mineral prospectivity mapping alok porwal centre of studies in resources engineering,

56
Indian Institute of Technology Bombay Indian Institute of Technology Bombay MINERAL PROSPECTIVITY MAPPING Alok Porwal Centre of Studies in Resources Engineering, Indian Institute of Technology (Bombay) India

Upload: imelda

Post on 23-Feb-2016

48 views

Category:

Documents


0 download

DESCRIPTION

MINERAL PROSPECTIVITY MAPPING Alok Porwal Centre of Studies in Resources Engineering, Indian Institute of Technology (Bombay) India. Introduction GIS-based mineral prospectivity mapping Generalized methodology Weights of evidence model Fuzzy model Other models (if time). Geology . - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

MINERAL PROSPECTIVITY MAPPINGAlok Porwal

Centre of Studies in Resources Engineering, Indian Institute of Technology (Bombay) India

Page 2: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

• Introduction GIS-based mineral prospectivity mapping Generalized methodology

• Weights of evidence model• Fuzzy model• Other models (if time)

Page 3: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

Remote SensingGeophysics

Geochemistry

Geology

Garbage In,Garbage Out

Mineral potential maps

GIS

Analyse / Combine

Good Data In, Good Resource Appraisal Out

Mineral potential maps

GIS

Analyse / Combine

Remote SensingGeophysics

Geochemistry

Geology

Page 4: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

database

Predictor maps

Continuous-scale favorability map

Binary favorability map

MINERAL POTENTIAL MAP

MODEL

Mineralization processes

Conceptual models

Knowledge-base

Mappable exploration criteria

Spatial proxies

Processing

Overlay

Validation

Systematic GIS-based prospectivity mapping

Page 5: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

database

Predictor maps

Continuous-scale favorability map

Binary favorability map

MINERAL POTENTIAL MAP

MODEL

Mineralization processes

Conceptual models

Knowledge-base

Mappable exploration criteria

Spatial proxies

Processing

Overlay

Validation

Systematic GIS-based prospectivity mapping

Page 6: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

• Deposits focal points of much larger mass flux and energy systems • Focus on critical processes that must occur to form a deposit • Allows identification of mineralization processes at all scales• Not restricted to particular geologic settings/deposit type

• Amenable to probabilistic analysis

Fluid Discharge

Ligand source

Metal source

Model I

Model II

Model III

Trap Region

Energy(Driving Force)

No Deposits

Mineral System(≤ 500 km) Deposit Halo

Deposit(≤ 10 km)

(≤ 5 km)

1. Energy 2. Ligand 3. Source 4. Transport 5. Trap 6. Outflow

Transporting fluid

Mineral systems approach (Wyborn et al. 1995)

Page 7: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

Fluid Discharge

Metal source

Model I

Model II

Model III

Trap Region

Energy(Driving Force)

Mineral System(≤ 500

km)Deposit Halo

Deposit(≤ 10 km)

(≤ 5 km)

1. Energy 2. Ligand 3. Source 4. Transport 5. Trap 6. Outflow

Transporting fluid

Mineral systems approach :Processes to Proxies

Deformation Metamorphism

Magmatism

Connate brinesMagmatic fluidsMeteoric fluids

Enriched source rocks

Magmatic fluids

Structures Permeable

zones

Structures Chemical

traps

Structures aquifers

MAP

PABL

E CR

ITER

IA

Metamorphic grade, igneous

intrusions, sedimentary

thickness

Evaporites, Organics, isotopes

Radiometric anomalies,

geochemical anomalies, whole-rock

geochemistry

Fault/shear zones, folds geophysical/ geochemical anomalies, alteration

Dilational traps, reactive

rocks, geophyiscal/ geochemical anomalies, alteration

magnetic/ radiometric/ geochemical anomalies, alteration, structures

SPAT

IAL

PROX

IES

Ligand/brine

source

Page 8: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

Broad Regiona

l

Prospect

Scale dependence of exploration criteria

(e.g. orogenic gold system - McCuaig and Beresford, 2009)

