(ministry of road transport and highways, govt. of india

4
NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport and Highways, Govt. of India) aaaGrater / REGIONAL OFFICE an we * : qaat $-2/167, 3te0 wicirh, gators ted WHA Ura, UlaTeT (7. ) 462016 BHARATMALA E-2/167, Arera Colony, Near Habibganj Railway Station, Bhopal (M.P.) 462016 ROAD TO PROSPERITY @TUTI/Phone : 0755-2426638, the /Fax : 0755-2426698, 3-Het/E-mail : [email protected] NHAVRO-MP/IND/ROLINH-59/Hatod/2020/ Ly | 8 SO Date: 23.01.2021 To, Authorized Signatory, Ms Indian Oil Corporation Ltd. Indore Divisional Office, Plot No.8, Scheme No.159, (Kushabhau Thakre Marg), MR-10, Indore (M.P.)-452016 Sub: 4-laning of Indore-MP/Gujrat Border Section of NH-59 from km. 9.500 to 171.100 in the State of Madhya Pradesh on BOT basis under NHDP Phase-Ill - Proposal for the construction of an approach road & Slab Culvert for proposed retail outlet of Indian Oil Corporation Ltd. on New NH-47 (Old NH-59) at Ch, 294.550 (294.528-294.573), LHS, Khasra No. 1157/3/1, Patwari Halka No. 42/84, Village-Hatod, Tehsil-Sardarpur & Distt.-Dhar in the State of Madhya Pradesh - In-principle approval - Reg. Ref: 1. M/s IOCL letter no. NH:NOC/HATODILF/01 dated 21.08.2020. 2. This office letter no, NHAIRO-MP/IND/ROL/NH-59/Hatod/2020/39293 dated 12.06.2020. 3. PD, PlU-Indore letter no. NHAI/PIU/IND/Ind.Guj./RO/2020/622 dated 12.03.2020. 4. This office letter no. NHAI/RO-MP/IND/ROL/NH-59/Hatod/2020/37641 dated 09.01.2020. 5, Mis IOCL letter no. NH:NOC/HATOD/01 dated 11.12.2019. Sir, Please refer to the PD, NHAI, Indore letter no. NHAMPIU/IND/Ind.Guj./RO/2020/622 dated 42.03.2020 vide which PD has recommended the proposal for the construction of an approach road & Slab Culvert for proposed retail outlet of Indian Oil Corporation Ltd. on New NH-47 (Old NH-59) at Ch. 294.550 (294.528-294.573), LHS, Khasra No. 1157/3/1, Patwari Halka No. 42/84, Village-Hatod, Tehsil-Sardarpur & Distt.-Dhar in the State of Madhya Pradesh. a 2, The PD, NHAI, Indore has certified that proposal fulfills all the conditions/norms of Ministry's circular no. RW/NH-33023/19/99-DO-III dated 24.07.2013. 3. in view of the above “In-principle” approval and provisional NOC is issued in accordance with Ministry's guidelines dated 24.07.2013 issued by MoRT&H under provision of section 28, 29, & 30 of Control of National Highway (Land & Traffic) Act, 2002 subject to following conditions:- (a) Oil companyfowner shall be responsible for the construction and maintenance of deceleration/acceleration lanes, channelizers, drainage arrangement, drinking water and toilet facilities, signs and markings in accordance with the approved layout specifications conforming to these norms, at his own cost. (b) In accordance with Ministry's Circular No. RW/NH-33044/05/2018/S&R (P&B) dated 18.01.2018 a standard layout for toilet unit has been provided. The Toilet Unit shall be provided at a standalone location within the Retail Outlet premises duly equipped with lighting, Water and requisite cleaning accessories etc. A separate access to all road users of National Highways with traffic signages for availability of toilet facility on NH may be provided and are kept open round the clock. (c) As per para 6.2.6 of policy circular the pavement of the access road including de acceleration, acceleration and connecting approached would have sufficient design strength for the expected traffic. It would have minimum pavement composition of 150 mm thick GSB overlaid by the three layers of WBM, each of 75mm thickness (other than WBM-Grading no. 1), topped by 50 mm thick BM and 25 mm thick SDBC. Interlocking Concrete Blocks as per IRC:SP-63 can also be considered. Se yar craters : sit 5 wa 6, Gaet 10 green, Ae faret-110075 EM: 91-11-2507 4100/2507 4200 aaAge : http:\www.nhai.org Corporate Office : G-5 & 6, Sector-10, New Delhi-110075 Phone : 91-11-2507 4100/2507 4200 Website : http:\\www.nhai.org

Upload: others

Post on 09-Jan-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport and Highways, Govt. of India)

aaa Grater / REGIONAL OFFICE an we * : qa at

$-2/167, 3te0 wicirh, gators ted WHA Ura, UlaTeT (7. ) 462016 BHARATMALA E-2/167, Arera Colony, Near Habibganj Railway Station, Bhopal (M.P.) 462016 ROAD TO PROSPERITY

