Minutes of the 86th meeting of State Environment Impact Assessment Authority
held on. 12.01.2016, under the Chairmanship Sh. Bharat Bhushan IAS (Retd.),
Chairman, SEIAA held in the meeting room of office of SEIAA Haryana, Sector-2
Panchkula, regarding Environmental Clearance under EIA Notification dated
14.9.2006.
The full Authority is present. The Cases recommended by SEAC for
Environmental Clearance or otherwise as listed in the Agenda item circulated vide letter
No. 2-4 dated 08.01.2016 were discussed. Following decisions were taken:-
Item No. [1] Environmental Clearance in respect of IT Compelx at Plot No. 287-288,
Udyog Vihar, Phase- II, Gurgaon by M/s PCI Ltd.
The recommendation of SEAC to accord environmental clearance to the project
was considered in the today’s meeting. The Authority observed that:
1. The project proponent on 26.11.2012 submitted application for seeking
environment clearance for the project. The project proposal was taken up by
SEAC in its 78th, 85th, 89th, & 106th meetings held on 26.03.2013, 24.06.2013,
27.08.2013 & 17.06.2014. The SEAC observed that the project proponent has
started the construction without obtaining prior environment clearance thus
violated the provision of EIA Notification. The project proponent also submitted
certified true copy of resolution dated 26.06.2013 admitting that the mistake for
starting construction without obtaining prior environment clearance and also
ensuring that the violation shall not be repeated in future; as per the requirement of
MoEF&CC, GoI, OM no. J-11013/41/2006-1AII(I) dated 12.12.2012. The SEAC
recommended initiating legal action against the project proponent.
2. The recommendation of SEAC was considered in the 73rd meeting held on
18.07.2014. The SEIAA decided to refer this case to Principal Secretary
Environment for initiating legal action against the project proponent as per
prescribed procedure. The SEIAA vide letter no. SEIAA/HR/2014/1078 dated
06.08.2014 requested Principal Secretary Environment to initiate legal action
against the project proponent under Environment (Protection) Act, 1986 and send
credible action taken report.
3. The project proponent filed an application in the Hon’ble Punjab & Haryana High
Court “CRM-M-30394 of 2013” during hearing this case on 09.10.2015. The
SEIAA came to know that legal action has already been initiated by RO, HSPCB
prior to submission of application by the project proponent for environment
clearance but intimation to the same was not given to SEIAA.
4. The Hon’ble Punjab & Haryana High Court on 09.10.2015 passed directions to
decide the application of the project proponent within 3 months. The case was
referred to SEAC for appraisal. The SEAC considered this case in its 121st
-
2
meeting held on 19.11.2015 and recommended this case for environmental
clearance.
5. The SEIAA vide letter no. SEIAA/HR/15/634 dated 28.12.2015 has already
sought clarification from MoEF&CC, GoI regarding change in procedure if any in
violation cases keeping in view the quashing of OM dated 12.12.2012 by Hon’ble
NGT but no response from the MOEF & CC, GOI has been received.
6. It was also observed that Hon’ble Supreme Court of India on 24.09.2015 in CA
No. 7191-7192/2015 in the matter of “M/s Dugar Housing Ltd V/s
S.P.Muthuraman & Ors has stayed the operation of impugned judgment (s) and
order (s) passed by Hon’ble NGT.
In view of the above observations it was decided to defer the case to the next
meeting with the decision that:
i. Giving reference of Hon’ble Supreme Court orders and the earlier
communication dated 28.12.2015 of this office, the MOEF & CC, GOI may
again be requested to send necessary clarification in the matter so as to enable
the SEIAA to take appropriate action in violation cases well within the
stipulated period as prescribed in the Notification/guidelines, in order to avoid
any litigation.
ii. The Hon’ble Punjab & Haryana High Court may be apprised of the factual
position of this case. A request may also be made to extend the deadline of
three months period (09.01.2016) for further two months in view of the
explained circumstances.
Item No. [2] Environmental Clearance for Group Housing Colony located at
Revenue Estate of Village Nuna Majra, Sector-37, Bahadurgarh,
Haryana by M/s HL Promoters Pvt Ltd.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the construction of Group
Housing Colony located at Revenue Estate of Village Nuna Majra, Sector-37,
Bahadurgarh, Haryana on a total plot area of 66494.8 sqm (16.43). The total built up area
shall be 140796.597 sqm. The proposed Project shall comprise 07 Blocks, Block-1 (4
Towers + GF + Stilt + 14 Floors), Block-2 (3 Tower + GF + Stilt + 14 Floors), Block-3
(2 Towers + GF + Stilt +14 Floors), Block-4 (1 Tower + Stilt + 6 Floors), Block-5 (1
Tower + GF+ Stilt + 14 Floors), Block-6 (3 Towers + GF + Stilt + 14 floors), Block-7 (2
Tower + GF + 7 Floors), Community building, Nursery Schools & Primary School etc.
The proposed project shall have 1352 Dwelling Units. The maximum height of the
building shall be 51 meter. The total water requirement shall be 1000 KLD. The fresh
water requirement shall be 617 KLD. The waste water generation shall be 740 KLD,
which will be treated in the 2 STPs of 675 KLD & 200 KLD capacity. The total power
requirement shall be 12067 KVA which will be supplied by UHBVN. The Project
-
3
Proponent has proposed to develop green belt on 30% of project area (25% tree
plantation + 5% landscaping). The Project Proponent proposed to construct 16 rain water
harvesting pits. The solid waste generation will be 3315.3 kg/day. The bio-degradable
waste will be treated in the project area by installation of OWC (organic waste
converter). The area required for OWC will be 3M x 4M. The total parking spaces
proposed are 1653 ECS.
The above recommendation of SEAC was taken up for consideration. Detailed
discussions were held regarding revenue rasta, HT Line, water requirement, quality of
water, green belt development plan, Ambient Air Quality, recycle and reuse of water,
parking plan, traffic circulation etc. It was found that the project proponent submitted the
assurance of HUDA for supply of water and NOC from AAI regarding height clearance.
It was noticed that the project proponent has proposed parking in the ROW reserved for
HT line. The project proponent submitted revised parking plan showing no
parking/proposed construction in the ROW reserved for HT Line. It was observed that the
project proponent has earmarked the space for solid waste management site on the plan
for collection, segregation and treatment of bio-degradable waste.
In view of the above discussions, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice.
[1] The project proponent shall provide green area on 30% of the project area.
[2] The project proponent shall essentially provide two numbers of STPs preferably
equivalent to 50% of total capacity or depending upon the initial occupancy as the
case may be.