‘Camp’ 2-D GIS-based prospectivity mapping

Page 9: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

Continuous-scale favorability map

Binary favorability map

MINERAL POTENTIAL MAP

MODEL

Mineralization processes

Conceptual models

Knowledge-base

Mappable exploration criteria

Spatial proxies

Overlay

Validation

database

Predictor maps

Processing

Model-based mineral potential mapping

Page 10: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay Primary

data

solid geology structural geology

airborne magnetic gravity

reactivity (Fe2+/(Fetot+ Mg + Ca) contrast

distance to faults

strike of nearest faultrheological contrast

Empirical

fav. tectonic environment

fav. host rock lithology Conceptualfav. litho. contact type

Creation of candidate layers in GIS: Feature extraction What are the exploration criteria for the mineralisation?

Page 11: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

11 Proxies to Predictor Maps: Systematic Analysis of Exploration Data

GIS

geology(1-of-n code d) magnetic a nomalygamma-ray channels total c ountdistance to nearest fau ltKTh

Uinput layer

hiddenlayer

outp utlayer

output

Test/Analyse

Derivative predictor maps

Remote SensingGeophysicsGeochemistry Geology

• Hypothesis testing• Select input layers

• Create candidate layers (Feature extraction based on mineral systems model)

• Input layers

Page 12: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

12For each exploration criteria, define a hypothesis in

terms of GIS layer(s)

- Generate all appropriate layers- Examine each layer’s spatial relationship to the targeted mineral deposits- Quantify results

- Define an experimental plan

Hypothesis incorrect Hypothesis correct

Factor identified,keep GIS layer for

prospectivity mapping

Discard layer

Rede

fine

hypo

thes

is

Page 13: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

Example: Rheology as an exploration criteria for gold trap

4

1

5BasaltGranite

Komatiite

GRANITE-GREENSTONEBELTS

UltramaficFelsic

Volcanics

High-Mgbasalts

Gneiss Foliatedmonzogranite

Monzogranite

Granodiorite

Tonalite

Dolerite

Granophyricdolerite

BIF

Volcaniclastic/clastic sedimentary

rocks

AndesiticPorphyry

Dolomite-Qtz rock

Tholeiitic basalt

5

3

2

1

0

4

1 2 3 4 5

Reac

tivi

ty(F

e x

[Fe

/ Fe+

Mg+

Ca])

Rheological strength

(Provided by David Groves)

Page 14: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

14 Experiment 1: Host Rock Rheology

Expected Results

0.000.200.400.600.801.00

1 2 3 4 5Rheology Value

Spat

ial a

ssoc

iati

on

Hypothesis: More deposits in high rheological strength rocks

4

1

5BasaltGranite

Komatiite

Page 15: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

15Experiment 1: Host Rock Rheology

The Results

0.000.200.400.600.801.00

1 2 3 4 5Rheology Value

EdjudinaKalgoorlieLavertonLeonoraYandal

Spat

ial a

ssoc

iati

on

Hypothesis rejected!

Page 16: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay Hypothesis: More deposits adjacent to

lithological contacts that have a higher rheological contrast

Experiment 2: Rheological Contrast

Expected Results

0.000.200.400.600.801.00

1 2 3 4 5Rheology contrast across geological contacts

Spat

ial a

ssoc

iati

on

4

1

5BasaltGranite

Komatiite

Page 17: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

The Results

0.00

0.20

0.40

0.60

0.80

1.00

0 1 2 3 4Rheology Contrast at lithological contactsSp

atia

l ass

ocia

tion

EdjudinaKalgoorlieLavertonLeonoraYandal

Experiment 2: Rheological Contrast

Hypothesis rejected!

