Sample Certification Questions This section includes some sample certification questions that may help familiarize you with the certification test. Questions Topic: Inventory Management Question 1 (5bf007 E) In the purchase order on which the goods receipt is based, you defined a purchase order price unit that differs from the purchase order unit. What is the significance of the purchase order price unit and what should you take note of in the case of a goods receipt? Answer 1: The purchase order price unit is stored in the material master record or purchasing info record and defines the unit of measure in which the material is ordered. Answer 2: The system establishes the relationship between the purchase order price unit and the purchase order unit by unit conversion in the purchase order. Answer 3: At the time of goods receipt, both the quantity in the purchase order unit and the quantity in the purchase order price unit have to be entered, however, the quantity in purchase order price unit is calculated by the system. You have to change it, when the calculated quantity differs from reality. Answer 4: Both at the time of goods receipt and invoice verification, the material is valuated on the basis of the purchase order unit.

Upload: penukonda8197

Post on 08-Apr-2015

225 views

Category:

Documents


10 download

TRANSCRIPT

Page 1: MM - Sample Certification Questions

Sample Certification Questions

This section includes some sample certification questions that may help familiarize you with the certification test.

Questions

Topic: Inventory Management

Question 1 (5bf007 E)

In the purchase order on which the goods receipt is based, you defined a purchase order price unit that differs from the purchase order unit. What is the significance of the purchase order price unit and what should you take note of in the case of a goods receipt?

Answer 1:

The purchase order price unit is stored in the material master record or purchasing info record and defines the unit of measure in which the material is ordered.

Answer 2:

The system establishes the relationship between the purchase order price unit and the purchase order unit by unit conversion in the purchase order.

Answer 3:

At the time of goods receipt, both the quantity in the purchase order unit and the quantity in the purchase order price unit have to be entered, however, the quantity in purchase order price unit is calculated by the system. You have to change it, when the calculated quantity differs from reality.

Answer 4:

Both at the time of goods receipt and invoice verification, the material is valuated on the basis of the purchase order unit.

Page 2: MM - Sample Certification Questions

Question 2 (5bf010 E)

You enter a goods issue and receive the following message: "W: On <current date>, only 0.000 pieces are available".What do you conclude from this?

Answer 1:

No stocks of the material exist anywhere in the entire plant. Therefore, nothing can be withdrawn.

Answer 2:

Only the specified storage location does not contain any stocks of the material. Therefore, nothing can be withdrawn.

Answer 3:

The material exists in the specified storage location on the current day, however, it is unavailable, because of other reservations.

Answer 4:

The message represents a warning which you can ignore by pressing the ENTER key.

Page 3: MM - Sample Certification Questions

Question 3 (5bf018 E)

At which level is physical inventory carried out in Inventory Management ?

Answer 1:

At material level

Answer 2:

At material/stock type level

Answer 3:

At material/plant/stock type level

Answer 4:

At material/plant/storage location/stock type level

Page 4: MM - Sample Certification Questions

Question 4 (5bf019 E)

What options do you have after entering a physical inventory count for a raw material?

Answer 1:

You can initiate a recount.

Answer 2:

You can print a list of differences to determine the materials you have to recount.

Answer 3:

You can post an inventory difference, whereby a material document and an accounting document are created in the background.

Answer 4:

You can post the inventory difference, whereby only an accounting document is created in the background.

Page 5: MM - Sample Certification Questions

Question 5 (5bf021 E)

How do you replicate a delivery free of charge in R/3’s Materials Management?

Answer 1:

You enter a purchase order with the purchase order price. Then, however, you post the receipt with reference to the purchase order using a non-valuated movement type.

Answer 2:

You enter a purchase order item, set its invoice indicator to blank and its purchase order price to zero, and then post the goods receipt.

Answer 3:

You do not enter a purchase order, but post the delivery free of charge using a specific movement type in Inventory Management.

Answer 4:

You create the material with the material type UNBW and then post the goods receipt without reference to the purchase order.

Page 6: MM - Sample Certification Questions

Question 6

When does the system automatically create a storage location view in the material master record?

Answer 1:

At the first goods receipt into special stocks the system creates a special stock - storage location view with the number 9999.

Answer 2:

Automatic creation of storage locations (views) must be permitted for the plant.