[3] The project proponent shall not raise any construction activity in the ROW
reserved/acquired for High Tension Wire passing through the project area and
shall maintain horizontal and vertical ROW as required under Indian Electricity
Rules, 1956/DHBVN latest instructions.
[4] The project proponent shall ensure that no construction activity is undertaken
either on surface or below or above surface of revenue rasta passing through the
project area.
[5] The project proponent shall indicate the width and length of revenue rasta passing
through the project area on sign board and shall display the same at both the ends
of revenue rasta stretch, for awareness of public. Sign board shall also display the
message that this is a public rasta/road and any citizen can use it. There shall not
be any gate with or without guards on revenue rasta further project proponent shall
not encroach revenue rasta and shall not cross internal roads over revenue rasta.
-
4
Item No. [3] Environmental Clearance for Expansion of Group Housing Colony
located at Village Lakkarpur, Sector-39, Faridabad-Ballabgarh
Complex, Haryana by M/s Ajay Enterprises Pvt. Ltd.
The SEAC has forwarded this case with the recommendation to seek clarification
from MOEF & CC, GOI regarding applicability of EIA Notification in the existing
project of project proponent. The recommendation of SEAC was taken up for
consideration in the today’s meeting and it was observed that:
1. The project proponent submitted application for expansion of Group Housing
Colony for construction of Group Housing on the additional license of 2.667 acres.
The license to the existing Group Housing Colony was granted in the year 1984
and 1995 measuring 30.35 Acres. The drawing/building plan of 30.35 acre was
sanction/approved in the year 1985.
2. The SEAC considered the exemption letter dated 13.01.2011 of RO, MOEF & CC,
GOI submitted by the project proponent mentioning that more than 45% of built
up area of the colony was completed and 9.36% of the total built up area was
above the plinth level prior to issuance of Notification dated 07.7.2004 and
therefore, the said colony neither attracts the provisions of 07.07.2004 nor EIA
Notification dated 14.09.2006 and no environmental clearance is required from
MOEF & CC, GOI/SEIAA for the existing colony. The SEAC was of the view
that only 45% of built up area was completed and 9.36% of total built up area was
above plinth level prior to Notification dated 07.07.2004. This means that
remaining built up area might have been completed after 13.01.2011 without
obtaining environment clearance.
3. The project proponent vide letter dated 06.12.2015 has requested for with-drawl
of present application. The project proponent has informed that he will submit
separate online application for additional 2.662 acres. The project proponent has
informed to develop independent group housing on 2.662 acres of land and shall
provide separate services in the unit.
4. The date of start of construction, date of completion of structure up to plinth level
and date of completion of project was not available in the records with
authenticated proof for ascertaining the applicability of EIA Notification dated
14.09.2006 in the existing project.
In view of the above observations it was decided that to defer the case to the next
meeting with the decision that the project proponent may be asked to furnish below
mentioned information within 10 days or before the next meeting of SEIAA.
[1] The project proponent shall submit the date of start of construction, date of
completion of structure up to plinth level and date of completion of project with
authenticated proof for ascertaining the applicability of EIA Notification dated
14.09.2006 in the existing project.
-
5
Item No. [4] Environmental Clearance for proposed expansion (Phase II) of “SRM
University” situated at Plot No. 39, Rajiv Gandhi Education City,
Sonipat, Haryana by SRM Institute of Science & Technology.
The SEAC has examined the proposal in the light of amended Notification dated
22.12.2014 issued by MoEF&CC, GoI and recommended to exempt this project proposal
from obtaining environmental clearance under EIA Notification dated 14.09.2006.
Subject to compliance of sustainable environment management as per guidelines issued
by MoEF & CC, GoI F.No. 19-2/2013-IA.III dated 09.06.2015.
The above recommendation of SEAC was taken up for consideration in the
today’s meeting. The Authority agreed with the recommendation of SEAC and decided to
grant exemption to the project proposal from obtaining environmental clearance subject
to compliance to guidelines issue by MoEF&CC, GoI dated 09.06.2015 by the project
proponent.
Item No. [5] Environmental Clearance for the service/Maintenance and Training
Facility for customers from Defence Forces and DRDO labs including
inspection, calibration and maintenance services project in the
industrial estate of plot no. 916, Sector-68, IMT, Faridabad, Haryana
by M/s Tata Power Company Ltd.
The SEAC has examined the proposal in the light of amended Notification dated
22.12.2014 issued by MoEF&CC, GoI and recommended to exempt this project proposal
from obtaining environmental clearance under EIA Notification dated 14.09.2006.
Subject to compliance of sustainable environment management as per guidelines issued
by MoEF & CC, GoI F.No. 19-2/2013-IA.III dated 09.06.2015.
The above recommendation of SEAC was taken up for consideration in the
today’s meeting. The Authority agreed with the recommendation of SEAC and decided to
grant exemption to the project proposal from obtaining environmental clearance subject
to compliance to guidelines issue by MoEF&CC, GoI dated 09.06.2015 by the project
proponent.
Item No. [6] Environmental Clearance for construction of STP/CETP Project at
Village Narkatari, Tehsil: Thaneshwar, Distt Kurukshetra, Haryana
by Public Health Engineering Division.
The SEAC has forwarded the case with the request to write a letter to HSPCB to
conduct comprehensive study of discharge in sewer and the drain to ascertain whether
this case is of STP or CETP. The case was considered in the today’s meeting. The
Authority observed that:
1. The project proponent on 26.02.2015 submitted application for seeking clearance
for the project under item no. 7(h) of schedule of EIA Notification dated
14.09.2006 for setting up of CETP. The project proponent has submitted
application in compliance to the Hon’ble NGT.
-
6
2. The project proponent claims that they intend to set up STP to treat sewage. This
activity is not covered under EIA Notification dated 14.09.2006 and
environmental clearance is not required. However the SEAC is of the opinion that
to ascertain whether this case is of STP or CETP a comprehensive study of
discharge in sewer and drain be got connected from HSPCB.
3. The Hon’ble NGT in application no. 124 of 2013 in the matter of “Kehar Singh
V/s State of Haryana” has clearly passed directions to the applicant. The relevant
part of directions (para 48 of order dated 12.09.2013) is reproduced as under:
“We direct the respondent to seek EC from SEIAA at the earliest and in any
case not later than one month from today. We further direct SEIAA to process the
application and complete the entire exercise of granting clearance conditional or
otherwise-or refusing the same within two months thereafter. In the
circumstances of the case, we would not direct removal of the plant to the extent
to which it has already been constructed at the site as all acts done so far and
that may be done hereafter would be subject to the grant of EC to the projects in
question by the competent authority.”
The project proponents in compliance to the Hon’ble NGT order vide letter
no. 14658 dated 04.10.2013 submitted application for environmental clearance.
