METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS ON TENDER DOCUMENT NO. MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax CLOSING DATE: Wednesday, October 7, 2020

Upload: others

Post on 21-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

  • METROPOLITAN REGIONAL HOUSING AUTHORITY

    INVITES BIDS ON

    TENDER DOCUMENT NO. MET20-125

    UST Removal, Boiler Upgrade, AHU Replacement in Halifax

    CLOSING DATE: Wednesday, October 7, 2020

  • Metropolitan Regional Housing Authority

    Tender No. MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax

    TABLE OF CONTENTS

    PAGES

    Section One

    Scheduled Tour Date

    Mandatory Requirements

    1

    2

    Instructions to Bidders 3 - 6

    Bid Form 7 - 9

    General Conditions of the Contract 10 - 28

    Asbestos Disclosure Materials Letter: January 2014 29

    Section Two

    Drawings / Sketches: Dr. Samuel Prince Manor USE Removal, Boiler Upgrade and AHU Replacement

    CS-1 Site Plan UST Removal 30

    EA-1 Electrical Demolition Plan and Power Lighting Plan Penthouse 31

    EA-2 Electrical Schedules Penthouse 32

    EB-1 Electrical Demolition Plan And Power & Lighting Plan Boiler Room 33

    EB-2 Electrical Schedules Boiler Room 34

    MA-1 Mechanical Demolition Plan and Heating Plan Penthouse 35

    MA-2 Mechanical Demolition Plan And Ventilation Plan Penthouse 36

    MA-3 MAU and Heat Exchanger Controls Schematics Penthouse 37

    MA-4 Mechanical Equipment Schedules Penthouse 38

    MB-1 Mechanical Demolition Plan and Heating/Plumbing Plan Boiler Room

    39

    MB-2 Mechanical Demolition Plan and Ventilation Plan Boil Room 40

    MB-3 Propane/Oil Demolition Plan and Natural Gas Plan Boiler Room 41

    MB-4 Boiler, DHW & Fan Control Schematics 42

    MB-5 Mechanical Equipment Schedules Boiler Room 43

    Specifications Section: UST Removal, Boiler Upgrade & AHU Replacement Dr. Samuel Prince Manor, 3792 Novalea Drive, Halifax N.S.

    44-343

    Appendixes

    Appendix A Agreement (For Information Purposes Only) 344-346

    Appendix B Request for Product Approval 347

    Total Pages for this Tender Package: 347

  • Metropolitan Regional Housing Authority

    Tender No. MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax

    SECTION ONE - SCHEDULED TOUR DATE

    Please note: Attendance at the site tour is NOT mandatory

    _________________________________________________________________________________

    1. Organized Tour Date

    .1 All bidders note:

    2. The tour is scheduled for: Tuesday, September 29 at 10:00:00 AM

    3. Site Location Information

    .1 Building: .1 Outside front entrance, Dr. Samuel Prince Manor, 3792 Novalea Dr., Halifax

    .2 Address: .1 3792 Novalea Drive, Halifax, N.S., Nova Scotia

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 1 of 347

  • Metropolitan Regional Housing Authority

    Tender No. MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax

    SECTION ONE - MANDATORY REQUIREMENTS

    _____________________________________________________________________

    The following are the mandatory requirements of a formal bid and failure to meet one or more shall result in the bid being disqualified:

    .1 the Bid document shall be signed and witnessed;

    .2 if bidders have been requested to provide Bid Security, security shall be provided in Canadian funds in the amount required in one of the following forms only: a certified cheque, a certified bank draft, Government of Canada bearer bonds, or a Surety Bid Bond. No other form of bid security shall be accepted;

    .3 all unit prices shall be included in unit price contracts;

    .4 the Bid package shall be on Metropolitan Regional Housing Authority documents;

    .5 any Bid based on modifying, qualifying or re-writing any of the terms or conditions of the Tender, the General Conditions or the Supplementary Conditions documents shall be disqualified; and,

    .6 the Tender Submission shall contain all pages of the Bid Form.

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 2 of 347

  • Metropolitan Regional Housing Authority

    Tender No. MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax

    SECTION ONE - INSTRUCTIONS TO BIDDERS

    __________________________________________________________________________________

    1. Bid Closing AddressThe Bid Closing Address is S u i t e 3 , 3770 Kempt Road, Halifax, Nova Scotia. Bids delivered to the Bid Closing Address must be in a sealed envelope marked “Bid” and bear the name of the bidder and the project “Description of Work”. Bids are to be placed in the Metropolitan Regional Housing Authority Tender Submission Drop Box, located in the front entrance of Suite 3, 3770 Kempt Road, Halifax (door located to the left of Subway). Bids will be received up to 2:00 PM local time and opened at 2:00 PM local time Wednesday, October 7, 2020.

    2. Bid FormBids shall be submitted on the original Bid Forms as provided by the Metropolitan Regional Housing Authority. These forms must be completely filled out in ink, or by typewriter, with the signatures in longhand, witnessed and shall be signed as follows:

    .1 Sole Proprietorship: Signature of sole proprietor in the presence of a witness who will sign where indicated. Insert the words "Sole Proprietor" under titles;

    .2 Partnership: Signature of all partners in the presence of a witness or witnesses who will sign where indicated. Insert the word "Partner" against each signature under titles; or,

    .3 Limited Company: If the bid is submitted by a Limited Company, the bid must be signed by duly authorized signing officers of the Company in their normal signatures designating against each signature the official capacity in which the signing officer acts. Signatures are to be made in the presence of a witness who will sign where indicated. The Corporate Seal of the Company shall be affixed to the bid. If the bid is signed by Officials other than the President or Secretary-Treasurer of the Company, a copy of the by-law or resolution of the Board of Directors authorizing them to do so must be submitted with the bid.

    The completed form shall be without interlineations, alterations, or erasures.

    3. Right to Reject

    The right to reject any or all Bids or to accept any Bid deemed most satisfactory is reserved by theMetropolitan Regional Housing Authority. The Metropolitan Regional Housing Authority reserves theright to waive any informality in any or all Bids.

    The Metropolitan Regional Housing Authority reserves the right to consider the following in theevaluation of tenders:

    .1 past experience with the bidder and / or its management, including, but not limited to thefollowing:

    .1 compliance with the terms and conditions of past contracts between the Metropolitan Regional Housing Authority or the Government of Nova Scotia and the bidder; and,

    .2 timely completion of past tenders awarded to the bidder.

    .2 information received in response to enquiries of credit, customer and industry references; and,

    .3 the experience and qualifications of the bidders’ senior management and project management.

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 3 of 347

  • Metropolitan Regional Housing Authority

    Tender No. MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax

    SECTION ONE - INSTRUCTIONS TO BIDDERS

    __________________________________________________________________________________

    4. Modifications to Bids

    Modifications may be made to bids by facsimile (fax) message to 902.420.7586 or by email to [email protected], provided the following requirements are met:

    .1 modifications must be received at the address indicated in Paragraph 1 of Instructions to Bidder, prior to Bid Closing Time;

    .2 modifications made by fax or email shall immediately be followed up by the original document being delivered to the Metropolitan Regional Housing Authority and signed as outlined in Paragraph 2 of Instructions to Bidder; and,

    .3 modifications should not include the total original or revised bid amount.

    Note: Messages received by telephone shall not be considered.

    5. Bid Security

    The Bid, together with the Bid Security hereinafter described, must be delivered in a sealed self-addressed envelope. Note:

    .1 Bid Security must be in Canadian funds; and,

    .2 Bid Security in the form of cash will not be accepted.

