #

3 A

ct o

f N

atu

re

(A

oN

) R

ep

airs\B

I.A

A

4.1

H

an

ga

r R

oo

f P

la

n.d

wg

S TAT E OF A LABAMA

REG I S T ERED ARCH I T ECT

J.MICHAELRUTLAND

2149

TIMOTHY R.HOLMES

3188

13

MOBILE ALABAMA

MOBILE AASF #3

ACT of NATURE

(AoN) REPAIRS

IFB#: AC-21-B-0025-S

21-1089

4 AUGUST 2021

CONSTRUCTION

GENERAL ROOFING NOTES

DETAIL KEY

A

ROOF WORK NOTE MARK

1PHOTO KEY

PLAN LEGEND

ROOF WORK SCHEDULE

A CLEAN AND PREPARE ALL EXISTING METAL ROOFING PANELS

AND INSTALL NEW SINGLE-PLY MEMBRANE ROOFING SYSTEM

PER THE DETAILS AND SPECIFICATIONS

B INFILL EXISTING OPENING IN ROOF WHERE MECHANICAL UNIT

WAS REMOVED. SEE DETAILS.

C RELOCATE EXISTING MECHANICAL UNIT AND CURB. EXTEND

CURB PER THE DETAILS. SEE MECHANICAL DRAWINGS.

D FURNISH AND INSTALL NEW ALUMINUM HOUSING TO MATCH

EXISTING FOR MECHANICAL EXHAUST FAN.

E REMOVE AND DISCARD EXISTING METAL GUTTER,

DOWNSPOUTS AND CONCRETE SPLASH BLOCKS. FURNISH

AND INSTALL NEW PRE-FINISHED GUTTERS AND

DOWNSPOUTS. NEW DOWNSPOUTS SHALL ALIGN WITH

EXISTING ALUMINUM CANOPY COLUMNS AND RUN DOWN TOP

OF CANOPY AND DOWN COLUMNS. FURNISH AND INSTALL

NEW CONCRETE SPLASH BLOCKS AT ALL DOWNSPOUTS.

F TEMPORARILY REMOVE EXISTING MECHANICAL UNIT AND

EXTEND EXISTING THROUGH NEW ROOFING PER DETAILS AND

SPECIFICATIONS.

G PRESSURE WASH AND CLEAN EXISTING ALUMINUM CANOPY.

H REMOVE AND DISCARD EXISTING RAKE TRIM AND REPLACE

WITH NEW P.T. WOOD FASCIA BLOCKING. SEE DETAILS.

J REMOVE EXISTING CAPPED OFF ROOF CURB. PATCH EXISTING

OPENING AND INSTALL NEW ROOFING SYSTEM. SEE DETAILS.

K GC TO REMOVE AND REINSTALL THE LIGHTNING PROTECTION

SYSTEM ON THE ROOF AND ALSO ANY OTHER

CABLES/SYSTEMS THAT ARE PENETRATING THE ROOF.

1. INSTALL NEW MECHANICALLY ATTACHED FLUTE FILLER

INSULATION, COVER BOARD, AND SINGLE PLY PVC ROOFING

MEMBRANE (SEE SPECIFICATIONS), AND ASSOCIATED METAL

FLASHING COMPONENTS OVER THE EXISTING ROOFING

SYSTEM. (DUE TO THE LOCATION OF THE FACILITY AND THE

NECESSITY FOR HIGH WIND RESISTANT ATTACHMENT A

"RHINO-BOND" OR SIMILAR SYSTEM FOR THERMALLY

ATTACHING THE NEW ROOF MEMBRANE TO THE FASTENER

PLATES THEREBY RESULTING IN THE DIRECT ATTACHMENT

OF THE MEMBRANE TO THE STRUCTURAL ROOF DECK

SYSTEM.

2. INSTALL NEW THRU-WALL COUNTER FLASHINGS AND

NECESSARY FRAMING AT ALONG THE BOTTOM OF THE

EXISTING METAL WALL PANELS.

3. REPLACE ALL EXISTING GUTTERS AND DOWNSPOUTS WITH

PRE-FINISHED METAL. GUTTERS SHALL UTILIZE A PROFILE

THAT ALLOWS FOR THE PROPER OVERFLOW OF THE

GUTTERS DURING EXTREME RAINFALL EVENTS.

4. REMOVE ANY ABANDONED ROOF CURBS AND RELOCATE ANY

CURBS / PENETRATIONS AWAY FROM VERTICAL WALL

PANELS.

5. INSTALL NEW FLEXIBLE TAPE / FABRIC AT ALL VERTICAL

JOINTS OF EXISTING WALL PANELS AND INSTALL NEW

ELASTOMERIC COATING OVER ALL METAL WALL PANELS.

DEMOLITION SCHEDULE

1. REMOVE AND DISCARD EXISTING STAINED / DAMAGED

CEILING TILES FROM THIS AREA. FURNISH AND INSTALL NEW

CEILING TILES TO MATCH EXISTING. SEE REFLECTED

CEILING PLAN.

2. REMOVE EXISTING ABANDONED MECHANICAL UNIT ROOFING

CURB AND PREPARE THE OPENING TO BE INFILLED PER THE

DETAILS. SEE ROOF PLAN

3. SAWCUT AND REMOVE THIS PORTION OF EXISTING METAL

WALL PANEL AND ASSOCIATED FLASHING. PROTECT

TEMPORARY OPENING FROM MOISTURE INTRUSION FOR

THE DURATION OF THE PROJECT. INSTALL NEW INFILL,

SUPPORTING ITEMS, FLASHINGS, ROOFING MEMBRANE, ETC.

IN ACCORDANCE WITH NEW DETAILS. SEE ELEVATIONS

AutoCAD SHX Text
A
AutoCAD SHX Text
A2.1

DETAILS

BI.A/A5.1

6

Project Number:

OF

Sheet Description

Revisions:

Date:

Sheet Number

DOCUMENTS

445 Dexter Avenue

Suite 5050

Montgomery, Al 36104

Phone: (334) 420-5672

Fax: (334) 420-5692

JMR+H

A r c h i t e c t u r e , P C

PR

IN

TE

D: 8

/4

/2

02

1 @

9

:4

5A

MF

IL

E N

AM

E: W

:\JM

RH

P

ro

je

cts 2

02

1\2

1-1

08

9 M

ob

ile

A

AS

F #

3 A

ct o

f N

atu

re

(A

oN

) R

ep

airs\B

I.A

A

5.1

D

eta

ils.d

wg

S TA T E OF A LABAMA

REG I S T ERED ARCH I T ECT

J.MICHAELRUTLAND

2149

TIMOTHY R.HOLMES

3188

13

MOBILE ALABAMA

MOBILE AASF #3

ACT of NATURE

(AoN) REPAIRS

IFB#: AC-21-B-0025-S

21-1089

4 AUGUST 2021

CONSTRUCTION

3

5

8

" METAL

STUDS @

16" O.C.

3

5

8

" METAL STUDS

CONTINUOUS BOX

BEAM

3

5

8

" METAL STUDS

CONTINUOUS BOX

BEAM

NEW MECHANICALLY

ATTACHED FLUTE-FILLER

RIGID INSULATION BOARD

NEW COVER

BOARD

NEW MECHANICALLY

ATTACHED SINGLE-PLY

MEMBRANE ROOFING

SYSTEM - SEE SPECS.

CLEAN & SEAL ALL EXTERIOR

METAL WALL PANELS &

APPLY NEW ELASTOMERIC

COATING WITH FABRIC

REINFORCEMENT.

SAWCUT EXISTING METAL

WALL PANELS TO A MINIMUM

OF 12" ABOVE NEW ROOFLINE

& INSTALL NEW PRE-FINISHED

METAL CLOSURE FLASHING

AT BOTTOM OF PANEL

MECHANICALLY ATTACHED

SINGLE-PLY MEMBRANE

ROOF FLASHING WITH

TERMINATION BAR

3

4

" CDX PLYWOOD

SCALE:

C

A5.13"=1'-0"

RAKE AT BRICK

NEW COVERBOARD

NEW MECHANICALLY

ATTACHED

FLUTE-FILLER RIGID

INSULATION BOARD

NEW MECHANICALLY

ATTACHED SINGLE-PLY

MEMBRANE ROOFING

SYSTEM - SEE

SPECIFICATIONS

SCALE:

A

A5.13"=1'-0"

EAVE AT BRICK

SCALE:

E

A5.13"=1'-0"

DETAIL

SCALE:

D

A5.13"=1'-0"

RAKE AT METAL PANEL

SCALE:

B

A5.13"=1'-0"

EAVE AT METAL PANEL

10

12

EXISTING METAL

ROOFING SYSTEM

NEW

5

8

" MINIMUM

COVER BOARD

NEW MECHANICALLY

ATTACHED

FLUTE-FILLER RIGID

INSULATION BOARD

NEW MECHANICALLY

ATTACHED SINGLE-PLY

MEMBRANE ROOFING

SYSTEM - SEE

SPECIFICATIONS

EXISTING RIDGE CAP

TO BE DEMOLISHED

SCALE:

F

A5.13"=1'-0"

RIDGE DETAIL

CLEAN AND SEAL ALL

EXTERIOR METAL WALL

PANELS & APPLY

ELASTOMERIC COATING

CLEAN AND SEAL ALL

EXTERIOR METAL WALL

PANELS & APPLY

ELASTOMERIC COATING

INSULATED METAL PANELS

TO REMAIN

NEW

5

8

" MINIMUM COVER BOARD

NEW MECHANICALLY ATTACHED

SINGLE-PLY MEMBRANE ROOFING

SYSTEM - SEE SPECIFICATIONS

NEW PRE-FINISHED

METAL GUTTER

NEW PRE-FINISHED

METAL DOWNSPOUT

NEW 2x8 FRT. WOOD FASCIA

BLOCKING WRAPPED IN PRE-

FINISHED BREAK METAL

SCALE:

G

A5.13"=1'-0"

RIDGE DETAIL

NEW 2X6 P.T. WOOD BLOCKING

NEW

1

2

" CDX BOARD

SLOPE

EXISTING METAL STUD FRAMING

NEW 2x6 FRT. NAILERS

NEW PRE-FINISHED METAL

FLASHING

EXISTING BRICK

VENEER

EXISTING CMU WALL

EXISTING STANDING

SEAM METAL ROOF

EXISTING

INSULATION

EXISTING METAL

ROOF DECK

SAWCUT AND REMOVE

STANDING SEAM METAL

ROOF AS NEEDED TO

ACCOMMODATE NEW

CONSTRUCTION

NEW COVERBOARD

NEW MECHANICALLY

ATTACHED

FLUTE-FILLER RIGID

INSULATION BOARD

NEW MECHANICALLY

ATTACHED SINGLE-PLY

MEMBRANE ROOFING

SYSTEM - SEE

SPECIFICATIONS

NEW 2x8 FRT. WOOD FASCIA

BLOCKING WRAPPED IN PRE-

FINISHED BREAK METAL

NEW 2x6 FRT. NAILERS

NEW PRE-FINISHED METAL

FLASHING

EXISTING BRICK

VENEER

EXISTING CMU WALL

EXISTING STANDING

SEAM METAL ROOF

EXISTING

INSULATION

EXISTING METAL

ROOF DECK

SAWCUT AND REMOVE

STANDING SEAM METAL

ROOF AS NEEDED TO

ACCOMMODATE NEW

CONSTRUCTION

SEALANT

NEW COVERBOARD

NEW MECHANICALLY

ATTACHED

FLUTE-FILLER RIGID

INSULATION BOARD

NEW MECHANICALLY

ATTACHED SINGLE-PLY

MEMBRANE ROOFING

SYSTEM - SEE

SPECIFICATIONS

NEW PRE-FINISHED

METAL GUTTER

NEW 2x8 FRT. WOOD FASCIA

BLOCKING WRAPPED IN PRE-

FINISHED BREAK METAL

NEW 2x6 FRT. NAILERS

NEW PRE-FINISHED METAL

FLASHING

EXISTING METAL

BUILDING EAVE STRUT

EXISTING STANDING

SEAM METAL ROOF

EXISTING

INSULATION

EXISTING METAL

ROOF DECK

SAWCUT AND REMOVE

STANDING SEAM METAL

ROOF AS NEEDED TO

ACCOMMODATE NEW

CONSTRUCTION

EXISTING METAL

BUILDING FRAME

CLEAN & SEAL ALL EXTERIOR METAL WALL

PANELS & APPLY NEW ELASTOMERIC

COATING WITH FABRIC REINFORCEMENT.