The SEIAA vide letter no. 1187 dated 07.11.2013 returned the application as the
same was found in-complete. Now the applicant has submitted application under
item no. 7(h) of schedule of EIA Notification dated 14.09.2006.
4. The SEIAA cannot ask HSPCB to conduct study as opined by SEAC. It is
responsibility of the project proponent and their consultant to get the study
conducted.
In view of the above observations the Authority decided to refer back this case to
SEAC with the advice to appraise this project under item no. 7(h) as submitted by the
applicant and send clear cut recommendation to the SEIAA within stipulated period as
prescribed in the Notification dated 14.09.2006.
Item No. [7] Environmental Clearance for Institutional Project located at Village
Bhupani, Faridabad, Haryana by Satyug Darshan Trust.
The SEAC has examined the proposal in the light of amended Notification dated
22.12.2014 issued by MoEF&CC, GoI and recommended to exempt this project proposal
from obtaining environmental clearance under EIA Notification dated 14.09.2006.
Subject to compliance of sustainable environment management as per guidelines issued
by MoEF & CC, GoI F.No. 19-2/2013-IA.III dated 09.06.2015.
The above recommendation of SEAC was taken up for consideration in the
today’s meeting. The Authority agreed with the recommendation of SEAC and decided to
grant exemption to the project proposal from obtaining environmental clearance subject
-
7
to compliance to guidelines issue by MoEF&CC, GoI dated 09.06.2015 by the project
proponent.
Item No. [8] Environmental Clearance for Construction of Commercial Complex at
Village-Pawala Khusrupur, Sector-109, Gurgaon, Haryana by M/s
Citra Properties Ltd. The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the construction of
Commercial Complex at Village-Pawala Khusrupur, Sector-109, Gurgaon, Haryana on a
total plot area of 23876.42 sqm (5.90 acre). The total built up area shall be 85458.21 sqm.
The proposed Project shall comprise of 3 basements + GF + maximum 20 floors. The
maximum height of the building shall be 90.9 meter. The total water requirement shall be
398 KLD. The fresh water requirement shall be 225 KLD. The waste water generation
shall be 216 KLD, which will be treated in the STP of 250 KLD capacity. The total
power requirement shall be 5850 KVA which will be supplied by DHBVN. The Project
Proponent has proposed to develop green belt on 5052.27 sqmt (25.47%) of project area
(1797.09 sqmt tree plantation + 702.21 sqmt avenue plantation + 2552.97 sqmt lawn
area). The Project Proponent proposed to construct 06 rain water harvesting pits. The
solid waste generation will be 1465 kg/day. The bio-degradable waste will be treated in
the project area by installation of OWC (organic waste converter). The area required for
OWC will be 3M x4M. The total parking spaces proposed are 1063 ECS.
The above recommendation of SEAC was taken up for consideration. Detailed
discussions were held regarding revenue rasta, water requirement, quality of water, green
belt development plan, Ambient Air Quality, NOC regarding non-involvement of
Aravalli Notification dated 07.05.1992, recycle and reuse of water, parking plan, traffic
circulation etc. It was found that the project proponent submitted the assurance of HUDA
for supply of water along with copies of EDC/IDC paid to HUDA for the services for
supply of water, sewerage connection and drainage system, NOC from DC Gurgaon
regarding non applicability of Aravalli Notification and NOC from AAI regarding height
clearance. It was also noticed that the project proponent has earmarked the space for solid
waste management site on the plan for collection, segregation and treatment of bio-
degradable waste. It was found that the project proponent has obtained structural stability
certificate issued by BMSF Design Consultants Pvt. Ltd dully signed by certified
registered structural engineer.
After detailed deliberations, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice.
[1] Vertical fenestration shall not exceed 25.47% of total wall area.
[2] The project proponent shall provide green area on terrace and roof top.
-
8
[3] The project proponent shall not use fresh water for HVAC and DG cooling. Air
based HVAC system should be adopted and only treated water shall be used by
project proponent for cooling, if it is at all needed.
[4] The project proponent shall install solar panel for energy conservation.
[5] The project proponent shall ensure that the plinth level of the building block
to be 1.5 meter above 100 years flood level of the said Najafgarh Jheel.
[6] The project proponent shall obtain NOC from HUDA as well as Irrigation
Department before the start of construction, regarding possible adverse effect
of project proposal on the said Najafgarh Jheel.
[7] The project proponent shall ensure that no construction activity is undertaken
either on surface or below or above surface of revenue rasta passing through the
project area.
[8] The project proponent shall indicate the width and length of revenue rasta passing
through the project area on sign board and shall display the same at both the ends
of revenue rasta stretch, for awareness of public. Sign board shall also display the
message that this is a public rasta/road and any citizen can use it. There shall not
be any gate with or without guards on revenue rasta further project proponent shall
not encroach revenue rasta and shall not cross internal roads over revenue rasta.
Item No. [9] Environmental Clearance for Construction of Group Housing Colony
located at Village Atmadpur, Sector-31, Faridabad, Haryana by M/s Ozone
GSP Infratech.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the construction of Group
Housing Colony located at Village Atmadpur, Sector-31, Faridabad, Haryana on a total
plot area of 7057.71 sqm (1.744 acre). The total built up area shall be 20734.9 sqm. The
Group Housing project shall have 3 towers with 2 basements + GF + maximum 15
Floors, EWS units, Servant units, Convenient shopping/Commercial and community
center. The Group Housing project shall have 816 Dwelling Units. The maximum height
of the building shall be 49.90 meter. The total water requirement shall be 81 KLD. The
fresh water requirement shall be 47 KLD. The waste water generation shall be 58 KLD,
which will be treated in the STP of 70 KLD capacity. The total power requirement shall
be 1014.43 KW which will be supplied by HVPNL. The Project Proponent has proposed
to develop green belt on 2052.91 sqmt (29.08%) of project area (485.48 sqmt tree
plantation + 321.35 sqmt avenue plantation + 62.73 sqmt shrubs plantation + 33.50 sqmt
hedge/ground cover + 1149.85 sqmt lawn area). The Project Proponent proposed to
construct 02 rain water harvesting pits. The solid waste generation will be 257 kg/day.
The bio-degradable waste will be treated in the project area by installation of OWC
(organic waste converter). The area required for OWC will be 3M x4M. The total parking
spaces proposed are 212 ECS.
-
9
In the today’s meeting the recommendation of SEAC and the project details were
taken up for consideration. Detailed discussions were held regarding water requirement,
quality of water, green belt development plan, Ambient Air Quality, NOC regarding non-
involvement of Forest land, recycle and reuse of water, parking plan, traffic circulation etc.
