military construction projects including ecip. warrior in transition complex fort bliss, tx project...
TRANSCRIPT
MilitaryConstruction
Projectsincluding
ECIP
Warrior in Transition Complex Fort Bliss, TX
Project Description• Design and construct a Warrior In Transition
Complex - consisting of a 232 person barracks, Battalion HQ Administration Facility, and a Soldier and Family Assistance Center (SFAC), to support two companies
Impact• Provide support for wounded warriors and
their families while transitioning within or out of active military service.
• Project provides housing, administration and integrated support services
Procurement• Contractor: Sundt Construction & FPM
Remediations Inc.• Obligations: $51.0M• Prime contractor is not a small business
concern
Project Status• Estimated Completion: June 2011
Military Construction (MilCon)
Fort Bliss Barracks and SFAC facility
Warrior in Transition ComplexFort Campbell, KY
Project Description• Construct a 206-person standard design WT
Barracks (125,320 SF)• Construct a 20,520-SF standard design
Medium Company HQ and a 8,100-SF standard design WT Battalion HQ
Impact• Provide adequate housing and operational
facilities in order to maximize the WTs’ healing process and minimize the time required for their transition back into active status or civilian life
Procurement• Contract 1: COS MATOC (Clark-Caddell JV),
$24.8M• Contract 2: 8(a) Set-Aside (Nationview, LLC),
$7.0M
Project Status• WT Barracks – 53% Complete; WT HQs – 16%
Complete; Scheduled completion – Sep 2011
Military Construction (MilCon)
Exterior view of WT Barracks under construction
Stubbed-up utilities for BN HQ shown, with CO HQ pad in the background. Both HQ slabs are now poured, with structural steel erection underway. WT Barracks and FY08 WT SFAC are shown in the distance.
Child Youth Services CenterFort Stewart (Hunter Army Airfield), GA
Project Description• Design and construct a standard design,
medium capacity Youth Center for youth ages 11-18 at Hunter Army Airfield.
Impact• Provides services for youth-aged dependents
Procurement• Contractor: J2 Engineering• Award amount: $8.5M
Project Status• Under Construction• 33% complete• Estimated Completion : 9 Aug 11 Masonry walls on-going
Child Development CenterFort Bragg, NC
Project Description• Design and construct a standard design 244-
child capacity Child Development Center (CDC) for children ages 0 to 5 years.
Impact• Provides child care services to support Army
stationing initiatives.
Procurement• Contractor: Atlantic Marine• Award amount: $8.9M
Project Status• Under Construction• 19% complete• Estimated Completion: 23 Oct 11
Utilities and foundation work underway
Installing Solar Walls Energy ImprovementsFort Drum, NY
Project Description• Design and install energy-saving “solar walls”
to preheat outside ventilation on four office buildings and rehabilitate the facilities by replacing insulation, windows, doors, and lights with energy-efficient systems
Impact• Decreases heating and cooling costs• Improves the employees’ work environment
Procurement• Contractor: Cadence Contract Services, LLC• Award amount: $1.4M• Prime contractor is a small business concern
Project Status• COMPLETED: Oct 2010
Installing new efficient insulation
Energy Conservation Investment Program (ECIP)
Install Photovoltaic SystemMarine Corps Air Ground Combat Center 29 Palms, CA
Project Description• Install solar panels on existing tactical
vehicle sunshades; annually generating 500,000 KWH of renewable energy back to the grid to meet installation electrical requirements.
