MIAMI UNIVERSITYMacMILLAN HALL RENOVATIONS 2019 PROJECT NO. 018-01130-00
ADDENDUM NO. 2
1
Date: April 1, 2019
RE: Miami UniversityMacMillan Hall Renovations 2019SSOE Project No. 018-01130-00
To: Bidders
This Addendum supplements and amends the original drawings and specifications, and shall be taken into account in preparing proposals, and shall become part of the Contract Documents. You must indicate receipt of ALL Addendums on your Bid Form.
From: SSOE Group1001 Madison AvenueToledo, Ohio 43604Telephone: (419) 255-3830Fax: (419) 255-6101
Item AD2.01 (Issued) Asbestos Inspection Report, dated September 1996
Item AD2.02 (Issued) Drawing SS-300
a. Updates to structural drawing to accommodate detail/additional information on structural plan in Addendum A
Item AD2.03 Question: Has the concrete & plaster been tested for asbestos? If so is the repot available?
Response: Attached is the initial building inspection report that shows the hard plaster was sampled for asbestos and shown to be negative. Note: that the building was renovated in 2001 and all asbestos-containing materials that were identified in the report were abated at that time. To the best of the universities knowledge the concrete has never been sampled for the presence of asbestos unless it was in the form of transite (e.g. was commonly used for lab benches, piping, cooling towers, etc.).
Item AD2.04 Question: Plans A110 and P100 show what appears to be two water coolers side by side but the plumbing schedule is calling for a single cooler with a bottle filler. Can you verify if the want two single coolers side by side, a Bi-Level unit or just a single cooler.
Response: The water cooler is to be a Bi-level cooler. Change EWC-1 Model to “Halsey Tayler HTHB-HAC8BLSS-WF, bi-level w/ bottle filler, ADA”.
END OF ADDENDUM
NOTES:
1. DO NOT REMOVE WALL UNTIL STEEL IS INSTALLED.
2. INSTALL CHANNEL COLUMNS. THRU BOLT CHANNELS THRU EXIST 14" CONC.
WALL w/ 3/4" Ø THREADED RODS STAGGERED @ 12" O.C.
3. BEAR NEW BASE PLATE ON EXIST STRIP FOOTING. FOOTING EXTENSION TO BE CENTERED ON
CHANNEL COLUMNS.
4. CONTRACTOR TO SUBMIT A CONSTRUCTION SEQUENCE PLAN FOR REVIEW AND APPROVAL.
CONTRACTOR TO REVIEW ALL EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
1/4" CLOSURE PL
C12x20.7 SHIM.
MC12 x 31 MC12 x 31
NOTE #3
NOTE #2
NOTE #1
NOTE #1
MC
12
x 3
1
MC
12
x 3
1
MC
12
x 3
1
EXISTING STRIP
FOOTING
SCALE:
SECTION
3/4"=1'-0"A110
A
2
SS-300
1
SS-300
3
SS-300
EXISTING CONCRETE
FLOOR STRUCTURE
C
LPIPE COLUMN
EXISTING 6" SCHD. 80
PIPE COLUMN
FIRST FLOOR EL
SEE PLAN
GROUND FLOOR EL
SEE PLAN
CHANNEL PERPENDICULAR TO FRAMING TO
RUN OVER CHANNEL COLUMN. FIELD WELD
COLUMN WEB TO CHANNEL FLANGE w/ 1/4"
FILLET WELD.. SEE ARCH. PLAN.
EXISTING CONCRETE WALL.
SEE ARCH. DRAWINGS FOR
EXTENTS.
C10x15.3 CHANNEL COLUMN. ATTACH
TO CONCRETE WALL w/ HILIT HIT-HY 200
STRUCTURAL ADHESIVE. DRILL AND
EMBED 6" w/ 3/4" DIA. THREADED ROD
(GR 36) AT 12" O.C. STAGGER AT 5"
PITCH. PROVIDE (1) MIN. EA. END.
5
SS-300
EXIST. WALL TO BE REMOVED
ONLY AFTER STEEL IS
INSTALLED IN-PLACE.
CHANNELS
PL 1"x13"x4"
w/ (2) 3/4" Ø RODS
CENTERED IN PLATE.
DRILL AND EMBED 6" w/
HILTI HIT-HY 200. TYP.
EXISTING STRIP
FOOTING
14" EXISTING
CONC. WALL
REMOVE EXIST. SLAB
ON GRADE AS
REQUIRED TO PLACE
NEW FOOTINGS.
NEW SLAB TO
MATCH EXIST.
SCALE:
SECTION
3/4"=1'-0"SS-300
1
SCALE:
SECTION
3/4"=1'-0"SS-300
2
SCALE:
SECTION
3/4"=1'-0"SS-300
3
INSTALL CHANNELS TIGHT
TO UNDERSIDE OF CONC.
