Miami-Dade Water and Sewer Department Multi-Year Capital Improvement Plan 1 Presentation for the II Forum - USA European Union - May 15, 2014

Upload: nhung

Post on 25-Feb-2016

44 views

Category:

Documents


1 download

DESCRIPTION

Miami-Dade Water and Sewer Department Multi-Year Capital Improvement Plan. Presentation for the II Forum - USA European Union - May 15, 2014. Existing Water Infrastructure. 3 large regional and 5 small water treatment plants 100 water supply wells 7,918 miles of pipes 38,000 fire hydrants - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

1

Miami-Dade Water and Sewer Department

Multi-Year Capital Improvement PlanPresentation for the II Forum - USA European Union - May 15, 2014

Page 2: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

Existing Water Infrastructure• 3 large regional and 5 small water treatment plants• 100 water supply wells• 7,918 miles of pipes• 38,000 fire hydrants• 126,000 valves• 11 treated water storage tanks • 455,000 water meters

Page 3: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

Existing Wastewater Infrastructure

• 3 wastewater treatment plants

• 2 ocean outfalls• 21 deep injection wells• 6,277 miles of pipes• 1,042 sewer pumps

stations

Page 4: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

WASD’s Water & WastewaterMajorFacilities

Page 5: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

Infrastructure Deficiencies• February 2012, R-170-12, directed Mayor to provide

report addressing WASD’s most critical infrastructure renewal needs

• July 2012, report transmitted to the Board • Report identified:

Critical water and sewer projects $1.1 billion estimated cost to implement

$364.2 million Water $736.1 million Wastewater

Total funding needs ($12.6B)

Page 6: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

Current Regulatory Challenges

• Compliance with the Federal Clean Water Act (EPA Consent Decree)

• Compliance with the State 2008 Ocean Outfall Legislation

• Continued compliance with Safe Drinking Water Act Requirements

• Renewing undersized water mains for fire flow and water quality requirements

• Consent Decree approved by the Federal Court on April 11,2014.

Page 7: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

State Ocean Outfall Legislation

• Bill passed in the 2008 Session• Requires:

July 1, 2013, submit implementation plan to FDEP

Reduce nutrients out to the oceanDecember 31, 2025, stop using outfall and

implement 60% reuse• Currently supporting a bill that will amend these

requirements to reduce implementation costs

Page 8: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

Other Needs • Other Regulatory Related: These are capital projects that are required by

various regulatory requirements such as Outfall Legislation, Safe Drinking Water Act, Health and Safety Regulations, etc. Failure to do these projects will result in violations of law subject to fines and other enforcement actions.

• Growth & Development Related: These are capital projects that address capacity limitations and other deficiencies in the system which restrict and/or limit construction projects and other developments.

• Rehabilitation and Replacement Related: These are capital projects that address identified rehabilitation and replacement infrastructure needs. Failure to perform these projects could result in pipe failures and equipment breakdowns with attendant service interruptions, sewage spills and other permit violations subject to regulatory enforcement actions and fines.

Page 9: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

9

Miami-Dade County Water & Sewer Department

• Proposed Multi-Year Capital Improvement Plan is $12.6Billion– Water is $4.08Billion– Wastewater is 8.56Billion

$0

$1,000,000

$2,000,000

$3,000,000

$4,000,000

$5,000,000

$6,000,000

$7,000,000

$8,000,000

$722,134$312,415 $551,681 $582,923

$930,315 $1,102,733 $924,694

$7,508,328Multi-Year Capital Improvement Budget by Fiscal Year (000)

Prior FY12-13 FY13-14 FY14-15 FY16-17 FY17-18 FY18-19 FY20-27

Page 10: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

Consent Decree Projected Expenditures timeline

Project Name PriorFY13 - 19

ExpendituresFY 20- 27

Expenditures Project Total

Wastewater Treatment Plants $7,126,868 $419,861,462 $599,778,803 $1,026,767,133

Wastewater Pipes $37,262,499 $353,705,256 $79,173,913 $470,141,668

Sewer Pump Stations $1,005,978 $105,762,443 $0 $106,768,421

Totals $45,395,345 $879,329,161 $678,952,716 $1,603,677,222

Consent Decree Related: These are wastewater capital projects that are included in the Consent Decree. Failure to do these projects within the prescribed schedule will result in violations of the terms and conditions of the Consent Decree subject to stipulated penalties.