Answer 3:

In customizing, you can define for movement types whether at goods movement the system creates a storage location view automatically.

Answer 4:

If the first goods receipt of a material is posted to a cost center and you have set the automatic creation of storage location views for the plant and movement type, the system creates the storage location view automatically.

Page 7: MM - Sample Certification Questions

Question 7

Which of the following statements about movement types are true?

Answer 1:

The movement type influences the update of material stock account and consumption account.

Answer 2:

In the standard SAP system, you can enter per material document only goods movements of one movement type.

Answer 3:

Goods movements, that are created from other application areas (for example a delivery in SD), are not described with movement types .

Answer 4:

The movement type used controls field selection for the goods movement transaction.

Answer 5:

If you use special stock indicators, you can create different stock and value updates of a material for one and the same movement type.

Page 8: MM - Sample Certification Questions

Topic: Valuation

Question 1 (5bw011 E)

Which of the following statements on procuring a material of material type NLAG are correct?

Answer 1:

The purchase order must be account assigned.

Answer 2:

The goods receipt must always be non-valuated.

Answer 3:

When you enter an invoice, you can change the account assignment as long as the goods receipt was non-valuated.

Answer 4:

When the material is for consumption, no document is ever created in Financial Accounting.

Page 9: MM - Sample Certification Questions

Question 2 (5bw012 E)

Which of the following stock transfers/transfer postings are relevant to valuation?

Answer 1:

Stock transfer from storage location to storage location within the same plant.

Answer 2:

Stock transfer from consignment stores of vendor XY to our unrestricted-use stock in storage location 0001.

Answer 3:

Transfer posting from stock in quality inspection in storage location 001 to stock in quality inspection in storage location 0002 within the same plant.

Answer 4:

Stock transfer of a material from storage location 0001 from plant 0001 to plant 0002. The plants belong to the same company, however the valuation areas are different (valuation level is plant).

Page 10: MM - Sample Certification Questions

Question 3

Which of the following statements about valuation classes are true?

Answer 1:

The valuation class is maintained in the material master record at the storage location level. With that, a split valuation per storage location is possible.

Answer 2:

The valuation class is maintained in the material master record at valuation area level. With that, different account determination is possible for the materials of one material type. For example, you can have different material stock accounts for different materials of the same material type.

Answer 3:

The valuation class is a standard class of the classification system. A characteristic of this class refers to the moving average price or standard price in the accounting view in the material master record. With that, it is possible to search for materials with similar prices. The search is possible with direct values, intervals and greater than / less than relationships.

Answer 4:

The valuation classes will be tied to one or more material types via an account category reference.

Page 11: MM - Sample Certification Questions

Question 4 (5bw017 E)

Which of the following statements on price control in the SAP R/3 system are correct?

Answer 1:

Price control “S” allows only purchase orders with constant prices. Therefore, for purchased materials with price control “S”, you should arrange outline agreements to protect the constant price.

Answer 2:

Price control “V” is recommended for purchased materials.

Answer 3:

If a goods issue is posted between when you post the goods receipt and when you post the invoice, and this leads to the total stock being smaller that the quantity to be settled, the system posts any differences between the purchase order price and the invoice for the quantity consumed (stock shortage) to a price difference account, irrespective of the price control that the material is subject to.

Answer 4:

The importance of price control “V” depends on whether the material ledger is active or not. If you are not working with the material ledger, price control “V” means that you are using the moving average price. This means that the value of the stock account and the price per price unit is adjusted for existing stocks.

Answer 5:

In the case of differences between the purchase order price and the valuation price in the material master, the difference is posted to a GR/IR clearing account at goods receipt if you are working with price control “S”. This is then cleared when the invoice is posted.

Page 12: MM - Sample Certification Questions

Topic: Material Req. Planning

Question 1 (5di006 E)

Which prerequisites must be fulfilled before a new MRP list can be created for a material?

Answer 1:

The material was included in the planning run.

Answer 2:

The creation indicator allows the creation of MRP lists

Answer 3:

The material has been assigned an MRP group.

Answer 4:

The material has been assigned an MRP profile.

Answer 5:

The planning run is carried out in the background.

