michael lee portfolio small

25
Architecture Portfolio Sample Works | Michael Lee

Upload: michael-lee

Post on 10-Mar-2016

225 views

Category:

Documents


0 download

DESCRIPTION

Sample works of past work and school experience

TRANSCRIPT

Page 1: Michael lee portfolio small

Architecture Portfolio Sample Works | Michael Lee

Page 2: Michael lee portfolio small

Summary of Quali�cations

- Work based on results attitude; strong execution skills - Effective team member with appropriate communication skills - Self-motivated; able to organize work ef�ciently - Strong in project coordination; updates apply to entire set of documents

Student Intern / TechnologistMichael Lee

Education

University of Waterloo, School of Architecture, Waterloo, ON Candidate for Bachelor of Architecture, Honors Program

Work Experience

QUADRANGLE ARCHITECTS, Toronto, OntarioStudent Intern

- Produced Permit, Tender and Construction Drawings for Broadcast, Residential, Of�ce, Retail buildings; coordinating with consultants as required - Miscellaneous Tasks include: Site visits (Surveying), Contract Admin., and design work (millwork, details, and elevations.)

FARROW PARTNERSHIP ARCHITECTS, Toronto, OntarioStudent Intern

- Produced Permit, Tender and Construction Drawings for Residential-Hospitality building; coordinating with consultants as required - Miscellaneous Tasks include: Site visits (Minor Surveying),

CS&P ARCHITECTS, Toronto, OntarioStudent Intern

- Participated in competitions; produced design drawings - Produced Presentation Boards - Produced Millwork Drawings

LANDS ARCHITTETURE, Lugano, SwitzerlandStudent Intern

- Participated in competitions; produced design drawings - Produced physical models

Sept. 2008 - Aug. 2013

Feb. 2010 - April 2010

Jan. 2011 - April 2011

Jan. 2012 - Sept. 2012

Jan. 2013 - April 2013

Sept. 2013 - Dec. 2013

Page 3: Michael lee portfolio small

Pages 14 - 21

Pages 24 - 25

Pages 2 - 3

Pages 4 - 7

Pages 8 - 13

1. Resume & Table of Contents

4. Contact Info.

3.1 Farrow Partnership Architects: 3.1.1 Mission Residential Health Centre

Page 22Page 23

3.2 Quadrangle Architects: 3.2.1 60 Atlantic Ave and Reroo�ng Tender 3.2.2 70 Jefferson Ave Partial Plans

2.2 Galt Spa and Community Centre

2.1 Autodesk and Independent Artist’s Of�ce

2. Academic Work

3. Professional Work

Table of Contents

Architecture Portfolio Sample Works | Michael Lee

Page 4: Michael lee portfolio small

4

Page 5: Michael lee portfolio small

SECTION A1 : 200

SOUTH-EAST ELEVATON1 : 200

The intersection of College and Spadina is a space that has strong cultural exchange from the congested markets of small Chinese shops to the camouflaged, yet busy, interchange of people from the upper residences to the urban fabric below. Although a sort of distinct culture manifests itself in those streets, there is no strong architectural language that acts as a catalyst for the continual formation of that particular urban fabric. The multi-functional complex is an opportunity to express a strong architectural language, which can provide an environment where different social and cultural groups can be celebrated while establishing the many dif-ferent programs within the building.

SITE PLAN1: 1000

SOUTH ELEVATION

SECTION C (REFER TO PLANS)

SITE PLAN

5

Page 6: Michael lee portfolio small

B B

A A

C

C

B B

A A

C

C

GROUND FLOOR1 : 200

B B

A A

C

C

B B

A A

C

C

SECOND FLOOR PLANGROUND FLOOR PLAN

OFFICE FLOOR PLAN SRO FLOOR PLAN6

Page 7: Michael lee portfolio small

SHARED SPACES

VERTICALCIRCULATION

GROUND FLOOR

1 : 200

B

B

A

A

C

C

B

B

A

A

C

C

B

B

A

A

C

C

B

B

A

A

C

C

B

B

A

A

C

C

B

B

A

A

C

C

B

B

A

A

C

C

CLOSED OFF TO OFFICE LEVELS

CLOSED OFF TO SECOND FLOOR EXCEPT SERVICE ELEVATOR TO THE AUDITORIUM BACK OF HOUSE

EAST ELEVATION

SECTION C (REFER TO PLANS)

