mid day meal scheme
DESCRIPTION
Mid Day Meal Scheme. Ministry of HRD Government of India. PAB-MDM Meeting – Daman & Diu On 07.02.2014. Review of Implementation of MDMS in Daman & Diu (Primary + Upper Primary) (1.4.2013 to 31.12.2013). Part-I. Ministry of HRD, Govt. of India. Status on Pre-requisite steps for AWP&B. - PowerPoint PPT PresentationTRANSCRIPT
Review of Implementation of MDMS in Daman & Diu
(Primary + Upper Primary)
(1.4.2013 to 31.12.2013)
Part-I
Ministry of HRD, Govt. of India
Status on Pre-requisite steps for AWP&B
Pre-requisite step Status
Plan should be approved by SSMC Meeting Yes
100% payment of honorarium shall be made to cook
cum helpers up to December 2013
Yes
100% payment of cost of foodgrains shall be made to
FCI upto 31st December 2013
Yes
Separate and detailed MME plan. Yes
Bank account should be opened for cook cum
helpers
Yes
Plan should also be submitted through MDM-MIS Yes
Contd..
Pre-requisite step Status
Annual and Monthly data entry for the FY 2013-14
should be completed up to December 2013.
Yes
ATN on commitments given by the State Govt. during
PAB Meeting of 2013-14.
No
ATN on findings of reports of MI and
recommendations of JRM reports
Yes
Plan should be submitted within the scheduled date
in hard and soft copies both.
Yes
Best Practices
All the children wash hands and say prayers before meals.
In some schools community members have donated plates.
The Gram Panchayats have donated refrigerator system to some of the schools.
It has been decided to provide one boiled egg/banana thrice a week to the children.
SCORE CARD- ALL COMPONENTS
10
7.59.9
6.5
10
6.8
8.74
1010
7.78
10
10
10
10
108
02468
10Institution
ChildrenWorking Days
FG Utilisation
Payment to FCI
Cooking Cost
Hon. to CCH
MMEKitchen-cum-store
Kitchen DevicesTA
School Health
Annual D.E
Monthly D E
Inspection
Drinking Water
Toilet FacilityFund Flow
Ministry of HRD, Govt. of India
12.0 11.9 11.5
9.6 109.29.5 9.23 8.70
0
5
10
15
2011-12 2012-13 2013-14Enrolment PAB Approval Achievement
Coverage against Enrolment: Children (Pry) during last 3 yrs
No.
of
Ch
ild
ren
(in
Th
ou
san
ds)
79% 77%75%
Ministry of HRD, Govt. of India
In Diu 95% of the enrolled children covered.Daman only 70% of the enrolled children covered.
7.7 7.7 7.7
5.86.5 6.16.1 6.1 5.8
0
5
10
2011-12 2012-13 2013-14
Enrolment PAB Approval Achievement
Coverage against Enrolment: Children (U. Pry) during last 3 yrs
No.
of
Ch
ild
ren
(in
Th
ou
san
ds)
79% 79% 75%
Ministry of HRD, Govt. of India
Summary of performance - Physical
75 75
99 100
0
50
100
Covg_Pry_vs_Enrolment Covg_Upr_vs_Enrolment W_Day_vs_Approval Institution_vs_Approval
Summary of performance – Financial
65
100
68
87
77
40
0
50
100
Food grain Payment toFCI
Cooking cost Hon. to CCH T. A. MME
Coverage : School Health Programme
Ministry of HRD, Govt. of India
Details Institutions Children
Total in State 99 15403
Health Checkup 99 15403(100%)
IFA Distribution 43 6196
Vitamin ‘A’ Distribution 89 10354
Deworming Tablets 89 15413
Spectacles 89 117
38% children were covered under health check up during 2012-13.
Proposal for 2014-15 : Children (PRIMARY)
11.49.2
8.6 8.29.7 9.6
0
7
14
2013-14
Enrollment 2013-14 PAB ApprovalAvg. No. of children availed MDM Q-1Q-2 Q-3
Ministry of HRD, Govt. of IndiaMinistry of HRD, Govt. of India
2013-14(Proposed)
Q-1 Q-2
13
9.2
Q-3
Proposal for 2014-15 : Children (Upper Primary)
7.6
5.7 5.7 6.2 6.4 6.0
0
5
10
2013-14
Enrollment 2013-14 PAB ApprovalAvg. No. of children availed MDM Q-1Q-2 Q-3
Ministry of HRD, Govt. of IndiaMinistry of HRD, Govt. of India
2014-15 (Proposed)
Q-1 Q-2
14
6.1
Q-3
Proposal for additional Cook-cum-helper
Ministry of HRD, Govt. of IndiaMinistry of HRD, Govt. of India
PAB approval PAB approval Already Already EngagedEngaged
Additional requirement Additional requirement (2014-15)(2014-15)
308 308 4
15
Proposal for Construction of Kitchen-cum-StoreProposal for Construction of Kitchen-cum-Store
Ministry of HRD, Govt. of IndiaMinistry of HRD, Govt. of India
No. of No. of CentresCentres
SanctioneSanctionedd
Constructed Constructed through through
convergenceconvergence
GapGap Proposal Proposal
67 32 30 5* 4
16
* 1 school is functional in rented building.
Proposals and Recommendations
Ministry of HRD, Govt. of IndiaMinistry of HRD, Govt. of India
S. No
Component PAB Approval 2013-14
Proposal for 2014-15
Recommendation
1 Children (Pry) 9230 8655 8700
2 Children (NCLP) 0 0 0
3 Children (U Pry) 6105 5949 6200
4 Working Day (Pry and U Pry)
220 220 220
5 Kitchen cum Store 4 4
6 Cook cum Helper 308 4 additional 4 additional
7 Kitchen Devices 0
8 Kitchen Devices (Replacement/Repair)
0
9 Notional Requirement of Central Assistance Rs. 209 lakh Rs. 224.79 lakh
17
It may be Painted at prominent Places on the outside wallIt may be Painted at prominent Places on the outside wall
of the school. of the school.
Ministry of HRD, Govt. of India
The MDM Logo should be Widely PublicizedThe MDM Logo should be Widely Publicized.