Page 13: MM - Sample Certification Questions

Question 2 (5di022 E)

Which data must you have maintained in the system so that schedule lines are automatically created as a result of the planning run for forecast-based planning?

Answer 1:

MRP procedure VV is defined in the material master record; past consumption values exist; a scheduling agreement exists; a source list with the scheduling agreement as the supply source is defined as relevant to planning; a forecast exists; a planning run is executed with an appropriate setting for the automatic creation of schedule lines.

Answer 2:

MRP procedure VV is defined in the material master record; a scheduling agreement exists; a quota arrangement exists and is defined as relevant to planning; a forecast exists; a planning run is executed with an appropriate setting for the automatic creation of schedule lines.

Answer 3:

MRP procedure VV is defined in the material master record; a scheduling agreement exits; a source list with the scheduling agreement as the supply source is defined as relevant to planning; a forecast exists; a planning run is executed with an appropriate setting for the automatic creation of schedule lines.

Answer 4:

MRP procedure VV is define in the material master record; past consumption values exist; a scheduling agreement exists; a quota arrangement relevant to planning exists; a forecast exists; a planning run is executed with an appropriate setting for the automatic creation of schedule lines.

Page 14: MM - Sample Certification Questions

Question 3

Which MRP procedures are used in consumption-based planning?

Answer 1:

Forecast-based Planning

Answer 2:

Material requirements Planning

Answer 3:

Manual reorder point Planning

Answer 4:

Systematic materials Planning

Answer 5:

Time-phased materials Planning

Page 15: MM - Sample Certification Questions

Topic: Purchasing

Question 1 (5ek019 E)

How can a purchasing info record be generated?

Answer 1:

Manual entry

Answer 2:

Update from purchase order

Answer 3:

Update from purchase requisition

Answer 4:

Update from RFQ

Page 16: MM - Sample Certification Questions

Question 2 (5ek024 E)

Purchase orders can be outputted (printed or transmitted) in different languages. Where does the system obtain the information determining the language in which a PO is to be printed?

Answer 1:

Customizing setting

Answer 2:

The language must be specified when you log on to the system. This is then used as the basis for system printing.

Answer 3:

You specify the language to be generally used for communication purposes for each vendor in the vendor master record.

Answer 4:

The language from the PO header is used.

Answer 5:

The language is defined via the material short text.

Page 17: MM - Sample Certification Questions

Question 3 (5ek026 E)

How is the outputting (printing/transmission) of purchase orders controlled?

Answer 1:

As a rule, the system attempts to determine a message record for each message type in the message schema by means of an access sequence.

Answer 2:

A message record in the PO header contains all the information that is necessary for outputting, such as the printer and the transmission time-spot.

Answer 3:

Printing only takes place if the print indicator has been set in the PO item.

Answer 4:

Printing only takes place if at least one message record can be found.

Page 18: MM - Sample Certification Questions

Question 4 (5ek027 E)

What is an access sequence?

Answer 1:

The access sequence is used within the context of the "condition technique" to find condition records.

Answer 2:

An access sequence can comprise several condition tables.

Answer 3:

An access sequence defines which condition records are allowed and the sequence in which they are selected.

Answer 4:

An access sequence is assigned to the condition types that are to be determined automatically.

Answer 5:

Within an access sequence you can define, that after the first successful access at a condition record the system is not searching another records.

Page 19: MM - Sample Certification Questions

Question 5 (5ek028 E)

How does the system determine the conditions when creating a purchase order?

Answer 1:

The system uses an access sequence stored in Customizing to determine the appropriate info record.

Answer 2:

If the info record concerned was created manually, you can copy the conditions directly from the info record to the purchase order.

Answer 3:

If the info record concerned was created automatically, there is only a reference to the previous purchase order, from which the system then determines the conditions.

Answer 4:

You can enter the conditions manually. However, you cannot use scale prices.

Page 20: MM - Sample Certification Questions

Question 6 (5ek036 E)

Which statements regarding the release (approval) of purchase requisitions with classification are correct?

Answer 1:

The assignment of the release strategy is effected automatically via the values assigned to the class characteristics.

Answer 2:

The release status describes which follow-on actions are possible in connection with the purchase requisition (for example, release for issue of RFQs, release for issue of RFQs and PO).

Answer 3:

The purpose of the release strategy is to exercise control over the transmission of the purchase requisition.