SAWCUT EXISTING METAL

PANEL TO ACCOMMODATE

NEW BLOCKING FOR ROOF

NEW COVERBOARD

NEW MECHANICALLY

ATTACHED

FLUTE-FILLER RIGID

INSULATION BOARD

NEW MECHANICALLY

ATTACHED SINGLE-PLY

MEMBRANE ROOFING

SYSTEM - SEE

SPECIFICATIONS

NEW 2x8 FRT. WOOD FASCIA

BLOCKING WRAPPED IN PRE-

FINISHED BREAK METAL

NEW 2x6 FRT.

NAILERS

NEW PRE-FINISHED

METAL FLASHING

EXISTING STANDING

SEAM METAL ROOF

EXISTING

INSULATION

EXISTING METAL

ROOF DECK

SAWCUT AND REMOVE

STANDING SEAM METAL

ROOF AS NEEDED TO

ACCOMMODATE NEW

CONSTRUCTION

EXISTING CMU WALL

CLEAN & SEAL ALL EXTERIOR

METAL WALL PANELS &

APPLY NEW ELASTOMERIC

COATING WITH FABRIC

REINFORCEMENT.

SAWCUT EXISTING METAL

PANEL TO ACCOMMODATE

NEW BLOCKING FOR ROOF

EXISTING ROOF

INSULATION

LINE OF EXISTING METAL

PANEL TO REMAIN

2x6 FRT. WOOD

FASCIA WRAPPED

IN PRE-FINISHED

BREAK METAL W/

CONT. CLEAT

SCALE:

B-1

A5.13"=1'-0"

ALTERNATE EAVE DETAIL

NEW COVERBOARD

NEW MECHANICALLY

ATTACHED

FLUTE-FILLER RIGID

INSULATION BOARD

NEW MECHANICALLY

ATTACHED SINGLE-PLY

MEMBRANE ROOFING

SYSTEM - SEE

SPECIFICATIONS

NEW PRE-

FINISHED METAL

GUTTER

NEW 2x8 FRT. WD.

FASCIA BLOCKING

WRAPPED IN PRE-

FINISHED BREAK

METAL

NEW 2x6 FRT.

NAILERS

NEW PRE-FINISHED

METAL FLASHING

EXISTING METAL

BUILDING EAVE STRUT

EXISTING STANDING

SEAM METAL ROOF

EXISTING METAL

ROOF DECK

SAWCUT AND REMOVE

STANDING SEAM METAL

ROOF AS NEEDED TO

ACCOMMODATE NEW

CONSTRUCTION

EXISTING METAL

BUILDING FRAME

EXISTING METAL PANEL TO REMAIN

SAWCUT EXISTING METAL

PANEL TO ACCOMMODATE

NEW BLOCKING FOR ROOF

NEW 2" PRE-FINISHED INSULATED

METAL WALL PANELS

NEW 2x FRT. WOOD

BLOCKING

EXISTING

INSULATION

SCALE:

D-1

A5.13"=1'-0"

ALTERNATE RAKE DETAIL

NEW COVERBOARD

NEW MECHANICALLY

ATTACHED

FLUTE-FILLER RIGID

INSULATION BOARD

NEW MECHANICALLY

ATTACHED SINGLE-PLY

MEMBRANE ROOFING

SYSTEM - SEE

SPECIFICATIONS

NEW 2x8 FRT. WOOD

FASCIA BLOCKING

WRAPPED IN PRE-

FINISHED BREAK

METAL

NEW 2x6 FRT.

NAILERS

NEW PRE-FINISHED

METAL FLASHING

EXISTING STANDING

SEAM METAL ROOF

EXISTING

INSULATION

EXISTING METAL

ROOF DECK

EXISTING CMU WALL

EXISTING METAL PANEL TO

REMAIN

SAWCUT EXISTING

METAL PANEL TO

ACCOMMODATE NEW

BLOCKING FOR ROOF

NEW 2" PRE-FINISHED

INSULATED METAL WALL

PANELS

NOTE: NO SURFACE

MOUNTED FLASHING

REGLET WILL BE

ALLOWED IN LIEU OF

THIS DETAIL.

EAST & WEST

SIDES ONLY

EAST & WEST

SIDES ONLY

5

1

2

"

4'-4

" +

/-

9

3

4

"

PRE-FINISHED

BREAK METAL

W/ CONT. CLEAT

DETAILS

BI.A/A5.2

7

Project Number:

OF

Sheet Description

Revisions:

Date:

Sheet Number

DOCUMENTS

445 Dexter Avenue

Suite 5050

Montgomery, Al 36104

Phone: (334) 420-5672

Fax: (334) 420-5692

JMR+H

A r c h i t e c t u r e , P C

PR

IN

TE

D: 8

/4

/2

02

1 @

9

:4

6A

MF

IL

E N

AM

E: W

:\JM

RH

P

ro

je

cts 2

02

1\2

1-1

08

9 M

ob

ile

A

AS

F #

3 A

ct o

f N

atu

re

(A

oN

) R

ep

airs\B

I.A

A

5.1

D

eta

ils.d

wg

S TA T E OF A LABAMA

REG I S T ERED ARCH I T ECT

J.MICHAELRUTLAND

2149

TIMOTHY R.HOLMES

3188

13

MOBILE ALABAMA

MOBILE AASF #3

ACT of NATURE

(AoN) REPAIRS

IFB#: AC-21-B-0025-S

21-1089

4 AUGUST 2021

CONSTRUCTION

SCALE:

H

A5.2

3"=1'-0"

DETAIL

NEW

5

8

" MINIMUM COVER BOARD

NEW MECHANICALLY ATTACHED

SINGLE-PLY MEMBRANE ROOFING

SYSTEM - SEE SPECIFICATIONS

SAWCUT EXISTING METAL WALL

PANELS TO A MINIMUM OF 12" ABOVE

NEW ROOFLINE & INSTALL NEW

PRE-FINISHED METAL CLOSURE

FLASHING AT BOTTOM OF PANEL

MECHANICALLY ATTACHED

SINGLE-PLY MEMBRANE ROOF

FLASHING WITH TERMINATION BAR

3

4

" PRESSURE TREATED PLYWOOD

3

5

8

" METAL STUDS

CONTINUOUS BOX BEAM

NEW MECHANICALLY

ATTACHED FLUTE-FILLER

RIGID INSULATION BOARD

EXISTING STANDING

SEAM METAL ROOF

ASSEMBLY

SCALE:

J

A5.2

VTR DETAIL / OVERFLOW DRAIN

3" = 1'-0"

NOTES:

1. WHEN USING TPO MEMBRANE, BONDING

ADHESIVE IS NOT REQUIRED WHEN THE

FLASHING HEIGHT IS 12" OR LESS AND THE

MEMBRANE IS FASTENED "AS SHOWN" ON TOP

OF THE CURB. WHEN TERMINATION BAR IS

USED BENEATH THE COUNTER-FLASHING,

BONDING ADHESIVE CAN BE ELIMINATED WHEN

THE MEMBRANE HEIGHT IS 18" OR LESS.

2. APPLICABLE BONDING ADHESIVE FOR PVC OR

TPO. IN CASE OF TPO, GRIP ADHESIVE MAY

ALSO BE USED ON VERTICAL PORTION.

3. WHEN MECHANICAL FASTENERS ARE USED TO

PENETRATE THE METAL COUNTER-FLASHING,

USE EPDM WASHERS, APPLY WATER CUT-OFF

MASTIC UNDER THE COUNTER-FLASHING OR

CAULK THE FASTENER HEADS.

4. APPROXIMATELY 1/8" DIAMETER BEAD OF CUT

EDGE SEALANT IS REQUIRED ON CUT EDGES OF

REINFORCED TPO MEMBRANE AND

RECOMMENDED ON CUT EDGES OF PVC

MEMBRANE.

5. REFER TO SPECIFICATIONS FOR ACCEPTABLE

FASTENERS AND PLATES.

6. MECHANICAL SECUREMENT MAY BE INSTALLED

INTO THE VERTICAL SUBSTRATE.

7. WHEN USING 60 MIL THICK CURB FLASHING,

THE INTERSECTIONS BETWEEN SPLICES MUST

OVERLAID WITH A THERMOPLASTIC COVER.

USE ONE CONTINUOUS

SHEET OF REINFORCED

THERMOPLASTIC MEMBRANE

TO WRAP AROUND CURB.

INSTALL

OUTSIDE

CORNERS

PER DETAIL

F/A9.1

THERMOPLASTIC

REINFORCED

MEMBRANE

FASTENER & SEAM

FASTENING PLATE,

MAX. 12" O.C.

5

CUT EDGE

SEALANT

HOT AIR WELD,

1-1/2" MIN.

4

6

METAL CAP OR

COUNTER-FLASHING

MAXIMUM 12"

O.C. FASTENER

SPACING

3

T-JOINT

COVER

7

APPLICABLE

BONDING

ADHESIVE

XX

XX

FASTENER & SEAM

FASTENING PLATE,

MAX. 12" O.C.

HOT AIR-WELD, 1-1/2"

MIN. BEYOND

FASTENING PLATES

THERMOPLASTIC

PRE-MOLDED PIPE

FLASHING

WATER CUT

OFF MASTIC

XX

XX

STAINLESS STEEL

CLAMPING RING

NOTES:

1. TEMPERATURE OF THE PIPE PENETRATION

MUST NOT EXCEED 140°F (60°C) WHEN USING

PVC AND 160°F (71°C) WHEN USING TPO

FLASHING.

2. PIPE SEAL MUST HAVE INTACT RIB AT TOP

EDGE, REGARDLESS OF PIPE DIAMETER.

3. INSTALL A MINIMUM OF 4 FASTENERS AND

PLATES AROUND THE PIPE, EQUALLY SPACED.

IF FASTENERS AND PLATES CANNOT BE

INSTALLED AS SHOWN, THEY MAY ALSO BE

POSITIONED OUTSIDE THE PIPE MAXIMUM 12"

(305mm) O.C. AND FLASHED WITH

THERMOPLASTIC REINFORCED

MEMBRANE/CUT-EDGE SEALANT.

4. FASTENERS AND PLATES ARE NOT REQUIRED

ON ADHERED SYSTEMS UNLESS PIPE DIAMETER

EXCEEDS 18" (457mm).

5. OVER FLOW DRAINS FLUSH WITH THE ROOF

WILL HAVE DRAIN FLASHING AS REQUIRED PER

THE ROOFING MANUFACTURER OVER FLOW

DRAINS ABOVE THE ROOF LINE WILL HAVE A

SMALL BOOT SET AS DETAILED ABOVE.

4 5

3

6

3/4" TO 8"

CO

LD

P

IP

E

THERMOPLASTIC

REINFORCED

MEMBRANE

PRE-MOLDED

OUTSIDE

CORNER

1

FASTENER & SEAM

FASTENING PLATE,

MAX. 12" O.C.

2

3

NOTES:

1. POSITION FASTENING PLATES 6" FROM THE CORNER AND 1/2" TO 1"

FROM EDGE OF MEMBRANE.

2. APPROXIMATELY 1/8" DIAMETER BEAD OF CUT EDGE SEALANT IS

REQUIRED ON CUT EDGES OF REINFORCED TPO MEMBRANE AND

RECOMMENDED ON CUT EDGES OF PVC MEMBRANE.

3. REFER TO SPECIFICATIONS FOR ACCEPTABLE FASTENERS AND

PLATES.