Page 18: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

18

Change in Philosophy

Frequent change

in rheology

Increased fluid flow

Deposit localization

Region of increased fluid

flow

Page 19: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

19

Hypothesis: Expect deposits to be more common in regions of greater density of rheological contrast.

Experiment 3: Rheological contrast density

Expected Results

0.000.200.400.600.801.00

1 2 3 4 5Geological contact density weighted by rheology contrast

Spat

ial a

ssoc

iati

on

Page 20: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

20

0 1 2 3 4

Rheology contrast at lithological contacts Rheology contrast density

LOW HIGH

Experiment 3: Rheological contrast density

Kalgoorlie

Kalgoorlie

Page 21: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

21

EdjudinaKalgoorlieLavertonLeonoraYandal

Experiment 3: Rheology Contrast Density

Results

Rheological Contrast DensityLOW HIGHSp

atia

l ass

ocia

tion

0.00

0.20

0.40

0.60

0.80

1.00

• Deposits more common in regions of greater rheology contrast density

• Select rheology contrast layer for inputting into mineral potential models

Page 22: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

22

Mineralization processes

Conceptual models

database

Predictor maps

Continuous-scale favorability map

Binary favorability map

MINERAL POTENTIAL MAP

Knowledge-base

MODEL

Mappable exploration criteria

Spatial proxies

Processing

Overlay

Validation

Model-based mineral potential mapping

Page 23: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

23Structure of a model for

mineral resource potential mapping

∫Integrating function

• linear or non-linear

• parametersInput predictor maps

• Categoric or numeric

• Binary or multi-class

Output mineral potential map • Grey-scale or

binary

Page 24: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

24 GIS-based mineral resource potential mapping - Modelling approaches

Exploration datasets with homogenous coverage – required for all models Expert knowledge (a knowledge base) and/or

Model parameters estimated from mineral deposits data(Known deposits required)Brownfields explorationExamples - Weights of evidence, Bayesian classifiers, NN, Logistic Regression

Data-driven Knowledge-driven

Hybrid

Mineral deposit data

Model parameters estimated from both mineral deposits dataand expert knowledge (Known deposits necessary)Semi-brownfields to brownfields explorationExamples – Neuro-fuzzy systems

Training data Expert knowledge

Model parameters estimated from expert knowledge (Known deposits not necessary)Greenfields explorationExamples – Fuzzy systems; Dempster-Shafer belief theory

Page 25: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

25

TheoryRich

SymbolicArtificial

Intelligence

FuzzySystems

Neural Networks/

GAPoor

Poor Rich

Bayesian

Any of the methods best: Hybrid Systems

Neuro-fuzzy; fuzzy WofE

Which model is best?

Greenfields BrownfieldsData

Page 26: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Indian Institute of Technology Bombay

26

Probabilistic Model (Weights of Evidence):

- used in the areas where there are already some known deposits

- spatial associations of known deposits/oil well with the geological features are used to determine the probability of occurrence of a mineral deposit (or well) in each unit cell of the study area.

Fuzzy Model:

- used in the areas where there are no known mineral deposits

- each geological feature is assigned a weight based on the expert knowledge, these weights are subsequently combined to determine the probability of occurrence of mineral deposit in each unit cell of the study area.

GIS MODELS FOR MINERAL EXPLORATION

Page 27: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

27

Weights of Evidence Model for Mineral Prospectivity Mapping

Page 28: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

28

Probabilistic model (Weights of Evidence)

• What is needed for the WofE calculations?– A training point layer –

i.e. known mineral deposits;

– One or more predictor maps in raster format.

Page 29: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

29

PROBABILISTIC MODELS (Weights of Evidence or WofE)

Four steps:1. Convert multiclass maps to binary maps2. Calculation of prior probability3. Calculate weights of evidence (conditional probability) for

each predictor map4. Combine weights

Page 30: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

30

• The probability of the occurrence of the targeted mineral deposit type when no other geological information about the area is available or considered.