CIRCULATION DIAGRAMPUBLIC SPACE DIAGRAM

SRO FLOOR PLAN 7

Page 8: Michael lee portfolio small

8

SITE PLAN

The overall idea was to create a building with materiality and form informed by the rhythm of daily programs within the spa. For example relaxation areas would be architectonically “slower” built with stone, large walls and occuring at larger intervals.

Page 9: Michael lee portfolio small

UNIVERSITY OF WATERLOO// 4B PROJECT2.2 - SPA AND COMMUNITY CENTRE

9

Page 10: Michael lee portfolio small

D

D

10

Page 11: Michael lee portfolio small

D

D

11

Page 12: Michael lee portfolio small

12

Page 13: Michael lee portfolio small

13

Page 14: Michael lee portfolio small

FARROW PARTNERSHIP ARCHITECTS3.1 - MISSION COMPLEX CARE CENTER AND CAMPUS FOR CARE

14

Page 15: Michael lee portfolio small

FARROW PARTNERSHIP ARCHITECTS3.1 - MISSION COMPLEX CARE CENTER AND CAMPUS FOR CARE

15

Page 16: Michael lee portfolio small

EXISTING BUILDING

MAIN ENTRANCE

ROUND COLUMNBEYOND BELOWSECOND FLOOR

SKYLIGHT REFERTO WINDOWSCHEDULE

MAIN ENTRANCE

DAYCARE SIDE ENTRANCECORRIDOR LINK(REFER TOSECTION

A-516) ROUND COLUMNBEYOND BELOW

WING 4B ELEVATIONS

.

CRC-A401

PROJECT TITLE:

CLIENT:

DRAWING TITLE:

PROJECT NUMBER:

DRAWN:

DATE:

DRAWING NUMBER:

MISSION COMMUNITY HEALTH PROJECT

COMPLEX RESIDENTIAL CARE

FRASER HEALTH AUTHORITYFACILITY PLANNING AND REAL STATE

#300, 1023-153rd ST; SURREY, B.C.

11014

SCALE:

ASSOCIATE ARCHITECT:

KEY PLAN

REVISION - RECORD

1/8"16

Page 17: Michael lee portfolio small

EXISTING BUILDING

MAIN ENTRANCE

ROUND COLUMNBEYOND BELOWSECOND FLOOR

SKYLIGHT REFERTO WINDOWSCHEDULE

MAIN ENTRANCE

DAYCARE SIDE ENTRANCECORRIDOR LINK(REFER TOSECTION

A-516) ROUND COLUMNBEYOND BELOW

WING 4B ELEVATIONS

.

CRC-A401

PROJECT TITLE:

CLIENT:

DRAWING TITLE:

PROJECT NUMBER:

DRAWN:

DATE:

DRAWING NUMBER:

MISSION COMMUNITY HEALTH PROJECT

COMPLEX RESIDENTIAL CARE

FRASER HEALTH AUTHORITYFACILITY PLANNING AND REAL STATE

#300, 1023-153rd ST; SURREY, B.C.

11014

SCALE:

ASSOCIATE ARCHITECT:

KEY PLAN

REVISION - RECORD

1/8"

MAIN ENTRANCE

ROUND COLUMNBEYOND BELOWSECOND FLOOR

SKYLIGHT REFERTO WINDOWSCHEDULE

MAIN ENTRANCE

DAYCARE SIDE ENTRANCE

ROUND COLUMNBEYOND BELOW

WING 4B ELEVATIONS

.