Page 11: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

Total Multi-Year Capital Improvement Plan

Project Categories PriorFY13-19 Projected

ExpendituresFY20-27 Projected

Expenditures Total

Water

Plants $76,089,575 $915,392,370 $626,305,799 $1,617,787,744

Pipelines $98,073,090 $558,733,216 $1,602,148,654 $2,258,954,960

Other $17,968,077 $93,140,625 $87,329,350 $198,438,052

Total $192,130,741 $1,567,266,211 $2,315,783,803 $4,075,180,755

Wastewater

Plants $161,994,872 $1,104,364,497 $3,781,910,738 $5,048,270,107

Pipelines $105,842,002 $1,053,314,491 $977,998,774 $2,137,155,267

Pump Stations $24,208,487 $793,872,137 $293,946,970 $1,112,027,594

Other $5,884,403 $118,016,032 $138,687,484 $262,587,919

Total $297,929,765 $3,069,567,157 $5,192,543,966 $8,560,040,888

Combined Total $490,060,506 $4,636,833,368 $7,508,327,769 $12,635,221,643

Page 12: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan
Page 13: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

Differentiating Delivery Methods

TraditionalDBB

Design Construction Operations

Design

Construction

Operations

DBODBOF

DBOOF

Page 14: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

WASD InitiativesAlternative Project Delivery (APD) Methods• Design Build• Progressive Design Build• IPD method• MGC• CMNAR• CMAR• Owner’s Representative

P3 Alternative Project Delivery (APD) Methods• Design Build Operate

(DBO)• Design Build Operate &

Maintain (DBOM)• Design Build Finance

Operate & Maintain (DBFOM)

• We are NOT contemplating any form of ownership transfers.

Page 15: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

Expression Of Interest

• 32 Respondents• Areas of Interest:

– WWTP– WTP– PS– Bio-solids– AMR– Energy Optimization

• Type of delivery proposed: DBFOM, DBOM, DBO, PDBO, etc.

Page 16: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

APD by States (W/WW)

Page 17: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

UtilityOperator

Utility

Customers

Ser

vice

Res

pons

ive

to P

olic

ies

Cha

rges

Cus

tom

er

Util

ity

Policy

Participants Under Design-Bid-BuildPolicy Makers/ Stakeholders

DesignEngineer

Fully Detailed

Design

Design Fee

Constructor

ProjectConstruction

Low Bid

Construction Fee

• DSDC• Construction

Inspection

*DSDC: Design Services During Construction

Page 18: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

Utility

Participants Under CM-at-Risk

Customers

Cha

rges

UtilityOperator

Res

pons

ive

to P

olic

ies

Cus

tom

er

Util

ity S

ervi

ce

Policy Makers/ Stakeholders

Policy

Owner’sAgent

Fee

ProcurementServices

CM-at-Risk

Subcontractors(CM subs most or all

construction)

Fee up to GMP*

ProjectConstruction

DesignEngineer

Fee

Fully Detailed

Design

$ Guarantee

*GMP: Guaranteed Maximum Price

Input DuringDesign

• DSDC• Construction Inspection

Page 19: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

Policy Makers/ Stakeholders

Utility

UtilityOperator

Participants Under Design-Build

Res

pons

ive

to P

olic

ies

Cha

rges

Cus

tom

er

Util

ity S

ervi

ce

Customers

DB ContractorDesign &

Construction

Design/BuildFeeOwner’s

Agent

Fee

ProcurementServices/ContractOversight

Guarantor*

Guaranty Agreement

* Guarantor may not be required if DB Contractor has adequate

financial strength.

• DSDC• Construction Inspection

Policy

Page 20: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

Participants Under Design-Build-Operate

Page 21: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

Classic International P3 Arrangement

Project DeveloperFinancier(s)

Public Sector Sponsor

Contractor(s)

Milestone Payments

User Fee Payments

FinancialInvestment

Interest orReturns

P3Agreement

Construction Contracts

The Public

Maintain Public ControlPublic sector holds ultimate ownership of asset, regardless if it is newly constructed or existing prior to lease

Deliver Much-Needed AssetsPublic sponsors can leverage APD to deliver assets in a tight budget environment

Drive Value CreationAPD projects must provide public value creation and satisfy numerous project, government, and general public requirements

Key Considerations

Page 22: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

Major AdvantagesDBO DBOF DBOOF• Public (tax-exempt) financing is lowest cost of borrowing

• County has substantial control of the entire process, which includes site selection, permitting, technology selection, and related issues

• County owns facility and pays construction costs via milestone payments, thus termination is easier

• No take or pay commitment required

• County has some involvement in development if ownership is retained

• County does not make payments until facility is constructed and operational

• Development, design, construction, and operation risks generally transferred to Contractor