@TUTI/Phone : 0755-2426638, the /Fax : 0755-2426698, 3-Het/E-mail : [email protected]

NHAVRO-MP/IND/ROLINH-59/Hatod/2020/ Ly | 8 SO Date: 23.01.2021

To, Authorized Signatory, Ms Indian Oil Corporation Ltd. Indore Divisional Office,

Plot No.8, Scheme No.159, (Kushabhau Thakre Marg),

MR-10, Indore (M.P.)-452016

Sub: 4-laning of Indore-MP/Gujrat Border Section of NH-59 from km. 9.500 to 171.100 in the State of

Madhya Pradesh on BOT basis under NHDP Phase-Ill - Proposal for the construction of an

approach road & Slab Culvert for proposed retail outlet of Indian Oil Corporation Ltd. on New

NH-47 (Old NH-59) at Ch, 294.550 (294.528-294.573), LHS, Khasra No. 1157/3/1, Patwari Halka

No. 42/84, Village-Hatod, Tehsil-Sardarpur & Distt.-Dhar in the State of Madhya Pradesh -

In-principle approval - Reg.

Ref: 1. M/s IOCL letter no. NH:NOC/HATODILF/01 dated 21.08.2020.

2. This office letter no, NHAIRO-MP/IND/ROL/NH-59/Hatod/2020/39293 dated 12.06.2020.

3. PD, PlU-Indore letter no. NHAI/PIU/IND/Ind.Guj./RO/2020/622 dated 12.03.2020.

4. This office letter no. NHAI/RO-MP/IND/ROL/NH-59/Hatod/2020/37641 dated 09.01.2020.

5, Mis IOCL letter no. NH:NOC/HATOD/01 dated 11.12.2019.

Sir, Please refer to the PD, NHAI, Indore letter no. NHAMPIU/IND/Ind.Guj./RO/2020/622 dated

42.03.2020 vide which PD has recommended the proposal for the construction of an approach road & Slab

Culvert for proposed retail outlet of Indian Oil Corporation Ltd. on New NH-47 (Old NH-59) at Ch. 294.550

(294.528-294.573), LHS, Khasra No. 1157/3/1, Patwari Halka No. 42/84, Village-Hatod, Tehsil-Sardarpur &

Distt.-Dhar in the State of Madhya Pradesh. a

2, The PD, NHAI, Indore has certified that proposal fulfills all the conditions/norms of Ministry's circular

no. RW/NH-33023/19/99-DO-III dated 24.07.2013.

3. in view of the above “In-principle” approval and provisional NOC is issued in accordance with

Ministry's guidelines dated 24.07.2013 issued by MoRT&H under provision of section 28, 29, & 30 of Control

of National Highway (Land & Traffic) Act, 2002 subject to following conditions:-

(a) Oil companyfowner shall be responsible for the construction and maintenance of

deceleration/acceleration lanes, channelizers, drainage arrangement, drinking water and toilet

facilities, signs and markings in accordance with the approved layout specifications conforming

to these norms, at his own cost.

(b) In accordance with Ministry's Circular No. RW/NH-33044/05/2018/S&R (P&B) dated

18.01.2018 a standard layout for toilet unit has been provided. The Toilet Unit shall be

provided at a standalone location within the Retail Outlet premises duly equipped with lighting,

Water and requisite cleaning accessories etc. A separate access to all road users of National

Highways with traffic signages for availability of toilet facility on NH may be provided and are

kept open round the clock.

(c) As per para 6.2.6 of policy circular the pavement of the access road including de acceleration,

acceleration and connecting approached would have sufficient design strength for the

expected traffic. It would have minimum pavement composition of 150 mm thick GSB overlaid

by the three layers of WBM, each of 75mm thickness (other than WBM-Grading no. 1), topped

by 50 mm thick BM and 25 mm thick SDBC. Interlocking Concrete Blocks as per IRC:SP-63

can also be considered. Se

yar craters : sit 5 wa 6, Gaet 10 green, Ae faret-110075 EM: 91-11-2507 4100/2507 4200 aaAge : http:\www.nhai.org

Corporate Office : G-5 & 6, Sector-10, New Delhi-110075 Phone : 91-11-2507 4100/2507 4200 Website : http:\\www.nhai.org

(9)