PRE-MOLDED OUTSIDE

CORNER BEFORE

INSTALLATION

5

8

" PRIMED COVER BOARD W/

TAPERED POLYISO INSULATION

5

8

" PRIMED COVER BOARD

W/ TAPERED POLYISO

INSULATION W/ FOAM

ADHESIVE

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

SEALANT

SCALE:

K

A5.2

CURB DETAIL

3" = 1'-0"

SCALE:

L

A5.2

CORNER DETAIL

3" = 1'-0"

EXISTING METAL WALL PANEL

SCALE:

M

A5.2

DETAIL @ ROOF INFILL

3" = 1'-0"

NEW

5

8

" MINIMUM COVER BOARD

NEW MECHANICALLY ATTACHED

SINGLE-PLY MEMBRANE ROOFING

SYSTEM - SEE SPECIFICATIONS

NEW MECHANICALLY

ATTACHED FLUTE-FILLER

RIGID INSULATION BOARD

NEW POLY-ISO INSULATION

TO MATCH EXISTING

NEW STEEL DECKING TO

MATCH EXISTING. PAINT

TO MATCH

NEW STEEL ANGLE. PAINT

EXISTING STEEL ANGLE

FRAMES

EXISTING ROOF DECKING

EXISTING ROOF

INSULATION

EXISTING METAL ROOFING

W/ FLUE FILLER

INSULATION

EXISTING STRUCTURE,

ROOFING & DECK

INFILL FORMER

MECH. CURB

PRE-FINISHED METAL FLASHING

INSULATED METAL PANELS

TO REMAIN

NEW

5

8

" MINIMUM COVER BOARD

NEW MECHANICALLY ATTACHED

SINGLE-PLY MEMBRANE ROOFING

SYSTEM - SEE SPECIFICATIONS

INSULATED METAL

PANELS TO REMAIN

NEW

5

8

" MINIMUM

COVER BOARD

NEW MECHANICALLY ATTACHED

SINGLE-PLY MEMBRANE ROOFING

SYSTEM - SEE SPECIFICATIONS

10

12

2x6 FRT. WOOD

FASCIA WRAPPED

IN PRE-FINISHED

BREAK METAL W/

CONT. CLEAT

PRE-FINISHED

BREAK METAL

W/ CONT. CLEAT

NEW COVERBOARD

NEW MECHANICALLY

ATTACHED

FLUTE-FILLER RIGID

INSULATION BOARD

NEW MECHANICALLY

ATTACHED SINGLE-PLY

MEMBRANE ROOFING

SYSTEM - SEE

SPECIFICATIONS

NEW 2x8 FRT. WOOD FASCIA

BLOCKING WRAPPED IN PRE-

FINISHED BREAK METAL

NEW 2x6 FRT.

NAILERS

NEW PRE-FINISHED

METAL FLASHING

EXISTING STANDING

SEAM METAL ROOF

EXISTING

INSULATION

EXISTING METAL

ROOF DECK

SAWCUT AND REMOVE

STANDING SEAM METAL

ROOF AS NEEDED TO

ACCOMMODATE NEW

CONSTRUCTION

SAWCUT EXISTING METAL

PANEL TO ACCOMMODATE

NEW BLOCKING FOR ROOF

CLEAN & SEAL ALL

EXTERIOR METAL

WALL PANELS & APPLY

NEW ELASTOMERIC

COATING WITH FABRIC

REINFORCEMENT.

SCALE:

N

A5.2

DETAIL @ GABLE RAKE

3" = 1'-0"

NOTE: NO SURFACE

MOUNTED FLASHING

REGLET WILL BE

ALLOWED IN LIEU OF

THIS DETAIL.

NEW METAL STUDS, BACK OF

PLYWOOD, ETC. TO BE PAINTED TO

MATCH ADJACENT WALL SURFACES

9

1

4

"

VA

RIE

S

HVAC INSTALLATION NOTES

RELIEF VENT SCHEDULE

HVAC & PLUMBING DRAWING INDEX

HVAC NOTES

PLUMBING RENOVATION NOTES

PLUMBING NOTES

PLUMBING ROOF PLAN

EXISTING CONDITIONS DRAWING IS FOR REFERENCE

PURPOSES ONLY. DEMOLITION IS SHOWN. OTHER NOTES ON

PLANS APPLY TO PREVIOUS PROJECTS AND DO NOT REPRESENT

NEW WORK EXCEPT AS SHOWN ON REVISED PLANS. FIELD VERIFY

ALL EXISTING CONDITIONS PRIOR TO BEGINNING ANY WORK.

S TA T E OF A LABAMA

REG I S T ERED ARCH I T ECT

J.MICHAELRUTLAND

2149

TIMOTHY R.HOLMES

3188

Project Number:

Sheet Description

Revisions:

Date:

Sheet Number

OF

445 Dexter Avenue

Suite 5050

Montgomery, Al 36104

Phone: (334) 420-5672

Fax: (334) 420-5692

JMR+H

A r c h i t e c t u r e , P C

21-1089

13

4 AUGUST 2021

DOCUMENTS

CONSTRUCTION

WHORTON ENGINEERING, INC.