    6. Bidders’ Responsibility

    Bidders will be held to have examined the drawings; to have visited the site; and to have informed themselves as to existing conditions and limitations. Bids shall cover the execution of the whole of the Work as described in the Specifications, as shown on the Drawings / Sketches and as described in any Addendums that may be issued.

    7. Registered Contractor / Subcontractors

    The Contractor and Subcontractors (whether incorporated or not) shall be individuals or companies registered in the Province of Nova Scotia under the Acts administered by the Registry of Joint Stock Companies. Firms not currently registered shall be required to register as condition of award.

    8. Security Deposit

    Security deposits shall be based on an amount of not less than ten percent (10%) of the total amount of the Bid.

    For bids less than $1,000,000 (one million Canadian dollars), each contractor submitting a Bid must submit the required amount of security deposit in one of the following forms:

    .1 a certified cheque or bank draft made payable to the "Metropolitan Regional Housing Authority";

    .2 Government of Canada bearer bonds; or,

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 4 of 347

    mailto:[email protected]

  • Metropolitan Regional Housing Authority

    Tender No. MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax

    SECTION ONE - INSTRUCTIONS TO BIDDERS

    __________________________________________________________________________________

    .3 a Surety Bid Bond.

    For bids of more than $1,000,000 (one million Canadian dollars), each contractor submitting a Bid must submit the required amount of security deposit in the form of a Surety Bid Bond only. This shall be either:

    .1 a Bid Bond shall be supplied on, or similar to, t he CCDC Form 220 and shall be signed and sealed by the Bonding Company and the Contractor; or,

    .2 a Surety Bond may be submitted, in the amount of ten percent (10%) of the Bid price, and the successful Bidder must deliver, upon winning the award, to the Metropolitan Regional Housing Authority a Performance Bond and a Labour and Material Bond each in the amount of fifty percent (50%) of the amount payable under the Contract.

    The Metropolitan Regional Housing Authority may require of any Bidder proof of financial and technical capability to undertake the work for which their Bid is submitted.

    A certified cheque or other security, when received, will be retained by the Metropolitan Regional Housing Authority as contract security in accordance with the provisions of Paragraph 5.1 of Instructions to Bidders. Bid security for the three lowest bids will be retained by the Metropolitan Regional Housing Authority until such time as the Metropolitan Regional Housing Authority approves an award of Contract. Bid security for all other bids will be returned immediately following the close of Bid.

    9. Agreement

    The successful Bidder shall enter into an Agreement with the Metropolitan Regional Housing Authority to deliver such goods and services as outlined within the Tender.

    10. Acceptance

    The Acceptance letter shall be issued, by:

    .1 delivering a letter by hand to the Contractor at either the address as set out in the Bid document, the Head Office of the Contractor, or to any officer of the Contractor, in which case acceptance shall be deemed to be the day the letter is delivered.

    11. Construction Safety

    Prior to contract award, the successful bidder must provide a Certificate of Recognition or Letter of Good Standing issued by an occupational health and safety organization approved by the Workers’ Compensation Board of Nova Scotia.

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 5 of 347

  • Metropolitan Regional Housing Authority

    Tender No. MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax

    SECTION ONE - INSTRUCTIONS TO BIDDERS

    __________________________________________________________________________________

    12. Addenda

    It is the responsibility of the bidder to periodically check for any addenda issued for this tender.

    General questions, please call:

    Bruce Chaisson at tel: 902.420.2108 or email: [email protected]

    13. Communications

    .1 The Project Manager for this Contract is Paul Power.

    .2 Enquiries shall be directed to [email protected]

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 6 of 347

    mailto:[email protected]:[email protected]

  • Metropolitan Regional Housing Authority

    Tender No. MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax

    SECTION ONE - BID FORM

    TO: METROPOLITAN REGIONAL HOUSING AUTHORITY

    FROM:

    Contractor's Full Business Name

    1. The undersigned Bidder has carefully examined the site of the proposed work described herein, has become familiar with local conditions and the character and extent of the work, has carefully examined every part of the proposed contract and thoroughly understands its stipulations, requirements and provisions, and has carefully examined the following documents, which shall be incorporated into and form part of the Agreement that the Contractor shall enter into with the Metropolitan Regional Housing Authority:

    Mandatory Requirements Instructions to Bidders Bid Form General Conditions Asbestos Disclosure Materials Letter: January 2014 Specifications Drawings Appendix A – Agreement (For Information Purposes Only) Addendum No. dated

    Addendum No. dated

    Addendum No. dated

    2. This contract is to provide for the the labor and materials relating to:

    Tender No. MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax

    3. The undersigned Bidder has determined the quality, quantity and source of supply of all materials

    required, has investigated labour conditions, and, has noted that sales taxes are not to be included

    in the "Bulk Sum Price" mentioned below in accordance with Paragraph 43 of the General

    Conditions of the Contract.

    4. The undersigned Bidder agrees:

    .1 BULK SUM PRICE: To provide all labour, tools, equipment, materials and incidentals necessary to complete the work in accordance with the Contract and agrees to accept, therefore, as payment in full the "Bulk Sum Price" of

    __________________________________________________________________________

    ($ ), and to undertake all changes or extra work required during the period of construction in accordance with the provisions of Article 23 of the General Conditions of the Contract.

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 7 of 347

  • Metropolitan Regional Housing Authority

    Tender No. MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax

    SECTION ONE - BID FORM

    .2 if awarded the Contract on this Bid Form, the Work is to begin work within ten (10) days of notification of Contract Award and to complete the Work within ONE HUNDRED TWENTY (120) days of award.

    .3 to use the Subcontractors hereinafter listed on the various phases of the work, and not to change or substitute these subcontractors, excepting under the provisions of Article 41 of the General Conditions of the Contract, without prior written permission of the Project Manager.

    .4 please list all subcontractors. Subcontractors will be reviewed as part of the tender evaluation. If needed, include a separate sheet listing Subcontractors.

    Subcontractor:

    Subcontractor:

    Subcontractor:

    5. The Bulk Sum Price set out above is made up as follows:

    .2 estimated cost of materials; and, $

    .3 all other charges including labour, contractors’ profits and overhead $

    .4 Total of bulk sum price, excluding taxes $

    6. Accompanying this Bid Form, the undersigned Bidder is submitting a Security Deposit in one of the following forms:

    .1 a certified cheque or bank draft made payable to the "Metropolitan Regional Housing Authority" in the amount of $ (see Instructions to Bidders);

    .2 Government of Canada Bearer Bonds in the amount of $ ; or,

    .3 a Surety (Bid) Bond in the amount of $ .

    .4 The undersigned Bidder agrees that, if this Bid is accepted within sixty (60) days from the closing date and the undersigned Bidder declines to enter into a contract in accordance with this Bid, then;

    .1 if I / we have submitted a security deposit in the form of a certified cheque or Government of Canada Bearer Bonds it shall be forfeited; or

    .2 if I / we have submitted a Surety (Bid) Bond, the surety shall be liable in accordance with the terms of the Bond.

    7. The Acceptance letter shall be issued at the option of the Metropolitan Regional Housing Authority

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 8 of 347

  • Metropolitan Regional Housing Authority

    Tender No. MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax

    SECTION ONE - BID FORM

    by;

    .1 delivering a letter by hand to the Contractor at either: the address set out in the Bid Form document, the Head Office of the Contractor, or to any officer of the Contractor, in which case acceptance shall be deemed to be the day the letter is delivered.

    8. The undersigned Bidder declares that this Bid Form is made without connection with any other person or persons, submitting bids for the same work, and is in all respects fair and without collusion.

