Page 1: Midstream Oil & Gas...2019/05/04  · Engineering design of a 152 MMSCFD natural gas metering & pressure regulation station for a newly converted power plant including process design,

Midstream Oil & Gas

Page 2: Midstream Oil & Gas...2019/05/04  · Engineering design of a 152 MMSCFD natural gas metering & pressure regulation station for a newly converted power plant including process design,

WA

OR

ID

MTND

UT

NM

CO

AZ

CA

NV

SD

KS

TX

AR

KY

VA

NC

MI

IN OH

IA

WI

NY

VT

ME

MO

AK

OR

ID

MT

CA

A

NV

VTT

ND

UTTTTTT

WAWW

CCO

AK

AZ

NMMMMMMMM

TT

VVVVAVV

MINY

C

KSKYKYKYKYKY

NNC

MI

IN OHOHOHOHHH

MO

OOOO

KS

WI

IAAAAAA

SD Y

TX

AR

AECOM Pipeline

LNG or Marine Terminal

Storage Field

O&G Midstream PipelineConstruction Districts

Major AECOM O&G Offices

AECOM Offices

Legend:

NYY

AECOM provides comprehensive services to support development, construction, operation, and retirement of midstream oil & gas assets worldwide. We excel at permitting, engineering, procurement, construction management/construction of wellpad facilities, pipelines, terminals, storage facilities, processing plants, and ancillary midstream operations for natural gas, crude oil, re ned products, and CO2.

Safety commitmentWe are committed to business practices, operations, and projects that protect people and the environment. The goal of our Health & Safety Program is zero incidents. Provision of safe and healthful working conditions for our employees, subcontractors, customers, and the communities where we work is a business-critical priority for us. Through Safety in Design, we take pride in the fact that our designs are safe to construct and operate.

Delivering comprehensive oil & gas services

25,000+miles of permitting for pipelines

20+countries

30+LNG projects in

10 countries

2,000+miles of design for pipelines and hundreds of midstream facilities

in the past 4 years

1,000+miles of construction of

pipelines

100+midstream facilities in the past 3 years

10+billion cubic feet per day of

design and/or construction of gas processing facilities handling

Page 3: Midstream Oil & Gas...2019/05/04  · Engineering design of a 152 MMSCFD natural gas metering & pressure regulation station for a newly converted power plant including process design,

Lifecycle servicesPROJECT DECISION SUPPORT, CONCEPTUAL DEVELOPMENT AND FRONT END ENGINEERING DESIGN FEED

− Feasibility studies − Optimization studies − Process economic studies − Conceptual design/pre-FEED

− Preliminary design/FEED − Process scale-up − Process technology selection and

development

− Functional equipment assessment − Process simulation − Cost estimating (Class I-V)

PLANNING, PERMITTING AND ENVIRONMENTAL SUPPORT − Strategic permitting approach − Stakeholder engagement and public

meeting planning − FERC certi cation − NEPA compliance − Environmental impact assessment

− Biological and cultural resources − Air quality services (modeling,

permitting, monitoring, emissions testing)

− Wetlands permits and mitigation − Water/wastewater

− Discharge permits − Due diligence − Environmental data management − Financial risk analysis − Cost optimization − Environmental inspection

PIPELINE AND PIPELINE FACILITIES ENGINEERING AND CONSTRUCTION − Natural gas, CO2 liquid/gas,

NGL, crude, e uent water and petrochemical pipelines

− Small to large diameters, ranging from one mile to hundreds of miles in length

− Bores/micro-tunneling/HDDs − Compressor/pump/meter/regulator

stations − Instrumentation, measurement, and

control system design − Pipeline integrity

− Right of way management − Land survey/GIS

OIL, GAS AND CHEMICALS FACILITY ENGINEERING AND CONSTRUCTION − Gas storage − Gas treating and compression − Sour gas handling and processing

units − Acid gas facilities − Helium recovery and nitrogen

rejection systems − CO2 recovery and reinjection units

− Sulfur recovery/tail gas cleanup − Reforming units − Produced water processing − Fractionation − Re nery process units − Heavy oil processing − Oil sands/SAGD − Fire protection/suppression