MOBILE, ALABAMA

MOBILE AASF #3

ACT of NATURE

(AoN) REPAIRS

IFB#: AC-21-B-0025-S

BI.A/MP1.1

HANGAR HVAC

& PLUMBING

ROOF PLAN

8

HANGAR HVAC &

AutoCAD SHX Text
1
AutoCAD SHX Text
OSA
AutoCAD SHX Text
4
AutoCAD SHX Text
EF
AutoCAD SHX Text
2
AutoCAD SHX Text
OSA
AutoCAD SHX Text
1
AutoCAD SHX Text
MUA
AutoCAD SHX Text
2
AutoCAD SHX Text
MUA
AutoCAD SHX Text
4
AutoCAD SHX Text
HRU
AutoCAD SHX Text
3
AutoCAD SHX Text
HRU
AutoCAD SHX Text
1
AutoCAD SHX Text
RELOCATE EXISTING RELIEF VENT TO NEW ROOF. (PRV-11)
AutoCAD SHX Text
1
AutoCAD SHX Text
RELOCATE EXISTING RELIEF VENT TO NEW ROOF. (PRV-12)
AutoCAD SHX Text
NEW RELIEF VENT ON NEW ROOF.
AutoCAD SHX Text
1
AutoCAD SHX Text
RELOCATE EXISTING OUTSIDE AIR UNIT TO NEW ROOF. (OSA-1)
AutoCAD SHX Text
1
AutoCAD SHX Text
RELOCATE EXISTING RELIEF VENT TO NEW ROOF. (GV-4)
AutoCAD SHX Text
RELOCATE EXISTING RELIEF VENT TO NEW ROOF. (GV-5)
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
RELOCATE EXISTING MAKE-UP AIR UNIT TO NEW ROOF. (MUA-1)
AutoCAD SHX Text
2
AutoCAD SHX Text
EXTEND FLUE A MINIMUM OF 24" ABOVE AIR INTAKES.
AutoCAD SHX Text
2
AutoCAD SHX Text
EXTEND FLUE A MINIMUM OF 24" ABOVE AIR INTAKES.
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
RELOCATE EXISTING RELIEF VENT TO NEW ROOF.
AutoCAD SHX Text
1
AutoCAD SHX Text
RELOCATE EXISTING RELIEF VENT TO NEW ROOF. (GV-3)
AutoCAD SHX Text
1
AutoCAD SHX Text
RELOCATE EXISTING RELIEF VENT TO NEW ROOF.
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
RELOCATE EXISTING RELIEF VENT TO NEW ROOF. (UVS-3)
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
RELOCATE EXISTING RELIEF VENT TO NEW ROOF. (UVS-2)
AutoCAD SHX Text
RELOCATE EXISTING RELIEF VENT TO NEW ROOF. (PRV-10)
AutoCAD SHX Text
RELOCATE EXISTING RELIEF VENT TO NEW ROOF. (PRV-4)
AutoCAD SHX Text
RELOCATE EXISTING RELIEF VENT TO NEW ROOF. (UVS-1)
AutoCAD SHX Text
RELOCATE EXISTING RELIEF VENT TO NEW ROOF. (PRV-8)
AutoCAD SHX Text
RELOCATE EXISTING RELIEF VENT TO NEW ROOF. (GV-4)
AutoCAD SHX Text
RELOCATE EXISTING RELIEF VENT TO NEW ROOF. (PRV-9)
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
RELOCATE EXISTING EXHAUST FAN TO NEW ROOF. (EF-4)
AutoCAD SHX Text
1
AutoCAD SHX Text
RELOCATE EXISTING MAKE-UP AIR UNIT TO NEW ROOF. (MUA-2)
AutoCAD SHX Text
RELOCATE EXISTING OUTSIDE AIR CONDENSING UNIT TO NEW ROOF. (OSA-2)
AutoCAD SHX Text
RELOCATE EXISTING CONDENSING UNIT TO NEW ROOF.
AutoCAD SHX Text
RELOCATE EXISTING CONDENSING UNIT TO NEW ROOF.
AutoCAD SHX Text
1
AutoCAD SHX Text
RV
AutoCAD SHX Text
2
AutoCAD SHX Text
RV
AutoCAD SHX Text
NEW RELIEF VENT ON NEW ROOF.
AutoCAD SHX Text
3
AutoCAD SHX Text
MUA
AutoCAD SHX Text
1
AutoCAD SHX Text
ROTATE AND RELOCATE EXISTING MAKE-UP AIR UNIT TO NEW ROOF. (MUA-2)
AutoCAD SHX Text
2" VTR
AutoCAD SHX Text
2" VTR
AutoCAD SHX Text
2" VTR
AutoCAD SHX Text
2" VTR
AutoCAD SHX Text
2" VTR
AutoCAD SHX Text
2" VTR
AutoCAD SHX Text
2" VTR
AutoCAD SHX Text
2" VTR
AutoCAD SHX Text
2" VTR
AutoCAD SHX Text
4"VTR
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
EXTEND FLUE A MINIMUM OF 24" ABOVE AIR INTAKE NEW ROOF.
AutoCAD SHX Text
2
AutoCAD SHX Text
2 FURNISH AND INSTALL NEW FLUE / ROOF CAP. EXTEND NEW FLUE TO EXISTING EQUIPMENT.
AutoCAD SHX Text
LOCATION WITH ROOFING CONTRACTOR. CONTRACTOR SHALL RELOCATE EXISTING EQUIPMENT
AutoCAD SHX Text
1 ROOFING CONTRACTOR SHALL FURNISH AND INSTALL NEW CURB. COORDINATE SIZE AND
AutoCAD SHX Text
TO NEW ROOF AND EXTEND ALL DUCTWORK, CONTROL WIRING, GAS PIPING, ETC. REQUIRED
AutoCAD SHX Text
TO RELOCATE EQUIPMENT.
AutoCAD SHX Text
CONTRACTOR SHALL FURNISH AND INSTALL HURRICANE RATED STRAPS FOR WIND LOAD OF 200 MPH
AutoCAD SHX Text
ON ALL ROOF MOUNTED EQUIPMENT. (REFERENCE DETAIL)
AutoCAD SHX Text
THROAT
AutoCAD SHX Text
AREA (SF)
AutoCAD SHX Text
12.962
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
FACTORY ROOF CURB
AutoCAD SHX Text
BIRDSCREEN
AutoCAD SHX Text
MARK
AutoCAD SHX Text
RV
AutoCAD SHX Text
1
AutoCAD SHX Text
NO.
AutoCAD SHX Text
7,750
AutoCAD SHX Text
CFM
AutoCAD SHX Text
MODEL
AutoCAD SHX Text
PR-48
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
ALUMINUM
AutoCAD SHX Text
0.10
AutoCAD SHX Text
P.D.
AutoCAD SHX Text
SPUN
AutoCAD SHX Text
OR APPROVED
AutoCAD SHX Text
MANUFACTURER
AutoCAD SHX Text
LOREN COOK
AutoCAD SHX Text
EQUAL
AutoCAD SHX Text
1
AutoCAD SHX Text
NO.
AutoCAD SHX Text
2
AutoCAD SHX Text
NOTES
AutoCAD SHX Text
12.962
AutoCAD SHX Text
RV
AutoCAD SHX Text
2
AutoCAD SHX Text
7,750
AutoCAD SHX Text
PR-48
AutoCAD SHX Text
ALUMINUM
AutoCAD SHX Text
0.10
AutoCAD SHX Text
SPUN
AutoCAD SHX Text
LOREN COOK
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
HANGAR HVAC & PLUMBING ROOF PLAN
AutoCAD SHX Text
BI.A/MP1.1
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
COORDINATION WITH OTHER TRADES. SHOP DRAWINGS WITH ALL TRADES
AutoCAD SHX Text
A WAY THAT NO WATER LEAKAGE IS INTRODUCED INTO THE BUILDING.
AutoCAD SHX Text
REVIEW ALL CONTRACT DOCUMENTS AND THE DESIGN OF OTHER TRADES BEFORE
AutoCAD SHX Text
EXPENSE TO THE OWNER.
AutoCAD SHX Text
AND ELECTRICAL. MAKE OFFSETS AND TRANSITIONS AS REQUIRED TO CLEAR
AutoCAD SHX Text
MAINTAIN DUCTWORK LEVEL AND AS HIGH AS POSSIBLE UNLESS NOTED OTHERWISE.
AutoCAD SHX Text
5 CONTRACTOR SHALL COORDINATE VOLTAGE AND PHASE OF EACH PIECE OF EQUIPMENT
AutoCAD SHX Text
4 COORDINATE ALL ROOF PENETRATIONS WITH THE STRUCTURAL ENGINEER AND ROOFING
AutoCAD SHX Text
CONTRACTOR TRANSITIONS RECTANGULAR DUCTWORK ON THE BOTTOM AND THE SIDES.
AutoCAD SHX Text
3 COORDINATE DUCTWORK AND PIPING WITH STRUCTURAL, PLUMBING, FIRE PROTECTION
AutoCAD SHX Text
STRUCTURAL MEMBERS, ETC. COORDINATE W/ OTHER TRADES WITHOUT ADDITIONAL
AutoCAD SHX Text
AND REPLACE AS NOTED OR AS REQUIRED FOR NEW ROOFING.
AutoCAD SHX Text
6 FIELD VERIFY EXISTING QUANTITY AND LOCATIONS OF ALL GAS FLUES. EXTEND GAS FLUE
AutoCAD SHX Text
WITH THE ELECTRICAL CONTRACTOR PRIOR TO ORDERING.
AutoCAD SHX Text
PREPARING SHOP DRAWINGS.
AutoCAD SHX Text
10 MECHANICAL CONTRACTOR IS TO REVIEW THE ENTIRE SET OF PLANS FOR
AutoCAD SHX Text
COORDINATED WILL BE REQUIRED.
AutoCAD SHX Text
1 ALL DIMENSIONS SHOWN ARE NET INTERNAL. ADD 2" TO ACCOUNT FOR 1" INTERNAL
AutoCAD SHX Text
INSULATION ON RECTANGULAR DUCT. INSULATE ALL ROUND DUCT WITH 1-1/2" THK WRAP
AutoCAD SHX Text
POSSIBLE CONDITIONS. IT IS INTENDED THAT A COMPLETE HVAC SYSTEM BE
AutoCAD SHX Text
PROVIDED WITH ALL NECESSARY EQUIPMENT, APPURTENANCES, AND CONTROLS,
AutoCAD SHX Text
CODES, STANDARDS, AND THESE CONTRACT DOCUMENTS SHALL BE FURNISHED
AutoCAD SHX Text
COMPLETELY COORDINATED WITH ALL DISCIPLINES. ALL REQUIREMENTS OF
AutoCAD SHX Text
WITHOUT INCURRING ANY ADDITIONAL COST TO THE CONTRACT. CAREFULLY
AutoCAD SHX Text
2 THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL
AutoCAD SHX Text
THESE DOCUMENTS SHALL BE STRICTLY CONFORMED WITH. ANY ITEMS AND LABOR
AutoCAD SHX Text
REQUIRED FOR A COMPLETE HVAC SYSTEM IN ACCORDANCE WITH ALL APPLICABLE
AutoCAD SHX Text
7 DUCTWORK SHALL BE INSULATED IN ACCORDANCE WITH THE FOLLOWING
AutoCAD SHX Text
9 THE CONTRACTOR SHALL INSTALL THE CURB-MOUNTED EQUIPMENT IN SUCH
AutoCAD SHX Text
8 DUCTWORK SHALL BE GALVANIZED AND INSTALLED IN ACCORDANCE WITH
AutoCAD SHX Text
NEW DUCT: 2" EXTERNAL.
AutoCAD SHX Text
SCHEDULE:
AutoCAD SHX Text
SMACNA STANDARDS.
AutoCAD SHX Text
WITH MINIMUM INSTALLED R-VALUE 6.0.
AutoCAD SHX Text
SOFT TOUCH DUCT WRAP WITH FSK VAPOR RETARDER FACING TYPE 100
AutoCAD SHX Text
11 NEW DUCT SHALL BE INSULATED WITH 2" DUCT WRAP EQUAL TO CERTAINTEED
AutoCAD SHX Text
EXISTING GAS APPLIANCE. NEW FLUE SHALL BE METAL-FAB INC. OR APPROVED
AutoCAD SHX Text
INCLUDE REPLACEMENT OF THE EXISTING FLUE AND CONNECTION TO THE
AutoCAD SHX Text
12 WHERE EXISTING GAS FLUES ARE BEING EXTENDED, THE CONTRACTOR SHALL
AutoCAD SHX Text
EQUAL, TYPE B VENT OR AS REQUIRED TO MATCH THE APPLIANCE. EXTENDING
AutoCAD SHX Text
SHALL INCLUDE NEW TALL CONE FLASHING, VENT CAP, AND STORM COLLAR.
AutoCAD SHX Text
STORM COLLAR SHALL BE SECURED WITH METAL-FAB INC. MST TAPE. ALL
AutoCAD SHX Text
VENTING SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S
AutoCAD SHX Text
RECOMMENDATIONS.
AutoCAD SHX Text
1 EXTEND EXISTING PLUMBING VENT UP 12" ABOVE NEW ROOFING SURFACE. REFERENCE ARCHITECTURAL PLANS FOR TYPICAL VENT PIPE FLASHING DETAIL.
AutoCAD SHX Text
1. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS. IT IS THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS. IT IS INTENDED THAT A COMPLETE PLUMBING SYSTEM BE PROVIDED WITH ALL NECESSARY EQUIPMENT, ACCESSORIES, AND CONTROLS COMPLETELY COORDINATED WITH ALL TRADES. ALL REQUIREMENTS GIVEN IN THESE DOCUMENTS SHALL BE STRICTLY CONFORMED TO. ANY ITEMS AND LABOR REQUIRED FOR A COMPLETE PLUMBING SYSTEM IN ACCORDANCE WITH ALL APPLICABLE CODES, STANDARDS, LOCAL AUTHORITIES, AND THESE CONTRACT DOCUMENTS SHALL BE FURNISHED WITHOUT INCURRING ANY ADDITIONAL COST TO THE OWNER. CAREFULLY REVIEW ALL CONTRACT DOCUMENTS AND THE DESIGN OF OTHER TRADES BEFORE PREPARING SHOP DRAWINGS. 2. PLUMBING CONTRACTOR SHALL MAKE FINAL CONNECTIONS TO ALL EQUIPMENT INDICATED ON DRAWINGS FINAL PLUMBING CONTRACTOR SHALL MAKE FINAL CONNECTIONS TO ALL EQUIPMENT INDICATED ON DRAWINGS FINAL CONNECTION SHALL INCLUDE ANY ADAPTORS, NIPPLES, SHUT-OFF VALVES, PRV'S, SHOCK ABSORBERS, BACKFLOW PREVENTION DEVICES, REGULATORS, ETC. 3. FIELD VERIFY EXISTING QUANTITY AND LOCATIONS OF ALL PLUMBING VENTS. EXTEND VENTS AS NOTED ON PLANS OR FIELD VERIFY EXISTING QUANTITY AND LOCATIONS OF ALL PLUMBING VENTS. EXTEND VENTS AS NOTED ON PLANS OR REQUIRED FOR NEW ROOFING.
AutoCAD SHX Text
2 EXTEND EXISTING PLUMBING VENT UP 12" EQUIPMENT INTAKE. REFERENCE ARCHITECTURAL PLANS FOR TYPICAL VENT PIPE FLASHING DETAIL.
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text
W
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
N
AutoCAD SHX Text
HVAC - PLUMBING - PROCESS CONTROL
AutoCAD SHX Text
RANDALL WHORTON, P.E.
AutoCAD SHX Text
PHONE: (256) 820-9897
AutoCAD SHX Text
WHORTON ENGINEERING PROJECT NO. 21172
AutoCAD SHX Text
25 SUMMERALL GATE ROAD
AutoCAD SHX Text
ANNISTON, ALABAMA 36205
AutoCAD SHX Text
DATE
AutoCAD SHX Text
08-04-2021
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
D
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
W
AutoCAD SHX Text
H
AutoCAD SHX Text
.
AutoCAD SHX Text
D
AutoCAD SHX Text
No.14192
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
M
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
E

SCALE:3/32"=1'-0"

OPERATIONS BUILDING FLOOR PLAN

N

PILOT

SUPERVISOR

INSTRUCTOR

SUPERVISOR

BREAK

ADMIN. SUPPORT

DATA PROCESS.

CLERK

TYPIST

LOBBY

STORAGE

JANITOR

CORRIDOR

VEST.

ENTRY

FLIGHT

PLANNING

FLIGHT

OPERATIONS

SPECIALIST

201

WOMEN

MEN

CORRIDOR

CO

RR

ID

OR

OPERATIONS

202

FLIGHT

SURGEON

ALSE

STORAGE

SIMILATION

DEVICES

A/V

STOR.

FLIGHT

OPERATIONS

203

FLIGHT

INSTRUCTOR

204

FLIGHT

INSTRUCTOR

205

FLIGHT

INSTRUCTOR

206

CORR.

LIBRARY

CLASSROOM

ALSE

LOCKERS

ELECT.

MECH.

SECURE

STORAGE

BRIEFING

EXAM ROOM

208

LEARNING

CENTER

207

2 2 2 2 2 2

2

2

7

9

8

11

10

12

14

13

15

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

OPERATIONS

BUILDING

FLOOR PLAN

BI.B/A1.1

9

Project Number:

OF

Sheet Description

Revisions:

Date:

Sheet Number

DOCUMENTS

445 Dexter Avenue

Suite 5050

Montgomery, Al 36104

Phone: (334) 420-5672

Fax: (334) 420-5692

JMR+H

A r c h i t e c t u r e , P C

PR

IN

TE

D: 8

/3

/2

02

1 @

3

:4

1P

MF

IL

E N

AM

E: W

:\JM

RH

P

ro

je

cts 2

02

1\2

1-1

08

9 M

ob

ile

A

AS

F #

3 A

ct o

f N

atu

re

(A

oN

) R

ep

airs\B

I.B

A

1.1

O

p B

ld

g F

lo

or P

la

n.d

wg

S TAT E OF A LABAMA

REG I S T ERED ARCH I T ECT

J.MICHAELRUTLAND

2149

TIMOTHY R.HOLMES

3188

13

MOBILE ALABAMA

MOBILE AASF #3

ACT of NATURE

(AoN) REPAIRS

IFB#: AC-21-B-0025-S

21-1089

4 AUGUST 2021

CONSTRUCTION

WORK SCHEDULE

1. SCRAPE, WIRE BRUSH, CLEAN, REMOVE ALL RUST AND

SCALE FROM EXISTING STEEL DECKING AND

STRUCTURAL STEEL SUPPORT MEMBERS, PREP AND

PRIME THESE ITEMS AND APPLY NEW PAINT FINISH TO

MATCH SURROUNDING AREA.

2. SCRAPE, CLEAN, REMOVE ALL RUST AND STAINS

FROM EXISTING MASONRY WALL IN THIS AREA. PREP

AND PRIME MASONRY AND APPLY NEW PAINT FINISH

TO ENTIRE WALL TO MATCH SURROUNDING AREA.

3. CLEAN AND PREPARE ALL EXISTING EXTERIOR METAL

WALL PANELS TO RECEIVE NEW ELASTOMERIC

COATING PER THE DETAILS AND SPECIFICATIONS.

4. INSTALL NEW INFILL, SUPPORTING ITEMS, FLASHINGS,

ROOFING MEMBRANE, ETC. IN ACCORDANCE WITH

NEW DETAILS WHERE PORTIONS OF EXISTING METAL

WALL PANEL AND ASSOCIATED FLASHINGS HAVE BEEN

REMOVED. PROTECT TEMPORARY OPENING FROM

MOISTURE INTRUSION FOR THE DURATION OF THE

PROJECT.