Impact • Increases energy efficiencies• Annual estimated electrical power
generation of over 500 KWH
Procurement• Contractor: Stronghold Engineering Inc. • Obligations: $3.7M• Prime Contractor is not a small business
concern
Project Status• COMPLETED: Jun 10
Energy Conservation Investment Program (ECIP)
New solar panels on sunshades
Photovoltaic System & Lighting RetrofitMarine Corps Base Camp Pendleton, CA
Project Description • Install rooftop photovoltaic systems on
various buildings to power LED lighting retrofits for class rooms and other interior lighting
Impact • Increases energy efficiency • Improves quality of work (instruction) in
class room environment
Procurement• Contractor: MW Services, Inc. • Obligations: $3.0M• Prime Contractor is a small business
concern
Project Status• COMPLETED: Jun 10
Energy Conservation Investment Program (ECIP)
New rooftop solar panels
SustainmentRestoration
ModernizationProjects
Replace Roof, Modernize Elect & Mech Sys Marine Corps Base Camp Lejeune, NC
Project Description• Provide cool roofing systems and replace
mechanical systems
Impact • Increased cooling and heating efficiencies• Reduced energy and water consumption
Procurement• Contractor: North State Mechanical, Inc.• Obligations: $1.5M• Prime contractor is a small business concern
Project Status• COMPLETED: Jun 10
Photovoltaic Panels Mounted on Roof
Facilities Sustainment, Restoration, & Modernization (FSRM)
Repair and Modernize BQ 580Camp Covington, Naval Base, Guam
Project Description• Project repairs and alters BEQ spaces to
comply with BEQ Construction Standards
Impact • Improves quality of life for Marines• Corrects health and safety deficiencies
including seismic strengthening and fire protection system upgrades
Procurement• Contractor: Reliable Builders, Inc.• Obligations: $4.2M• Prime contractor is a small business
concern
Project Status• COMPLETED: Jun10
Drywall work
Facilities Sustainment, Restoration, & Modernization (FSRM)
Modernize Urology/Orthopedics Suite Naval Hospital, Guam
Project Description• Renovate B3 wing Orthopedics/Urology to
provide a combined waiting area at the entrance to the wing. Relocate treatment rooms and Doctors offices and add one extra treatment room
Impact• Improves patient flow and space utilization• Increases workspace, patient privacy and
confidentiality
Procurement• Contractor: LA Painting and Construction Co.• Obligations: $488.0K• Prime contractor is a small business concern
Project Status• COMPLETED: Jan 10
Completed waiting area
Facilities Sustainment, Restoration, & Modernization (FSRM)
Restore Aged Cooling Towers National Naval Medical Center San Diego
Project Description• Replace three rooftop cooling towers
servicing hospital IT spaces with new energy efficient units
• Repair the roofing system underneath the cooling towers, correcting damage from the old leaking cooling towers
Impact • Improves energy efficiency
Procurement• Contractor: Souza Construction Inc. • Obligations: $339.1K• Prime contractor is a small business
concern
Project Status• COMPLETED: Jun 10
1 of 3 Completed Rooftop Cooling Towers
Facilities Sustainment, Restoration, & Modernization (FSRM)
Repair Asphalt Adjacent to South ApronMacDill Air Force Base, FL
14
Project Description• Mill and over-lay asphalt pavements north
of the concrete area of the South Apron
Impact • Reduces potential for foreign object debris
hazards
Procurement• Contractor: Chugach Management
Services, Inc.• Obligations: $365.5K
Project Status• COMPLETED: Aug 09
Before
After
Facilities Sustainment, Restoration, & Modernization (FSRM)
Repair H TaxiwayMcChord Air Force Base, WA
Project Description• Repair concrete to include slab replacements,
crack sealing, and joint sealing. Repair asphalt shoulder to include patching and crack sealing
Impact• Repair of the parallel taxiway prevent back-
taxiing on the runway and maximizes runway operations
• Reduces potential for foreign object debris hazards
Procurement• Contractor: Advanced Technology
Construction• Obligations: $1.2M• Prime contractor is a small business concern
Project Status• COMPLETED: Jul 2010
Performing Edge Repairs
Facilities Sustainment, Restoration, & Modernization (FSRM)
Repair Fuel Pit Aprons (16-25)MacDill Air Force Base, FL
16
Project Description• Repair South Apron Fuel Pits (16-25) by
replacing concrete slabs, resealing joints and remarking the apron surfaces
• Repave an 8-foot wide strip around ten fuel pits to repair the interface between the concrete and asphalt surfaces
Impact • Increases the pavement’s load bearing
capacity to support heavier aircraft
Procurement• Contractor: Chugach Management