− Marine facilities − Rail and truck loading and unloading − Direct hire construction − Construction management − Engineering services during

construction − Commissioning and start-up

EQUIPMENT FABRICATION, MODULARIZATION AND FIELD SERVICES − Facility eld construction and

maintenance − Well site construction and

maintenance − Engineering and fabrication of

crude oil and natural gas processing

equipment and measurement systems

− Oil, natural gas, water and sand separation units, glycol dehydration units, direct and indirect re heaters

− BTEX and emission control systems,

− Amine sweetening plants and fuel gas conditioning

− Piperack and equipment modules

OPERATIONS, MAINTENANCE AND ASSET RETIREMENT − Plant operations and maintenance − Turnarounds − Training − Operations and maintenance

manuals − Pipeline maintenance

− Environmental management and compliance programs

− Security threat, vulnerability assessments, cyber-security, site security plan

− Seconded sta programs

− Capital programs engineering − GIS/data management − Facility decommissioning − Demolition − Environmental remediation − Pipeline abandonment

Planning & Permitting EPC/EPCM Operational Support Closure

AECOM has the process technology expertise to provide clients competitive advantage via innovative solutions to their most challenging problems. Our business model is to become involved in our clients projects from the early planning/concept development phase through EPC. Our ability to evaluate competing technologies on their technical, economic and project evaluation merits without promoting in-house technologies is greatly valued by our clients, which range from small technology developers to international oil companies. We have performed conceptual pre-FEED, FEED and EPC work for many unique, rst-of-a-kind projects.

Example ProjectsPIPELINE PROJECT COLORADO, UNITED STATES. Preliminary engineering and permitting through IFA for the Execution Phase to install a new 34-mile, 24”, 1000 psi high pressure gas pipeline to repower the station from coal to natural gas. Scope included route selection and preliminary design of facilities.

OIL & GAS PROGRAM PENNSYLVANIA, UNITED STATES. Conceptual studies and nal designs for well pads and gathering

and compression facilities, procurement of equipment, and quality control services. Performed detail design engineering feasibility studies, eld engineering, and permitting. Also provided process engineering services for the pipelines that collect and transport crude oil and natural gas and liquids to downstream facilities for processing, re ning, and distribution.

CRUDE OIL PIPELINE PROJECT ILLINOIS, KANSAS, MISSOURI, OKLAHOMA, UNITED STATES. Environmental eld survey and environmental permitting for the construction of a 600-mile crude oil pipeline including route alternatives analysis, agency consultations, environmental eld

studies (wetlands, surface water crossings, threatened and endangered species, cultural resources, and soil studies), permit application preparation and support for agency negotiations and public meetings.

NORTH MONTNEY PIPELINE BRITISH COLUMBIA, CANADA. Pre-FEED engineering services for a 6.7-mile natural gas pipeline and liquids handling facility located at the Highway Gas Plant. Scope included pipeline route selection, inlet gas separation equipment sizing, and detailed cost estimate for 200 MMSCFD liquids handling facility and interconnecting pipelines.

WATFORD CITY WATER SUPPLY AND DISPOSAL SYSTEM NORTH DAKOTA, UNITED STATES. FEED analysis of a water supply and disposal system in Watford City.

SHALE GAS TREATING STUDIES  BRITISH COLUMBIA, CANADA. Conducted initial study to assist in the e cient development of the Horn River shale gas play. Sixteen primary gas treating options were evaluated. Summaries of each technology along with advantages and disadvantages were tabulated to allow short listing to the two best options. Each option was developed to the point of a Class 5 estimate.

Route selection/project feasibility studies

Page 4: Midstream Oil & Gas...2019/05/04  · Engineering design of a 152 MMSCFD natural gas metering & pressure regulation station for a newly converted power plant including process design,

Rio 2016 Olympic ParkRio de Janiero, Brazil

Pipeline and facility design and engineeringUsing “ t-for-purpose” design tools and processes, AECOM provides technical and management expertise to design and engineer safe, cost-e ective midstream equipment and systems.