Study area (S)

Target deposits D

Assuming- 1. Unit cell size = 1 sq km2. Each deposit occupies 1 unit cell

Total study area = Area (S) = 10 km x 10 km = 100 sq km = 100 unit cells

Area where deposits are present = Area (D) = 10 unit cells

Prior Probability of occurrence of deposits = P {D} = Area(D)/Area(S)= 10/100 = 0.1

Prior odds of occurrence of deposits = P{D}/(1-P{D}) = 0.1/0.9 = 0.1110k

10k

1k1k

Calculation of Prior Probability

Page 31: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

31

Convert multiclass maps into binary maps

• Define a threshold value, use the threshold for reclassification

Multiclass map

Binary map

Page 32: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

• How do we define the threshold?

Use the distance at which there is maximum spatial association as the threshold !

Convert multiclass maps into binary maps

Page 33: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

• Spatial association – spatial correlation of deposit locations with geological feature.

A

BC

D

A

BC

D

10km

10km

1km

1km

Gold Deposit (D) Study area (S)

Convert multiclass maps into binary maps

Page 34: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay A

B C

D

Which polygon has the highest spatial association with D?More importantly, does any polygon has a positive spatial association with D ???

What is the expected distribution of deposits in each polygon, assuming that they were randomly distributed? What is the observed distribution of deposits in each polygon?

Positive spatial association – more deposits in a polygon than you would expect if the deposits were randomly distributed.

If observed >> expected; positive associationIf observed = expected; no association If observed << expected; negative association

Convert multiclass maps into binary maps

Page 35: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

A

B C

D

Area (A) = n(A) = 25; n(D|A) = 2Area (B) = n(A) = 21; n(D|B) = 2Area(C) = n(C) = 7; n(D|C) = 2 Area(D) = n(D) = 47; n(D|D) = 4Area (S) = n(S) = 100; n(D) = 10

OBSERVED DISTRIBUTION

Convert multiclass maps into binary maps

Page 36: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

A

B C

DArea (A) = n(A) = 25; n(D|A) = 2.5Area (B) = n(A) = 21; n(D|B) = 2.1Area(C) = n(C) = 7; n(D|C) = 0.7Area(D) = n(D) = 47; n(D|D) = 4.7(Area (S) = n(S) = 100; n(D) = 10)

EXPECTED DISTRIBUTION

Expected number of deposits in A = (Area (A)/Area(S))*Total number of deposits

Convert multiclass maps into binary maps

Page 37: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

A

B C

D

Area (A) = n(A) = 25; n(D|A) = 2.5

Area (B) = n(A) = 21; n(D|B) = 2.1

Area(C) = n(C) = 7; n(D|C) = 0.7

Area(D) = n(D) = 47; n(D|D) = 4.7

(Area (S) = n(S) = 100; n(D) = 10)

EXPECTED DISTRIBUTIONArea (A) = n(A) = 25; n(D|A) = 2

Area (B) = n(A) = 21; n(D|B) = 2

Area(C) = n(C) = 7; n(D|C) = 2

Area(D) = n(D) = 47; n(D|D) = 4

Area (S) = n(S) = 100; n(D) = 10

OBSERVED DISTRIBUTION

Only C has positive association!So, A, B and D are classified as 0; C is classified as 1.

Another way of calculating the spatial association : = Observed proportion of deposits/ Expected proportion of deposits= Proportion of deposits in the polygon/Proportion of the area of the polygon= [n(D|A)/n(D)]/[n(A)/n(S)] • Positive if this ratio >1• Nil if this ratio = 1 • Negative if this ratio is < 1

Convert multiclass maps into binary maps

Page 38: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

LA

BC

D

10km

10km

1km

1km

Gold Deposit (D) Study area (S)

Convert multiclass maps into binary maps – Line features

Page 39: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

1km

1km

Gold Deposit (D)