The representative of the project proponent submitted copy of EDC/IDC paid to HUDA
for the services for supply of water, sewerage connection and drainage system, NOC of
airport Authority regarding height clearance and NOC from DFO regarding Non
involvement of Forest land. It was also noticed that the project proponent has earmarked
the space for solid waste management site on the plan for collection, segregation and
treatment of bio-degradable waste.
In view of the above discussions, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice.
[1] The project proponent shall provide green area on 29.08% of the project area.
[2] The project proponent shall install solar panel for energy conservation.
[3] The project proponent shall essentially provide two numbers of STPs preferably
equivalent to 50% of total capacity or depending upon the initial occupancy as the
case may be.
Item No. [10] Environmental Clearance for Construction for an Affordable Group
Housing located at Village Badha, Sector-86, Gurgaon, Haryana by
M/s Pyramid Infratech Pvt. Ltd.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the construction of
Affordable Group Housing located at Village Badha, Sector-86, Gurgaon, Haryana on a
total plot area of 21397.72 sqm (5.2875 acres). The total built up area shall be 50004.508
sqm. The proposed Project shall comprise 10 Towers, Tower 1 to 7 (Basement + Stilt +
GF + 13 Floors in each tower), Tower 8 to 10 (Basement + Stilt +GF + 3 Floors in each
tower), Commercial Building, Aganwadi etc. The maximum height of the building shall
be 45 meter. The total water requirement shall be 660 KLD. The fresh water requirement
shall be 459 KLD. The waste water generation shall be 553 KLD, which will be treated in
the STP of 670 KLD capacity. The total power requirement shall be 3800.14 KVA which
will be supplied by DHBVN. The Project Proponent has proposed to develop green belt
on 4714.684 sqmt (22.03%) of project area (3152.146 sqmt tree plantation + 1562.538
sqmt landscaping). The Project Proponent proposed to construct 06 rain water harvesting
pits. The solid waste generation will be 2388 kg/day. The bio-degradable waste will be
treated in the project area by installation of OWC (organic waste converter). The area
required for OWC will be 3M x4M. The total parking spaces proposed are 485 ECS.
The above recommendation of SEAC was taken up for consideration. Detailed
discussions were held regarding water requirement, quality of water, green belt
-
10
development plan, Ambient Air Quality, NOC regarding non-involvement of Aravalli
Notification dated 07.05.1992, recycle and reuse of water, parking plan, traffic circulation
etc. It was found that the project proponent submitted the assurance of HUDA for supply
of water along with copies of EDC/IDC paid to HUDA for the services for supply of
water, sewerage connection and drainage system, NOC from DC Gurgaon regarding non
applicability of Aravalli Notification and NOC from AAI regarding height clearance. It
was also noticed that the project proponent has earmarked the space for solid waste
management site on the plan for collection, segregation and treatment of bio-degradable
waste.
In view of the above discussions, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice.
[1] The project proponent shall provide green area on 22.03% of the project area.
[2] The project proponent shall install solar panel for energy conservation.
[3] The project proponent shall essentially provide two numbers of STPs preferably
equivalent to 50% of total capacity or depending upon the initial occupancy as the
case may be.
Item No. [11] Environmental Clearance for construction of Group Housing Colony
(2.5625 acre) located in the Revenue Estate of Village Gurgaon, Sector-
3, Gurgaon, Haryana by M/s Santur Realtor Pvt. Ltd.
The SEIAA in its 83rd meeting held on 28.09.2015 decided to refer back this case
to the SEAC for re-appraisal. The SEAC in its 123rd meeting held on 10.12.2015
considered the reply dated 23.11.2015 submitted by the project proponent on the
observations as raised by SEIAA as under:-
(i) The SEAC should examine the revise traffic circulation plan submitted by project
proponent vide letter dated 09.03.2015.
(ii) The project proponent shall obtain clarification from the competent authority of
electricity department and shall submit the same to SEAC.
(iii)The SEAC shall ensure that the solid waste generation calculation and parking
calculation is as per latest prescribed norms and shall also ensure that the project
proponent has furnished details of appropriate technology to be adopted for
treatment of bio-degradable waste.
(iv) The SEAC shall ensure that Khasra no. indicated in the NOC regarding non
applicability of Aravalli Notification issued by DC conform that of Khasra no.
indicated the license.
The SEAC has again recommended this case for environmental clearance. The
recommendation of SEAC was taken up for consideration in the today’s meeting. The
reply submitted by project proponent and considered by SEAC was found in order.
-
11
After detailed deliberation, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice.
[1] The project proponent shall provide green area on 30.17% of the project area.
[2] The project proponent shall install solar panel for energy conservation.
[3] The project proponent shall essentially provide two numbers of STPs preferably
equivalent to 50% of total capacity or depending upon the initial occupancy as the
case may be.
Item No. [12] Environmental Clearance for Group Housing Complex namely “Ansal
Heights” at Sector-92, Village- Wazirpur, Tehsil & Distt. Gurgaon,
Haryana by M/S Ansal Housing & Construction Ltd.
The SEIAA in its 83rd meeting held on 28.09.2015 decided to refer back this case
to the SEAC for re-appraisal. The SEAC in its 123rd meeting held on 10.12.2015
considered the reply dated 20.10.2015 submitted by the project proponent on the
observations as raised by SEIAA as under:-
(i) The project proponent shall obtain permission of competent authority for use of
revenue rasta and shall submit the same to SEAC.
(ii) The SEAC shall ensure that the solid waste generation calculation and parking
calculation is as per latest prescribed norms and shall also ensure that the project
proponent has furnished details of appropriate technology to be adopted for
treatment of bio-degradable waste.
(iii) The SEAC shall ensure that Khasra no. indicated in the NOC regarding non
applicability of Aravalli Notification issued by DC conform that of Khasra no.
indicated the license.
The SEAC has again recommended this case for environmental clearance. The
recommendation of SEAC was taken up for consideration in the today’s meeting. The
reply submitted by project proponent and considered by SEAC was found in order.
After detailed deliberation, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice.
[1] The project proponent shall provide green area on 30% of the project area.
[2] The project proponent shall install solar panel for energy conservation.
[3] The project proponent shall essentially provide two numbers of STPs preferably
equivalent to 50% of total capacity or depending upon the initial occupancy as the
case may be.
[4] The project proponent shall submit NOC from Chief Wild Life Warden stating
that the project area does not fall in the area notified as eco-sensitive zone around
Sultanpur National Park Gurgaon before the start of construction.
-
12
[5] The project proponent shall ensure that no construction activity is undertaken
either on surface or below or above surface of revenue rasta passing through the
project area.