Page 21: MM - Sample Certification Questions

Question 7 (5ek037 E)

In which way can you obtain information on purchase orders issued to a vendor that have not yet been invoiced?

Answer 1:

You make use of a list that displays all the purchase orders issued to a certain vendor. You limit the POs shown on the list to those that have not yet been invoiced by the appropriate definition of the Scope of List.

Answer 2:

You make use of a list that displays all the purchase orders issued to a certain vendor. You limit the POs shown on the list to those that have not yet been invoiced by means of the selection parameters.

Answer 3:

The selection parameters and list scopes are predefined by SAP and cannot be changed.

Page 22: MM - Sample Certification Questions

Question 8

How does the system assign prices to items when creating a purchase order? To what extent can you use these prices in subsequent purchase orders?

Answer 1:

You can enter conditions manually. However, you cannot use scale prices.

Answer 2:

The conditions for the purchase order items are saved as conditions in the info record. The system then proposes these prices in subsequent purchase orders.

Answer 3:

Info records that the system created automatically from the purchase order only contain the reference to the previous purchase order, from which the system determines the conditions.

Answer 4:

If there is no info record, and if the purchase order item is created with reference to a purchase requisition item that has a material master record, the system assumes the price from the purchase requisition.

Page 23: MM - Sample Certification Questions

Question 9

What does the purchasing document type control?

Answer 1:

Number assignment

Answer 2:

Permitted item categories

Answer 3:

The eligibility of scaled prices in contracts

Answer 4:

The eligibility of scaled prices in scheduling agreements

Answer 5:

Which header texts, appendix texts, and item texts are printed

Page 24: MM - Sample Certification Questions

Topic: Invoice Verification

Question 1 (5rp001 E)

Which options for handling cash discounts are available in R/3?

Answer 1:

Gross or net posting at the time of goods receipt

Answer 2:

Gross or net posting at the time of invoice receipt

Answer 3:

Gross or net posting at the time of purchase order entry

Answer 4:

Deduction of cash discount during the payment run in Financial Accounting

Answer 5:

Gross or net posting when the invoice is released

Page 25: MM - Sample Certification Questions

Question 2 (5rp006 E)

Which of the following statements on purchasing transactions using foreign currencies are correct?

Answer 1:

An exchange rate can be entered in the order header. This is only for statistical purposes to be able to analyze fluctuations.

Answer 2:

At goods receipt the system uses the current exchange rate.

Answer 3:

You can configure the system so that it uses the current exchange rate in Invoice Verification.

Answer 4:

You can configure the system so that it uses the exchange rate from the purchase order in Invoice Verification.

Answer 5:

You can configure the system so that it uses the exchange rate from the order header in Invoice Verification.

Page 26: MM - Sample Certification Questions

Question 3

What must you take into account if you want to post an invoice before the goods receipt? What are the consequences of using this procedure?

Answer 1:

You must set the GR-based invoice verification indicator in the purchase order at the latest.

Answer 2:

Before you enter the invoice, you must set the GR-based invoice verification indicator in the vendor master record.

Answer 3:

The system cannot refer to the quantity to be settled and the corresponding amount. You must enter this information manually every time.

Answer 4:

The system identifies a quantity variance and blocks the invoice for payment (provided that the appropriate tolerance limits are exceeded).

Page 27: MM - Sample Certification Questions

Topic: Master Data

Question 1

Which of the following statements about the material number are true?

Answer 1:

You can extend the length of the material number to a maximum of 40 characters. You configure this in Customizing.

Answer 2:

When you create a material, the system checks if the material number falls within a number range defined in Customizing, depending on the material type.

Answer 3:

The system checks the existence of the material number in all transactions that work with material master records.

Answer 4:

When you create a new material master record without specifying a material number, the system always generates a material number automatically.

Answer 5:

You can use a template to format the material number, which you configure in Customizing. It applies to all material master records in an R/3 System.

Page 28: MM - Sample Certification Questions

Question 2 (5st006 E)

What controls the account group in the vendor master?

Answer 1:

Account determination

Answer 2:

Field selection in the vendor master

Answer 3:

Type of number assignment for vendor master

Answer 4:

Particular use of vendor master record in your business.

