Metropolitan St. Louis Sewer District Project Clear: St. Louis’ CD Solution Shaw Landscape Series - March 4, 2014

Upload: others

Post on 12-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Metropolitan St. Louis Sewer DistrictProject Clear: St. Louis’ CD Solution

Shaw Landscape Series - March 4, 2014

Page 2: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

OutlineWhat is Project Clear?What is the Rainscaping Program?Pilot Program OverviewNeighborhood Scale Raingardens– Siting– Design– Construction– Maintenance– Monitoring

Early Action Program

2

Page 3: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

St. Louis MSD StatisticsFormed 1954

525 square miles

– City of St. Louis & 80% County

– 93 Municipalities

– Serve - 1.4 million (519,000 accounts)

Responsibilities:

– Collection & Treatment of Wastewater

• 7 Treatment Plants - 370 MGD Average Total

– Stormwater Management

3

Page 4: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

4

Separate Sewers

– Storm in one set of pipes

– Sanitary in another

Combined Sewers

– Storm and sanitary in same pipes

Page 5: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

St. Louis MSD Statistics (cont.)

From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows.

August 2011 Department of Justice filed a settlement or consent decree

April 27, 2012 consent decree agreement between MSD, the EPA and the Missouri Coalition for the Environment went into effect.

Projects Estimated at $4.7 Billion (Project Clear)

5

Page 6: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

What is Project Clear?MSD’s multi-decade, multi-billion dollar program to improve water quality and alleviate many wastewater concerns in the St. Louis region

Clear Priorities– Consent Decree – The Rules

– CSO LTCP / SSO Master Plan – The Plans

– Good Steward of Public’s Money – Our Responsibility

Clear Communications

Clear Water6

Page 7: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Repair & Maintain

Get the Rain Out

Build System Improvements

7

3 Focus Areas for Project Clear

Page 8: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Get the Rain OutStormwater Disconnects– Mandatory private stormwater

disconnections

– Touches Many Customers

Rainscaping– Green Infrastructure

Citysheds – Combined Sewer Area– Resident Relocations

– Combined Sewer Separations8

Page 9: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Repair & Maintain

Get the Rain Out

Build System Improvements

9

3 Focus Areas for Project Clear

Page 10: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Repair and Maintain

System Maintenance

System Inspection

System Rehab. and Replacement

Fats, Oil and Grease Control Program

Emergency Response

Results Already Happening

10

Page 11: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Repair & Maintain

Get the Rain Out

Build System Improvements

11

3 Focus Area for Project Clear

Page 12: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

System Improvements

Tunnels– 11 Tunnels, 33 miles,

– from 4ft – 30ft diameter

Storage Facilities– 2 Above Ground Tanks

High-Rate Treatment– 1 HRT – End of Large CSO Tunnel

Relief Sewers– As Necessary

12

Page 13: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

How big is Project Clear?

Building One of the Largest Public Projects in St. Louis History

Mostly Out of Sight

13

=12

9

Page 14: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Repair & Maintain

Get the Rain Out

Build System Improvements

14

What is the Rainscaping Program?

Page 15: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

What is Rainscaping?Combinations of plantings, water features, and other activities that manage stormwater as close as possible to where it falls by slowing it down so it can be absorbed by the soil and/or plants

15

Page 16: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

MSD’s Green Infrastructure Program for CSO Volume Reduction (aka MSD’s RainscapingProgram)

• Plan to address combined sewer overflows (CSOs)

• www.stlmsd.com

MSD’s Long Term Control Plan (LTCP)

• Chapter 12

• Appendix Q

Green Infrastructure

Program details:

16

Page 17: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

RainscapingProgram

• $100 Million

• 23 years

• Area that flows to CSO’s along the Mississippi River

• Bissell Point service area

• Mostly within the City of St. Louis

17

Page 18: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Pilot Program

•First $3 Million

•First 5 years (2011-2015)

•Demonstration Projects

•Monitoring

•Education/Outreach

•Develop plan for Full GI Program

•Final Report18

Page 19: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

19

Page 20: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

20

How’s it going so far?

• 219 parcels

• 221 buildings

• Removed 10 acres impervious surface

Demolitions completed

by LRA

Page 21: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Site Scale Projects

21

Habitat for Humanity Planter Boxes

Page 22: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Site Scale Projects

22

Individual Raingardens

Amended Soil

Page 23: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Neighborhood Scale Projects

23

Clinton St. Rain Garden in Old North Constructed fall 2012, photo following spring

Page 24: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

24

Page 25: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Site Selection Bissell Point studyInitial screening – GIS analysis of city blocksDesktop review of blocks with demosField visit blocks with demo and high ranking blocks nearbyPrioritization of potential sites – it’s all about the variety!Habitable structure search

25

Page 26: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Site Selection Lessons

LRA partnership

Topography

Sewer capacity

Environmental concerns

Politics and community

26

Page 27: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Site Selection SolutionsLarge number of lots to choose from

Variety of features plus other projects to study

Development Agreements

Detention & backflow prevention

27

Page 28: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Design – Neighborhood-scaleAll bioretention with IWS

Forebays

Some work in ROW

Pervious overlook (Clinton)

Detention (stacked & separate)

Aesthetics matter!28

Page 29: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Design Criteria

Used MSD WQv (1.14”) and sizing criteriaAssumed re-developed % imperviousForebay 10% of WQvDetention at least 20-yr back to grass, as requiredBackflow prevention, as required

29

Page 30: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Design ProcessMSD process adaptations

Phase 1 ESA & geotechnical investigation

Integration with landscape design

Coordination with City of St. Louis

30

Page 31: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

ConstructionMSD “master” specification changes

No pay items – lump with SOV

Costs conceptual estimate did not include (water $10K+)

Availability of materials

31

Page 32: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Construction Inspection

Coordination with plant designer

Inspector familiarity or not

Performance testing

32

Page 33: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Subsurface conditions

Abandoned foundations and walls

Building rubble = higher excavation cost

Over-excavate 2’ and geotextile fabric where rubble encountered

33

Page 34: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

MaintenanceRoutine vs. IntensiveTrash – especially near dumpsters in alleyLeaf cleanout 2 to 3x/yrVandalism – minimal so farRG Mix is VERY dry –use drought tolerant plantsMaintenance crews can be great ambassadors!

34

Page 35: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Monitoring

Plan for during design

Difficult to get an “ideal” situation

Allow more time than you need (weather, equipment failures)

Have a backup plan

35

Page 36: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Pilot Program Schedule

2013 Construction

Complete

Monitoring and Outreach

Full Program Development

2015 Pilot Program Report

36

Page 37: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

37

Full GI Program Jump Start

• Good opportunities for partnership

• Must be approved by EPA

• Next application period this fall

• Application and details available: http://www.projectclearstl.org/get-the-rain-out/early-action-program/

• Small grants coming soon!

“Early

Action”

projects:

Page 38: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

38

www.ProjectClearSTL.org

@ProjectClearSTL

Project Clear STL

Find Us Online

Page 39: Metropolitan St. Louis Sewer District · 2014-03-11 · St. Louis MSD Statistics (cont.) From 1992 to 2010, MSD spent approximately $2.3 billion to remove over 300 overflows. August

Questions?

39