    Contractor’s Full Business Address

    Contractor’s Full Business Name Street Address

    City, Province, Postal Code

    Contractor’s Signature Business Telephone Number

    Contractor’s Name Contractor’s E-mail Address

    Signed, Sealed and Delivered on behalf of the Contractor this day of _______________ 2020, in the presence of

    Witness’ Title

    AFFIX SEAL

    Witness’ Signature

    Witness’ Name

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 9 of 347

  • Metropolitan Regional Housing Authority

    Tender No. MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax

    SECTION ONE - GENERAL CONDITIONS OF THE CONTRACT

    ______________________________________________________________________

    INDEX

    1. Definitions 2. Documents 3. Detail Drawings and Instructions 4. Copies Furnished 5. Shop Drawings 6. Drawings & Specifications of the Work 7. Ownership of Drawings & Models 8. Samples 9. Project Manager and Contractor 10. The Project Manager's Decisions 11. Foreman, Supervision 12. Materials, Appliances, Employees 13. Inspection of Work 14. Correction before Final Payment 15. Deductions for Uncorrected Work 16. Guarantee Warranty 17. Protection of Work and Property 18. Emergencies 19. Contractor's Liability Insurance 20. Fire Insurance 21. Contract Security 22. Cash Allowances 23. Changes in Work 24. Valuation of Changes 25. Claims against Contractor, Subcontractors

    of Suppliers

    26. Payments 27. Liens 28. Permits, Notices, Laws 29. Patent Fees 30. Use of Premises 31. Cleaning Up 32. Cutting, Patching and Digging 33. Delays 34. Assessments and Damages for Late

    Completion 35. Metropolitan Regional Housing

    Authority's Right to do Work 36. Owner's Right to Terminate Contract 37. Contractor's Right to Stop Work or

    Terminate Contract 38. Mutual Responsibility of Contractors 39. Separate Contracts 40. Assignment 41. Subcontracts 42. Relations of Contractor and Sub-

    Contractor 43. Taxes 44. Progress Estimates 45. Workers’ Compensation 46. Discounts and Rebates

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 10 of 347

  • Metropolitan Regional Housing Authority

    Tender No. MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax

    SECTION ONE - GENERAL CONDITIONS OF THE CONTRACT

    ______________________________________________________________________

    1. Definitions

    .1 The contract documents consist of the Agreement, the General Conditions of the Contract, the Specifications, Drawings and/or Sketches, including all modifications thereof plus any Addendums incorporated in the documents before their execution. These constitute the Contract when signed by the Metropolitan Regional Housing Authority and Contractor.

    .2 The Metropolitan Regional Housing Authority, the Contractor and the Project Manager are those named as such in the Agreement.

    .3 The term "Subcontractor" includes only a person, firm or corporation having a contract for the execution of a part or parts of the Work included in the general contract, and a person, firm, or corporation furnishing materials called for in the general contract and worked to a special design according to the plans and specifications, but does not include one who merely furnished material so worked.

    .4 Instructions shall be deemed to have been duly given if issued in writing, at the option of the Metropolitan Regional Housing Authority, by either:

    .1 forwarding by registered mail a letter to the Contractor, to the last business address known to the Metropolitan Regional Housing Authority, in which case instructions shall be deemed to have been duly given on the day this letter is deposited in the mail, or;

    .2 delivering a letter by hand to the Contractor at either the address set out in the Bid Form, the Head Office of the Contractor, or to any officer of the Contractor, in which case acceptance shall be deemed to be the day the letter is delivered.

    .5 The term "Work" of the Contractor or Subcontractor includes all labour and materials shown or described in the Contract Specifications or Drawings and/or Sketches plus any Addendums that may have been issued.

    .6 The term "Other Contractors" means any person or firm or corporation employed by, or having a contract directly or indirectly with, the Metropolitan Regional Housing Authority otherwise than through the Contractor.

    .7 National Building Code, National Research Council of Canada, shall apply unless otherwise indicated in the Drawings and/or Sketches or Project Specifications.

    .8 Municipal by-laws shall apply where they supersede CMHC Technical Builder's Bulletin.

    .9 The Contract is deemed to be "substantially performed":

    .1 when the work or improvement is ready for use or is being used for the purpose intended; and,

    .2 when the work to be done under the Contract is capable of completion or correction at a cost of not more than two and one-half percent (2.5%) of the Contract price.

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 11 of 347

  • 1. Documents

    .1 The Contract documents are complementary, and what is called for by anyone shall be binding as if called for by all. The intention of the documents is to include all labour and materials reasonably necessary for the proper execution of the Work. It is not intended, however, that materials or work not covered by or properly inferable from any heading, section or trade in the Specifications shall be supplied unless distinctly so noted on the Drawings and/or Sketches. Descriptions of materials or work in words which so applied having well-known technical or trade meaning shall be held to refer to such recognized standards.

    .2 Should the Specifications conflict with the Drawings and/or Sketches, the Specifications shall govern. In the case of discrepancies between Drawings, those of larger scale, or if the scales are the same, those of a later date shall govern. All Drawings and/or Sketches and Specifications shall be interpreted in conformity with the Agreement and those General Conditions of the Contract which shall govern.

    2. Detail Drawings and Instructions

    .1 The Project Manager shall furnish as necessary for the execution of the Work additional instructions, by means of drawings or otherwise. All such additional instructions shall be consistent with the Contract documents. The Work shall be executed in conformity therewith and the Contractor shall do no work without such additional instructions. In giving such additional instructions, the Project Manager shall have authority to make minor changes in the Work, not inconsistent with the Contract.

    .2 The Contractor and the Project Manager, if either so requests, shall jointly prepare a schedule, subject to change from time to time in accordance with the progress of the Work, fixing the dates at which the various detail drawings will be required, and the Project Manager shall furnish them in accordance with the schedule. Under like conditions, a schedule shall be prepared, fixing the dates for the submission of shop drawings, for the beginning of manufacture and installation of materials and for the completion of the various parts of the work.

    3. Copies Furnished

    .1 In addition to the signed duplicates of the Contract documents, the Metropolitan Regional Housing Authority shall furnish to the Contractor, free of charge, eight (8) copies of all Drawings and/or Sketches and Specifications applicable to the Work.

    4. Shop Drawings

    .1 The Contractor shall furnish to the Project Manager, at proper times, all shop and setting drawings or diagrams which the Project Manager may deem necessary in order to make clear the work intended or to show its relation to adjacent work of other trades. The Contractor shall make any changes in such drawings or diagrams which the Project Manager may require consistent with the Contract, and shall submit two copies of the revised prints to the Project Manager, one of which shall be returned to the Contractor and the other retained by the Project Manager. When submitting such shop and setting drawings, the Contractor shall notify the Project Manager in writing

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 12 of 347

  • of changes made therein from the Project Manager's drawings or specifications. The Project Manager's approval of such drawings, or of the revised drawings, shall not relieve the Contractor from responsibility for errors made by the Contractor therein or for changes made from the Project Manager's drawings or specifications not covered by the Contractor's written notification to the Project Manager. All models and templates submitted shall conform to the spirit and intent of the Contract documents.

    5. Drawings and Specifications of the Work

    .1 The Contractor shall keep one copy of all Drawings and/or Sketches and Specifications of the Work, in good order, available to the Project Manager and to his/her representatives.

    6. Ownership of Drawings and Models

    .1 All Drawings and/or Sketches, Specifications and copies thereof and all models furnished by the Project Manager are his/her property. They are not to be used on other work and, with the exception of the signed Contract set of the Drawings and/or Sketches and Specifications, all furnished Drawings and/or Sketches and Specifications are to be returned to him/her upon request on the completion of the Work.

