mickiel vroon - test environment, the future achilles’ heel
TRANSCRIPT
![Page 1: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/1.jpg)
Test environment
Achilles heel of the future?
Michiel Vroon
![Page 2: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/2.jpg)
Test environment
![Page 3: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/3.jpg)
Sounds familiar?
• I thought we solved this defect before?
• This part worked fine some moment ago!
• Who knows the correct configuration?
• What do you mean, first production??!!
• This looks different from production!
• Do you know a user-id we can use?
• What is in the current release?
• I cannot reproduce the defect!
![Page 4: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/4.jpg)
Some causes
• No dedicated competence
• Difficult to define requirements for test
• There are no processes, plan or strategy
• Design is not clear
• Test data is not maintained
• Too many people involved
• Responsibilities are vague
• Manageable versus flexible
• …
![Page 5: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/5.jpg)
Some solutions
• Define single point of contact
• Set up processes
• Arrange test data
• Work with environment types
• Use master/copy
• Install shared environments
• Have an authorization strategy
![Page 6: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/6.jpg)
Define single point of contact
• Test environment coordinator
– Responsible for setting up and maintaining environment
– Single gateway to all parties involved
– Combination of technical and testing skills
– Control function
– Communicator and project leader
– In bigger organizations:
dedicated department of
test environments
![Page 7: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/7.jpg)
Set up processes - 1
• Define what to deliver when and by whom
• Connection with other processes: design, build,
test and implementation
• Simple process:
1. Specifying the infrastructure
2. Realising the infrastructure
3. Specifying the infrastructure intake
4. Intake of the infrastructure
5. Maintaining the infrastructure
6. Preserving the infrastructure
2 3
5
Start
4
1
6
End
![Page 8: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/8.jpg)
Set up processes - 2
Maintaining the environment
– Configuration management
– Change management
– Release management
Wish Use
Dev Test Acc Prod
Configuration management
Change
Release
![Page 9: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/9.jpg)
Arrange test data
• Define test data
– Production data (real or scrambled)
– Test data (regular system functions or separate)
• Naming test data
– Real names
– Functional names
– Test related names
• Maintain test data
– Cumulative
– Periodic restore
– Several versions
![Page 10: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/10.jpg)
Work with environment types
• DTAP –Model, 4 types of environments
– Development
– Test
– Acceptance
– Production
• Not a technical solution!
• Each type has it’s own characteristics on:
– Maintenance and ownership
– Authorization
– Flexibility
![Page 11: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/11.jpg)
Example
Local development
STenvironment
UATenvironment
Development Test Acceptance Production
Environment in project
Environment type acc. to DTAP
Central development
PATenvironment
Productionenvironment
Shadowenvironment
![Page 12: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/12.jpg)
Use master/copy
• Principle for setting up environments
Master
CopyCopy
Copy
• What is the master?
• What is in the master?
• Who owns the master?
![Page 13: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/13.jpg)
Install shared environments
• An end-to-end environment
• Consistent end-to-end test data
• Shared use by different projects
• Well defined user processes
• Always up and running
• Continuous maintenance
![Page 14: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/14.jpg)
Have an authorization strategy
• How to deal with authorization in the
environment?
• Test users or real life users?
• Impersonal users (roles like “guest”) or
personal users?
![Page 15: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/15.jpg)
The case!
ITO ProjectIntegrale Test Omgeving(Integral Test Environment)
![Page 16: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/16.jpg)
The situation
• Dutch bank
• Department Environments
– Responsible for all test environments
![Page 17: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/17.jpg)
Single point of contact
Department environments
Coordinator environments
Maintenance&
Exploitation
Outsourceparties
Projects
External partners
Deliveryunit
Unix
Local
Central
Test data
![Page 18: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/18.jpg)
Processes
![Page 19: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/19.jpg)
Current situation
• Availability environments
– Demand > supply
– Temporary solutions
• Maintainability environments
– Versions
• Test data environments
– End-to-end consistency
• Complexity
– Replacement old client systems (OLI > SIEBEL)
– Connections
![Page 20: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/20.jpg)
The environments
OLI (25)
X (25)
Y (20)
Z (15)
A (10)
B (5)
Siebel (2)
![Page 21: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/21.jpg)
Replacement old client systems
OLI (25)
X (25)
Y (20)
Z (15)
A (10)
B (5)
Siebel (25)
![Page 22: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/22.jpg)
end-to-end shared environments
OLI (5)
X (5)
Y (5)
Z (5)
A (5)
B (5)
Siebel (5) Connected systemsConsistent test dataMaintainedShared useRules
![Page 23: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/23.jpg)
Goals
• Reduction of systems
• Transparency
– You know what’s in the environment (data, software,
hardware, connections etc)
– It’s consistent
– All users are known
• Shorten setup time
– It’s already there
– Only adjustments of connections
![Page 24: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/24.jpg)
Results
![Page 25: Mickiel Vroon - Test Environment, The Future Achilles’ Heel](https://reader031.vdocuments.site/reader031/viewer/2022020218/55a9ee5f1a28ab2c248b4684/html5/thumbnails/25.jpg)