mineduc-unicef study, presentation of findings jres, 12 th november 2015 analysis of the costs of...
TRANSCRIPT
![Page 1: MINEDUC-UNICEF STUDY, PRESENTATION OF FINDINGS JRES, 12 TH NOVEMBER 2015 ANALYSIS OF THE COSTS OF PRE- PRIMARY EDUATION IN RWANDA](https://reader036.vdocuments.site/reader036/viewer/2022082613/5697c0011a28abf838cc2ae8/html5/thumbnails/1.jpg)
M I N E D U C - U N I C E F S T U D Y , P R E S E N T A T I O N O F F I N D I N G S J R E S , 1 2 T H N O V E M B E R 2 0 1 5
ANALYSIS OF THE COSTS OF PRE-PRIMARY EDUATION IN
RWANDA
![Page 2: MINEDUC-UNICEF STUDY, PRESENTATION OF FINDINGS JRES, 12 TH NOVEMBER 2015 ANALYSIS OF THE COSTS OF PRE- PRIMARY EDUATION IN RWANDA](https://reader036.vdocuments.site/reader036/viewer/2022082613/5697c0011a28abf838cc2ae8/html5/thumbnails/2.jpg)
PRE-PRIMARY BUDGET 2015/16
REB Budget, 2015/16 Amount, RwF
Curriculum and Pedagogical Materials
Pre-primary books 50,000,000
Education Quality and Standards
Pre-primary inspections 3,500,000
Construction pre-primary (300 classrooms) 1,130,322,858
REB Total 1,183,822,858
Extra budget (curriculum and pedagogical materials), UNICEF
786,530,015
Total 1,970,352,873
% of education budget on pre-primary 0.9%
![Page 3: MINEDUC-UNICEF STUDY, PRESENTATION OF FINDINGS JRES, 12 TH NOVEMBER 2015 ANALYSIS OF THE COSTS OF PRE- PRIMARY EDUATION IN RWANDA](https://reader036.vdocuments.site/reader036/viewer/2022082613/5697c0011a28abf838cc2ae8/html5/thumbnails/3.jpg)
BUDGETARY PRIORITIES
Teacher salaries
Construction Capitation grants
Note: Results from stakeholder consultation with DEOs, head teachers, parents
![Page 4: MINEDUC-UNICEF STUDY, PRESENTATION OF FINDINGS JRES, 12 TH NOVEMBER 2015 ANALYSIS OF THE COSTS OF PRE- PRIMARY EDUATION IN RWANDA](https://reader036.vdocuments.site/reader036/viewer/2022082613/5697c0011a28abf838cc2ae8/html5/thumbnails/4.jpg)
COSTING: 3 PACKAGES
Basic Package Enhanced Package Full Package Teacher salaries (A2)
Capitation grants (4,250 RwF)
Construction
Investment in quality
Teacher salaries (A2)
Capitation grants (4,250 RwF)
Construction
Investment in quality
ECE caregiver assistants salaries
Vulnerable fund
Special needs education fund
Teacher salaries (A2)
Capitation grants (4,250 RwF)
Construction
Investment in quality
ECE caregiver assistants salaries
Vulnerable fund
Special needs education fund
School Feeding
![Page 5: MINEDUC-UNICEF STUDY, PRESENTATION OF FINDINGS JRES, 12 TH NOVEMBER 2015 ANALYSIS OF THE COSTS OF PRE- PRIMARY EDUATION IN RWANDA](https://reader036.vdocuments.site/reader036/viewer/2022082613/5697c0011a28abf838cc2ae8/html5/thumbnails/5.jpg)
TARGETING PRIORITY DISTRICTS
Rank District Rank District
1 Gisagara 11 Nyagatare
2 Rutsiro 12 Gatsibo
3 Nyamasheke
4 Nyaruguru 13 Karongi
5 Ngoma 14 Ruhango
6 Burera 15 Bugesera
7 Nyabihu
8 Kirehe
9 Gicumbi
10 Ngororero
Note: Targeting combines poverty levels and educational need: Poverty rates (EICV 4) – weighting of 40%; District level GERs (MINEDUC) – weighting of 60% Investment in 10, 12 and 15 districts are costed throughout. All 15 districts are part of the GPE-monitored group of 22 districts
![Page 6: MINEDUC-UNICEF STUDY, PRESENTATION OF FINDINGS JRES, 12 TH NOVEMBER 2015 ANALYSIS OF THE COSTS OF PRE- PRIMARY EDUATION IN RWANDA](https://reader036.vdocuments.site/reader036/viewer/2022082613/5697c0011a28abf838cc2ae8/html5/thumbnails/6.jpg)
COSTING METHODOLOGY
• Number of children aged 3-6 in each district (real need)
• Benchmark of 50% used – ie. meet needs of 50% of 3-6 year olds in selected districts
• Construction schedule of classrooms for each year (over 3 year period) to meet this benchmark in selected districts
• Assumption of double-shifting for pre-primary level applied: 80 children per classroom/40 per session
![Page 7: MINEDUC-UNICEF STUDY, PRESENTATION OF FINDINGS JRES, 12 TH NOVEMBER 2015 ANALYSIS OF THE COSTS OF PRE- PRIMARY EDUATION IN RWANDA](https://reader036.vdocuments.site/reader036/viewer/2022082613/5697c0011a28abf838cc2ae8/html5/thumbnails/7.jpg)
COSTING THE 3 PACKAGES: A 3 YEAR INVESTMENT
Districts 2015/16[Amount; % of
budget]
2016/17 2017/18
Basic Package
10 priority districts 7.4bn (3.4%) 8.3bn 9.4bn