Example ProjectsMASTER SERVICES AGREEMENT ALASKA, UNITED STATES. Master Services Agreement (MSA) for engineering, procurement, and construction management services for major maintenance projects on the Trans-Alaska Pipeline System, consisting of 800 miles of 48” crude oil pipeline.

PIPELINE CONVERSION UNITED STATES. Detailed design engineering for conversion of a natural gas pipeline to crude oil service (460 miles of natural gas pipeline conversion; 260 miles of new oil pipeline; 25 miles of gas pipeline laterals; 10 new oil pumping stations, and 3 delivery/receipt meter stations); construction or modi cation of gas compressor sites; and demolition or recon guration of 80 existing gas interconnect sites.

MULTIPLE PIPELINE PROJECTS NORTH CAROLINA, UNITED STATES. Engineering, procurement, and construction management services for new 140-mile, 38-mile, and 7-mile pipelines to power plants, including new pipeline facilities.

COMPRESSOR STATION 559 TEXAS, UNITED STATES. Procurement, fabrication, testing, installation, and assembly of new launcher and receiver, slug catcher, pumps, compressors, tanks, lter separators, scrubbers, piping, foundations, electrical, controls, and other accessories for a grassroots compressor station.

NEW PIPELINE UNITED STATES. Mapping and detailed engineering services for two new, approximately 245-mile, 12-inch mixed product

(ethane/propane and natural gasoline) pipelines from Harrison County, Ohio to an interconnect near the Michigan border.

GAS PLANT WYOMING, UNITED STATES. Progressively designed and built a three-train gas plant. Responsible for all engineering and construction with a total capacity of 600 MMscfd at this grassroots facility, from conceptual design through commissioning.

GAS FIELD DEVELOPMENT COLORADO, UNITED STATES. Front-end engineering and design and engineering, procurement, and construction management services for the construction of a central treating facility and the development of approximately 28,800 acres.

PIPELINE AND PROCESS FACILITY  NORTH DAKOTA, UNITED STATES. Detailed design of 2 concurrent projects to support ongoing gas gathering e orts: a new, 58-mile, 10” natural gas transport pipeline with four remotely operated mainline valve stations and one brown eld compressor station, with an amine unit for H2S removal, a dehydration unit, and a point of end metering facility. Additionally provided engineering and design services for a PLC-based process control system to develop, deploy, and implement programming to support a compressor station, four mainline valve stations, an endpoint metering/regulation station, as well as the integration of all of these facilities into a large scale SCADA/HMI system for remote monitoring, control, and alarming.

SHAWVILLE METER & REGULATOR STATION PENNSYLVANIA, UNITED STATES. Engineering design of a 152 MMSCFD natural gas metering & pressure regulation station for a newly converted power plant including process design, instrumentation and equipment speci cation, selection, and procurement support for all instrumentation and equipment; civil/structural design and details; detailed piping design; power and control design, and overall start-up and commissioning management and support.

Resource surveys, project planning and permittingWe develop and implement e ective strategies to obtain the necessary permits and approvals for cost-e ective construction, operation, and maintenance of those assets.

Example ProjectsNATURAL GAS PIPELINE PENNSYLVANIA AND NEW YORK, UNITED STATES. FERC pre- ling support, Environmental Report, federal and state permitting, environmental eld surveys, rare species surveys, and

cultural resource surveys for a 124-mile natural gas pipeline from the Marcellus Shale to major northeast markets.

KEYSTONE CRUDE OIL PIPELINE PROJECT  NORTH DAKOTA, SOUTH DAKOTA, NEBRASKA, ILLINOIS, MISSOURI, KANSAS AND OKLAHOMA, UNITED STATES. For the 1,300-mile U.S. portion of this pipeline that is now transporting crude oil from the Alberta tar sands to St. Louis (MO) and Cushing (OK), provided all permitting and surveying services. The project took less than 24 months from the start of permitting to the issuance of the Record of Decision after the Final EIS.