    7. Samples

    .1 The Contractor shall furnish for the Project Manager's approval such samples as he/she may reasonably require. The Work shall be in accordance with approved samples.

    8. Project Manager and Contractor

    .1 The Project Manager shall be responsible for administering the Contract, but the Contractor shall have complete control of the Work on site (subject to Paragraph 11 of Section One – General Conditions of the Contract).

    9. The Project Manager's Decisions .1 The Project Manager shall decide on questions arising under the contract

    documents, whether as to the performance of the Work or the interpretation of the Specifications and Drawings and/or Sketches, but should the Contractor hold such decisions to be at variances with the Contract documents, or to involve changes in work already built, fixed, ordered or in hand, to be in excess of the contract or to be given in error, he/she shall notify the Project Manager in writing before proceeding to carry them out.

    10. Foreman, Supervision

    .1 The Contractor shall keep on the Work, during its progress, a competent foreman and any necessary assistants, all satisfactory to the Project Manager. The foreman shall not be changed except with the consent of the Project Manager, unless the foreman proves to be unsatisfactory to the Contractor and ceases to be in his/her employ. The foreman shall represent the Contractor in his/her absence and directions on minor

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 13 of 347

  • matters given to him shall be held to be given to the Contractor. Important directions shall be given in writing to the Contractor. The Contractor shall give efficient supervision to the Work, using his/her best skill and attention.

    11. Materials, Appliances, Employees

    .1 Unless otherwise stipulated, the Contractor shall provide and pay for all materials, labour, water, tools, equipment, light and power necessary for the execution of work.

    .2 Unless otherwise specified, all materials shall be new. Both workmanship and materials shall be of the quality specified.

    .3 The Contractor shall not employ on the Work any unfit person or anyone not skilled in the work assigned to him.

    12. Inspection of Work

    .1 The Metropolitan Regional Housing Authority or the Project Manager on his/her behalf and their representative shall at all times have access to the Work, wherever it is in preparation or progress, and the Contractor shall provide proper facilities for such access and for inspection.

    .2 If the Specifications, the Project Manager's instructions, laws, ordinances or any public authorities require any work to be specially tested or approved, the Contractor shall give the Project Manager timely notice of its readiness for inspection, and if the inspection is by an authority other than the Project Manager, of the date and time fixed for such inspection. Inspections by the Project Manager shall be promptly made. If any work should be covered up without approval or consent of the Project Manager, it must, if required by the Project Manager, be uncovered for examination, and made good at the Contractor's expense.

    .3 Re-examination of questioned work may be ordered by the Project Manager. If such works are found in accordance with the Contract, the Metropolitan Regional Housing Authority shall pay the cost of re-examination and replacement. If such works are found not in accordance with the Contract, through the fault of the Contractor, the Contractor shall pay such cost.

    13. Correction Before Final Payment

    .1 The Contractor shall promptly remove from the premises all material condemned by the Project Manager as failing to conform to the Contract whether incorporated in the Work or not, and the Contractor shall promptly replace and re-execute his/her own work in accordance with the Contract and without expense to the Metropolitan Regional Housing Authority and shall bear the expense of making good all work of other contractors destroyed or damaged by such removal or replacement.

    .2 If the Contractor does not remove such condemned materials or work within the time fixed by written notice, the Metropolitan Regional Housing Authority may remove and may store such materials at the expense of the Contractor. If the Contractor does not pay the expense of such removal within five days thereafter, the Metropolitan Regional Housing Authority may, upon ten (10) days' written notice, sell such materials at

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 14 of 347

  • auction or at private sale and shall account for the net proceeds thereof, after deducting all costs and expenses incurred in the removal, storage and sale of the material and any other costs and expenses that should have been borne by the Contractor.

    14. Deductions for Uncorrected Work

    .1 If in the opinion of the Project Manager, it is not expedient to correct defective work or work not done in accordance with the Contract documents, the Metropolitan Regional Housing Authority may deduct from the Contract price the difference in value between the Work as done and that called for by the Contract, the amount of which shall be determined in the first instance by the Project Manager.

    15. Guarantee Warranty

    .1 Warranty coverage shall be provided by a guarantee warranty on all materials and workmanship for a period of one (1) year from the date of completion. Performance of the Contractor over the one (1) year period shall be guaranteed by the retention by the Metropolitan Regional Housing Authority of one percent (1%) of the contract price, or $2,500 (two thousand, five hundred Canadian dollars), whichever amount is greater.

    .2 The Contractor shall in addition to any specific warranty or guarantee called for, warrant and guarantee, for a period of one (1) year from the date of completion, all work performed and called for on the Drawings and/or Sketches and the Specifications, including any additional work approved and accepted as an extra to the Contract. The Contractor shall at his/her own expense, rectify any defects latent or patent that arise, as a result of poor, or improper, workmanship or defective materials, fixtures or apparatus during this one (1) year period. Performance of the Contractor over the one (1) year period shall be guaranteed, by the retention by the Metropolitan Regional Housing Authority of one percent (1%) of the contract price, or $2,500 (two thousand, five hundred Canadian dollars), whichever amount is the greater. Neither the final certificate nor payment thereunder, nor any provisions in the Contract shall relieve the Contractor from the responsibility for faulty materials or workmanship which shall appear during this one (1) year period.

    .3 Cracks in plaster, drywall, masonry, stucco, and concrete which occur during the warranty period will be considered defects in workmanship and materials, and shall be rectified at the Contractor's expense including the expense of repainting necessary to complete the finished product. Where touch-up painting does not match existing paint, the entire surface shall be repainted.

    .4 Neither the final certificate, nor payment under this contract, nor any provisions in the contract shall relieve the Contractor from responsibility for latent defects in materials or workmanship which appear after this one (1) year warranty period.

    .5 In the event that the Contractor places in use certain apparatus, machinery or electrical equipment, prior to the completion date, it shall remain the Contractor's responsibility to maintain the guarantee period as stated above, regardless of the

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 15 of 347

  • possibility that the manufacturers' guarantee may have expired previously.

    .6 Notwithstanding the provisions of this article, if any statute in force in the Province of Nova Scotia creates a more extended liability for faulty materials or workmanship, the provisions of such statutes shall apply.

    .7 For the purposes of this article, completion of the project shall be the latter of either the date of project handover, or the date of the certificate of substantial completion.

    16. Protection of Work and Property

    .1 The Contractor shall maintain continuously adequate protection of all his/her work from damage and shall protect the Metropolitan Regional Housing Authority's property from all injury arising in connection with this Contract. He/She shall make good any such damage or injury, except such as may be directly due to errors in the Contract documents. He/She shall adequately protect adjacent property as required by law and the Contract documents.

    17. Emergencies

    .1 The Project Manager has authority to stop the progress of the Work whenever, in his/her opinion, such stoppage may be necessary to ensure its proper execution. In an emergency affecting or threatening the safety of life, or of the structure, or of adjoining property, he/she has authority to make such changes and to order such work extra to the Contract or otherwise as may in his/her opinion be necessary.

    18. Contractor's Liability Insurance

    .1 The Contractor shall maintain such insurance or pay such assessments as will protect him and the Metropolitan Regional Housing Authority from claims under Workers’ Compensation Acts. In addition, the Contractor shall maintain insurance to protect him and the Metropolitan Regional Housing Authority from any other claims for bodily injury or property damage. This insurance coverage shall be Comprehensive General Liability at least as broad as the Insurers Advisory Organization Form GL-2002, including a rider for products and completed operations coverage for one (1) year period following completion of all works. Endorsements must also be provided for Broad Form Property Damage, Cross Liability Clause and thirty (30) days’ notice of any cancellation by registered mail.