5. PRESSURE WASH AND CLEAN EXISTING ALUMINUM

CANOPY.

PLAN LEGEND

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS AND DIMENSIONS PRIOR TO BEGINNING

ANY WORK. NOTIFY A/E OF ANY DISCREPANCIES FOUND

PRIOR TO ORDERING MATERIALS AND BEGINNING ANY

WORK.

2. AT ALL EXTERIOR METAL WALL PANELS - CLEAN,

RE-SEAL, AND APPLY NEW ELASTOMERIC COATING - SEE

DETAILS AND SPECIFICATIONS.

3. ALL AREAS AFFECTED BY DEMOLITION OR

CONSTRUCTION ACTIVITIES NOT INDICATED TO RECEIVE

NEW FINISHES ARE TO BE PATCHED & REPAIRED TO

MATCH ADJACENT SURFACES.

4. DIMENSIONS SHOWN ARE TO THE FACE OF STUD OR

MASONRY WALL UNLESS OTHERWISE NOTED.

5. REFER TO PLANS, DETAILS, SECTIONS, AND SCHEDULES

FOR FURTHER CLARIFICATION OF INTERIOR FINISHES.

6. REFER TO REFLECTED CEILING PLAN (RCP) FOR

SPECIFIC CEILING TYPE(S) AND HEIGHTS.

7. ALL PAINT, ELASTOMERIC, AND FINISH COLORS MUST BE

APPROVED BY THE OWNER AND ARCHITECT PRIOR TO

BEGINNING INSTALLATION.

GENERAL WORK NOTES

DETAIL KEY

ROOM FINISH MARK

2

WORK NOTE MARK

A

ROOF WORK NOTE MARK.

SEE ROOF PLAN

1PHOTO KEY

ROOF WORK SCHEDULE

A CLEAN AND PREPARE ALL EXISTING METAL ROOFING PANELS

AND INSTALL NEW SINGLE-PLY MEMBRANE ROOFING SYSTEM

PER THE DETAILS AND SPECIFICATIONS

B INFILL EXISTING OPENING IN ROOF WHERE MECHANICAL UNIT

WAS REMOVED. SEE DETAILS.

C RELOCATE EXISTING MECHANICAL UNIT AND CURB. EXTEND

CURB PER THE DETAILS. SEE MECHANICAL DRAWINGS.

D FURNISH AND INSTALL NEW ALUMINUM HOUSING TO MATCH

EXISTING FOR MECHANICAL EXHAUST FAN.

E REMOVE AND DISCARD EXISTING METAL GUTTER,

DOWNSPOUTS AND CONCRETE SPLASH BLOCKS. FURNISH

AND INSTALL NEW PRE-FINISHED GUTTERS AND

DOWNSPOUTS. NEW DOWNSPOUTS SHALL ALIGN WITH

EXISTING ALUMINUM CANOPY COLUMNS AND RUN DOWN TOP

OF CANOPY AND DOWN COLUMNS. FURNISH AND INSTALL

NEW CONCRETE SPLASH BLOCKS AT ALL DOWNSPOUTS.

F TEMPORARILY REMOVE EXISTING MECHANICAL UNIT AND

EXTEND EXISTING THROUGH NEW ROOFING PER DETAILS AND

SPECIFICATIONS.

G PRESSURE WASH AND CLEAN EXISTING ALUMINUM CANOPY.

H REMOVE AND DISCARD EXISTING RAKE TRIM AND REPLACE

WITH NEW P.T. WOOD FASCIA BLOCKING. SEE DETAILS.

J REMOVE EXISTING CAPPED OFF ROOF CURB. PATCH EXISTING

OPENING AND INSTALL NEW ROOFING SYSTEM. SEE DETAILS.

AutoCAD SHX Text
SECURITY COUNTER
AutoCAD SHX Text
EWC
AutoCAD SHX Text
MOVABLE WALL
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
PLATFORM
AutoCAD SHX Text
INSTRUCTOR
AutoCAD SHX Text
FLIGHT PLANNING COUNTER
AutoCAD SHX Text
FEC
AutoCAD SHX Text
205
AutoCAD SHX Text
A
AutoCAD SHX Text
A2.1

FINISH FLOOR

SCALE:

EAST ELEVATION

1/8"=1'-0"

E

E

FINISH FLOOR

SCALE:

NORTH ELEVATION

1/8"=1'-0"

3

A A A

E E E E

E

3

FINISH FLOOR

SCALE:

WEST ELEVATION

1/8"=1'-0"

3 33

FINISH FLOOR

SCALE:

SOUTH ELEVATION

1/8"=1'-0"

3

A A A

E E E E3

OPERATIONS

BUILDING

EXTERIOR

ELEVATIONS

BI.B/A2.1

10

Project Number:

OF

Sheet Description

Revisions:

Date:

Sheet Number

DOCUMENTS

445 Dexter Avenue

Suite 5050

Montgomery, Al 36104

Phone: (334) 420-5672

Fax: (334) 420-5692

JMR+H

A r c h i t e c t u r e , P C

PR

IN

TE

D: 8

/3

/2

02

1 @

3

:4

2P

MF

IL

E N

AM

E: W

:\JM

RH

P

ro

je

cts 2

02

1\2

1-1

08

9 M

ob

ile

A

AS

F #

3 A

ct o

f N

atu

re

(A

oN

) R

ep

airs\B

I.B

A

2.1

O

ps B

ld

g E

le

va

tio

ns.d

wg

S TAT E OF A LABAMA

REG I S T ERED ARCH I T ECT

J.MICHAELRUTLAND

2149

TIMOTHY R.HOLMES

3188

13

MOBILE ALABAMA

MOBILE AASF #3

ACT of NATURE

(AoN) REPAIRS

IFB#: AC-21-B-0025-S

21-1089

4 AUGUST 2021

CONSTRUCTION

WORK SCHEDULE

1. SCRAPE, WIRE BRUSH, CLEAN, REMOVE ALL RUST AND

SCALE FROM EXISTING STEEL DECKING AND

STRUCTURAL STEEL SUPPORT MEMBERS, PREP AND

PRIME THESE ITEMS AND APPLY NEW PAINT FINISH TO

MATCH SURROUNDING AREA.

2. SCRAPE, CLEAN, REMOVE ALL RUST AND STAINS

FROM EXISTING MASONRY WALL IN THIS AREA. PREP

AND PRIME MASONRY AND APPLY NEW PAINT FINISH

TO ENTIRE WALL TO MATCH SURROUNDING AREA.

3. CLEAN AND PREPARE ALL EXISTING EXTERIOR METAL

WALL PANELS TO RECEIVE NEW ELASTOMERIC

COATING PER THE DETAILS AND SPECIFICATIONS.

4. INSTALL NEW INFILL, SUPPORTING ITEMS, FLASHINGS,

ROOFING MEMBRANE, ETC. IN ACCORDANCE WITH

NEW DETAILS WHERE PORTIONS OF EXISTING METAL

WALL PANEL AND ASSOCIATED FLASHINGS HAVE BEEN

REMOVED. PROTECT TEMPORARY OPENING FROM

MOISTURE INTRUSION FOR THE DURATION OF THE

PROJECT.

5. PRESSURE WASH AND CLEAN EXISTING ALUMINUM

CANOPY.

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS AND DIMENSIONS PRIOR TO BEGINNING

ANY WORK. NOTIFY A/E OF ANY DISCREPANCIES FOUND

PRIOR TO ORDERING MATERIALS AND BEGINNING ANY

WORK.

2. AT ALL EXTERIOR METAL WALL PANELS - CLEAN,

RE-SEAL, AND APPLY NEW ELASTOMERIC COATING - SEE

DETAILS AND SPECIFICATIONS.

3. ALL AREAS AFFECTED BY DEMOLITION OR

CONSTRUCTION ACTIVITIES NOT INDICATED TO RECEIVE

NEW FINISHES ARE TO BE PATCHED & REPAIRED TO

MATCH ADJACENT SURFACES.

4. DIMENSIONS SHOWN ARE TO THE FACE OF STUD OR

MASONRY WALL UNLESS OTHERWISE NOTED.

5. REFER TO PLANS, DETAILS, SECTIONS, AND SCHEDULES

FOR FURTHER CLARIFICATION OF INTERIOR FINISHES.

6. REFER TO REFLECTED CEILING PLAN (RCP) FOR

SPECIFIC CEILING TYPE(S) AND HEIGHTS.

7. ALL PAINT, ELASTOMERIC, AND FINISH COLORS MUST BE

APPROVED BY THE OWNER AND ARCHITECT PRIOR TO

BEGINNING INSTALLATION.

GENERAL WORK NOTES

EXISTING TO REMAIN

1

DENOTES DEMOLITION WORK

SCHEDULE NOTE KEY

EXISTING TO BE REMOVED

GENERAL DEMOLITION NOTES

DEMOLITION LEGEND

DEMOLITION SCHEDULE

1. REMOVE AND DISCARD EXISTING STAINED / DAMAGED

CEILING TILES FROM THIS AREA. FURNISH AND INSTALL NEW

CEILING TILES TO MATCH EXISTING. SEE REFLECTED

CEILING PLAN.

2. REMOVE EXISTING ABANDONED MECHANICAL UNIT ROOFING

CURB AND PREPARE THE OPENING TO BE INFILLED PER THE

DETAILS. SEE ROOF PLAN

3. SAWCUT AND REMOVE THIS PORTION OF EXISTING METAL

WALL PANEL AND ASSOCIATED FLASHING. PROTECT

TEMPORARY OPENING FROM MOISTURE INTRUSION FOR

THE DURATION OF THE PROJECT. INSTALL NEW INFILL,

SUPPORTING ITEMS, FLASHINGS, ROOFING MEMBRANE, ETC.

IN ACCORDANCE WITH NEW DETAILS. SEE ELEVATIONS

1. THE CONTRACTOR AND ALL SUB-CONTRACTORS SHALL MAKE A

DETAILED INVESTIGATION OF THE SITE PRIOR TO STARTING WORK

TO ENSURE THAT THE FULL SCOPE FOR THE DEMOLITION IS

DOCUMENTED. THE ELEMENTS OUTLINED AND IDENTIFIED ON THE

DEMOLITION DRAWINGS (ALL DISCIPLINES) ARE GENERAL IN NATURE

& ARE NOT INTENDED TO ESTABLISH OR IMPLY THE COMPLETE

DEMOLITION SCOPE. ALL NECESSARY PROCEDURES, TECHNIQUES,

MATERIALS AND PRODUCTS TO COMPLETE ALL DEMOLITION

REQUIRED TO ACCOMMODATE ALL NEW CONSTRUCTION SHALL BE A

PART OF THIS CONTRACT. ALL MECHANICAL, PLUMBING &

ELECTRICAL DEMOLITION SHALL BE INCLUDED IN THEIR RESPECTIVE

SCOPE OR AS COORDINATED FOR COMPLETION BY THE

CONTRACTOR IN THE GENERAL PROJECT SCOPE.

2. GENERAL CONTRACTOR SHALL DISPOSE OF AND OR SALVAGE ALL

EXISTING DEMOLISHED MATERIALS, EQUIPMENT, FIXTURES, ETC.

CONTRACTOR SHALL BE RESPONSIBLE FOR THE FINAL DISPOSITION

OF ANY DEMOLISHED, SALVAGED ITEM. NO ITEM IS TO REMAIN ON

THE SITE. ANY AND ALL DEMOLISHED OR SALVAGED ITEMS

REQUIRING SENSITIVE DISPOSAL SHALL BE THE RESPONSIBILITY OF

THE CONTRACTOR. FINAL VERIFICATION WITH OWNERS

REPRESENTATIVE AT PRE-BID CONFERENCE PRIOR TO REMOVAL AS

TO WHICH MIGHT BE REQUIRED TO BE SALVAGED TO OWNER.

3. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PATCHING AND

REPAIR OF ANY FINISHES OR BUILDING COMPONENTS INCLUDING

BUT NOT LIMITED TO WALLS, CEILINGS, TRIM, FLOORS ETC. DAMAGED

BY THE CONTRACTOR OR HIS SUBS DURING THE PROCESS OF THE

WORK. THE CONTRACTOR AND HIS SUBCONTRACTORS SHALL

BECOME FULLY AWARE OF THE SCOPE OF DEMOLITION AND ITS

EFFECT ON BUILDING SYSTEMS TO REMAIN OR TO BE CONSTRUCTED

SO AS TO ANTICIPATE ANY PATCHING OR REPAIR REQUIRED TO

COMPLETE THE PROJECT AS OUTLINED IN THE CONSTRUCTION

DOCUMENTS.

4. A DEMOLITION/ CUTTING/ PATCHING PRE-WORK CONFERENCE WILL

BE HELD TO ENSURE THAT ALL DEMOLITION / CUTTING IS

COORDINATED TO ENSURE ALL TRADES MAINTAIN THE INTEGRITY OF

THE EXISTING STRUCTURE AND REPORT TO AND CONSULT WITH THE

ARCHITECT IF ANY DEMOLITION PROCESS APPEARS THAT IT MIGHT

NEGATIVELY AFFECT THE INTEGRITY OF THE EXISTING STRUCTURE.

5. GENERAL CONTRACTOR SHALL BE AWARE THE EXISTING BUILDING IS

TO REMAIN OCCUPIED DURING CONSTRUCTION. IT SHALL BE THE

RESPONSIBILITY OF THE GENERAL CONTRACTOR TO PROTECT ALL

EXISTING MATERIALS AND FINISHES THAT ARE TO REMAIN INCLUDING

BUILDING CONTENTS. MAINTAIN EXISTING BUILDING IN A WEATHER

TIGHT CONDITION AT ALL TIMES. INSURE ALL BUILDING REQUIRED

EXITS ARE PROTECTED AND REMAIN CLEAN AT ALL TIMES.

CONTRACTOR WILL FURNISH OVERHEAD PROTECTION AS REQUIRED.

ROOF WORK SCHEDULE

A CLEAN AND PREPARE ALL EXISTING METAL ROOFING PANELS

AND INSTALL NEW SINGLE-PLY MEMBRANE ROOFING SYSTEM

PER THE DETAILS AND SPECIFICATIONS

B INFILL EXISTING OPENING IN ROOF WHERE MECHANICAL UNIT

WAS REMOVED. SEE DETAILS.

C RELOCATE EXISTING MECHANICAL UNIT AND CURB. EXTEND

CURB PER THE DETAILS. SEE MECHANICAL DRAWINGS.

D FURNISH AND INSTALL NEW ALUMINUM HOUSING TO MATCH

EXISTING FOR MECHANICAL EXHAUST FAN.

E REMOVE AND DISCARD EXISTING METAL GUTTER,

DOWNSPOUTS AND CONCRETE SPLASH BLOCKS. FURNISH

AND INSTALL NEW PRE-FINISHED GUTTERS AND

DOWNSPOUTS. NEW DOWNSPOUTS SHALL ALIGN WITH

EXISTING ALUMINUM CANOPY COLUMNS AND RUN DOWN TOP

OF CANOPY AND DOWN COLUMNS. FURNISH AND INSTALL

NEW CONCRETE SPLASH BLOCKS AT ALL DOWNSPOUTS.

F TEMPORARILY REMOVE EXISTING MECHANICAL UNIT AND

EXTEND EXISTING THROUGH NEW ROOFING PER DETAILS AND

SPECIFICATIONS.

G PRESSURE WASH AND CLEAN EXISTING ALUMINUM CANOPY.

H REMOVE AND DISCARD EXISTING RAKE TRIM AND REPLACE

WITH NEW P.T. WOOD FASCIA BLOCKING. SEE DETAILS.

J REMOVE EXISTING CAPPED OFF ROOF CURB. PATCH EXISTING

OPENING AND INSTALL NEW ROOFING SYSTEM. SEE DETAILS.

1

1

1111

1

1

SCALE:

OPERATIONS BUILDING REFLECTED CEILING PLAN

1/8"=1'-0"

PILOT

SUPERVISOR

INSTRUCTOR

SUPERVISOR

BREAK

ADMIN. SUPPORT

DATA PROCESS.

CLERK

TYPIST

LOBBY

STORAGE

JANITOR

CORRIDOR

VEST.

ENTRY

FLIGHT

PLANNING

FLIGHT

OPERATIONS

SPECIALIST

201

WOMEN

MEN

CORRIDOR

CO

RR

ID

OR

OPERATIONS

202

FLIGHT

SURGEON

ALSE

STORAGE

SIMILATION

DEVICES

A/V

STOR.

FLIGHT

OPERATIONS

203

FLIGHT

INSTRUCTOR

204

FLIGHT

INSTRUCTOR

205

FLIGHT

INSTRUCTOR

206

CORR.

LIBRARY

CLASSROOM

ALSE

LOCKERS

ELECT.

MECH.

SECURE

STORAGE

BRIEFING

EXAM ROOM

208

LEARNING

CENTER

207 OPERATIONS

BUILDING

REFLECTED

CEILING PLAN

BI.B/A3.1

11

Project Number:

OF

Sheet Description

Revisions:

Date:

Sheet Number

DOCUMENTS

445 Dexter Avenue

Suite 5050

Montgomery, Al 36104

Phone: (334) 420-5672

Fax: (334) 420-5692

JMR+H

A r c h i t e c t u r e , P C

PR

IN

TE

D: 8

/3

/2

02

1 @

3

:4

4P

MF

IL

E N

AM

E: W

:\JM

RH

P

ro

je

cts 2

02

1\2

1-1

08

9 M

ob

ile

A

AS

F #

3 A

ct o

f N

atu

re

(A

oN

) R

ep

airs\B

I.B

A

3.1

O

ps B

ld

g R

CP

.d

wg

S TAT E OF A LABAMA

REG I S T ERED ARCH I T ECT

J.MICHAELRUTLAND

2149

TIMOTHY R.HOLMES

3188

13

MOBILE ALABAMA

MOBILE AASF #3

ACT of NATURE

(AoN) REPAIRS

IFB#: AC-21-B-0025-S

21-1089

4 AUGUST 2021

CONSTRUCTION

WORK SCHEDULE

1. SCRAPE, WIRE BRUSH, CLEAN, REMOVE ALL RUST AND

SCALE FROM EXISTING STEEL DECKING AND

STRUCTURAL STEEL SUPPORT MEMBERS, PREP AND

PRIME THESE ITEMS AND APPLY NEW PAINT FINISH TO

MATCH SURROUNDING AREA.

2. SCRAPE, CLEAN, REMOVE ALL RUST AND STAINS

FROM EXISTING MASONRY WALL IN THIS AREA. PREP

AND PRIME MASONRY AND APPLY NEW PAINT FINISH

TO ENTIRE WALL TO MATCH SURROUNDING AREA.

3. CLEAN AND PREPARE ALL EXISTING EXTERIOR METAL

WALL PANELS TO RECEIVE NEW ELASTOMERIC

COATING PER THE DETAILS AND SPECIFICATIONS.

4. INSTALL NEW INFILL, SUPPORTING ITEMS, FLASHINGS,

ROOFING MEMBRANE, ETC. IN ACCORDANCE WITH

NEW DETAILS WHERE PORTIONS OF EXISTING METAL

WALL PANEL AND ASSOCIATED FLASHINGS HAVE BEEN

REMOVED. PROTECT TEMPORARY OPENING FROM

MOISTURE INTRUSION FOR THE DURATION OF THE

PROJECT.

5. PRESSURE WASH AND CLEAN EXISTING ALUMINUM

CANOPY.

PLAN LEGEND

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS AND DIMENSIONS PRIOR TO BEGINNING

ANY WORK. NOTIFY A/E OF ANY DISCREPANCIES FOUND

PRIOR TO ORDERING MATERIALS AND BEGINNING ANY

WORK.

2. AT ALL EXTERIOR METAL WALL PANELS - CLEAN,

RE-SEAL, AND APPLY NEW ELASTOMERIC COATING - SEE

DETAILS AND SPECIFICATIONS.

3. ALL AREAS AFFECTED BY DEMOLITION OR

CONSTRUCTION ACTIVITIES NOT INDICATED TO RECEIVE

NEW FINISHES ARE TO BE PATCHED & REPAIRED TO

MATCH ADJACENT SURFACES.

4. DIMENSIONS SHOWN ARE TO THE FACE OF STUD OR

MASONRY WALL UNLESS OTHERWISE NOTED.

5. REFER TO PLANS, DETAILS, SECTIONS, AND SCHEDULES

FOR FURTHER CLARIFICATION OF INTERIOR FINISHES.

6. REFER TO REFLECTED CEILING PLAN (RCP) FOR

SPECIFIC CEILING TYPE(S) AND HEIGHTS.

7. ALL PAINT, ELASTOMERIC, AND FINISH COLORS MUST BE

APPROVED BY THE OWNER AND ARCHITECT PRIOR TO

BEGINNING INSTALLATION.

GENERAL WORK NOTES

DETAIL KEY

ROOM FINISH MARK

2

WORK NOTE MARK

A

ROOF WORK NOTE MARK.

SEE ROOF PLAN

1PHOTO KEY

DEMOLITION SCHEDULE

1. REMOVE AND DISCARD EXISTING STAINED / DAMAGED

CEILING TILES FROM THIS AREA. FURNISH AND INSTALL NEW

CEILING TILES TO MATCH EXISTING. SEE REFLECTED

CEILING PLAN.

2. REMOVE EXISTING ABANDONED MECHANICAL UNIT ROOFING

CURB AND PREPARE THE OPENING TO BE INFILLED PER THE

DETAILS. SEE ROOF PLAN

3. SAWCUT AND REMOVE THIS PORTION OF EXISTING METAL

WALL PANEL AND ASSOCIATED FLASHING. PROTECT

TEMPORARY OPENING FROM MOISTURE INTRUSION FOR

THE DURATION OF THE PROJECT. INSTALL NEW INFILL,

SUPPORTING ITEMS, FLASHINGS, ROOFING MEMBRANE, ETC.

IN ACCORDANCE WITH NEW DETAILS. SEE ELEVATIONS

EXISTING ACOUSTICAL

CEILING TO REMAIN

DAMAGED CEILING TILE

TO BE REMOVED AND

REPLACED

AutoCAD SHX Text
205
AutoCAD SHX Text
A
AutoCAD SHX Text
A2.1

SCALE:

OPERATIONS BUILDING ROOF PLAN

1/8"=1'-0"

H

H

H

H

H

H

H

H

E

E E E

E

E

E E

A

A

A

A

F

F

F

F

7

8

9

10

11

12

13

F

14

15

A4.1

A

A4.1

B

A4.1

C

A4.1

A

K

K

SCALE:

C

A4.1

3"=1'-0"

RIDGE DETAIL

NEW COVERBOARD

NEW MECHANICALLY

ATTACHED

FLUTE-FILLER RIGID

INSULATION BOARD

NEW MECHANICALLY

ATTACHED SINGLE-PLY

MEMBRANE ROOFING

SYSTEM - SEE

SPECIFICATIONS

SCALE:

A

A4.13"=1'-0"

EAVE AT BRICK

SCALE:

B

A4.13"=1'-0"

RAKE AT BRICK

EXISTING METAL

ROOFING SYSTEM

NEW

5

8

" MINIMUM

COVER BOARD

NEW MECHANICALLY

ATTACHED

FLUTE-FILLER RIGID

INSULATION BOARD

NEW MECHANICALLY

ATTACHED SINGLE-PLY

MEMBRANE ROOFING

SYSTEM - SEE

SPECIFICATIONS

EXISTING RIDGE CAP

TO BE DEMOLISHED

NEW PRE-FINISHED

METAL GUTTER

NEW PRE-FINISHED

METAL DOWNSPOUT

NEW 2x8 FRT. WOOD FASCIA

BLOCKING WRAPPED IN PRE-

FINISHED BREAK METAL

SCALE:

E

A4.1

VTR DETAIL / OVERFLOW DRAIN

3" = 1'-0"

NOTES:

1. WHEN USING TPO MEMBRANE, BONDING

ADHESIVE IS NOT REQUIRED WHEN THE

FLASHING HEIGHT IS 12" OR LESS AND THE

MEMBRANE IS FASTENED "AS SHOWN" ON TOP

OF THE CURB. WHEN TERMINATION BAR IS

USED BENEATH THE COUNTER-FLASHING,

BONDING ADHESIVE CAN BE ELIMINATED WHEN

THE MEMBRANE HEIGHT IS 18" OR LESS.