10

0

000

0

000

11

112

11

1

1111

111

111

1

11

2 3 4 5 6 7 8 9 2 3 4 5 6 7 8 2 3 4 5 6 7 8

2 3 4 5 6 7 2 3 4 5 6 2 3 4 5 6

2 3 4 5 2 3 4 2 3 4 2 3 4

3 2 3 2 4 3 2 4 3 2

5 4 3 2 5 4 3 2

Distance from

the fault

No. of

pixels

No of deposit

s

Ratio (Observe

d to Expected

)0 9 1 1.11 21 3 1.42 17 0 0.03 16 3 1.94 14 2 1.45 9 0 0.06 6 0 0.07 4 0 0.08 3 1 3.39 1 0 0.0

Convert multiclass maps into binary maps – Line features

Page 40: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

• Calculate observed vs expected distribution of deposits for cumulative distances

Gold Deposit (D)

10

0

000

0

000

11

112

11

1

1111

111

111

1

11

2 3 4 5 6 7 8 9 2 3 4 5 6 7 8 2 3 4 5 6 7 8

2 3 4 5 6 7 2 3 4 5 6 2 3 4 5 6

2 3 4 5 2 3 4 2 3 4 2 3 4

3 2 3 2 4 3 2 4 3 2

5 4 3 2 5 4 3 2

Distance from the fault

No. of pixels

Cumul No. of pixels

No of deposits

Cumul No. of deposits

Ratio (Observed to Expected)

0 9 9 1 1 1.1

1 21 30 3 4 1.3

2 17 47 0 4 0.9

3 16 63 3 7 1.1

4 14 77 2 9 1.2

5 9 86 0 9 1.0

6 6 92 0 9 1.0

7 4 96 0 9 0.9

8 3 99 1 10 1.0

9 1 100 0 10 1.0

=< 1 – positive association (Reclassified into 1)> 1– negative association (Reclassified into 0)

Convert multiclass maps into binary maps – Line features

Page 41: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Weights of evidence ~ quantified spatial associations of the resource with predictor maps

Calculation of Weights of Evidence

Study area (S)

10k

10kUnit cell

1k1k

Objective: To estimate the probability of occurrence of D in each unit cell of the study area

Approach: Use BAYES’ THEOREM for updating the prior probability of the occurrence of deposits to posterior probability based on the conditional probabilities (or weights of evidence) of the predictor features.

Deposit locationsPredictor feature (B1) Predictor Feature (B2)

Page 42: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

42

P{D|B} = P{D& B}

P{B}= P{D} P{B|D}

P{B}

P{D|B} = P{D & B}

P{B}= P{D} P{B|D}

P{B}

Posterior probability of D given the presence of B

Posterior probability of D given the absence of B

Bayes’ theorem:

D- Well

B- Predictor Feature

THE BAYES EQUATION ESTIMATES THE PROBABILTY OF A WELL GIVEN THE PREDICTOR FEATURE FROM THE

PROBABILITY OF THE FEATURE GIVEN A WELL

ObservationInference

Calculation of Weights of Evidence

Page 43: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

43

Using odds (P/(1-P)) formulation:

O{D|B} = O{D} P{B|D}

P{B|D}Odds of D given the presence of B

O{D|B} = O{D} P{B|D}

P{B|D}Odds of D given the absence of B

Taking logs on both sides:

Loge (O{D|B}) = Loge(O{D}) + Log of odds of D given the presence of BP{B|D}P{B|D}

loge

Loge (O{D|B}) = Loge(O{D}) + Log of odds of D given the absence of BP{B|D}P{B|D}

loge

+ive weight of evidence (W+)

-ive weight of evidence (W-)

Calculation of Weights of Evidence

Page 44: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

Contrast (C) measures the net strength of spatial association between the

geological feature and mineral deposits

Contrast = W+ – W-

+ ive Contrast – net positive spatial association

-ive Contrast – net negative spatial association

zero Contrast – no spatial association

Can be used to test spatial associations

44

Calculation of contrast

Page 45: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

2121

2

2

1

121

2

2

1

1

21

21

2

2

1

1

2

2

1

1

21

21

21

21

21

2121

2

2

1

121

2

2

1

121

21

2121

)()/&(log(

))/()/(log()

)/()/(log()()/&(log(

)/()/(.