REFINED PRODUCTS PIPELINE EXPANSION  CALIFORNIA AND NEVADA, UNITED STATES. Permitting for new 233-mile-long, 16-inch-diameter pipeline system to carry re ned products from Los Angeles-area re neries and marine terminals to Las Vegas.

CRUDE OIL PIPELINE KANSAS, OKLAHOMA, MISSOURI AND ILLINOIS, UNITED STATES. For construction of a 595-mile-long, 36-inch-diameter crude oil pipeline to transport 600,000 bpd of crude oil from the Bakken and western Alberta to central USA petroleum centers, served as prime environmental contractor for fast-track completion of eld surveys and permitting; completion of over 700 miles of surveys (wetlands, threatened & endangered species, and cultural resources); and preparation and submittal of permit applications and approval requests to over 25 government agencies.

FERC JURISDICTIONAL CONVERSION  WYOMING, COLORADO, NEBRASKA AND KANSAS, UNITED STATES. To obtain FERC 7(c) certi cation for this project, completed ecological and cultural resources surveys, provided GIS and agency consultation support, and prepared permit applications. With the client’s project team, we submitted a Final Implementation Plan within four working days of the FERC Certi cate Order.

NATURAL GAS STORAGE PROJECT  MISSISSIPPI, UNITED STATES. Permitting and NEPA support for construction of a 14-billion-cubic-foot storage facility in solution-mined salt-dome caverns.

Page 5: Midstream Oil & Gas...2019/05/04  · Engineering design of a 152 MMSCFD natural gas metering & pressure regulation station for a newly converted power plant including process design,

Equipment fabrication, modularization and eld servicesAECOM has operational o ces and manufacturing facilities throughout the United States. We are located in the continent’s major basins, including today’s most active unconventional plays.

Each of our district o ces is sta ed by experienced people geared to the unique needs of their region. We also have the capability to draw upon resources from other AECOM districts to support major projects.

Our fabrication facilities in Waller, Texas and Casper, Wyoming provide standardized equipment and custom fabrications for pipeline or facility projects.

Field Services− Well site construction and

maintenance− Pipeline and facility engineering

and construction− Pipeline and plant maintenance− Product pro le

Products− Pressure vessels− Shell and tube exchangers− Crude oil emulsion treaters− Air cooled exchangers− Reboilers and direct red heaters− Oil & gas separation packages− Distillation columns− Filter-coalescing separators− Construction and mining

equipment− Structural steel fabrication− Piperack and equipment modules− Skid-mounted oil & gas processing

plants− Packaged wellhead gas

production units− Packaged wellhead gas

dehydration units

− Amine sweetening − Glycol dehydration units

− Gas liquids fractionation− Crude oil and natural gas liquids

stabilization− Mechanical refrigeration systems

and dew point control− Separation and metering units for

oil, water and gas− Fuel gas conditioning− Full-line gas and liquid

measurement solutions provider− BTEX emission control− VOC emission control− Pipeline liquids stabilization− Incinerators and combustors

Construction and start-upWe manage and/or perform the construction and start-up of pipelines and midstream assets. Facilities construction projects may range from <$1 million to >$1 billion. Pipeline construction projects can be up to 24 inches in diameter.

Example ProjectsGALENA PARK NORTH PLANT FACILITY PROJECT TEXAS, UNITED STATES.Constructed terminal’s new connections to a petroleum condensate processing facility. Provided construction labor and equipment for all concrete, piping, civil, and site work to construct the manifolds, pipe racks, manifold piping, and tank connections to transport product from splitter to manifolds and storage tanks.

YOAKUM COMPRESSOR STATION 559  TEXAS, UNITED STATES. Procurement, fabrication, testing, installation, and assembly of new launcher and receiver, slug catcher, pumps, compressors, tanks, lter separators, scrubbers, piping, foundations, electrical, controls, and other accessories for a grassroots compressor station.

PIPELINE NEW YORK, UNITED STATES.Permit compliance and environmental inspection during construction of 187 miles of pipeline; monitoring and restoration of wetland, stream, and agricultural features; and ongoing agency coordination for project compliance.