2. APPLICABLE BONDING ADHESIVE FOR PVC OR

TPO. IN CASE OF TPO, GRIP ADHESIVE MAY

ALSO BE USED ON VERTICAL PORTION.

3. WHEN MECHANICAL FASTENERS ARE USED TO

PENETRATE THE METAL COUNTER-FLASHING,

USE EPDM WASHERS, APPLY WATER CUT-OFF

MASTIC UNDER THE COUNTER-FLASHING OR

CAULK THE FASTENER HEADS.

4. APPROXIMATELY 1/8" DIAMETER BEAD OF CUT

EDGE SEALANT IS REQUIRED ON CUT EDGES OF

REINFORCED TPO MEMBRANE AND

RECOMMENDED ON CUT EDGES OF PVC

MEMBRANE.

5. REFER TO SPECIFICATIONS FOR ACCEPTABLE

FASTENERS AND PLATES.

6. MECHANICAL SECUREMENT MAY BE INSTALLED

INTO THE VERTICAL SUBSTRATE.

7. WHEN USING 60 MIL THICK CURB FLASHING,

THE INTERSECTIONS BETWEEN SPLICES MUST

OVERLAID WITH A THERMOPLASTIC COVER.

USE ONE CONTINUOUS

SHEET OF REINFORCED

THERMOPLASTIC MEMBRANE

TO WRAP AROUND CURB.

INSTALL

OUTSIDE

CORNERS

PER DETAIL

F/A9.1

THERMOPLASTIC

REINFORCED

MEMBRANE

FASTENER & SEAM

FASTENING PLATE,

MAX. 12" O.C.

5

CUT EDGE

SEALANT

HOT AIR WELD,

1-1/2" MIN.

4

6

METAL CAP OR

COUNTER-FLASHING

MAXIMUM 12"

O.C. FASTENER

SPACING

3

T-JOINT

COVER

7

APPLICABLE

BONDING

ADHESIVE

XX

XX

FASTENER & SEAM

FASTENING PLATE,

MAX. 12" O.C.

HOT AIR-WELD, 1-1/2"

MIN. BEYOND

FASTENING PLATES

THERMOPLASTIC

PRE-MOLDED PIPE

FLASHING

WATER CUT

OFF MASTIC

XX

XX

STAINLESS STEEL

CLAMPING RING

NOTES:

1. TEMPERATURE OF THE PIPE PENETRATION MUST NOT EXCEED 140°F

(60°C) WHEN USING PVC AND 160°F (71°C) WHEN USING TPO FLASHING.

2. PIPE SEAL MUST HAVE INTACT RIB AT TOP EDGE, REGARDLESS OF

PIPE DIAMETER.

3. INSTALL A MINIMUM OF 4 FASTENERS AND PLATES AROUND THE PIPE,

EQUALLY SPACED. IF FASTENERS AND PLATES CANNOT BE INSTALLED

AS SHOWN, THEY MAY ALSO BE POSITIONED OUTSIDE THE PIPE

MAXIMUM 12" (305mm) O.C. AND FLASHED WITH THERMOPLASTIC

REINFORCED MEMBRANE/CUT-EDGE SEALANT.

4. FASTENERS AND PLATES ARE NOT REQUIRED ON ADHERED SYSTEMS

UNLESS PIPE DIAMETER EXCEEDS 18" (457mm).

5. OVER FLOW DRAINS FLUSH WITH THE ROOF WILL HAVE DRAIN

FLASHING AS REQUIRED PER THE ROOFING MANUFACTURER OVER

FLOW DRAINS ABOVE THE ROOF LINE WILL HAVE A SMALL BOOT SET

AS DETAILED ABOVE.

4 5

3

6

3/4" TO 8"

CO

LD

P

IP

E

THERMOPLASTIC

REINFORCED

MEMBRANE

PRE-MOLDED

OUTSIDE

CORNER

1

FASTENER & SEAM

FASTENING PLATE,

MAX. 12" O.C.

2

3

NOTES:

1. POSITION FASTENING PLATES 6" FROM THE CORNER AND 1/2" TO 1"

FROM EDGE OF MEMBRANE.

2. APPROXIMATELY 1/8" DIAMETER BEAD OF CUT EDGE SEALANT IS

REQUIRED ON CUT EDGES OF REINFORCED TPO MEMBRANE AND

RECOMMENDED ON CUT EDGES OF PVC MEMBRANE.

3. REFER TO SPECIFICATIONS FOR ACCEPTABLE FASTENERS AND

PLATES.

PRE-MOLDED OUTSIDE

CORNER BEFORE

INSTALLATION

5

8

" PRIMED COVER BOARD W/

TAPERED POLYISO INSULATION

5

8

" PRIMED COVER BOARD

W/ TAPERED POLYISO

INSULATION W/ FOAM

ADHESIVE

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

SEALANT

SCALE:

F

A4.1

CURB DETAIL

3" = 1'-0"

SCALE:

G

A4.1

CORNER DETAIL

3" = 1'-0"SCALE:

D

A4.1

DETAIL @ ROOF INFILL

3" = 1'-0"

NEW

5

8

" MINIMUM COVER BOARD

NEW MECHANICALLY ATTACHED

SINGLE-PLY MEMBRANE ROOFING

SYSTEM - SEE SPECIFICATIONS

NEW MECHANICALLY

ATTACHED FLUTE-FILLER

RIGID INSULATION BOARD

NEW POLY-ISO INSULATION

TO MATCH EXISTING

NEW STEEL DECKING TO

MATCH EXISTING. PAINT

TO MATCH

NEW STEEL ANGLE. PAINT

EXISTING STEEL ANGLE

FRAMES

EXISTING ROOF DECKING

EXISTING ROOF

INSULATION

EXISTING METAL ROOFING

W/ FLUE FILLER

INSULATION

EXISTING STRUCTURE,

ROOFING & DECK

INFILL FORMER

MECH. CURB

NEW 2x6 FRT. NAILERS

NEW PRE-FINISHED METAL

FLASHING

EXISTING BRICK

VENEER

EXISTING CMU WALL

EXISTING STANDING

SEAM METAL ROOF

EXISTING

INSULATION

EXISTING METAL

ROOF DECK

SAWCUT AND REMOVE

STANDING SEAM METAL

ROOF AS NEEDED TO

ACCOMMODATE NEW

CONSTRUCTION

NEW COVERBOARD

NEW MECHANICALLY

ATTACHED

FLUTE-FILLER RIGID

INSULATION BOARD

NEW MECHANICALLY

ATTACHED SINGLE-PLY

MEMBRANE ROOFING SYSTEM

- SEE SPECIFICATIONS

NEW 2x8 FRT. WOOD FASCIA

BLOCKING WRAPPED IN PRE-

FINISHED BREAK METAL

NEW 2x6 FRT. NAILERS

NEW PRE-FINISHED METAL

FLASHING

EXISTING BRICK

VENEER

EXISTING CMU WALL

EXISTING STANDING

SEAM METAL ROOF

EXISTING

INSULATION

EXISTING METAL

ROOF DECK

SAWCUT AND REMOVE

STANDING SEAM METAL

ROOF AS NEEDED TO

ACCOMMODATE NEW

CONSTRUCTION

EXISTING ROOF

INSULATION

LINE OF EXISTING METAL

PANEL TO REMAIN

OPERATIONS

BUILDING

ROOF PLAN

BI.B/A4.1

12

Project Number:

OF

Sheet Description

Revisions:

Date:

Sheet Number

DOCUMENTS

445 Dexter Avenue

Suite 5050

Montgomery, Al 36104

Phone: (334) 420-5672

Fax: (334) 420-5692

JMR+H

A r c h i t e c t u r e , P C

PR

IN

TE

D: 8

/4

/2

02

1 @

2

:4

7P

MF

IL

E N

AM

E: W

:\JM

RH

P

ro

je

cts 2

02

1\2

1-1

08

9 M

ob

ile

A

AS

F #

3 A

ct o

f N

atu

re

(A

oN

) R

ep

airs\B

I.B

A

4.1

O

ps B

ld

g R

oo

f P

la

n.d

wg

S TAT E OF A LABAMA

REG I S T ERED ARCH I T ECT

J.MICHAELRUTLAND

2149

TIMOTHY R.HOLMES

3188

13

MOBILE ALABAMA

MOBILE AASF #3

ACT of NATURE

(AoN) REPAIRS

IFB#: AC-21-B-0025-S

21-1089

4 AUGUST 2021

CONSTRUCTION

GENERAL ROOFING NOTES

DETAIL KEY

A

ROOF WORK NOTE MARK

1PHOTO KEY

PLAN LEGEND

ROOF WORK SCHEDULE

A CLEAN AND PREPARE ALL EXISTING METAL ROOFING PANELS

AND INSTALL NEW SINGLE-PLY MEMBRANE ROOFING SYSTEM

PER THE DETAILS AND SPECIFICATIONS

B INFILL EXISTING OPENING IN ROOF WHERE MECHANICAL UNIT

WAS REMOVED. SEE DETAILS.

C RELOCATE EXISTING MECHANICAL UNIT AND CURB. EXTEND

CURB PER THE DETAILS. SEE MECHANICAL DRAWINGS.

D FURNISH AND INSTALL NEW ALUMINUM HOUSING TO MATCH

EXISTING FOR MECHANICAL EXHAUST FAN.

E REMOVE AND DISCARD EXISTING METAL GUTTER,

DOWNSPOUTS AND CONCRETE SPLASH BLOCKS. FURNISH

AND INSTALL NEW PRE-FINISHED GUTTERS AND

DOWNSPOUTS. NEW DOWNSPOUTS SHALL ALIGN WITH

EXISTING ALUMINUM CANOPY COLUMNS AND RUN DOWN TOP

OF CANOPY AND DOWN COLUMNS. FURNISH AND INSTALL

NEW CONCRETE SPLASH BLOCKS AT ALL DOWNSPOUTS.

F TEMPORARILY REMOVE EXISTING MECHANICAL UNIT AND

EXTEND EXISTING THROUGH NEW ROOFING PER DETAILS AND

SPECIFICATIONS.

G PRESSURE WASH AND CLEAN EXISTING ALUMINUM CANOPY.

H REMOVE AND DISCARD EXISTING RAKE TRIM AND REPLACE

WITH NEW P.T. WOOD FASCIA BLOCKING. SEE DETAILS.

J REMOVE EXISTING CAPPED OFF ROOF CURB. PATCH EXISTING

OPENING AND INSTALL NEW ROOFING SYSTEM. SEE DETAILS.

K GC TO REMOVE AND REINSTALL THE LIGHTNING PROTECTION

SYSTEM ON THE ROOF AND ALSO ANY OTHER

CABLES/SYSTEMS THAT ARE PENETRATING THE ROOF.

1. INSTALL NEW MECHANICALLY ATTACHED FLUTE FILLER

INSULATION, COVER BOARD, AND SINGLE PLY PVC ROOFING

MEMBRANE (SEE SPECIFICATIONS), AND ASSOCIATED METAL

FLASHING COMPONENTS OVER THE EXISTING ROOFING

SYSTEM. (DUE TO THE LOCATION OF THE FACILITY AND THE

NECESSITY FOR HIGH WIND RESISTANT ATTACHMENT A

"RHINO-BOND" OR SIMILAR SYSTEM FOR THERMALLY

ATTACHING THE NEW ROOF MEMBRANE TO THE FASTENER

PLATES THEREBY RESULTING IN THE DIRECT ATTACHMENT

OF THE MEMBRANE TO THE STRUCTURAL ROOF DECK

SYSTEM.

2. INSTALL NEW THRU-WALL COUNTER FLASHINGS AND

NECESSARY FRAMING AT ALONG THE BOTTOM OF THE

EXISTING METAL WALL PANELS.

3. REPLACE ALL EXISTING GUTTERS AND DOWNSPOUTS WITH

PRE-FINISHED METAL. GUTTERS SHALL UTILIZE A PROFILE

THAT ALLOWS FOR THE PROPER OVERFLOW OF THE

GUTTERS DURING EXTREME RAINFALL EVENTS.