[6] The project proponent shall indicate the width and length of revenue rasta passing
through the project area on sign board and shall display the same at both the ends
of revenue rasta stretch, for awareness of public. Sign board shall also display the
message that this is a public rasta/road and any citizen can use it. There shall not
be any gate with or without guards on revenue rasta further project proponent shall
not encroach revenue rasta and shall not cross internal roads over revenue rasta.
Item No. [13] Environmental Clearance for expansion of Hotel Project at Sector-60,
Gurgaon by M/s Toucan Real Estates Pvt. Ltd.
The SEIAA in its 83rd meeting held on 28.09.2015 decided to refer back this case
to the SEAC for re-appraisal. The SEAC in its 123rd meeting held on 10.12.2015
considered the reply dated 20.10.2015 submitted by the project proponent on the
observations as raised by SEIAA as under:-
(i) The project proponent has not obtained the assurance for water supply from
competent authority. The project proponent shall obtain the same and submit to
the SEAC.
(ii) The project proponent shall submit proof of having deposited up to date
EDC/IDC paid to the concerned department to the SEAC.
(iii) The SEAC shall ensure that Khasra no. indicated in the NOC regarding non
applicability of Aravalli Notification issued by DC conform that of Khasra
number indicated the license.
(iv) The SEAC shall ensure that the solid waste generation calculation and parking
calculation is as per latest prescribed norms and shall also ensure that the
project proponent has furnished details of appropriate technology to be adopted
for treatment of bio-degradable waste.
The SEAC has again recommended this case for environmental clearance. The
recommendation of SEAC was taken up for consideration in the today’s meeting. The
reply submitted by project proponent and considered by SEAC was found in order.
After detailed deliberation, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice.
[1] The project proponent shall provide green area on 20% of the project area.
[2] The project proponent shall install solar panel for energy conservation.
[3] The project proponent shall meet the emission standards for Hotel Industry
prescribed by CPCB under schedule-I of rule 3 of Environment (Protection)
Rules, 1986.
-
13
Item No. [14] Environmental Clearance for Affordable group hosing colony (10
acres) in the revenue estate of village Hayatpur, Sector -90, Gurgaon,
Haryana by M/s Aster Infrahome Pvt. Ltd.
The SEIAA in its 83rd meeting held on 28.09.2015 decided to refer back this case
to the SEAC for re-appraisal. The SEAC in its 123rd meeting held on 10.12.2015
considered the reply dated 03.11.2015 submitted by the project proponent on the
observations as raised by SEIAA as under:-
(i) The SEAC shall ensure that Khasra no. indicated in the NOC regarding non
applicability of Aravalli Notification issued by DC conform that of Khasra
number indicated the license
(ii) The SEAC shall ensure that the solid waste generation calculation and parking
calculation is as per latest prescribed norms and shall also ensure that the
project proponent has furnished details of appropriate technology to be adopted
for collection of solid waste and treatment of bio-degradable waste.
(iii) The project proponent shall ensure the applicability of standards and codes for
fire and safety.
The SEAC has again recommended this case for environmental clearance. The
recommendation of SEAC was taken up for consideration in the today’s meeting. The
reply submitted by project proponent and considered by SEAC was found in order.
After detailed deliberation, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice.
[1] The project proponent shall provide green area on 21.54% of the project area.
[2] The project proponent shall install solar panel for energy conservation.
Item No. [15] Environmental Clearance for construction of Affordable Group
Housing Colony project at Village Kherki Majra Dhankot, Sector-99,
Distt Gurgaon, Haryana by M/s Pivotal Infrastructure Pvt. Ltd.
The SEAC in its 118th meeting held on 04.03.2015 recommended this project for
environmental clearance. In compliance to the Hon’ble NGT order the MoEF&CC, GoI
perused the recommendations of SEAC and raised certain observations. The MoEF&CC,
GoI vide letter dated 14.09.2015 requested to re-appraise the project in term of the
deficiencies as stated in the letter as per the requirement contained in the EIA
Notification 2006. The case was referred to the SEAC to re-appraise the case in terms of
deficiencies as under:-
(i) Out of the total water requirement of 713 kld, 455 kld would be fresh water and
258 kld recycled treated water. The fresh water requirement is to be met through
HUDA municipal supply. However there in no firm commitment of HUDA in
this regard. A letter of commitment be obtained from HUDA.
-
14
(ii) The project site falls in un-sewered area. The project proponent and SEAC have
mentioned about an arrangement of zero discharge, but how the same will be
achieved in rainy season, has not been clarified.
(iii) One of the specific conditions in recommendations of SEAC, the project
proponent to comply is read as under:-
“Fly ash should be used for building material in the construction as per the
provisions of Fly Ash Notification of September, 1999 and as amended on 22nd
August, 2003”
There is no implementation mechanism proposed by the project proponent in this
regard.
(iv) The project proponent has other projects under implementation in the State, as is
evident from the SEAC minutes of the meeting held on 16th April, 2014.
Compliance status of EC conditions in those projects be filed for further action.
The SEAC in its 123rd meeting held on 10.12.2015 considered the reply dated
21.10.2015 submitted by the project proponent on the above observations and again
recommended this case for environmental clearance.
The recommendation of SEAC along with reply dated 21.10.2015 submitted by
the project proponent was considered in the today’s meeting. It was found that the project
proponent has submitted proof of submission of 6 monthly compliance report but failed
to submit the certified copies of compliance of in respect of (i) Affordable Group
Housing, Sector-84, Gurgaon. (ii) DD Township Group Housing Sector-70 Faridabad.
(iii) Apex Build Well; Group Housing Project, Sector-37C Gurgaon. The project
proponent is required to submit certified copy of compliance report from RO,
MoEF&CC, GoI Chandigarh in respect of the above three projects.
After detailed deliberation, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice.
[1] The project proponent shall provide green area on 16.14% of the project area.
[2] The project proponent shall install solar panel for energy conservation.
[3] The project proponent shall essentially provide two numbers of STPs preferably
equivalent to 50% of total capacity or depending upon the initial occupancy as the
case may be.
[4] The project proponent shall submit certified copy of compliance report from RO,
MoEF&CC, GoI, Chandigarh in respect of (i) Affordable Group Housing, Sector-
84, Gurgaon. (ii) DD Township Group Housing Sector-70 Faridabad. (iii)Apex
Build Well; Group Housing Project, Sector-37C Gurgaon within three months
-
15
period falling which the EC granted shall stand withdrawn without further
intimation.
[5] The project proponent shall not raise any construction activity in the ROW
reserved/acquired for High Tension Wire passing through the project area and
shall maintain horizontal and vertical ROW as required under Indian Electricity
Rules, 1956/DHBVN latest instructions.