)/()/().(

)/()./()/()./().(

)()/(.

)()/().(

)()/(.

)()/().(

)&()/&().(

)&()/&().(

)&/()&/()/&(

)()/(.

)()/().()&/(

,)(

)/(.)(

)/()/&(

is, that ce,independen lconditiona assume We)&(

)/&().()&/(

)()/().()/(

WWDOddsDBBOdds

DBPDBP

DBPDBPDOddsDBBOdds

DBPDBP

DBPDBPDOdds

DBPDBPDBPDBPDOdds

BPDBP

BPDBPDP

BPDBP

BPDBPDP

BBPDBBPDP

BBPDBBPDP

BBDPBBDPDBBOdds

BPDBP

BPDBPDPBBDP

BPDBP

BPDBPDBBP

BBPDBBPDPBBDP

BPDBPDPBDP

WEIGHTS OF EVIDENCE FOR MULTIPLE MAPS

Page 46: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

2121

2121

2121

2121

)()/&(log(

)()/&(log(

)()/&(log(

)()/&(log(

WWDOddsDBBOdds

WWDOddsDBBOdds

WWDOddsDBBOdds

WWDOddsDBBOdds

WEIGHTS OF EVIDENCE FOR MULTIPLE MAPS

Page 47: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

47

Loge (O{D|B1, B2}) =

Loge(O{D}) + W+B1 + W+B2

Loge (O{D|B1, B2}) =

Loge(O{D}) + W-B1 + W+B2

Loge (O{D|B1, B2}) =

Loge(O{D}) + W+B1 + W-B2

Loge (O{D|B1, B2}) =

Loge(O{D}) + W-B1 + W-B2

Log of odds of D given the presence of B1 and B2

Log of odds of D given the absence of B1 and presence B2Log of odds of D given the presence of B1 and absence B2

Log of odds of D given the absence of B1 and B2

Loge (O{D|B1, B2, … Bn}) =

Loge(O{D}) + ∑W+/-Bii=1

n

Or in general, for n predictor features,

The sign of W is +ive or -ive, depending on whether the feature is absent or present

The odds are converted back to posterior probability using the relation 0 = P/(1+P)

Feature B2 Feature B1

Well D

Page 48: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

48

Loge (O{D|B1, B2}) =

Loge(O{D}) + ∑W+/-Bii=1

n

Calculation of posterior probability (or odds) require:• Calculation of pr prob (or odds) of occurrence of wells in the study area• Calculation of weights of evidence of all predictor features, i.e,

Implementation

P{B|D}P{B|D}

loge

P{B|D}P{B|D}

loge

W+ =

W- =

&

Page 49: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

49

Exercise-2Layer – B1 (Fold Axes buffers

1.25k)

There are 54 base-metal deposits in the study area. Out of these, 35 deposits occur within 1.25 km buffers of fold axes (B1), and 42 deposits are associated with mafic volcanic rocks (B2). The total area in the fold axes buffers is 7132 sq km, while the mafic volcanic rocks occupy 4374 sq km area. If the total study area is 55987 sq km, calculate the following (assuming 1 sq km unit area size):1. Prior probability and odds of base-metal deposits in the study area;2. W+B1, W-B1, W+B2, W-B2;3. Contrast values for B1 and B2; and4. Posterior Log(odds) and probability of base-metal deposits in the study area, wherei. Both B1 and B2 are present; ii. B1 present but B2 absent; iii. B2 present but B1 absent; and iv. Both B1 and B2 are absent

Layer – B2 (Mafic volcanic rocks)

ARAVALLI STUDY AREA

Page 50: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

EXERCISE

Feature B2 Feature B1

Well D

Calculate posterior probability for each cell.