CRC-A401

PROJECT TITLE:

CLIENT:

DRAWING TITLE:

PROJECT NUMBER:

DRAWN:

DATE:

DRAWING NUMBER:

MISSION COMMUNITY HEALTH PROJECT

COMPLEX RESIDENTIAL CARE

FRASER HEALTH AUTHORITYFACILITY PLANNING AND REAL STATE

#300, 1023-153rd ST; SURREY, B.C.

11014

SCALE:

ASSOCIATE ARCHITECT:

KEY PLAN

REVISION - RECORD

1/8"17

Page 18: Michael lee portfolio small

PROJECT TITLE:

CLIENT:

DRAWING TITLE:

PROJECT NUMBER:

DRAWN:

DATE:

DRAWING NUMBER:

MISSION COMMUNITY HEALTH PROJECT

COMPLEX RESIDENTIAL CARE

FRASER HEALTH AUTHORITYFACILITY PLANNING AND REAL STATE

#300, 1023-153rd ST; SURREY, B.C.

11014

SCALE:

ASSOCIATE ARCHITECT:

KEY PLAN

REVISION - RECORD

COURTYARD ELEVATIONS

1/8"

CRC-A407

.18

Page 19: Michael lee portfolio small

PROJECT TITLE:

CLIENT:

DRAWING TITLE:

PROJECT NUMBER:

DRAWN:

DATE:

DRAWING NUMBER:

MISSION COMMUNITY HEALTH PROJECT

COMPLEX RESIDENTIAL CARE

FRASER HEALTH AUTHORITYFACILITY PLANNING AND REAL STATE

#300, 1023-153rd ST; SURREY, B.C.

11014

SCALE:

ASSOCIATE ARCHITECT:

KEY PLAN

REVISION - RECORD

COURTYARD ELEVATIONS

1/8"

CRC-A407

.

PROJECT TITLE:

CLIENT:

DRAWING TITLE:

PROJECT NUMBER:

DRAWN:

DATE:

DRAWING NUMBER:

MISSION COMMUNITY HEALTH PROJECT

COMPLEX RESIDENTIAL CARE

FRASER HEALTH AUTHORITYFACILITY PLANNING AND REAL STATE

#300, 1023-153rd ST; SURREY, B.C.

11014

SCALE:

ASSOCIATE ARCHITECT:

KEY PLAN

REVISION - RECORD

COURTYARD ELEVATIONS

1/8"

CRC-A407

.19

Page 20: Michael lee portfolio small

PROJECT TITLE:

CLIENT:

DRAWING TITLE:

PROJECT NUMBER:

DRAWN:

DATE:

DRAWING NUMBER:

MISSION COMMUNITY HEALTH PROJECT

COMPLEX RESIDENTIAL CARE

FRASER HEALTH AUTHORITYFACILITY PLANNING AND REAL STATE

#300, 1023-153rd ST; SURREY, B.C.

11014

SCALE:

ASSOCIATE ARCHITECT:

KEY PLAN

REVISION - RECORD

TYPICAL DETAILS

CRC-A510

1"20

Page 21: Michael lee portfolio small

PROJECT TITLE:

CLIENT:

DRAWING TITLE:

PROJECT NUMBER:

DRAWN:

DATE:

DRAWING NUMBER:

MISSION COMMUNITY HEALTH PROJECT

COMPLEX RESIDENTIAL CARE

FRASER HEALTH AUTHORITYFACILITY PLANNING AND REAL STATE

#300, 1023-153rd ST; SURREY, B.C.

11014

SCALE:

ASSOCIATE ARCHITECT:

KEY PLAN

REVISION - RECORD

TYPICAL DETAILS

CRC-A510

1"

TOP OFPARAPET

CONCRETE BASE

FLUIDCOOLER REFERTO MECHANICAL

CLERESTORY WINDOWSREFER TO ELEVATIONS A409

EXPOSED CONCRETEEXPOSED CONCRETE

TOP OF42" PARAPET

OPENPARKINGBEYOND

OPENPARKINGBEYOND

OPENPARKINGBEYOND

OPENPARKINGBEYOND

LINKCORRIDOR(REFER TOSECTION2-A516)