Services, Inc.• Obligations: $1.1M
Project Status• COMPLETED: Jul 10
Before
After
Facilities Sustainment, Restoration, & Modernization (FSRM)
Repaired Apron and Taxiway
Repair Airfield Parking ApronFort Belvoir, VA
Project Description• Repair fixed and rotary wing aircraft parking
aprons, runways, and taxiways
Impact • Corrects flight safety hazards
Procurement• Contractor: Firvida Construction• Award Amount: $805.0K• Prime contractor is a small business
concern
Project Status• COMPLETED: Jul 10
Facilities Sustainment, Restoration, & Modernization (FSRM)
Repair Various Airfield Pavements Grand Forks Air Force Base, ND
Project Description• Replace concrete on aircraft maintenance
ramp driveway into 600 hangar area
Impact • Repairs/replaces unsatisfactory, severely
degraded airfield pavement resulting in elimination of aircraft waiver for use and enhances mission capability
• Reduces potential for foreign object debris hazards
Procurement• Contractor: Mi-TY Trucking/Strata
Corporation• Obligations: $1.0M• Prime contractor is a small disadvantaged
business concern
Project Status• COMPLETED: Sep 09
New concrete being placed with paver
Facilities Sustainment, Restoration, & Modernization (FSRM)
Maintain/Repair Aircraft Parking ApronMinneapolis-St. Paul Air Reserve Station, MN
Project Description• Replace airfield concrete pavement• Accomplish spall repair
Impact • Reduce potential of foreign object damage
(FOD) to mission aircraft
Procurement• Contractor: Geo-Marine, Inc. • Obligations: $1.3M• Prime Contractor is small business concern
Project Status• COMPLETED: Aug 10
Replaced Concrete Pavement
Facilities Sustainment, Restoration, & Modernization (FSRM)
Repair Electrical Lines Flight Line N. Grand Forks Air Force Base, ND
Project Description• Repair and replace overhead power lines
servicing the north end of the base’s flight line area
Impact • Less interrupted power outages
Procurement• Contractor: Weibolt Electric / Strata
Corporation• Obligations: $2.1M• Prime contractor is a small business
concern
Project Status• COMPLETED: Jul 10
New underground power ducts being installed
Facilities Sustainment, Restoration, & Modernization (FSRM)
Repair South Apron Storm Drainage MacDill Air Force Base, FL
Project Description• Repaired the South Apron Storm Drainage
(Networks F&G)
Impact • Stabilizes apron pavement and improves
drainage on South Apron• Eliminates source of voids under the
pavement increasing safety
Procurement• Contractor: Chugach Management Service,
Inc.• Obligations: $3.5M
Project Status• COMPLETED: Apr 2010
New storm drainage culvert
Facilities Sustainment, Restoration, & Modernization (FSRM)
Repair Water Valves Basewide Fairchild Air Force Base, WA
22
Project Description• Replaced 82 aging water distribution valves
Impact• Increases ability to manage base water
distribution system • Reduces base water consumption from
leaking underground valves
Procurement• Contractor: Garco Const. Inc. • Obligations: $ 552.6K• Prime Contractor is small business concern
Project Status• COMPLETED: May 10
Installation of new valves
Facilities Sustainment, Restoration, & Modernization (FSRM)
Locate Natural Gas Distribution LinesGrand Forks Air Force Base, ND
Project Description• Locate and document all natural gas
distribution lines on base
Impact • Reduces likelihood of gas line cuts and life
threatening accidents
Procurement• Contractor: Phoenix Solutions, Inc • Obligations: $164.2K• Prime contractor is a small disadvantaged
business concern
Project Status• COMPLETED: Feb 10
Hydro excavation to locate gas lines
Facilities Sustainment, Restoration, & Modernization (FSRM)
Repair Steam & Condensate LinesHanscom Air Force Base, MA
Project Description• Project will repair leaking steam and
condensate lines Impact• Improves energy efficiencies
Procurement• Prime Contractor: IAP Worldwide Services• Sub Contractor: J. D'Amico, Inc• Obligations: $430.3K• Prime Contractor is a small business concern
Project Status• COMPLETED: May 10
Performing layout work
Facilities Sustainment, Restoration, & Modernization (FSRM)
Chilled Water Cooling LinesMaxwell Air Force Base, AL
Project Description• Improves chilled water distribution systems
for 13 of 46 facilities connected to central chiller plant
Impact• Saves $140K annually in energy and
maintenance costs
Procurement• Contractor: H & H Builders & Contracting
LLC• Obligations: $2.6M• Prime Contractor is small business concern
Project Status• COMPLETED: Mar 10
Trenching from chiller plant
Facilities Sustainment, Restoration, & Modernization (FSRM)
Repair HVAC SystemsCharleston Air Force Base, SC
26
Project Description• Replace non-serviceable heating, ventilation,