    .2 The use of explosives must be covered by the policy, if blasting by explosives is required.

    .3 The Contactor shall also maintain liability insurance for all owned and non-owned automobiles, either licensed for highway use or unlicensed.

    .4 The limits of liability coverage shall be not less than $2,000,000 (two million Canadian dollars) inclusive for bodily injury or property damage per occurrence. Certificates of such insurance showing “HOUSING NOVA SCOTIA and METROPOLITAN REGIONAL HOUSING AUTHORITY” as named insured shall be filed with the Metropolitan Regional Housing Authority and shall be subject to approval as to adequacy of protection. Such insurance shall be maintained until the Project Manager certifies that the Work is

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 16 of 347

  • complete.

    .5 The Contractor's liability policy shall be endorsed with an undertaking from the insurance company that such insurance shall not be cancelled or changed without twenty-one (21) days prior notice by registered mail to the Metropolitan Regional Housing Authority.

    20. Fire Insurance

    .1 The Contractor shall maintain and pay for fire insurance in the joint names of the Metropolitan Regional Housing Authority and the Contractor totalling not less than one hundred percent (100%) of the Contract Award Amount, so that any loss under such policies of insurance will be payable to the Metropolitan Regional Housing Authority and the Contractor as their respective interests appear, and he/she shall furnish a copy of such policy to the Metropolitan Regional Housing Authority. Should a fire loss be sustained, the Contractor shall act on behalf of the Metropolitan Regional Housing Authority and himself for the purpose of adjusting the amount of such loss with the insurance companies. As soon as such adjustment has been satisfactorily completed, the Contractor shall proceed to repair the damage and complete the Work and shall be entitled to receive from the Metropolitan Regional Housing Authority in addition to the total Contract price, the amount at which the Metropolitan Regional Housing Authority's interest has been appraised in the adjustment made with the insurance companies as referred to above, said amount to be paid to the Contractor as the work of restoration proceeds. Any loss or damage by fire which may occur shall not affect the rights and obligations of either party under the Contract documents except that in such event the Contractor shall be entitled to a reasonable extension of time for the performance of the Work. Upon completion of the Work or on occupancy by the Metropolitan Regional Housing Authority, whichever shall first occur, the Contractor's obligation (if any) to maintain the fire insurance shall cease, and the Metropolitan Regional Housing Authority shall assume full responsibility for insuring the whole of the Work against loss or damage by fire. The date of such transfer of responsibility shall be the date on which the Metropolitan Regional Housing Authority is notified of the issue by the Project Manager of this Final Certificate, or the date the Metropolitan Regional Housing Authority occupies the premises, as the case may be.

    21. Contract Security

    .1 The successful Contactor must submit a Performance Bond and a Labour and Material Bond, each in the amount of fifty percent (50%) of the Contract, such Performance Bond and Labour and Material Bond are to be delivered to the Metropolitan Regional Housing Authority prior to signing of the Contract and shall be on the form enclosed as part of these documents, or to like effect.

    .2 Where the contract amount is less than $1,000,000 (one million Canadian dollars), the Metropolitan Regional Housing Authority will accept a certified cheque, bank draft, or Government of Canada Bearer Bonds, in an amount of ten percent (10%) of the Contract price.

    .3 If the successful Bidder elects to provide security other than the Performance, Labour

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 17 of 347

  • and Material Bonds and has provided security in the form of Government of Canada Bearer Bonds, certified cheque, or bank draft, then said security must be fully paid for, assigned to the Metropolitan Regional Housing Authority and deposited with the Metropolitan Regional Housing Authority in trust. Contracts in excess of $1,000,000 (one million Canadian dollars) can only be secured by Performance, Labour and Material Bonds.

    .4 If the Work is taken out of the Contractor's hands, or if the Contract is terminated pursuant to the General Conditions, or if the Contractor is in breach or in default under the Contract, the Metropolitan Regional Housing Authority may negotiate the security deposit, in the case of bonds, or Term Deposit Certificate, or convert the security deposit to its own use, in the case of negotiable security, and the amount realized by the Metropolitan Regional Housing Authority shall be deemed to be a debt payable by the Metropolitan Regional Housing Authority to the Contractor and the Metropolitan Regional Housing Authority shall have the right of set-off against the debt any sum or amount which the Contractor may be liable to pay to the Metropolitan Regional Housing Authority and the balance of the debt, if any, after the right of set-off has been exercised, and if such balance, in the opinion of the Project Manager, is not required for the purposes of the Contract shall be paid by the Metropolitan Regional Housing Authority to the Contractor.

    .5 If the Contractor is not in breach of, or default under, the Contract at the time the Project Manager's Interim Certificate of Completion is issued by the Regional or Project Manager, the Metropolitan Regional Housing Authority will return the security deposit to the Contractor. Notwithstanding the above, the Metropolitan Regional Housing Authority, may, under circumstances where it is considered advantageous, release the security deposit to the Contractor prior to one hundred percent (100%) completion but in no event at less than ninety percent (90%) completion. Such a release at less than ninety-five percent (95%) completion of the project shall be submitted to the Metropolitan Regional Housing Authority and have approval.

    22. Cash Allowances

    .1 The Contractor shall include in the Contract sum all cash allowances mentioned in the Specifications, which allowances shall be expended in whole or in part as the Project Manager shall direct, the amount of the Contract sum adjusted in conformity therewith. The Contract sum includes such sums for expenses and profit on account of such cash allowances as the Contractor requires. The Contractor shall not be required to employ for any such work, persons against whom he/she has a reasonable objection.

    23. Changes in Work

    .1 The Metropolitan Regional Housing Authority or the Project Manager, without invalidating the Contract, may make changes by altering, adding to, or deducting from the Work, the Contract sum being adjusted accordingly. All such work shall be executed under the conditions of the original Contract except that any claim for extension or reduction of time caused thereby shall be adjusted at the time of ordering such change.

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 18 of 347

  • .2 Except as provided in Paragraph 18 of Section One – General Conditions of the Contract, no change shall be made unless it is made pursuant to a written order from the Project Manager, and no claim for an addition to or a deduction from the Contract sum shall be valid unless so order.

    24. Valuation of Changes

    .1 The valuation of any changes in the Work shall be determined in one or more of the following ways:

    .1 by estimate and acceptance in a lump sum, submitted with Subcontractors’ and suppliers' signed quotations and breakdown of estimates for material and labour;

    .2 for changes where the individual trade cost is anticipated to be less than $1000 (one thousand Canadian dollars), the requirement for the detailed cost breakdowns may be waived but the individual trade quotation must be supplied;

    .3 by unit prices agreed upon or as listed in the Contract; or,

    .4 cost of work and percentage or by cost and fixed fee.

    .2 In cases of additional work to be paid for under method Paragraph 24.1.3 of Section One – General Conditions of the Contract, the Contractor shall keep and present in such form as the Project Manager may direct, a correct account of the net cost of labour and materials, together with vouchers. The Project Manager shall certify to the amount due to the Contractor including the profit and overhead as described in the Schedule. Pending final determination of value, payments on account of changes shall be made on the Project Manager's certificate.

    .3 In determining methods Paragraph 24.1.1 or Paragraph 24.1.3 of Section One – General Conditions of the Contract, the labour costs shall be calculated by the actual estimated hours at an hourly rate calculated as follows:

    .1 the hourly labour rate shall be the total payroll costs including hourly wage, statutory contributions to UIC, WCB and CPP and other applicable labour burdens paid directly by the employer such as vacation pay, holiday pay and pension plan;

    .2 the Owner reserves the right to verify the payroll costs by independent audit; and,

    .3 the following percentages shall apply to the total payroll costs:

    .1 small tools/expenditures: five percent (5%) on payroll costs; and,

    .2 site supervision: five percent (5%) on payroll costs.

