Page 1: MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/2011. 2 TAC3/7/2011 02/22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization

MISUG TAC Update

Jackie AshbaughERCOT3/7/2011

Page 2: MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/2011. 2 TAC3/7/2011 02/22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization

2 TAC3/7/2011

02/22/2011 Meeting

Focus on the high priority items from MISUG:• Review task list prioritization from January meeting• Review NPRR for security classification changes

from SECURE to PUBLIC• Collect market MIS dashboard requirements

Page 3: MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/2011. 2 TAC3/7/2011 02/22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization

3 TAC3/7/2011

NPRR329, Correct Security Classification Changes for Extracts/Reports

• Submitted 2/23/2011 with request for Urgency• Urgency was granted• Updates the Protocol language to post on MIS PUBLIC for the

following reports:– Seven-Day Load Forecast by Forecast Zone– Seven-Day Load Forecast by Weather Zone– Short Term System Adequacy Report– Load Forecast Distribution Factors– Settlement Points List and Electrical Buses Mapping– DAM Ancillary Service Plan– Weather Assumptions– Aggregated Wind Generation Resource Power Potential Forecast– Actual and Forecasted Regional Wind Production– Hourly RMR Services Deployed– Daily RUC Active & Binding Transmission Constraints– Hourly RUC Active & Binding Transmission Constraints– Adverse Weather– System-Wide Demand– State Estimator Load Report - Load by Electrical Bus by Load Zone– State Estimator Load Report - Total System Load on Electrical Buses– State Estimator Load Report - Total ERCOT Generation– Changes to Transmission Facility Status– SCED Shadow Prices and Binding Transmission Constraints– Planned Service Four Coincident Peak Calculations Report– State Estimator Load Report – DC Tie Flows

Page 4: MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/2011. 2 TAC3/7/2011 02/22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization

4 TAC3/7/2011

Dashboard Enhancement Summary from 2/22 MISUG High Priority Changes

•  Make Dashboards Public

– Estimate promotion of following dashboards to public domain considering costs and benefit in public communications of:• LMP Contour map • Load Forecast vs. Actual• Real-Time System Conditions• SCED Up/Down• System Ancillary Services Capacity Monitor• New Wind Graph

• Enhance Real-Time System Conditions Dashboard

– Investigate using new 5-minute SE report implementing this month that includes all discreet element flows that make up CSCs and CREs except Valley Import and Laredo:

• Add Interface and CSCs with DC Ties on this display with labels• Consider new display of all available CSC/CRE elements

– Increase frequency of wind refresh to align with DC Tie frequency of 5 minutes

• SCED UpDown Dashboard

– Merge to be on same axis so SCED Up is positive, and SCED down is negative

• Wind Graph Dashboard

– Create graph and corresponding report - Total and Groupings of wind output

– Aggregate values Day-Ahead or 48-hr, Adjustment Period/Hourly, Actual (similar to load forecast vs actual)• Sub-total grouping for actual values• Both sides of W-N constraint• Coastal wind• The more granular the better in regional without confidentiality • Consider solar (other renewable)

Page 5: MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/2011. 2 TAC3/7/2011 02/22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization

5 TAC3/7/2011

03/31/2011 Meeting Agenda Topics

• Review new task list items and prioritize• Status update on NPRR329, Correct Security Classification

Changes for Extracts/Reports • Review draft SCRs and NPRRs for high priority dashboard

requirements for submission• Collect market requirements for high priority new reports to

draft NPRRs/OGRRs:– Daily Grid Operations Report– Monthly TDSP Load by LSE Report– DC Tie Schedules Report– Sum of HDLs/LDLs Report– Unconfirmed Trades Report– Total and Groupings of Wind Output Report

Page 6: MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/2011. 2 TAC3/7/2011 02/22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization

6 TAC3/7/2011

For Reference:

January Statistics

Page 7: MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/2011. 2 TAC3/7/2011 02/22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization

7 MISUG3/7/2011

ERCOT Website Page Views – January 2011

Page 8: MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/2011. 2 TAC3/7/2011 02/22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization

8 MISUG3/7/2011

External Web Services Market Transactions – January 2011

Page 9: MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/2011. 2 TAC3/7/2011 02/22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization

9 MISUG3/7/2011

External Web Services Market Info Reports – January 2011

Page 10: MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/2011. 2 TAC3/7/2011 02/22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization

10 MISUG3/7/2011

External Web Services Alerts/Notifications – January 2011

Page 11: MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/2011. 2 TAC3/7/2011 02/22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization

11 MISUG3/7/2011

External Web Services Alerts/Notifications – January 2011

Page 12: MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/2011. 2 TAC3/7/2011 02/22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization

12 MISUG3/7/2011

Market Extract & Report Postings – January 2011

Market Extract & Report PostingsRun on Feb. 3, 2011 6:11:02PM

Start Date: Jan 1, 2011End Date: Jan 31, 2011

Page 13: MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/2011. 2 TAC3/7/2011 02/22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization

13 MISUG3/7/2011

Top 10 Market Extract & Report Postings – January 2011

Top 10 Market Extract & Report PostingsRun on Feb. 3, 2011 6:09:38PM

Start Date: Jan 1, 2011End Date: Jan 31, 2011

Page 14: MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/2011. 2 TAC3/7/2011 02/22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization

14 MISUG3/7/2011

Market Extract & Report Downloads – January 2011

Market Extract & Report DownloadsRun on Feb. 3, 2011 5:14:42PM

Start Date: Jan 1, 2011End Date: Jan 31, 2011

Page 15: MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/2011. 2 TAC3/7/2011 02/22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization

15 MISUG3/7/2011

Top 10 Market Extract & Report Downloads – January 2011

Top 10 Market Extract & Report DownloadsRun on Feb. 3, 2011 6:04:12PM

Start Date: Jan 1, 2011End Date: Jan 31, 2011

Page 16: MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/2011. 2 TAC3/7/2011 02/22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization

16 TAC3/7/2011

Questions?