and air conditioning systems at multiple facilities
Impact• Replaces non-serviceable equipment,
improves indoor air quality, and provides better work environment for occupants
Procurement• Contractor: Chugach Government Services,
Inc.• Obligations: $850.9K• Prime Contractor is small business concern
Project Status• COMPLETED: Mar 10
Removing non-serviceable equipment
Facilities Sustainment, Restoration, & Modernization (FSRM)
Replace Street Lights FixturesMarine Corps Base Camp Lejeune, NC
Project Description• Replace street light fixtures with energy
efficient Light Emitting Diode (LED) street lamps in the Camp Johnson, Courthouse Bay and Paradise Point areas of MCB Camp Lejeune
Impact • Energy efficiencies• Improved outdoor illumination and security• Reduced maintenance costs
Procurement• Contractor: EnVetCo• Obligations: $1.3M• Prime contractor is a small business concern
Project Status• COMPLETED: Jul 10
Before LED Street Lights
Newly Installed LED Street Lights
Facilities Sustainment, Restoration, & Modernization (FSRM)
Replace Siding Tooele Army Depot, UT
Project Description• Remove shakes, replace vinyl siding,
shutters, and rain gutters from Family Housing Quarters #25
Impact • Improve energy efficiencies• Return the unit to occupancy
Procurement• Contractor: Diversified Maintenance
Systems• Obligations: $38.2K• Prime contractor is a small business
concern
Project Status• COMPLETED: Sep 09
Siding Replacement in Process
Siding Replacement Complete
Facilities Sustainment, Restoration, & Modernization (FSRM)
Phone Switch-F/P ImprovementsCharleston Air Force Base, SC
29
Project Description• Relocate vehicle parking area and install
security gates to achieve antiterrorism standoff distances
Impact• Increases Antiterrorism/Force Protection
posture of facility
Procurement• Contractor: Chugach Government Services,
Inc.• Obligations: $269.1K• Prime contractor is a small business concern
Project Status• COMPLETED: May 10
Installing security gate
Facilities Sustainment, Restoration, & Modernization (FSRM)
Repair Steam and Condensate SystemMarine Corps Air Station New River, NC
Project Description•Replace boilers and perform related incidental work
Impact•Energy efficiencies and reduced energy costs•Enhanced quality of life
Procurement•Contractor: Military & Federal Construction Co., Inc.•Obligations: $720.2K•Prime contractor is a small business concern
Project Status•COMPLETED: Jul 10
New Mechanical Equipment
Facilities Sustainment, Restoration, & Modernization (FSRM)
Add/Alter Petroleum Operations FacilityAlpena Combat Readiness Training Center, Michigan
Project Description• Construct a 1,730 SF addition consisting of
offices, a classroom, and a fuels laboratory in addition to renovating 1,062 SF of existing office space
Impact• Provide functional space to operate and
maintain a fully functional, safe, environmentally compliant fueling system.
• Increase effectiveness of military training for visiting unit personnel
Procurement• Contractor: B & B General Contracting• Obligations: $586.3K• Prime Contractor is small business concern
Project Status• COMPLETED: Mar 10
Exterior work in progress at Petroleum Operations Facility
Facilities Sustainment, Restoration, & Modernization (FSRM)
Repair RoadsTooele Army Depot, UT
Project Description• Repair roads at the North ammunition
entrance, TV road G-28 siding and apply slurry seal
Impact• Prolongs life of road• Improves safety• Minimizes damage to vehicles
Procurement• Contractor: Advanced Solutions Group,
LLC• Obligations: $265.0K• Prime contractor is a small business
concern
Project Status• COMPLETED: Sep 09
Completed Road Repair
Road Prior to Repair
Facilities Sustainment, Restoration, & Modernization (FSRM)
Repair RoadsTooele Army Depot, UT
Project Description• Repair POV Road, add road base and
apply slurry seal
Impact• Prolongs life of road• Improves safety• Minimizes damage to vehicles
Procurement• Contractor: Advanced Solutions Group,
LLC• Obligations: $105.9K• Prime contractor is a small business
concern
Project Status• COMPLETED: Sep 09
Road Prior to Repair
Completed Road Repair
Facilities Sustainment, Restoration, & Modernization (FSRM)
Repair Range Road White Sands Missile Range, NM
Project Description• Scarification of surfaces and asphalt
overlay to include repair of shoulders and replacement of signage.
Impact • Prolongs life and improve safety• Minimizes damage to vehicles
Procurement• Contractor: Omega Paving• Obligations: $ 3.2M• Prime contractor is a small business
concern
Project Status• COMPLETED: Feb 10
Resurfacing/Shoulder Repairs
Facilities Sustainment, Restoration, & Modernization (FSRM)