Page 29: MM - Sample Certification Questions

Answers

Topic: Inventory Management

Question 1 (5bf007 E)

In the purchase order on which the goods receipt is based, you defined a purchase order price unit that differs from the purchase order unit.What is the significance of the purchase order price unit and what should you take note of in the case of a goods receipt?

Answer 1: Incorrect

The purchase order price unit is stored in the material master record or purchasing info record and defines the unit of measure in which the material is ordered.

Answer 2: Correct

The system establishes the relationship between the purchase order price unit and the purchase order unit by unit conversion in the purchase order.

Answer 3: Correct

At the time of goods receipt, both the quantity in the purchase order unit and the quantity in the purchase order price unit have to be entered, however, the quantity in purchase order price unit is calculated by the system. You have to change it, when the calculated quantity differs from reality.

Answer 4: Incorrect

Both at the time of goods receipt and invoice verification, the material is valuated on the basis of the purchase order unit.

Page 30: MM - Sample Certification Questions

Question 2 (5bf010 E )

You enter a goods issue and receive the following message: "W: On <current date>, only 0.000 pieces are available".What do you conclude from this?

Answer 1: Incorrect

No stocks of the material exist anywhere in the entire plant. Therefore, nothing can be withdrawn.

Answer 2: Incorrect

Only the specified storage location does not contain any stocks of the material. Therefore, nothing can be withdrawn.

Answer 3: Correct

The material exists in the specified storage location on the current day, however, it is unavailable, because of other reservations.

Answer 4: Correct

The message represents a warning which you can ignore by pressing the ENTER key.

Page 31: MM - Sample Certification Questions

Question 3 (5bf018 E)

At which level is physical inventory carried out in Inventory Management ?

Answer 1: Incorrect

At material level

Answer 2: Incorrect

At material/stock type level

Answer 3: Incorrect

At material/plant/stock type level

Answer 4: Correct

At material/plant/storage location/stock type level

Page 32: MM - Sample Certification Questions

Question 4 (5bf019 E)

What options do you have after entering a physical inventory count for a raw material?

Answer 1: Correct

You can initiate a recount.

Answer 2: Correct

You can print a list of differences to determine the materials you have to recount.

Answer 3: Correct

You can post an inventory difference, whereby a material document and an accounting document are created in the background.

Answer 4: Incorrect

You can post the inventory difference, whereby only an accounting document is created in the background.

Page 33: MM - Sample Certification Questions

Question 5 (5bf021 E)

How do you replicate a delivery free of charge in R/3’s Materials Management?

Answer 1: Incorrect

You enter a purchase order with the purchase order price. Then, however, you post the receipt with reference to the purchase order using a non-valuated movement type.

Answer 2: Correct

You enter a purchase order item, set its invoice indicator to blank and its purchase order price to zero, and then post the goods receipt.

Answer 3: Correct

You do not enter a purchase order, but post the delivery free of charge using a specific movement type in Inventory Management.

Answer 4: Incorrect

You create the material with the material type UNBW and then post the goods receipt without reference to the purchase order.

Page 34: MM - Sample Certification Questions

Question 6

When does the system automatically create a storage location view in the material master record?

Answer 1: Incorrect

At the first goods receipt into special stocks the system creates a special stock - storage location view with the number 9999.

Answer 2: Correct

Automatic creation of storage locations (views) must be permitted for the plant.

Answer 3: Correct

In customizing, you can define for movement types whether at goods movement the system creates a storage location view automatically.

Answer 4: Incorrect

If the first goods receipt of a material is posted to a cost center and you have set the automatic creation of storage location views for the plant and movement type, the system creates the storage location view automatically.

Page 35: MM - Sample Certification Questions

Question 7

Which of the following statements about movement types are true?

Answer 1: Correct

The movement type influences the update of material stock account and consumption account.

Answer 2: Incorrect

In the standard SAP system, you can enter per material document only goods movements of one movement type.

Answer 3: Incorrect

Goods movements, that are created from other application areas (for example a delivery in SD), are not described with movement types.

Answer 4: Correct

The movement type used controls field selection for the goods movement transaction.

Answer 5: Correct

If you use special stock indicators you can create different stock and value updates of a material for one and the same movement type.