Item No. [16] Environmental Clearance for the proposed “Gateway Tower, IT
Park” Project measuring 8.50 acres at Sector-37, Village- Anangpur,
Faridabad, Haryana being developed by M/s Dove Infrastructure Pvt.
Ltd.
The SEAC in its 123rd meeting held on 11.12.2015 recommended this case for
environmental clearance. The SEAC in its recommendations has stated that before
granting EC clarification from MoEF&CC, GoI the obtained as to whether the OM dated
12.12.2012 is applicable or not in view of the stay granted by Hon’ble Supreme Court of
India. The recommendation of SEAC was taken up for consideration in the today’s
meeting and the Authority observed that:
1. The project proponent on 30.04.2014 submitted application for environment
clearance for the project as indicated in the subject. On the recommendation of
SEAC the SEIAA vide letter dated 06.08.2014 requested Principal Secretary
Environment to initiate legal action against the project proponent under EPA 1986
as the project proponent had started the construction without obtaining prior
environmental clearance. A request was also made to send credible action taken
report. The Principal Secretary environment vide letter dated 11.03.2015 provided
the evidence of credible action taken against the project proponent.
2. Due to the lapse term of SEIAA/SEAC the case could not be appraised and
transferred to MoEF&CC, GoI. No action taken by MoEF&CC, GoI and the case
was returned to SEIAA after its reconstitution.
3. The SEIAA vide letter SEIAA/HR/2015/634 dated 28.12.2015 has already
requested Joint Secretary MoEF&CC, GoI to provide necessary clarification in the
matter so as to enable the SEIAA to take appropriate action in violation cases.
In view of the above observations it was decided to defer the case to the next
meeting with the decision that:
(i) Giving reference of Hon’ble Supreme Court orders and the earlier
communication dated 28.12.2015 of this office, the MOEF & CC, GOI may
again be requested to send necessary clarification in the matter so as to enable
the SEIAA to take appropriate action in violation cases well within the
stipulated period as prescribed in the Notification/guidelines, in order to avoid
any litigation.
-
16
Item No. [17] Environmental Clearance for “Expansion of Commercial Complex” at
Sector-65, Badshahpur, Gurgaon, Haryana by M/s Prajakta Colonizers
Pvt. Ltd.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the construction of
“Expansion of Commercial Complex” at Sector-65, Badshahpur, Gurgaon, Haryana with
the proposal as given under.
Particulars Existing Area
(EC Granted)
Expansion Area
(EC Required)
Total Area
Plot area 22864.83 sqm
(5.656 acre)
No change 22864.83 sqm
(5.656 acre)
Ground coverage achieved 6110.68 sqmt 250.57 sqmt 6361.295 sqmt
FAR achieved 32144.745 sqm 122.2 sqmt 32267.001 sqmt
Total Built up Area 60168.659 sqmt 271.396 sqmt 60440.055 sqmt
Total no. of Floors G+5 1 Floor G+6
Number of Blocks 3 -1 2
Height 26 meter 4 meter 30 meter
Green Area (27%) 4888.96 sqmt No change 4888.96 sqmt
Parking 646 ECS
Total Water Requirement 334 KLD -20 KLD 314 KLD
Fresh Water 231 KLD -78 KLD 153 KLD
Waste Water 114 KLD 55 KLD 169 KLD
STP 140 KLD 60 KLD 200 KLD
Power (DHBVN) 3059 KW 563.52 KW 3622.52 KW
RWH 3 pits 2 pits 5 pits
Solid waste 734 kg/day 41 kg/day 775 kg/day
The above recommendation of SEAC was taken up for consideration. Detailed
discussions were held regarding water requirement, quality of water, green belt
development plan, Ambient Air Quality, NOC regarding non-involvement of Aravalli
Notification dated 07.05.1992, recycle and reuse of water, parking plan, traffic circulation
and status of compliance of conditions imposed in the EC letter. It was also noticed that
the project proponent has proposed to dispose of Bio-degradable waste to MSW site. The project
proponent is required to submit assurance for the same. It was also noticed that the license
granted by Town and Country Planning Department has lapsed on 07.11.2015 and the project
proponent is required to submit copy of validated license.
After detailed deliberations, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice. It was also decided
that the EC shall be issued only after the submission of copy of validated license and
assurance of competent Authority for disposal of MSW at the designated site.
[1] Vertical fenestration shall not exceed 27% of total wall area.
[2] The project proponent shall provide green area on terrace and roof top.
[3] The project proponent shall not use fresh water for HVAC and DG cooling. Air
based HVAC system should be adopted and only treated water shall be used by
project proponent for cooling, if it is at all needed.
-
17
[4] The project proponent shall install solar panel for energy conservation.
[5] The project proponent shall submit copy of validated license and assurance of
competent Authority for disposal of MSW at the designated site.
Item No. [18] Environmental Clearance for construction of Affordable Group
Housing at Sector-99A, Gurgaon Manesar Urban Complex, Gurgaon,
Haryana by M/s Prime Infradevelopers Pvt. Ltd.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the construction of
“Affordable Group Housing” at Sector-99A, Gurgaon Manesar Urban Complex,
Gurgaon, Haryana on a total plot area of 24104 sqm. The total built up area shall be
52104.76 sqm. The proposed Project shall have 03 Blocks, Stilt + maximum 12 floors.
The proposed project shall have 816 Dwelling Units. The maximum height of the
building shall be 38.950 meter. The total water requirement shall be 582 KLD. The fresh
water requirement shall be 379 KLD. The waste water generation shall be 494 KLD,
which will be treated in the STP of 595 KLD capacity. The total power requirement shall
be 4500 KW which will be supplied by DHBVN. The Project Proponent has proposed to
develop green belt on 9222.14 sqmt of project area (5981.93 sqmt tree plantation +
3240.210 sqmt landscaping). The Project Proponent proposed to construct 05 rain water
harvesting pits. The solid waste generation will be 2.16 Ton/day. The bio-degradable
waste will be treated in the project area by installation of OWC (organic waste
converter). The area required for OWC will be 100 sqm. The total parking spaces
proposed are 409 ECS.
The above recommendation of SEAC was taken up for consideration. Detailed
discussions were held regarding water requirement, quality of water, green belt
development plan, Ambient Air Quality, NOC regarding non-involvement of Aravalli
Notification dated 07.05.1992, recycle and reuse of water, parking plan, traffic circulation
etc. It was found that the project proponent submitted the assurance of HUDA for supply
of water along with copies of EDC/IDC paid to HUDA for the services for supply of
water, sewerage connection and drainage system, NOC from DC Gurgaon regarding non
applicability of Aravalli Notification and NOC from AAI regarding height clearance. It
was also noticed that the project proponent has earmarked the space for solid waste
management site on the plan for collection, segregation and treatment of bio-degradable
waste.