Page 51: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

51

• The probability of the occurrence of the wells when no other information about the area is available or considered.

Study area (S)

Wells DAssuming- 1. Unit cell size = 1 sq km2. Each deposit occupies 1 unit cell

Total study area = Area (S) = 10 km x 10 km = 100 sq km = 100 unit cells

Area where wells are present = Area (D) = 10 unit cellsPrior Probability of occurrence of wells = P {D} =

Area(D)/Area(S)= 10/100 = 0.1Prior odds of occurrence of wells = P{D}/(1-P{D})

= 0.1/0.9 = 0.11

10k

10k

1k1k

Calculation of Prior Probability

Page 52: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

52

Basic quantities for estimating weights of evidenceTotal number of cells in study area: n(S)Total number of cells occupied by wells (D): n(D)Total number of cells occupied by the feature (B): n(B)Total number of cells occupied by both feature and wells : n(B&D)

Derivative quantities for estimating weights of evidenceTotal number of cells not occupied by D: n( ) = n(S) – n(D) Total number of cells not occupied by B: n( ) = n(S) – n(B)Total number of cells occupied by B but not D: n( B & D) = n(B) – n( B & D)Total number of cells occupied by D but not B: n(B & D) = n(D) – n(B & D)Total number of cells occupied by neither D but nor B: n( B & D) = n(S) – n(B) – n(D) + n( B & D)

DB

Probabilities are estimated as area (or no. of unit cells) proportions

Calculation of Weights of Evidence

P{B|D}P{B|D}

loge

W+ = P{B|D}P{B|D}

loge

W- =

= n( )/n(D) = n( )/ = n( )/n(D) = n( )/

B & D

B & DP{B|D}P{B|D} B & D

P{B|D}

P{B|D} B & D

n(D)

n(D)

Where,

B1

D

B2

B2 D B2 D

B2 D

B2 D

B1 D B1 D

B1 D

B1 D

B1

SD

B2

SD

Page 53: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

53

Exercise

B2 D B2 D

B2 D

B2 DB1 D B1 D

B1 D

B1 D

10k

10kB

1

B2

S

B1

SD B

2S

D

Unit cell size = 1 sq km & each well occupies 1 unit cell

n(S) = 100n(D) = 10n(B1) = 16n(B2) = 25n(B1 & D) = 4n(B2 & D) = 3

Calculate the weights of evidence (W+ and W-) and Contrast values for B1 and B2

= n( )/n(D) = n( )/ = [n(B) – n( )]/[n(S) –n(D)] = n( )/n(D) = [n(D) – n( )]/n(D) = n( )/ = [n(S) – n(B) – n(D) + n( )]/[n(S) –

n(D)]

B & D

B & DP{B|D}P{B|D} B & D

P{B|D}

P{B|D} B & D

n(D)

n(D)

Where,B &

D

B & D

B & D

P{B|D}P{B|D}

loge

W+ = P{B|D}P{B|D}

loge

W- =

Page 54: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

54

Solution

B2 D B2 D

B2 D

B2 DB1 D B1 D

B1 D

B1 D

10k

10k

B1

B2

S

B1

SD B

2S

D

W-B1 = loge = loge(0.6000/0.8667)

= loge(0.6923) = -0.3678

= n( )/n(D) = 4/10 = 0.4000 = n( )/ = 12/90 = 0.1333 = n( )/n(D) = 6/10 = 0.6000 = n( )/ = 78/90 = 0.8667

B1& D

B1&D P{B1|D}P{B1|D}

B1&D

P{B1|D}

P{B1|D}

B1& D

n(D)n(D)

W+B1 = loge = loge(0.4000/0.1333)

= loge(3.0007) = 1.0988

P{B1|D}P{B1|D}

P{B1|D}P{B1|D}

Contrast = W+B1 – W-B1 = 1.0988 – (-0.3678) = 1.4666

W-B2 = loge = loge(0.7000/0.7555)