Page 36: MM - Sample Certification Questions

Topic: Valuation

Question 1 (5bw011 E)

Which of the following statements on procuring a material of material type NLAG are correct?

Answer 1: Correct

The purchase order must be account assigned.

Answer 2: Incorrect

The goods receipt must always be non-valuated.

Answer 3: Correct

When you enter an invoice, you can change the account assignment as long as the goods receipt was non-valuated.

Answer 4: Incorrect

When the material is for consumption, no document is ever created in Financial Accounting.

Page 37: MM - Sample Certification Questions

Question 2 (5bw012 E)

Which of the following stock transfers/transfer postings are relevant to valuation?

Answer 1: Incorrect

Stock transfer from storage location to storage location within the same plant or company code.

Answer 2: Correct

Stock transfer from consignment stores of vendor XY to our unrestricted-use stock in storage location 0001.

Answer 3: Incorrect

Transfer posting from stock in quality inspection in storage location 001 to stock in quality inspection in storage location 0002 within the same plant.

Answer 4: Correct

Stock transfer of a material from storage location 0001 from plant 0001 to plant 0002. The plants belong to the same company, however the valuation areas are different (valuation level is plant).

Page 38: MM - Sample Certification Questions

Question 3

Which of the following statements about valuation classes are true?

Answer 1: Incorrect

The valuation class is maintained in the material master record at the storage location level. With that, a split valuation per storage location is possible.

Answer 2: Correct

The valuation class is maintained in the material master record at valuation area level. With that, different account determination is possible for the materials of one material type. For example, you can have different material stock accounts for different materials of the same material type.

Answer 3: Incorrect

The valuation class is a standard class of the classification system. A characteristic of this class refers to the moving average price or standard price in the accounting view in the material master record. With that, it is possible to search for materials with similar prices. The search is possible with direct values, intervals and greater than / less than relationships.

Answer 4: Correct

The valuation classes will be tied to one or more material types via an account category reference..

Page 39: MM - Sample Certification Questions

Question 4 (5bw017 E)

Which of the following statements on price control in the SAP R/3 system are correct?

Answer 1: Incorrect

Price control “S” allows only purchase orders with constant prices. Therefore, for purchased materials with price control “S”, you should arrange outline agreements to protect the constant price.

Answer 2: Correct

Price control “V” is recommended for purchased materials.

Answer 3: Correct

If a goods issue is posted between when you post the goods receipt and when you post the invoice, and this leads to the total stock being smaller that the quantity to be settled, the system posts any differences between the purchase order price and the invoice for the quantity consumed (stock shortage) to a price difference account, irrespective of the price control that the material is subject to.

Answer 4: Correct

The importance of price control “V” depends on whether the material ledger is active or not. If you are not working with the material ledger, price control “V” means that you are using the moving average price. This means that the value of the stock account and the price per price unit is adjusted for existing stocks.

Answer 5: Incorrect

In the case of differences between the purchase order price and the valuation price in the material master, the difference is posted to a GR/IR clearing account at goods receipt if you are working with price control “S”. This is then cleared when the invoice is posted.

Page 40: MM - Sample Certification Questions

Topic: Material Req. Planning

Question 1 (5di006 E)

Which prerequisites must be fulfilled before a new MRP list can be created for a material?

Answer 1: Correct

The material was included in the planning run.

Answer 2: Correct

The creation indicator allows the creation of MRP lists.

Answer 3: Incorrect

The material has been assigned an MRP group.

Answer 4: Incorrect

The material has been assigned an MRP profile.

Answer 5: Incorrect

The planning run is carried out in the background.

Page 41: MM - Sample Certification Questions

Question 2 (5di022 E)

Which data must you have maintained in the system so that schedule lines are automatically created as a result of the planning run for forecast-based planning?

Answer 1: Correct

MRP procedure VV is defined in the material master record; past consumption values exist; a scheduling agreement exists; a source list with the scheduling agreement as the supply source is defined as relevant to planning; a forecast exists; a planning run is executed with an appropriate setting for the automatic creation of schedule lines.

Answer 2: Incorrect

MRP procedure VV is defined in the material master record; a scheduling agreement exists; a quota arrangement exists and is defined as relevant to planning; a forecast exists; a planning run is executed with an appropriate setting for the automatic creation of schedule lines.