In view of the above discussions, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice.
[1] The project proponent shall provide green area on 9222.14 sqmt of the project
area.
[2] The project proponent shall install solar panel for energy conservation.
-
18
[3] The project proponent shall essentially provide two numbers of STPs preferably
equivalent to 50% of total capacity or depending upon the initial occupancy as the
case may be.
Item No. [19] Environmental Clearance for construction of Group Housing Project
(10 acres) allot ed by HUDA, Faridabad at Rojka Meo Industrial
Estate, District Mewat, Haryana by M/s MMTC PAMP India Pvt. Ltd.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the construction of Group
Housing Project (10 acres) allotted by HUDA, Faridabad at Rojka Meo Industrial Estate,
District Mewat, Haryana on a total plot area of 40480 sqm. The total built up area shall
be 28920 sqm. The proposed Project shall have 14 Blocks, GF + Maximum 08 Floors,
157 DU. The maximum height of the building shall be 29 meter. The total water
requirement shall be 210 KLD. The fresh water requirement shall be 108 KLD. The
waste water generation shall be 129 KLD, which will be treated in the STP of 155 KLD
capacity. The total power requirement shall be 874 KW which will be supplied by
DHBVN. The Project Proponent has proposed to develop green belt on 39% of project
area (20% tree plantation + 19% landscaping). The Project Proponent proposed to
construct 10 rain water harvesting pits. The solid waste generation will be 0.56 Ton/day.
The bio-degradable waste will be treated in the project area by installation of Bio-
Mechanical Composting. The area required for Bio-Mechanical Composting will be 3M x
4M. The total parking spaces proposed are 5723.298 sqmt.
The above recommendation of SEAC was taken up for consideration. Detailed
discussions were held regarding water requirement, quality of water, green belt
development plan, Ambient Air Quality, NOC regarding non-involvement of Forest land,
recycle and reuse of water, parking plan, traffic circulation etc. It was found that the
project proponent submitted the assurance of HUDA for supply of water and NOC from
Forest Department regarding non involvement of Forest land. It was observed that the
project proponent has not earmarked the space for solid waste management site on the
plan for collection, segregation and treatment of bio-degradable waste.
In view of the above discussions, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice..
[1] The project proponent shall provide green area on 39% of the project area.
[2] The project proponent shall essentially provide two numbers of STPs preferably
equivalent to 50% of total capacity or depending upon the initial occupancy as the
case may be.
[3] The project proponent shall obtain assurance of power supply as per prevailing
rules/norms.
-
19
Item No. [20] Environmental Clearance for proposed Affordable Group Housing
Colony Project at Village Dhorka, Sector-95, District-Gurgaon,
Haryana by M/s Ramsons Organics Ltd.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the construction of
Affordable Group Housing Colony Project at Village Dhorka, Sector-95, District-
Gurgaon, Haryana on a total plot area of 19600.96641 sqm (4.8435 acres). The total built
up area shall be 45975.331 sqm. The proposed Project shall comprise 7 Block (A-G)
Residential and Commercial building. The maximum height of the building shall be
48.15 meter. The total water requirement shall be 567 KLD. The fresh water requirement
shall be 363 KLD. The waste water generation shall be 479 KLD, which will be treated in
the STP of 575 KLD capacity. The total power requirement shall be 7000 KVA which
will be supplied by DHBVN. The Project Proponent has proposed to develop green belt
on 21.5% of project area (15% plantation + 6.5% landscaping). The Project Proponent
proposed to construct 05 rain water harvesting pits. The solid waste generation will be
2137.49 kg/day. The bio-degradable waste will be treated in the project area by adopting
appropriate technology. The total parking spaces proposed are 504 ECS.
The above recommendation of SEAC was taken up for consideration. Detailed
discussions were held regarding water requirement, quality of water, green belt
development plan, Ambient Air Quality, NOC regarding non-involvement of Aravalli
Notification dated 07.05.1992, recycle and reuse of water, parking plan, traffic circulation
etc. It was found that the project proponent submitted the assurance of HUDA for supply
of water along with copies of EDC/IDC paid to HUDA for the services for supply of
water, sewerage connection and drainage system, NOC from DC Gurgaon regarding non
applicability of Aravalli Notification and NOC from AAI regarding height clearance. It
was also noticed that the project proponent has earmarked the space for solid waste
management site on the plan for collection, segregation and treatment of bio-degradable
waste but the detail of technology for treatment of bio-degradable waste are not discussed
and dimensions of the reserved area not given.
In view of the above discussions, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice. The EC shall be
submitted subject to the submission of details of technology to be adopted for treatment
of bio-degradable waste in the project area along with the dimensions of area earmarked
for management of solid waste within 15 days.
[1] The project proponent shall provide green area on 21.5% of the project area.
[2] The project proponent shall install solar panel for energy conservation.
-
20
[3] The project proponent shall essentially provide two numbers of STPs preferably
equivalent to 50% of total capacity or depending upon the initial occupancy as the
case may be.
[4] The project proponent shall submit detail of technology for treatment of bio-
degradable waste and dimensions of the area reserved for management of solid
waste.
Item No. [21] Environmental Clearance for proposed Affordable Group Housing
Colony project at Village Naurangpur, Sector-79, 79B, Distt Gurgaon,
Haryana by M/s Revital Reality Pvt. Ltd.
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the construction of
Affordable Group Housing Colony Project at Village Naurangpur, Sector-79, 79B, Distt.
Gurgaon, Haryana on a total plot area of 48967.01 sqm (12.10 acres). The total built up
area shall be 146757.47 sqm. The proposed Project shall comprise 15 Towers +
Basement + GF + maximum 17 Floors, Commercial (Mumty +Water tank),
Anganwadi/Community. The maximum height of the building shall be 55.285 meter. The
total water requirement shall be 1424 KLD. The fresh water requirement shall be 903
KLD. The waste water generation shall be 1237 KLD, which will be treated in the 2 STPs
of 1180 KLD & 307 KLD capacity. The total power requirement shall be 7015 KW
which will be supplied by DHBVN. The Project Proponent has proposed to develop
green belt on 10277.354 sqm (20.99%) of project area (7345.05 sqm plantation + 2932.3
sqm landscaping). The Project Proponent proposed to construct 12 rain water harvesting
pits. The solid waste generation will be 5331.977 kg/day. The bio-degradable waste will
be treated in the project area by installation of OWC (organic waste converter). The area
required for OWC will be 3M x4M. The total parking spaces proposed are 1093 ECS.