The drinking water and toilet facilities shall be accessible to the public round the clock. In order to inform the public about these, a display board showing availability of such facilities shall be installed before the entry to the Fuel Station. On completion of the construction accordance with checklist and conforming te the approvals, a Completion Certificate would be issued by the field unit of NHAI for getting approval of Highway Administration. The Oil Company will remove/shift the trees and utilities, if existing, at its own cost on the proposed site & access road after taking the prior approval of Competent Authority as per prevailing rules & norms. The Oil Company/Owner may construct the Fuel Station along with its access as per approved drawings at their own cost within 6 months of the issue of Provisional NOC. After the construction as per approved drawings and to the satisfaction of the Highway Administration, the final approval may be given within 30 days of the receipt of communication from the applicant about the completion of construction work and License deed may be signed by the Competent Authority (i.e. Highway Administration). In case, the construction is not done in one year, the provisional approval shall be deemed to be cancelled, unless renewed by Highway Administration. You have submitted the receipt of License Fee for. Rs.. 2,81,421/- deposited through BHARATKOSH portal in the Ministry's account with transaction Ref. no. 2008200005082 dated 20.08.2020 for the subject cited proposal. If at any point of time, it is observed that the said amount is not realized in the account of Government of India, this provisional NOC shall stand cancelled. The License Deed will be processed after verification of License Fee realization in Ministry's account and completion of construction of Retail Outlet as per approved drawings with certification in this regard by the concerning Highway Administrator. In case the sitting of proposed Retail Outlet is not found in accordance with Ministry's Circular no. RW/NH-33023/19/99-DO-III dated 24.07.2013 and RW/NH-33044/05/2018/ S&R (P&B) dated 18.01.2018 the permission shall stand cancelled, and the NHAI shall not be responsible for any claim/damage/loss to the Oil Company or any person.

The Highway Administration or Implementing Agency responsible for the concerned NH section may carryout inspections for determining the deviations from the prescribed norms or approved layout plan any time, even after signing -of ‘license deed and in case of defaults/deviations found during inspections by Highway Administration, each deficiency shall be immediately rectified, which in no case should exceed 30 days from the date of inspection/date of notifying such defects by the inspecting Authority. The failure to rectify the

identified deficiencies within the prescribed time would lead to de-energizing the fuel station by the concerned Oil Company. The re-energizing would be done only on complete rectification and on the authorization by Highway Administration,

This issues with the approval of Regional Officer cum Highway Administration. eZ

Copy to:

(R.K. Gupta) DGM (Tech.)

1. The Regional Officer (MoRT&H), 2% floor, Nirman Bhawan, Arera Hills, Bhopal-Please find enclosed herewith the receipt for Rs. 2,81,421/- with Transaction’Ref. no. 2008200005082 dated 20.08.2020, 2. The Collector, District-Dhar (M.P.) for kind information please.

3. The Project Director, NHAI, PIU-Indore (M.P.) for information and necessary action please. 4, Concessionaire, M/s IVRCL Indore Gujarat Tollways Ltd. 5. e-mail: [email protected].

- S}UNODDY Jo jelauay 49}]}011U09

-: Asayino5

9E-VE-VO OCOZ-80-02

/UO pajuld

UOHeIUSYINe

JO ssodind

3yi 40)

paiinbas s:

ainjyeusis jedisAud

ou aduay

‘ydiazes 31UO1}Ia]/9

pa e19UuaT

wWjsds &

SI SIU]

~JOWNe[IsIG

YVH

“LSIG GOLVH

T/E/ZSTT “HASH

8CS'V6C""HD Z-HN MIN D0!

‘ “SUONe}S

Jan] OF

Sdaj uOTSssiuued

SSooYy

$0 JUNODDe

Bul Ul

JUSWAed

SUulJUO pased JaussqU]

Ysnosyy

[AJUG eUO-AlueM | PoJPUNH

annoy puesnouL

SUO-AIYSIF SUE]

OMI) TZPT8Z

UNI JO

Wins au

dE E-b

OZOZ OZ

SHY DaleG

780S000028002

‘ON'J8Y UOIeSUeL]

YUM YVGILVd

HSSIN UA

WOJ panladoy

WdITy 0202

02 8ny

:pajeq C80SO00007800Z

“ON Jey UONDeSUeL)

idl333u

SJUNODIY JO

JeISUS5) 19]]01}U045

-: ASeine5

£0°9€:TO O€O02-L0-20

-UO palulid

uolje31}Uay

Ne Jo

asodind

auj 40}

pasinbas si

ainjeugis je2s1isAyd

ou a2duayY

‘jdiasa4 D]U01jDa]a

pajyesauas waysAs

e SI

SIU] -uaWIe]ISIG

VHC GOLVH T/E/ZSTT

HN SH1 825

6c H2

6S-HNGIO ZP-HN

101 ‘

“SUOIIE]S [an] O} Sda;

UONSSIUed Ssaay

$0 JUNOD9e

By} Ul

JUaWAed

aul|UO Paseg

JoualU| YsnosU}

(AjUO puesnoy]

Yel) OOOOT

UNI JO

Wns ayi

WdOE-T O¢OZ

¢ UES

pale

OTSTOOOOLTOZO ‘ON'}9y

UONDesUeL] YIM

VINUVHS HS3Nid

UA wo

paniaray

INdOE:T OZOT

Z URL

pale OTSZOOO0ZTOZO

“ON Jay UOIIDeSUeL]

idI3934u