Answer 3: Incorrect

MRP procedure VV is defined in the material master record; a scheduling agreement exits; a source list with the scheduling agreement as the supply source is defined as relevant to planning; a forecast exists; a planning run is executed with an appropriate setting for the automatic creation of schedule lines.

Answer 4: Incorrect

MRP procedure VV is define in the material master record; past consumption values exist; a scheduling agreement exists; a quota arrangement relevant to planning exists; a forecast exists; a planning run is executed with an appropriate setting for the automatic creation of schedule lines.

Page 42: MM - Sample Certification Questions

Question 3

Which MRP procedures are used in consumption-based planning?

Answer 1: Correct

Forecast-based Planning

Answer 2: Incorrect

Material requirements Planning

Answer 3: Correct

Manual reorder point Planning

Answer 4: Incorrect

Systematic materials Planning

Answer 5: Correct

Time-phased materials Planning

Page 43: MM - Sample Certification Questions

Topic: Purchasing

Question 1 (5ek019 E)

How can a purchasing info record be generated?

Answer 1: Correct

Manual entry

Answer 2: Correct

Update from purchase order

Answer 3: Incorrect

Update from purchase requisition

Answer 4: Incorrect

Update from RFQ

Page 44: MM - Sample Certification Questions

Question 2 (5ek024 E)

Purchase orders can be outputted (printed or transmitted) in different languages. Where does the system obtain the information determining the language in which a PO is to be printed?

Answer 1: Incorrect

Customizing setting

Answer 2: Incorrect

The language must be specified when you log on to the system. This is then used as the basis for system printing.

Answer 3: Correct

You specify the language to be generally used for communication purposes for each vendor in the vendor master record.

Answer 4: Correct

The language from the PO header is used.

Answer 5: Incorrect

The language is defined via the material short text.

Page 45: MM - Sample Certification Questions

Question 3 (5ek026 E)

How is the outputting (printing/transmission) of purchase orders controlled?

Answer 1: Correct

As a rule, the system attempts to determine a message record for each message type in the message schema by means of an access sequence.

Answer 2: Correct

A message record in the PO header contains all the information that is necessary for outputting, such as the printer and the transmission time-spot.

Answer 3: Incorrect

Printing only takes place if the print indicator has been set in the PO item.

Answer 4: Correct

Printing only takes place if at least one message record can be found.

Page 46: MM - Sample Certification Questions

Question 4 (5ek027 E)

What is an access sequence?

Answer 1: Correct

The access sequence is used within the context of the "condition technique" to find condition records.

Answer 2: Correct

An access sequence can comprise several condition tables.

Answer 3: Incorrect

An access sequence defines which condition records are allowed and the sequence in which they are selected.

Answer 4: Correct

An access sequence is assigned to the condition types that are to be determined automatically.

Answer 5: Correct

Within an access sequence you can define, that after the first successful access at a condition record the system is not searching another records.

Page 47: MM - Sample Certification Questions

Question 5 (5ek028 E)

How does the system determine the conditions when creating a purchase order?

Answer 1: Correct

The system uses an access sequence stored in Customizing to determine the appropriate info record.

Answer 2: Correct

If the info record concerned was created manually, you can copy the conditions directly from the info record to the purchase order.

Answer 3:Correct

If the info record concerned was created automatically, there is only a reference to the previous purchase order, from which the system then determines the conditions.

Answer 4: Correct

You can enter the conditions manually. However, you cannot use scale prices.

Page 48: MM - Sample Certification Questions

Question 6 (5ek036 E)

Which statements regarding the release (approval) of purchase requisitions with classification are correct?

Answer 1: Correct

The assignment of the release strategy is effected automatically via the values assigned to the class characteristics.

Answer 2: Correct

The release status describes which follow-on actions are possible in connection with the purchase requisition (for example, release for issue of RFQs, release for issue of RFQs and PO).

Answer 3: Incorrect

The purpose of the release strategy is to exercise control over the transmission of the purchase requisition.

Page 49: MM - Sample Certification Questions

Question 7 (5ek037 E)

In which way can you obtain information on purchase orders issued to a vendor that have not yet been invoiced?