    .4 In determining methods Paragraph 24.1.1 and Paragraph 24.1.3 of Section One – General Conditions of the Contract, the material costs shall be calculated as follows:

    .1 Contractor’s net costs, including contractor discounts from suppliers, freight on board (FOB) to the project site, plus applicable taxes.

    .5 In determining methods Paragraph 24.1.1 and Paragraph 24.1.3 of Section One – General Conditions of the Contract, equipment rental costs for major pieces of

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 19 of 347

  • equipment required shall be at local industry rates.

    .6 In determining methods Paragraph 24.1.1 and Paragraph 24.1.3 of Section One – General Conditions of the Contract, overhead and fees shall be calculated as follows:

    .1 The cost of any authorized change shall be determined by the net total of labour and material or equipment as outlined in Paragraph 24.3.1, Paragraph 24.3.2 and Paragraph 24.3.3 of Section One – General Conditions of the Contract on which the percentage mark-up shall be determined as follows:

    .1 For Each Change Up To $5,000 (Five Thousand Dollars): Subcontractors’ own work - Overhead & Fee: 15% (fifteen percent) total General Contractor’s own work - Overhead & Fee: 15% (fifteen percent) total General Contractor on Subcontractors work: 10% (ten percent) total (No percentage mark-up shall be applied to deductions)

    .2 For Each Change Above $5,000 (Five Thousand Dollars): Subcontractors’ own work - Overhead & Fee: 10% (ten percent) total General Contractor’s own work - Overhead & Fee: 10% (ten percent) total General Contractor on Subcontractors work: 8% (eight percent) total (No percentage mark-up shall be applied to deductions)

    25. Claims Against Contractor, Subcontractors or Suppliers

    .1 The Contractor shall ensure that Subcontractors, suppliers, and all others supplying labour, materials or services to the project are promptly paid. Such payments shall be made at the time payment for the same are made to the Contractor by the Metropolitan Regional Housing Authority.

    .2 Should the Metropolitan Regional Housing Authority be advised that a Subcontractor or supplier has not been paid for material, service, or labour provided to the project, the Metropolitan Regional Housing Authority may hold back, in addition to any other holdback stipulated in this Contract, sufficient monies as the Metropolitan Regional Housing Authority deems necessary to make such payments.

    .3 This right to hold back additional monies shall apply where:

    .1 Contractor, Subcontractors, or suppliers have been adjudged bankrupt;

    .2 Contractor, Subcontractors, or suppliers have made a general assignment;

    .3 Contractor, Subcontractors, or suppliers have had a receiver appointed;

    .4 payment for work is in dispute; and,

    .5 for any other reason, payment has not been made.

    .4 It is the responsibility of the Contractor, his/her successor, trustee, receiver or assigns to settle all such claims and liens made on the Metropolitan Regional Housing Authority and the Metropolitan Regional Housing Authority shall hold all monies retained until advised by the claimants that the accounts have been settled. If claims are not settled by the Contractor or successors within a reasonable time, the

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 20 of 347

  • Metropolitan Regional Housing Authority may pay for labour, services and materials claimed, whether supported by liens or not, from any date to any date and to any amount which may be claimed, or the Metropolitan Regional Housing Authority may make application to the courts, to pay any amounts held for such claims into court for the court to determine who should be paid and in what amount. Any monies so paid by the Metropolitan Regional Housing Authority shall be deducted from any monies that may be due, or that thereafter may become due, to the Contractor or successor.

    .5 Before final settlement is made for work executed and materials furnished under the Contract, the Contractor shall furnish evidence, satisfactory to the Metropolitan Regional Housing Authority, that the work and all its parts are free and clear from lawful claims or liens under any law, for labour, services, materials and otherwise. The Contractor must also furnish evidence that no claim exists, in respect to which a claim or lien upon the Work could or might attach. The Contractor shall indemnify and hold harmless the Metropolitan Regional Housing Authority and all his/her property from any kind of liens accruing from labour and services performed and materials supplied in or about the work.

    26. Payments

    .1 Cash payments equal to percentage stipulated in the agreement of the value of the work done, as valued by the Project Manager, will be made to the Contractor monthly, as the work progresses, on the written Certificate of the Project Manager that the Work, for or on account of which the certificate is granted, has been duly executed to his/her satisfaction, and stating the value of such work as computed by him/her, and insurance policies for the project are in force. The said certificate shall be a condition precedent to the right of the Contractor to be paid the said percentage, or any part thereof. No such monthly payment shall be construed to be an acceptance of any defective work or improper materials.

    .2 Whenever the Work is performed completely, according to the Builders Lien Act and according to the plans and specifications and to the satisfaction of the Project Manager, the Project Manager shall make and certify the final estimate for the same. The Metropolitan Regional Housing Authority will then pay to the Contractor after sixty-five ( 65 ) days have expired from the execution of the said final certificate the remainder which shall be found to be due, excepting therefrom such sum or sums as may be lawfully deducted or retained under any of the provisions of the Contract. The written Certificate of the Project Manager certifying to the final completion of the said Work to his/her entire satisfaction shall be a condition precedent to the right of the Contractor to receive or to be paid the balance due, of any part thereof. The right is reserved by the Metropolitan Regional Housing Authority to reject the whole or any part of the Work, should the said certificate be found to be inconsistent with the terms of the Contract, or otherwise improperly given.

    .3 The Project Manager's progress certificates, and the payment of progress estimates based upon the same, shall not be construed as an acceptance or approval of the Work but only as temporary advances to the Contractor; and he/she shall be bound, notwithstanding such progress estimates, to well and truly complete, finish and hand

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 21 of 347

  • over in good condition, and to the entire satisfaction of the Project Manager, by the time specified and in accordance with the terms and conditions of the Specification, the whole of the Work included therein; and all the percentage retained by the Metropolitan Regional Housing Authority shall be retained until the said full and satisfactory completion has been formally certified by the Project Manager.

    27. Liens

    .1 The Contractor shall be bound by the terms of the Builders Lien Act R.S., c. 277, s. 1; 2004, c. 14, s. 2.

    28. Permits, Notices, Laws

    .1 The Contractor shall obtain and pay for all necessary permits or licenses required for the execution of the Work (but this shall not include the obtaining of permanent easements).

    .2 The Contractor shall give all necessary notices and pay all fees required by law and comply with all laws, ordinances, rules and regulations relating to the Work and to the preservation of the public health and safety and if the Specifications and Drawings are at variance therewith any resulting additional expense incurred by the Contractor shall constitute an addition to the Contract price.

    29. Patent Fees

    .1 The Contractor shall pay all royalties and license fees and shall save the Metropolitan Regional Housing Authority harmless from loss on account of suits or claims which may arise by reason of the work for infringement of patents.

    30. Use of Premises

    .1 The Contractor shall confine his/her apparatus, the storage of materials and the operations of his/her workmen to limits indicated by law, ordinances, permits or directions of the Project Manager and shall not unreasonably encumber the premises with his/her materials.

    .2 The Contractor shall not load or permit any part of the structure to be loaded with a weight that will endanger its safety.

    .3 The Contractor shall enforce the Project Manager's instructions regarding signs, advertisements, fires and smoking.

    31. Cleaning Up

    .1 The Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by the employees or work, and at the completion of the Work he/she shall remove all his/her rubbish from and about the building and all his/her tools, scaffolding and surplus materials, and shall leave his/her work "Broom Clean" or its equivalent, unless more exactly specified. In case of dispute the Metropolitan Regional Housing Authority may remove the rubbish and charge the cost to the Contractor as the Project Manager shall determine to be just.