SLAB CONSTRUCTION
SHIM TIGHT w/ 1/4" PL AND
WELD IN PLACE.
FIRST FLOOR EL
SEE PLAN
GROUND FLOOR EL
SEE PLAN
EXISTING CONCRETE
FLOOR STRUCTURE
PAINT MASTIC ON BELOW GRADE
STEEL AND POUR ISOLATION
JOINTS AT CHANNEL COLUMNS.
EXIST. CONCRETE STRIP
FOOTING. VERIFY SIZES PRIOR
TO CONSTRUCTION.
#5 DOWEL AT 12" O.C. DRILL AND
EMBED 6" W/ HILTI HIT HY 200.
(3) #5 BARS
NOTES:
1. FOOTING RETROFIT TO BE CENTERED ON NEW BUILT UP COLUMN.
REFERENCE SECTION
3/SS-300 FOR STRIP FOOTING
ALTERATIONS.
NO CHANNEL COLUMNS AT SIM.
EXIST. WALL TO BE REMOVED
ONLY AFTER STEEL IS
INSTALLED IN-PLACE.
C10x25 W/
3
4
"Ø THRU BOLTS
STAGGERED AT 6" PITCH AT 12"
O.C.
SCALE:
SECTION
3/4"=1'-0"A110
4
INSTALL CHANNELS TIGHT
TO UNDERSIDE OF CONC.
SLAB CONSTRUCTION
SHIM TIGHT w/ 1/4" PL AND
WELD IN PLACE.
FIRST FLOOR EL
SEE PLAN
EXISTING CONCRETE
FLOOR STRUCTURE
1/4" CLOSURE PL
14" EXISTING
CONC. WALL
REFERENCE SECTION
6&4/SS-300 FOR END
ANCHORAGE REQUIREMENTS
C12x20.7 SHIM.
PROVIDE ACCESS IN HOLE IN
PLATE TO GROUT CHANNEL
SOLID.
®
DRAWING NO:
DRAWING TITLE:
PROJECT NO:
PROJECT MANAGER:
DESIGNED:
CHECKED:
REVISION OR ISSUE
NO. DATE SUBJECT
CLIENT PROJECT NO:
SEAL ON THIS DOCUMENT AUTHORIZED BY:
CONSULTANTS:
DA
TE
:
PROJECT INFORMATION:
CLIENT INFORMATION:
1001 Madison Avenue
Toledo, OH 43604
T. (419) 255-3830
SSOE, Inc.
A
P
P
L
Y
S
T
A
M
P
I
N
B
L
U
E
B
E
A
M
TB
_R
EV
1.0
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
H
C:\A
utodesk\R
evit\0180113000_A
18_S
SO
E_C
D_nate83.rvt
2/8/2019 10:27:29 A
M
SS-300
STRUCTURAL
SECTIONS AND DETAILS
W. KUSSRO
R. BRAUN, J. KRAMER
L. MUSHUNG
018-01130-00
----
MIAMI UNIVERSITY
531 EAST SPRING ST.
OXFORD, OH
45056
MACMILLAN
GROUND FLOOR
INTERIOR
RENOVATION 2019
A 2.22.19 100% CD REVIEW
0 3.01.19 ISSUE FOR BID/PERMITS
20" (F.V.)
2'-0" WIDE X
6'-0" LONG
(3'-0" AT SIM).
1'-0"
(F
.V
.)
PL 3/8"x8"x3 1/2"
w/ 3/4"Ø BOLTS
C10
MC12
SCALE:
SECTION
1 1/2"=1'-0"SS-300
5
1"
1 1/2"
2 1/2"
2 1/2"
1 1/2"
2"
NOTES:
1. REFERENCE ARCHITECTURAL DRAWINGS AD100 & A110 FOR ADDITIONAL
INFORMATION.
2" 3"
2"
5"
(4) 3/4"Ø THREADED
RODS (GR36)
THRU-BOLTED IN
STD HOLES
6"
TOS
SCALE:
SECTION
1 1/2"=1'-0"A110
6
SCALE:
SECTION
3"=1'-0"A110
7
1 1/2"
3"
1 1/2"
3 1/2"
5"
3 1/2"
3"
(4) 3/4"Ø THREADED
RODS (GR36) IN STD
HOLES DRILL AND
EMBED 6" w/ HILTI
HIT HY 200
EDGE OF WALL
PL 1/2"
2'-0" WIDE X
6'-0" LONG
(3'-0" AT SIM).
SCALE:
SECTION
1 1/2"=1'-0"A110
8
B 4.01.19 ADDENDUM 2