Answer 1: Incorrect

You make use of a list that displays all the purchase orders issued to a certain vendor. You limit the POs shown on the list to those that have not yet been invoiced by the appropriate definition of the Scope of List.

Answer 2: Correct

You make use of a list that displays all the purchase orders issued to a certain vendor. You limit the POs shown on the list to those that have not yet been invoiced by means of the selection parameters.

Answer 3: Incorrect

The selection parameters and list scopes are predefined by SAP and cannot be changed.

Page 50: MM - Sample Certification Questions

Question 8

How does the system assign prices to items when creating a purchase order? To what extent can you use these prices in subsequent purchase orders?

Answer 1: Correct

You can enter conditions manually. However, you cannot use scale prices.

Answer 2: Incorrect

The conditions for the purchase order items are saved as conditions in the info record. The system then proposes these prices in subsequent purchase orders.

Answer 3: Correct

Info records that the system created automatically from the purchase order only contain the reference to the previous purchase order, from which the system determines the conditions.

Answer 4: Incorrect

If there is no info record, and if the purchase order item is created with reference to a purchase requisition item that has a material master record, the system assumes the price from the purchase requisition.

Page 51: MM - Sample Certification Questions

Question 9

What does the purchasing document type control?

Answer 1: Correct

Number assignment

Answer 2: Correct

Permitted item categories

Answer 3: Incorrect

The eligibility of scaled prices in contracts

Answer 4: Correct

The eligibility of scaled prices in scheduling agreements

Answer 5: Correct

Which header texts, appendix texts, and item texts are printed

Page 52: MM - Sample Certification Questions

Topic: Invoice Verification

Question 1 (5rp001 E)

Which options for handling cash discounts are available in R/3?

Answer 1: Correct

Gross or net posting at the time of goods receipt

Answer 2: Correct

Gross or net posting at the time of invoice receipt

Answer 3: Incorrect

Gross or net posting at the time of purchase order entry

Answer 4: Correct

Deduction of cash discount during the payment run in Financial Accounting

Answer 5: Incorrect

Gross or net posting when the invoice is released

Page 53: MM - Sample Certification Questions

Question 2 (5rp006 E)

Which of the following statements on purchasing transactions using foreign currencies are correct?

Answer 1: Incorrect

An exchange rate can be entered in the order header. This is only for statistical purposes to be able to analyze fluctuations.

Answer 2: Incorrect

At goods receipt the system uses the current exchange rate.

Answer 3: Correct

You can configure the system so that it uses the current exchange rate in Invoice Verification.

Answer 4: Correct

You can configure the system so that it uses the exchange rate from the purchase order in Invoice Verification.

Answer 5: Correct

You can configure the system so that it uses the exchange rate from the order header in Invoice Verification.

Page 54: MM - Sample Certification Questions

Question 3

What must you take into account if you want to post an invoice before the goods receipt? What are the consequences of using this procedure?

Answer 1: Incorrect

You must set the GR-based invoice verification indicator in the purchase order at the latest.

Answer 2: Incorrect

Before you enter the invoice, you must set the GR-based invoice verification indicator in the vendor master record.

Answer 3: Correct

The system cannot refer to the quantity to be settled and the corresponding amount. You must enter this information manually every time.

Answer 4: Correct

The system identifies a quantity variance and blocks the invoice for payment (provided that the appropriate tolerance limits are exceeded).

Page 55: MM - Sample Certification Questions

Topic: Master Data

Question 1

Which of the following statements about the material number are true?

Answer 1: Incorrect

You can extend the length of the material number to a maximum of 40 characters. You configure this in Customizing.

Answer 2: Correct

When you create a material, the system checks if the material number falls within a number range defined in Customizing, depending on the material type.

Answer 3: Correct

The system checks the existence of the material number in all transactions that work with material master records.

Answer 4: Incorrect

When you create a new material master record without specifying a material number, the system always generates a material number automatically.

Answer 5: Correct

You can use a template to format the material number, which you configure in Customizing. It applies to all material master records in an R/3 System.

Page 56: MM - Sample Certification Questions

Question 2 (5st006 E)

What controls the account group in the vendor master?

Answer 1: Incorrect

Account determination

Answer 2: Correct

Field selection in the vendor master

Answer 3: Correct

Type of number assignment for vendor master

Answer 4: Correct