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 22 of 347

  • 32. Cutting, Patching And Digging

    .1 The Contractor shall do all cutting, fitting or patching of work that may be required to make parts come together properly and fit to receive or be received by work of other contractors shown, or implied by, the Contract documents and make good, as the Project Manager may direct.

    .2 Any cost caused by ill-timed work shall be borne by the party responsible therefore.

    .3 The Contractor shall not endanger any existing work by cutting, digging or otherwise and shall not cut or alter the work of any other contactor save with the consent of the Project Manager.

    33. Delays

    .1 If the Contractor should be delayed in the completion of Work by any act or neglect of the Metropolitan Regional Housing Authority or Project Manager or of any employee of either, or by any other contractor employed by the Metropolitan Regional Housing Authority or by changes ordered in Work, or by strikes, lockouts, fire, unusual delay by common carriers or unavoidable casualties or by any other cause or any kind beyond the Contractor's control or by any cause within the Contractor's control which the Project Manager shall decide as justifying delay, then the time of completion shall be extended for such reasonable time as the Project Manager may decide.

    .2 No such extension shall be made for delay occurring more than seven days before claim therefore is made in writing to the Project Manager, provided, however, that in the case of a continuing cause of delay, only one claim shall be necessary.

    .3 If no schedule is made under Paragraph 4 of Section One – General Conditions of the Contract, no claim for delay shall be allowed on account of failure to furnish Drawings until two (2) weeks after demand for such Drawings and not then unless such claim be reasonable.

    .4 The Project Manager shall not, except by written notice to the Contractor, stop or delay any part of the main Contract work pending decision of proposed changes.

    34. Assessments and Damages for Late Completion

    .1 The Work of the Contract is completed on schedule provided the Contract is "substantially performed" on or before the date for completion under Article 2.3 in the Agreement attached for information purposes only as Appendix A to this Tender, or the latest revision to this date authorized by change order. Any period of time required for "substantial completion" in excess of the above noted latest date shall be considered a period of delay.

    .2 During this period of delay, the Contractor shall be liable to the Metropolitan Regional Housing Authority for damages in an amount equal to the aggregate of:

    .1 all salaries, charges, and travelling expenses of Metropolitan Regional Housing Authority staff and outside consultants overseeing the performance of the Work;

    .2 the costs incurred by the Metropolitan Regional Housing Authority as a result of

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 23 of 347

  • the inability to use the completed Work during the period of delay; and,

    .3 all other expenses, including interest charges, and damages incurred or sustained by the Metropolitan Regional Housing Authority during the period of delay as a result of the Work not being completed.

    .3 The Metropolitan Regional Housing Authority reserves the right to waive, in whole or in part, the amount payable by the Contractor under this article.

    35. Metropolitan Regional Housing Authority's Right to do Work

    .1 If the Contractor should neglect to prosecute the Work properly or fail to perform any provisions of this Contract, the Metropolitan Regional Housing Authority, after three (3) days' written notice to the Contractor, may without prejudice to any other remedy he/she may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor.

    36. Owner's Right to Terminate Contract

    .1 If the Contractor should be adjudged as bankrupt, or if he/she should make a general assignment for the benefit of his/her creditors, or if a receiver should be appointed on account of his/her insolvency or if he/she should, except in cases recited in Paragraph 33 of Section One – General Conditions of the Contract, refuse or fail to supply enough properly skilled workmen or proper materials after having received seven (7) days' notice in writing from the Project Manager to supply additional workmen or materials, or if he/she should fail to make prompt payment to subcontractors for material or labour, or persistently disregard laws, ordinances or the instructions of the Project Manager, or otherwise be guilty of a substantial violation of the provisions of the contract then the Metropolitan Regional Housing Authority may, without prejudice to any other right or remedy, by giving the Contractor written notice, terminate the employment of the Contractor and take possession of the premises and of all materials, tools and appliances thereon and finish the work by whatever method which may be deemed expedient, but without undue delay or expense. In such case the Contractor shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the contract price shall exceed the expense of finishing the Work such excess shall be paid to the Contractor. If such expense shall exceed such unpaid balance the Contractor shall pay the difference to the Metropolitan Regional Housing Authority.

    37. Contractor's Right to Stop Work or Terminate Contract

    .1 If the work should be stopped under an order of any court, or other public authority, through no act or fault of the Contractor or of anyone employed by him, then the Contractor may, upon three (3) days' written notice to the Metropolitan Regional Housing Authority and the Project Manager, stop work or terminate this contract and recover from the Metropolitan Regional Housing Authority payment for all work executed and any loss sustained upon any plant or material with reasonable profit and damages.

    38. Mutual Responsibility of Contractors

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 24 of 347

  • .1 Should the Contractor suffer damage by any act, neglect or default of any other contractor employed by the Metropolitan Regional Housing Authority upon the Work, the Metropolitan Regional Housing Authority shall be responsible therefore but shall be subrogated to the rights of the damaged Contractor against the contractor causing the damages. The Contractor shall make his/her claim in writing against the Metropolitan Regional Housing Authority within forty-eight (48) hours after the happening of the event causing such damage to the Contractor.

    .2 Should the Contactor cause damage to any other contractor on the Work, the Contactor agrees, upon due notice, to settle with such other contractor by agreement if he/she will so settle. If such other contractor sues the Metropolitan Regional Housing Authority on account of any damage alleged to have been so sustained, the Metropolitan Regional Housing Authority shall notify the Contractor, who shall defend such proceedings at his/her own expense and if any judgement against the Metropolitan Regional Housing Authority arises therefrom, the Contractor shall be responsible and shall pay such judgement promptly together with all costs incurred by the Metropolitan Regional Housing Authority.

    39. Separate Contracts

    .1 The Metropolitan Regional Housing Authority reserves the right to let other contracts in connection with the undertaking of which the Work is a part and the Contractor shall connect properly and co-ordinate his/her work with that of other contractors. If any part of the Contractor's work depends for its proper execution or result upon the work of another contractor, the Contractor shall report promptly to the Project Manager any defects in the Work of such other contractor as may interfere with the proper execution of the Contractor's work. Should the Contractor fail so to inspect and report, he/she shall have no claim against the Metropolitan Regional Housing Authority by reason of the defective or unfinished work of any other contractor except as to latent defects not reasonably noticeable at the time of the commencement of the Contractor's work.

    40. Assignment

    .1 The Contractor shall not assign the Contract or assign any monies due to accruing under the Contract under any circumstances.

    41. Subcontracts

    .1 The Contractor must use the Subcontractors listed in the Bid Form. If the change of any names on this list is considered necessary by the Contractor, this request, giving reasons for the change, shall be submitted in writing to the Project Manager and the proposed change will be official after written approval by the Project Manager. If additional Subcontractors are required for the principal parts of the Work, the Contractor shall notify the Project Manager in writing of the names of the Subcontractors proposed and shall not employ any to whom the Project Manager may reasonably object.

    .2 If the change of any names on such list is required by the Project Manager, and the Work has to be awarded to a higher bidder, the Contract Price shall be increased by

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 25 of 347

  • the difference between the two bids.

    .3 The Project Manager shall on request furnish to any Subcontractor wherever practicable, evidence of the amounts certified to on his/her account.

    42. Relations of Contractor and Subcontractor

    .1 The Contractor agrees to bind every Subcontractor by the terms of the General Conditions, Drawings and Specifications as far as applicable to his/her work.

    43. Taxes

    .1 Harmonized Sales Tax

    .1 The Contractor shall not include in the Bid Form Amount Harmonized Sales Tax (HST), but shall pay HST on all materials and services on which the tax is charged. The Contractor shall show the amount of the HST to be paid on the Bulk Sum Price separately.