The above recommendation of SEAC was taken up for consideration. Detailed
discussions were held regarding revenue rasta, water requirement, quality of water, green
belt development plan, Ambient Air Quality, NOC regarding non-involvement of
Aravalli Notification dated 07.05.1992, recycle and reuse of water, parking plan, traffic
circulation etc. It was found that the project proponent submitted the assurance of HUDA
for supply of water along with copies of EDC/IDC paid to HUDA for the services for
supply of water, sewerage connection and drainage system, NOC from DC Gurgaon
regarding non applicability of Aravalli Notification and NOC from AAI regarding height
clearance. It was also noticed that the project proponent has earmarked the space for solid
waste management site on the plan for collection, segregation and treatment of bio-
degradable waste.
In view of the above discussions, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice.
-
21
[1] The project proponent shall provide green area on 20.99% of the project area.
[2] The project proponent shall install solar panel for energy conservation.
[3] The project proponent shall essentially provide two numbers of STPs preferably
equivalent to 50% of total capacity or depending upon the initial occupancy as the
case may be.
[4] The project proponent shall ensure that no construction activity is undertaken
either on surface or below or above surface of revenue rasta passing through the
project area.
[5] The project proponent shall indicate the width and length of revenue rasta passing
through the project area on sign board and shall display the same at both the ends
of revenue rasta stretch, for awareness of public. Sign board shall also display the
message that this is a public rasta/road and any citizen can use it. There shall not
be any gate with or without guards on revenue rasta further project proponent shall
not encroach revenue rasta and shall not cross internal roads over revenue rasta.
Item No. [22] Environmental Clearance for proposed Group Housing Project at
Sector-2, Tehsil-Sohna & District Gurgaon, Haryana by M/s Ashiana
Dwellings Pvt. Ltd. (Formerly M/s PSL Infratech Pvt. Ltd)
The SEAC has recommended this project for Environmental Clearance subject to
stipulation stated therein. The Project Proponent has proposed the construction of Group
Housing Colony located at Revenue Estate of Village Nuna Majra, Sector-37,
Bahadurgarh, Haryana on a total plot area of 41480.27 sqm (10.25 acre). The net planned
area is 35279.28 sqm (8.717 acre). The total built up area shall be 118863 sqm. The
proposed Project shall have 10 Residential Towers, 01 EWS Tower, 01 Commercial
Block, Community Building and Educational Building. The project will have 660 MDU,
117 EWS and 70 Servant units. The maximum number of floors shall be Basement + GF
+ 18 Floors. The maximum height of the building shall be 65 meter. The total water
requirement shall be 698 KLD. The fresh water requirement shall be 414 KLD. The
waste water generation shall be 540 KLD, which will be treated in the STP of 620 KLD
capacity. The total power requirement shall be 5537 KW which will be supplied by
DHBVN. The Project Proponent has proposed to develop green belt on 30.29% of project
area (20.28% tree plantation + 10.01% landscaping). The Project Proponent proposed to
construct 10 rain water harvesting pits. The solid waste generation will be 2261.37
kg/day. The bio-degradable waste will be treated in the project area by installation of
OWC (organic waste converter). The area required for OWC will be 100 sqm. The total
parking spaces proposed are 1266 ECS.
The above recommendation of SEAC was taken up for consideration. Detailed
discussions were held regarding water requirement, quality of water, green belt
development plan, Ambient Air Quality, recycle and reuse of water, parking plan, traffic
circulation etc. It was found that the project proponent submitted the assurance of HUDA
-
22
for supply of water and NOC from AAI regarding height clearance. It was observed that
the project proponent has earmarked the space for solid waste management site on the
plan for collection, segregation and treatment of bio-degradable waste. It was found that
the project proponent has obtained structural stability certificate issued by TPC Technical
Projects Consultants (P) Ltd. dully signed by registered structural engineer.
In view of the above discussions, the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the following condition in addition to the usual conditions in practice.
[1] The project proponent shall provide green area on 30.29% of the project area.
[2] The project proponent shall essentially provide two numbers of STPs preferably
equivalent to 50% of total capacity or depending upon the initial occupancy as the
case may be.
Item No. [23] Application for extension of validity period of Environment Clearance
for Group Housing and Colony for construction of group housing
colony project at Sector-5 Dharuhera Dist. Rewari, Haryana by M/s
Elite Homes Pvt. Ltd.
The application of project proponent seeking extension of validity of
environmental clearance letter along with representation submitted by the project
proponent was considered in the today’s meeting. The Authority observed that:
1. The MoEF&CC, GoI on 08.01.2008 granted environmental clearance to the
project proponent. The project proponent has submitted application for extension
of validity on 29.12.2014/25.02.2015. No action was taken due to lapse of term of
SEIAA. The case was transferred to MoEF&CC, GoI no action was taken and the
same was returned to SEIAA after its reconstitution.
2. The MoEF&CC, GoI vide letter dated 05.10.2015 has advised the project
proponent to seek fresh Environmental Clearance as the case is time bar.
3. The project proponent on 24.11.2015 and 08.12.2015 submitted representation to
considered grant extension of validity of EC keeping in view the amendment to
the Principal Notification dated 29.04.2015, wherein the validity of EC had been
extended from 5 to 7 year and also clarified that the MoEF&CC, GoI while issuing
the letter dated 05.10.2015 has not taken in to consideration the amended
notification extending validity period from 5 years to 7 years.
4. This office of SEIAA vide letter dated 18.12.2015 forwarded the representation of
project proponent and sought clarification from MoEF&CC, GoI whether project
proposal qualifies for consideration in view of amendment to the notification or
not. Again on 31.12.2015 a reminder was issued but clarification from
MoEF&CC, GoI is still awaited.
-
23
5. In the similar case, Regional office Ministry of Environment Forest & Climate
Change, Chandigarh vide letter no. F.No. 4-625/2009-RO(NZ) dated 17.07.2015
has extended the validity of environment clearance granted to M/s Energetic
Construction Pvt. Ltd. by SEIAA, Haryana vide letter no. DEH/08/SEAC-15/6-8
dated 23.01.2009 from 5 years to 7 years i.e. up to 22.01.2016.
6. The environmental clearance to the project proponent was granted by MoEF&CC,
GoI vide F.No. 21-409/2007-IA.III dated 08.01.2008. The validity of EC as per
amended notification dated 29.04.2015 was up to 07.01.2015. The project
proponent on 25.02.2015 submitted the complete application for extension of
validity of EC. The project proponent has completed about 60% of the
construction.
7. The Director of the company also submitted an undertaking on 24.11.2015 that no
construction after the expiry of the validity of EC has been raised.
In view of the above observations the Authority decided to grant extension of
validity of environmental clearance for further 7 years with effect from 07.01.2015
subject to compliance of the conditions imposed in the environmental clearance letter
issued by MoEF&CC, GoI dated 08.01.2008.
********