= loge(0.9265) = -0.0763

= n( )/n(D) = 3/10 = 0.3000

= n( )/ = 22/90 = 0.2444

= n( )/n(D) = 7/10 = 0.7000

= n( )/ = 68/90 = 0.7555

B2&D

B2& DP{B2|D}

P{B2|D}

B2&D

P{B2|D}

P{B2|D}

B2& D

n(D)

n(D)

W+B2 = loge = loge(0.3000/0.2444)

= loge(1.2275) = 0.2050

P{B2|D}P{B2|D}

P{B2|D}P{B2|D}

Contrast = W+B2 – W-B2 = 0.2050 – (-0.0763) = 0.2812

Assuming Unit cell size = 1 sq km and each well occupies 1 unit cell

n(S) = 100n(D) = 10n(B1) = 16n(B2) = 25n(B1 & D) = 4n(B2 & D) = 3

n( ) = - n(B2) - n(D) + n( ) =68

B2& D n(S) B2&D

n( ) = n(B2) – n( ) = 22

B2& Dn( ) = n(D) – ( ) =

7B2&

D

B2& D B2&

D

n(D) = n(S) – n(D) =90n(B2) = n(S) – n(B2) = 75

Cells occupied by

deposits

n( ) = n(B1) – n( ) =12

B1& Dn( ) = n(D) – n( )

= 6 B1&D

B1& DB1& D

n(D) = n(S) – n(D) =90n(B1) = n(S) – n(B1) = 84

n( ) = - n(B1) - n(D) + n( ) = 78

B1& D n(S) B1& D

Page 55: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

55

Loge (O{D|B1, B2}) =

Loge(O{D}) + W+/-B1 + W+/-B2

Loge(O{D}) = Loge(0.11) = -2.2073

Exercise - Calculation of Posterior Probability

Calculate posterior probability given:1. Presence of B1 and B2;2. Presence of B1 and absence of B2;3. Absence of B1 and presence of B2;4. Absence of both B1 and B2

B1

B2

S

Prior Prb = 0.10Prior Odds =

0.11

Page 56: MINERAL PROSPECTIVITY MAPPING Alok  Porwal Centre of Studies in Resources Engineering,

Indian Institute of Technology Bombay

56

Loge (O{D|B1, B2}) =

Loge(O{D}) + W+/-B1 + W+/-B2

Loge (O{D|B1, B2}) = -2.2073 + 1.0988 + 0.2050 = -0.8585

O{D|B1, B2} = Antiloge (-0.8585) = 0.4238 P = O/(1+O) = (0.4238)/(1.4238) = 0.2968

For the areas where both B1 and B2 are present

Loge (O{D|B1, B2}) = -2.2073 + 1.0988 - 0.0763 = -1.1848

O{D|B1, B2} = Antiloge (- 1.1848) = 0.3058 P = O/(1+O) = (0.3058)/(1.3058) = 0.2342

For the areas where B1 is present but B2 is absent

Loge (O{D|B1, B2}) = -2.2073 - 0.3678 + 0.2050 = -2.3701

O{D|B1, B2} = Antiloge (-2.3701) = 0.0934 P = O/(1+O) = (0.0934)/(1.0934) = 0.0854

Loge (O{D|B1, B2}) = -2.2073 - 0.3678 - 0.0763 = -2.6514

O{D|B1, B2} = Antiloge (-2.6514) = 0.0705 P = O/(1+O) = (0.0705)/(1.0705) = 0.0658

For the areas where both B1 and B2 are absent

For the areas where B1 is absent but B2 is present

Loge(O{D}) = Loge(0.11) = -2.2073

Posterior probability0.29680.2342

0.08540.0658

Ground Water potential Map

Calculation of Posterior Probability

B1

B2

S

Prior Prb = 0.10