4. REMOVE ANY ABANDONED ROOF CURBS AND RELOCATE ANY

CURBS / PENETRATIONS AWAY FROM VERTICAL WALL

PANELS.

5. INSTALL NEW FLEXIBLE TAPE / FABRIC AT ALL VERTICAL

JOINTS OF EXISTING WALL PANELS AND INSTALL NEW

ELASTOMERIC COATING OVER ALL METAL WALL PANELS.

DEMOLITION SCHEDULE

1. REMOVE AND DISCARD EXISTING STAINED / DAMAGED

CEILING TILES FROM THIS AREA. FURNISH AND INSTALL NEW

CEILING TILES TO MATCH EXISTING. SEE REFLECTED

CEILING PLAN.

2. REMOVE EXISTING ABANDONED MECHANICAL UNIT ROOFING

CURB AND PREPARE THE OPENING TO BE INFILLED PER THE

DETAILS. SEE ROOF PLAN

3. SAWCUT AND REMOVE THIS PORTION OF EXISTING METAL

WALL PANEL AND ASSOCIATED FLASHING. PROTECT

TEMPORARY OPENING FROM MOISTURE INTRUSION FOR

THE DURATION OF THE PROJECT. INSTALL NEW INFILL,

SUPPORTING ITEMS, FLASHINGS, ROOFING MEMBRANE, ETC.

IN ACCORDANCE WITH NEW DETAILS. SEE ELEVATIONS

AutoCAD SHX Text
2" VTR
AutoCAD SHX Text
2" VTR
AutoCAD SHX Text
3" VTR
AutoCAD SHX Text
3" VTR
AutoCAD SHX Text
SLOPE
AutoCAD SHX Text
SLOPE
AutoCAD SHX Text
A
AutoCAD SHX Text
A2.1

HVAC INSTALLATION NOTES

ROOF MOUNTED EQUIPMENT

TYPICAL CURB FOR

TYPICAL RELIEF VENT DETAIL

HVAC & PLUMBING DRAWING INDEX

PLUMBING RENOVATION NOTES

PLUMBING NOTES

OPERATIONS BUILDING HVAC & PLUMBING ROOF PLAN

EXISTING CONDITIONS DRAWING IS FOR REFERENCE

PURPOSES ONLY. DEMOLITION IS SHOWN. OTHER NOTES ON

PLANS APPLY TO PREVIOUS PROJECTS AND DO NOT REPRESENT

NEW WORK EXCEPT AS SHOWN ON REVISED PLANS. FIELD VERIFY

ALL EXISTING CONDITIONS PRIOR TO BEGINNING ANY WORK.

S TA T E OF A LABAMA

REG I S T ERED ARCH I T ECT

J.MICHAELRUTLAND

2149

TIMOTHY R.HOLMES

3188

Project Number:

Sheet Description

Revisions:

Date:

Sheet Number

OF

445 Dexter Avenue

Suite 5050

Montgomery, Al 36104

Phone: (334) 420-5672

Fax: (334) 420-5692

JMR+H

A r c h i t e c t u r e , P C

21-1089

13

4 AUGUST 2021

DOCUMENTS

CONSTRUCTION

WHORTON ENGINEERING, INC.

MOBILE, ALABAMA

MOBILE AASF #3

ACT of NATURE

(AoN) REPAIRS

IFB#: AC-21-B-0025-S

BI.B/MP1.1

OPERATIONS

BUILDING HVAC &

PLUMBING ROOF

PLAN

13

AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
EXTEND FLUE THRU NEW ROOF.
AutoCAD SHX Text
RELOCATE EXISTING RELIEF VENT TO NEW ROOF. (GV-5)
AutoCAD SHX Text
RELOCATE EXISTING RELIEF VENT TO NEW ROOF. (GV-5)
AutoCAD SHX Text
RELOCATE EXISTING RELIEF VENT TO NEW ROOF. (GV-2)
AutoCAD SHX Text
2" VTR
AutoCAD SHX Text
2" VTR
AutoCAD SHX Text
3" VTR
AutoCAD SHX Text
3" VTR
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
2 FURNISH AND INSTALL NEW FLUE / ROOF CAP. EXTEND NEW FLUE TO EXISTING EQUIPMENT.
AutoCAD SHX Text
LOCATION WITH ROOFING CONTRACTOR. CONTRACTOR SHALL RELOCATE EXISTING EQUIPMENT
AutoCAD SHX Text
1 ROOFING CONTRACTOR SHALL FURNISH AND INSTALL NEW CURB. COORDINATE SIZE AND
AutoCAD SHX Text
TO NEW ROOF AND EXTEND ALL DUCTWORK, CONTROL WIRING, GAS PIPING, ETC. REQUIRED
AutoCAD SHX Text
TO RELOCATE EQUIPMENT.
AutoCAD SHX Text
CONTRACTOR SHALL FURNISH AND INSTALL HURRICANE RATED STRAPS FOR WIND LOAD OF 200 MPH
AutoCAD SHX Text
ON ALL ROOF MOUNTED EQUIPMENT. (REFERENCE DETAIL)
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
EXISTING ROOF
AutoCAD SHX Text
STRUCTURE
AutoCAD SHX Text
NEW STAINLESS STEEL 3"X12" PLATE (WELDED)
AutoCAD SHX Text
NEW 3/8" DIA. STAINLESS STEEL HARDWARE
AutoCAD SHX Text
NEW STAINLESS STEEL 3" HOOKEYE (WELDED)
AutoCAD SHX Text
NEW 1/4" STAINLESS STEEL CABLE
AutoCAD SHX Text
NEW PREMIUM HOODED FASTENER WITH
AutoCAD SHX Text
WEATHERSEAL WASHER (8" O.C.)
AutoCAD SHX Text
NEW STAINLESS STEEL "U" BOLT
AutoCAD SHX Text
NEW STAINLESS STEEL 3" HOOKEYE (WELDED)
AutoCAD SHX Text
EXISTING ROOF
AutoCAD SHX Text
ROOF CURB
AutoCAD SHX Text
NEW 3/8" DIA. STAINLESS
AutoCAD SHX Text
STEEL HARDWARE
AutoCAD SHX Text
FURNISH AND INSTALL GALVANIZED STEEL CHANNELS
AutoCAD SHX Text
ACROSS EXISTING ROOF MOUNTED EQUIPMENT RAILS.
AutoCAD SHX Text
ANCHOR CHANNELS TO EQUIPMENT RAILS WITH FOUR
AutoCAD SHX Text
NEW STAINLESS STEEL
AutoCAD SHX Text
3"X12" PLATE (WELDED -
AutoCAD SHX Text
CANT-STRIP
AutoCAD SHX Text
3/8" BOLTS. BOLT UNIT TO CHANNELS AND ANCHOR
AutoCAD SHX Text
CONDENSING UNIT WITH HURRICANE RESISTANT STRAPS
AutoCAD SHX Text
FOR 200 MPH WIND LOAD.
AutoCAD SHX Text
SET IN CONT. TAPE MASTIC)
AutoCAD SHX Text
NEW PRESSURED TREATED
AutoCAD SHX Text
2X WOOD BLOCKING - CUT
AutoCAD SHX Text
TO FIT (TYPICAL).
AutoCAD SHX Text
NOTE: 8" MINIMUM FROM TOP
AutoCAD SHX Text
OF EQUIPMENT CURB TO NEW
AutoCAD SHX Text
ROOF SYSTEM - TYPICAL
AutoCAD SHX Text
(SEE ROOF CURB DETAILS FOR
AutoCAD SHX Text
ADDITIONAL INFORMATION)
AutoCAD SHX Text
(2 AT EACH END) - TYPICAL
AutoCAD SHX Text
NEW STAINLESS STEEL CABLE CLAMPS
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
RELIEF VENT, MINIMUM
AutoCAD SHX Text
18 GAUGE ALL ALUMINUM
AutoCAD SHX Text
CONSTRUCTION, STANDARD
AutoCAD SHX Text
MANUFACTURER ITEM EQUAL
AutoCAD SHX Text
TO LOREN COOK PR
AutoCAD SHX Text
PRE-FAB CURB BY MECHANICAL
AutoCAD SHX Text
CONTRACTOR, 16 GAUGE ALUMINUM
AutoCAD SHX Text
WELDED BUILT-IN CANT.,
AutoCAD SHX Text
2" INSULATION
AutoCAD SHX Text
12"
AutoCAD SHX Text
BIRDSCREEN
AutoCAD SHX Text
ROOF OPENING
AutoCAD SHX Text
AS REQUIRED BY
AutoCAD SHX Text
MANUFACTURER'S
AutoCAD SHX Text
RECOMMENDATIONS
AutoCAD SHX Text
FROM EXHAUST
AutoCAD SHX Text
FAN (SEE PLAN)
AutoCAD SHX Text
FROM EXHAUST
AutoCAD SHX Text
FAN (SEE PLAN)
AutoCAD SHX Text
BACKDRAFT DAMPER
AutoCAD SHX Text
FACTORY
AutoCAD SHX Text
COORDINATE ALL ROOF CURBS WITH THE ROOFING CONTRACTOR
AutoCAD SHX Text
PRIME AND PAINT ROOF CURB TO MATCH ROOF
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
OPERATIONS BUILDING HVAC & PLUMBING ROOF PLAN
AutoCAD SHX Text
BI.B/MP1.1
AutoCAD SHX Text
1 EXTEND EXISTING PLUMBING VENT UP 12" ABOVE NEW ROOFING SURFACE. REFERENCE ARCHITECTURAL PLANS FOR TYPICAL VENT PIPE FLASHING DETAIL.
AutoCAD SHX Text
1. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS. IT IS THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS. IT IS INTENDED THAT A COMPLETE PLUMBING SYSTEM BE PROVIDED WITH ALL NECESSARY EQUIPMENT, ACCESSORIES, AND CONTROLS COMPLETELY COORDINATED WITH ALL TRADES. ALL REQUIREMENTS GIVEN IN THESE DOCUMENTS SHALL BE STRICTLY CONFORMED TO. ANY ITEMS AND LABOR REQUIRED FOR A COMPLETE PLUMBING SYSTEM IN ACCORDANCE WITH ALL APPLICABLE CODES, STANDARDS, LOCAL AUTHORITIES, AND THESE CONTRACT DOCUMENTS SHALL BE FURNISHED WITHOUT INCURRING ANY ADDITIONAL COST TO THE OWNER. CAREFULLY REVIEW ALL CONTRACT DOCUMENTS AND THE DESIGN OF OTHER TRADES BEFORE PREPARING SHOP DRAWINGS. 2. PLUMBING CONTRACTOR SHALL MAKE FINAL CONNECTIONS TO ALL EQUIPMENT INDICATED ON DRAWINGS FINAL PLUMBING CONTRACTOR SHALL MAKE FINAL CONNECTIONS TO ALL EQUIPMENT INDICATED ON DRAWINGS FINAL CONNECTION SHALL INCLUDE ANY ADAPTORS, NIPPLES, SHUT-OFF VALVES, PRV'S, SHOCK ABSORBERS, BACKFLOW PREVENTION DEVICES, REGULATORS, ETC. 3. FIELD VERIFY EXISTING QUANTITY AND LOCATIONS OF ALL PLUMBING VENTS. EXTEND VENTS AS NOTED ON PLANS OR FIELD VERIFY EXISTING QUANTITY AND LOCATIONS OF ALL PLUMBING VENTS. EXTEND VENTS AS NOTED ON PLANS OR REQUIRED FOR NEW ROOFING.
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text
W
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
N
AutoCAD SHX Text
HVAC - PLUMBING - PROCESS CONTROL
AutoCAD SHX Text
RANDALL WHORTON, P.E.
AutoCAD SHX Text
PHONE: (256) 820-9897
AutoCAD SHX Text
WHORTON ENGINEERING PROJECT NO. 21172
AutoCAD SHX Text
25 SUMMERALL GATE ROAD
AutoCAD SHX Text
ANNISTON, ALABAMA 36205
AutoCAD SHX Text
DATE
AutoCAD SHX Text
08-04-2021
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
D
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
W
AutoCAD SHX Text
H
AutoCAD SHX Text
.
AutoCAD SHX Text
D
AutoCAD SHX Text
No.14192
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
M
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
E