ENTRANCETO STAIR H

TOP OFPARAPET

ENTRANCETO WASTE DISPOSAL

CLERESTORY WINDOWSREFER TO CLERESTORYELEVATIONS A409

CANTILVERROOF CANOPYREFER TO STRUC DWGS

GATEREFER TO PLAN

TOP OF42" PARAPET

2 HOURFIRE WALL

ENTRANCETO CORRIDOR

ENTRANCETO SPRINKLER

ENTRANCETO STAFFLOUNGE

CONCRETE BASE

TOP OFPARAPET

TOP OFPARAPET

TOP OF42" PARAPET

TOP OF 42"PARAPET

CLERESTORY

FLUIDCOOLER REFERTO MECHANICAL

EXPOSED CONCRETE

TOP OFPARAPET

PROJECT TITLE:

CLIENT:

DRAWING TITLE:

PROJECT NUMBER:

DRAWN:

DATE:

DRAWING NUMBER:

MISSION COMMUNITY HEALTH PROJECT

COMPLEX RESIDENTIAL CARE

FRASER HEALTH AUTHORITYFACILITY PLANNING AND REAL STATE

#300, 1023-153rd ST; SURREY, B.C.

11014

SCALE:

ASSOCIATE ARCHITECT:

KEY PLAN

REVISION - RECORD

WING 4A AND 1A

1/8"

CRC-A400

ELEVATIONS

RIDGE VENT

RIDGE VENT

PITCHED ROOF

PITCHED ROOF

CONC. BASE

RIDGE VENT

BAY WINDOW

PITCHED ROOFPITCHED ROOF

BEYOND

RIDGE VENT

2H FIRE WALLBEYOND(REFER TOPLANS)

SUPPLY ANDEXHAUST DUCTSBEYOND REFER TOMECHANICAL

TOP OF FIREWALL 6"MINIMUM EXPOSURE

SCREEN FENCE TOJOIN AND ALIGNWITH PITCHED ROOF

SUPPLY ANDEXHAUST DUCTSBEYOND REFER TOMECHANICAL

SCREEN FENCE TOJOIN AND ALIGNWITH PITCHED ROOF

WING 3A ELEVATIONS

.

CRC-A402

1/8"

PROJECT TITLE:

CLIENT:

DRAWING TITLE:

PROJECT NUMBER:

DRAWN:

DATE:

DRAWING NUMBER:

MISSION COMMUNITY HEALTH PROJECT

COMPLEX RESIDENTIAL CARE

FRASER HEALTH AUTHORITYFACILITY PLANNING AND REAL STATE

#300, 1023-153rd ST; SURREY, B.C.

11014

SCALE:

ASSOCIATE ARCHITECT:

KEY PLAN

REVISION - RECORD

21

Page 22: Michael lee portfolio small

SCALE:

1 West Building Roof Plan (North Part)1:100

KEY PLAN

SCALE:

2 Roof NotesNTS

P R O J E C T

SCALE:

1 West Building Roof Plan (South Part)1:100

60 Atlantic Ave. Rendering

70 Jefferson Ave. Reroofing Tender Plans

QUADRANGLE ARCHITECTSVARIOUS PROJECTS

22

Page 23: Michael lee portfolio small

70 Jefferson Ave. Partial Plans

SCALE:

4 Women's W/C 115 Elevations1:50

SCALE:

6 W/C 174 Elevations1:50

SCALE:

2 Women's W/C 115 Demo Plan1:50

SCALE:

5 W/C 174 Demo & Partition Plan1:50

SCALE:

3 Women's W/C 115 Partition, PDC and Finish Plan1:50

23

Page 24: Michael lee portfolio small
Page 25: Michael lee portfolio small

Michael Lee1120 Logan Ave.Toronto, ON CanadaM4K 3G7

Phone Number: 647 - 879 - 5228Email Address: [email protected]

CONTACT INFORMATION

Architecture Portfolio Sample Works | Michael Lee