Page 6: Midstream Oil & Gas...2019/05/04  · Engineering design of a 152 MMSCFD natural gas metering & pressure regulation station for a newly converted power plant including process design,

Our core values and cultureCore Values It’s one thing to imagine a better world. AECOM was built to deliver it.

Our values de ne who we are, how we act and what we aspire to:.

SAFEGUARD – We operate ethically and with integrity, while prioritizing safety and security in all that we do.

COLLABORATE – We build diverse teams that connect expertise to create innovative solutions.

INSPIRE – We develop and celebrate our people, and elevate the communities we touch.

ANTICIPATE – We understand the complexity of our clients’ challenges and help them see further.

DELIVER – We grow our business through operational excellence and awless execution.

DREAM – We transcend the industry by reimagining what is possible – and realizing it.

Safety CultureLEADERSHIP COMMITMENT. Safety is the foundation of how we work in the eld, at our project sites, and in our o ces.

BEHAVIOR BASED SAFETY. Our culture is rooted in a behavior-based safety program, both on and o the job.

TRAINING. Safety and quality training are delivered starting on the rst day of employment, then reassessed and renewed annually.

CONTINUOUS IMPROVEMENT DRIVEN BY RESULTS ORIENTED LEADERSHIP.Our recordable incident rates have declined steadily, even as our company has grown, diversi ed its services, and increased its geographicreach.

QualityAECOM empowers employees with tools to provide value through quality work products and services, Every task... the right way... every time.

Management resources are aligned to drive continuous improvement.

E ective communication and feedback systems promote high levels of customer satisfaction.

Internal and external collaboration fosters trust and encourages the use of best practices and lessons learned from similar projects.

Operation supportThroughout the operational life of midstream assets, we provide a wide range of operation, maintenance, and monitoring services and environmental services to keep the assets at peak performance.

Example ProjectsCRUDE OIL SPILL RESPONSE MICHIGAN, UNITED STATES. Lead on-site environmental consultant for response to an 800,000-gallon release of heavy crude oil. Provided

eld teams, inspectors, and technical support, as well as national-level expertise in compliance, sediment contamination, risk assessment, hydrogeology, and data management.

PRODUCT TERMINAL TEXAS, UNITED STATES. Operation and maintenance of environmental remediation and compliance systems for major marine terminal.

TERMINAL TEXAS, UNITED STATES.On-site environmental consultant for

ongoing, long-term environmental compliance program under RCRA and state compliance programs.

STREAMBED ALTERATION AGREEMENT  CALIFORNIA, UNITED STATES. Developed designs that minimized the need for environmental surveys, prepared permit applications, and completed the state-required initial study to enable an existing crude oil pipeline to be buried deeper under the Santa Clara River.

Asset retirementWe provide comprehensive services to help clients remove assets that are beyond their useful service life—from removal surveying and planning, to decontamination, salvage of reusable equipment, demolition, and site restoration.

Example ProjectsPROCESSING PLANTS LOUISIANA AND TEXAS, UNITED STATES. Demolition, remediation, and site restoration of natural gas processing plants.

ALYESKA PIPELINE ALASKA, UNITEDSTATES. Bid package preparation for performance-based demolition of Valdez Marine Terminal Berth 1.

IDLE PIPELINE ABANDONMENT CALIFORNIA, UNITED STATES.

Management and technical support for assessment, isolation and draining, cleaning, liquids disposal, purging, sealing, and document for the retirement of over 125 miles of pipeline facilities in accordance with State Fire Marshal requirements.

COMPRESSOR STATION REPLACEMENT  UNITED STATES 5 STATES . Detailed engineering,

design, and procurement support for demolition of 17 existing compressor stations.

Top down commitmentAECOM is committed to providing a safe and healthy work environment, as well as minimizing client liability concerns regarding the safety performance of contractors. To achieve these goals, AECOM has instituted a comprehensive behavior-based global Health & Safety Program that is designed to protect employees, comply with all pertinent governmental regulations, and satisfy our clients’ health and safety requirements. Our focus on world-class safety has resulted in a 10+ year trend of accident reduction and numerous safety recognition awards from leading oil, gas and chemical sector leaders.