12 priority districts 9.1bn (4.2%) 10.2bn 11.6bn
15 priority districts 10.9bn (5%) 12.3bn 14bn
Enhanced Package
10 priority districts 7.7bn (3.6%) 8.9bn 10.2bn
12 priority districts 9.4bn (4.4%) 10.8bn 12.5bn
15 priority districts 11.3 (5.2%) 13.1bn 15.1bn
Full Package
10 priority districts 8bn (3.7%) 9.6bn 11.4bn
12 priority districts 9.7bn (4.5%) 11.7bn 14bn
15 priority districts 11.7bn (5.4%) 14.2bn 16.9bn
![Page 8: MINEDUC-UNICEF STUDY, PRESENTATION OF FINDINGS JRES, 12 TH NOVEMBER 2015 ANALYSIS OF THE COSTS OF PRE- PRIMARY EDUATION IN RWANDA](https://reader036.vdocuments.site/reader036/viewer/2022082613/5697c0011a28abf838cc2ae8/html5/thumbnails/8.jpg)
LEVEL OF INVESTMENT NEEDED TO MEET GPE TARGETS
• Current national pre-primary GER: 12.7% (corrected)
• GPE target is 17% (2017) in 22 districts (baseline: 7.9%, 2014)
• Payment by results means just under US$8m dependent on meeting this target
• Investment in 15 districts: enrolment across 22 would reach 18% (enrolment across 15 would reach 27%)
• Investment in 12 districts: enrolment across 22 would reach 16.7%
![Page 9: MINEDUC-UNICEF STUDY, PRESENTATION OF FINDINGS JRES, 12 TH NOVEMBER 2015 ANALYSIS OF THE COSTS OF PRE- PRIMARY EDUATION IN RWANDA](https://reader036.vdocuments.site/reader036/viewer/2022082613/5697c0011a28abf838cc2ae8/html5/thumbnails/9.jpg)
EXTRA SLIDES FOR REFERENCE ONLY
![Page 10: MINEDUC-UNICEF STUDY, PRESENTATION OF FINDINGS JRES, 12 TH NOVEMBER 2015 ANALYSIS OF THE COSTS OF PRE- PRIMARY EDUATION IN RWANDA](https://reader036.vdocuments.site/reader036/viewer/2022082613/5697c0011a28abf838cc2ae8/html5/thumbnails/10.jpg)
COSTS BORNE BY FAMILIES TO ACCESS PRE-PRIMARY
• Types of cost: school fees, uniforms, school materials, porridge
• Impact: • Exclusion of poorest (and drop out) + reduced demand • Teacher retention, motivation problems - impact on quality and
wasted investments in teacher training• Lack of ‘institutionalisation’ of the pre-primary system
Costs per year for pre-primary
Item Costs reported (low)
Costs reported (middle)
Costs reported
(high)
School Fees 4,500 15,000-27,000 54,000
Total 16,000-26,600 43,000-70,000 100,500-152,500
![Page 11: MINEDUC-UNICEF STUDY, PRESENTATION OF FINDINGS JRES, 12 TH NOVEMBER 2015 ANALYSIS OF THE COSTS OF PRE- PRIMARY EDUATION IN RWANDA](https://reader036.vdocuments.site/reader036/viewer/2022082613/5697c0011a28abf838cc2ae8/html5/thumbnails/11.jpg)
COSTING OF THE 3 PACKAGES: 2.5 YEAR INVESTMENT
Districts 2015/16 (mid-year)
2016/17 2017/18
Basic Package
10 priority districts 3.9bn 9.5bn 11bn
12 priority districts 4.8bn 11.8bn 13.6bn
15 priority districts 5.7bn 14.2bn 16.4bn
Enhanced Package
10 priority districts 4.2bn 10bn 11.7bn
12 priority districts 5bn 12.2bn 14.3bn
15 priority districts 6bn 14.8bn 17.4bn
Full Package
10 priority districts 4.3bn 10.4bn 12.7bn
12 priority districts 5.1bn 12.8bn 15.7bn
15 priority districts 6.1bn 15.5bn 18.9bn
![Page 12: MINEDUC-UNICEF STUDY, PRESENTATION OF FINDINGS JRES, 12 TH NOVEMBER 2015 ANALYSIS OF THE COSTS OF PRE- PRIMARY EDUATION IN RWANDA](https://reader036.vdocuments.site/reader036/viewer/2022082613/5697c0011a28abf838cc2ae8/html5/thumbnails/12.jpg)
ANALYSIS OF INVESTMENT IN CONTEXT OF ENROLMENT PROJECTIONS (2)
Note:• These estimates are based on the 2.5 year investment, starting mid-year 15/16• The 2017 GER is just giving the figure mid-way between 2 figures given for the FYs. • Only the investment in 15 districts achieves the GPE target (where 22 districts progress is
measured)• Isolating the districts for investment (rather than the full 22) shows much better progress of
course• Waiting to start a 3 year investment in 2016/17 is not an option.
District investment
Estimate GER across 22 GPE
districts 2016/17
Estimate GER across 22 GPE
districts – end of 2017
Estimate GER across 22 GPE
districts 2017/18
10 priority districts 12.5 15.3 18.2
12 priority districts 13.1 16.7 20.3
15 priority districts 13.7 18 22.4
For comparative purposes only:
Estimate GER across 15 priority
districts only, 2016/17
Estimate GER across 15 priority districts only, end
of 2017
Estimate GER across 15 priority districts
only, 2017/18
15 priority districts 20.8 27.4 34