• Debt service payments are Contractor’s responsibility

• Off balance sheet financing approach

• County does not make payments until facility is constructed and operational

• Full development, design, construction, and operations risk transferred to Developer

• Debt service payments are Developer’s responsibility

• Off balance sheet financing approach

Page 23: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

Major DisadvantagesDBO DBOF DBOOF• County required to issue bonds and pay for development at project outset

• Debt service remains on County’s books

• Payment to Contractor must generally be a fixed fee for O&M services (i.e., usage fee for majority of O&M services not allowed under IRS regulations)

• Private financing is much more expensive than public financing

• Take or pay commitment required by the County for water purchase

• County has little involvement in development especially if ownership is private

• Private financing is much more expensive than public financing

• Take or pay commitment required by the County for water purchase

• County has no involvement in development since it is a completely private facility

• Limited County options at the end of the contract term

Page 24: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

Issues before Proceeding with Private Sector Development

Policy Issues• Need for the project and financial viability• Selection of delivery method• Overall goals of Owner• Implementation strategy• Commitment required before proceeding

Process Issues• Owner procurement process• Water quantity and quality requirements• Interrelationship with rate structure• Development schedule• Market outreach

Page 25: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

Thoughtful Procurement Process Critical for Project Success

Receive Technical & Price Proposals

ReceiveSOQs

Owner Approval

IssueRFQ

Short-listRespondents

Issue RFPw/

Contract

Clarification Requests and Meetings w/

Proposers (Optional)

Evaluate Proposalsand Select Successful

Proposer

Finalize Contract w/Successful Proposer Execute

Contract

Owner Specific Policies and Procedures

Incorporate SelectedProposal Information

into Contract

Page 26: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

Shadow Analysis - P3 Project Delivery AlternativeValue for Money Analysis

Project Name: South Miami Heights Water Treatment Plant Planned start date:P3 Delivery Method: PDBFOM Planned completion date:Project Estimate: $150,000,000.00 Substantial completion:Construction duration: 2 years Term completion:

Project Variables: Project constants:n1= County financing rate 4.80% p= Project scope Performance basedn2= Private financing rate 6.20% o= Operational requirements Performance basedy= Term of the Contract 20 c= Project cost As estimated by the Ownerr1= Risk of the construction 10.00%r2= Risk of the operational aspects 15.00%

Item Status1 5.00% = 5.00%2 9.00% > 0.00%3 2.50% > 0.00%4 6.00% > 0.00%5 100.00% > 95.00%6 8.00% = 8.00%7 10.00% > 1.00%8 15.00% > 0.00%9 15.00% > 0.00%

10 4.80% < 6.20%11 20 Years > 20 Years12 20 Years < 20 Years

>

Savings for the County over the Life Cycle of the ContractThe analysis supports the execution of this project via P3

Basis of Design Report (BODR)Construction DocumentsConstructability AnalysisError & Ommissions AllowanceConstruction Cost

P3 <= Traditional County Delivery Method

Activity$7,500,000.00

$150,000,000.00$12,000,000.00

$22,500,000.00$22,500,000.00

Risk in Project CompletionRisk in Project PerformanceCost of FinanceCost of OperationsMaintenance Costs

Traditional Delivery Method

Allowance account (contingencies)Program/Construction Management

$93,160,300.00$164,000,000.00

$10,000,000.00

P3 Delivery Alternative

$13,500,000.00$3,750,000.00

$0.00$142,500,000.00

$15,000,000.00 $1,500,000.00

$9,000,000.00

$7,500,000.00

$12,000,000.00

Value for Money from the County's perspective = $106,624,300.00

$522,910,300.00 $416,286,000.00

$130,000,000.00$10,700,000.00

Total Cost Over the Term of the Contract

January 1, 2015January 1, 2017

February 1, 2017January 27, 2037

$112,086,000.00

$0.00$0.00

$0.00$0.00

Page 27: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

Conclusions• To renew the system, fulfill regulatory

obligations, and support economic development, significant investment is required in the coming years ($12.6 billion)

• Investment is necessary in both, facilities and operations.

• All Project deliveries alternatives are being fully explored and evaluated.

• Good news is that even with the needed investment, rates will remain very competitive when compared with other utilities.

Page 28: Miami-Dade Water and Sewer Department  Multi-Year Capital Improvement Plan

28

Questions?JC Arteaga, AIA, NCARB, APA, CGC, CBO, LEED®AP Deputy DirectorWater & Sewer Department3071 SW 38 Avenue, Miami, FL 33146Off 786-552-8571Cell 305-218-8976Email: [email protected]: www.miamidade.gov/water