    44. Progress Estimates

    .1 Progress claims submitted for payment must be broken down in accordance with the Metropolitan Regional Housing Authority’s standard progress claim form.

    .2 Claims for material on site but not installed, must be supported by suppliers’ invoices showing their unit prices, including provincial and municipal taxes. The amount for HST shall also be included separately. When material has been taken from Contractors’ or Subcontractors’ general stock on hand, they shall supply invoices priced at current trade prices without Contractors’ or Subcontractors’ profit.

    45. Workers’ Compensation

    .1 The Contractor shall carry Workers’ Compensation coverage on all employees engaged under this contract. The Contactor shall supply the Metropolitan Regional Housing Authority with a letter of Good Standing from the Workers’ Compensation Board and their Revenue Canada Business Number prior to the Work commencing.

    46. Discounts from Manufacturers / Principal

    .1 Suppliers and contractors are expected to pass on discounts or rebates obtained from their principals or manufacturers to Metropolitan Regional Housing Authority while submitting their bids. Examples of such discounts or rebates could come from Efficiency Nova Scotia, manufacturers of goods and equipment, service providers, etc.

    .2 Invoice shall identify if rebate was already or not passed onto the contractor. It can be a collective invoice for all items such as multiple pumps, but all items need to be identified separately.

    .3 ID Information of each item shall be included on the invoice record: brand and model

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 26 of 347

  • number, design designation label.

    .4 Contractor Equipment Invoice Provisions with Respect to Efficiency Nova Scotia Rebate.

    The following provisions apply to products or services which may be eligible for

    rebates/incentives through various programs including those offered by Efficiency

    Nova Scotia. Eligible products and services may include, but are not limited to:

    • Heating equipment (e.g. heat pumps);

    • Lighting equipment and technologies;

    • High efficiency circulator pumps;

    • Insulation (e.g. exterior rigid, attic etc.);

    • Windows and doors;

    • Heat Recovery Ventilation (HRV);

    • Energy Recovery Ventilator (ERV), and

    • Air-sealing.

    Provision 1: Supplier to Contractor Invoice

    The Contractor shall provide a copy of supplier invoices for the following products:

    • High-efficiency circulator pumps (i.e. pumps

    containing permanent magnet motors and VFD

    technologies), and

    • Lighting equipment (i.e. bulbs and fixtures).

    All eligible product(s) shall be identified on the invoice c/w description

    (model/make), quantity, and design designation label. The location in

    which the product will be installed shall be identified by the Contractor.

    Provision 2: Quotations/Estimates

    At the request of the RHA and/or HNS, the Contractor shall provide

    quotations/estimates that show the installed price of all eligible

    product(s) and services prior to commencing any work. All eligible

    product(s) shall be identified in the quotation/estimate with the following

    information:

    • Quantity of product(s);

    • Manufacturer;

    • Model number;

    • Material cost per unit;

    • Labour as a separate line item, and

    • Applicable taxes.

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 27 of 347

  • Provision 3: Contractor to Housing Authority Invoice

    At the request of the RHA and/or HNS, the Contractor shall provide an

    invoice that shows the installed price of all eligible product(s) and

    services. All eligible product(s) shall be identified in the invoice with the

    details listed under Provision 2.

    The Housing Authority and/or Housing Nova Scotia reserve the

    right to request invoicing with detailed material and labour

    breakdown. Breakdowns may be required by building, or by

    residential unit.

    -END OF GENERAL CONDITIONS-

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 28 of 347

  • Metropolitan Regional Housing Authority

    Tender No. MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax

    ASBESTOS DISCLOSURE MATERIALS LETTER: JANUARY 2014

    January 2014 To Whom It May Concern,

    This is to advise that certain building materials used in the construction of apartment buildings,

    office buildings and homes between the years 1946-1986 may contain asbestos fibres. Asbestos

    may typically be found in drywall filler, texture coats (stucco), floor tiles, tile adhesive, gaskets,

    hard board, plaster, ceiling tiles, caulking and seamless flooring. Asbestos can be a hazard if

    the fibres in the building material are released or separated from the material or become air

    borne. In order for asbestos fibres to be released from this material, it must be sanded or

    crumbled into small pieces.

    Asbestos is not otherwise poisonous and it does not off-gas any toxic chemicals. Under normal

    conditions of day-to-day usage, these materials do not pose a risk to occupants, as they are not

    releasing dust.

    As many of the Metropolitan Regional Housing Authority (MRHA) buildings were constructed prior

    to 1986, we are advising that asbestos may be present in the building materials. When properly

    managed these materials are not a cause for concern.

    Typically, if asbestos is found in MRHA buildings it is in the drywall filler (the material used to cover

    the seams where two (2) pieces of gyproc meet or the corners of a room or where the ceiling and

    walls meet), stucco or plaster. Gyproc itself does not contain asbestos.

    The following responsibilities fall upon any contractor whose work may results in the disturbance

    of any asbestos-containing or contaminated materials or surfaces:

    1. Before commencing work, ensure all contractors employees and supervisory staff have

    been informed as to the presence and approximate location of all asbestos-containing

    materials that may become subject to disturbance (whether intentional or not);

    2. Only workers trained and authorized in Type 1, 2, or 3 asbestos work procedures are

    assigned to work involving exposure to material containing asbestos;

    3. File with the Metropolitan Regional Housing Authority a signed and executed copy of a

    Contractor's Notification & Acknowledgement form as provided at the end of this document;

    4. Perform work in such a manner as to avoid the disturbance of any asbestos-containing or

    contaminated surfaces or materials other than those materials intentionally contracted to

    remove, repair, encapsulate or enclose;

    5. Upon discovery of any unidentified asbestos-containing or suspect asbestos-containing

    materials, secure the area, suspend all activities that may disturb such materials and do

    not proceed with work in the area until it has been determined if the material in question

    contains asbestos and written authorization to proceed is obtained from the Metropolitan

    Regional Housing Authority;

    6. Prior to proceeding with any asbestos disturbance for Type 2 and Type 3 work (i.e. removal,

    clean-up or repair) ensure a signed and duly executed Asbestos Work Permit is obtained

    from the Metropolitan Regional Housing Authority;

    7. Ensure all work that may disturb any asbestos-containing or contaminated surfaces is

    completed in accordance with current regulatory requirements; and,

    8. As required, provide the Metropolitan Regional Housing Authority with a copy of all

    executed Asbestos Waste Transportation Manifests, verifying the safe and proper

    disposal of asbestos waste generated.

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 29 of 347

  • PR

    OP

    ER

    TY

    L

    IN

    E (A

    PP

    RO

    X.)

    GRASS

    CIVIC NO. 3792

    NOVALEA DRIVE

    D

    R

    IV

    E

    W

    A

    Y

    U

    /

    G

    F

    U

    E

    L

    L

    I

    N

    E

    CB

    HE

    AT

    HE

    RW

    OO

    D C

    OU

    RT

    NOVALEA DRIVE

    BOILER

    ROOM

    U/G POWER &

    PHONE LINE

    TREES

    CB

    OBS.

    WELL

    Fill & Vent

    CONCRETE

    U/G PROPANE LINE

    BACKUP GENERATOR

    U/G

    H

    eritag

    e G

    as L

    in

    e

    U

    /G

    D

    R

    A

    IN

    A

    G

    E

    WATER &

    SEWER

    LINES

    CONCRETE

    CONCRETE

    ASPHALT

    PARKING

    LOT

    ASPHALT

    CA

    NO

    PY

    1

    2

    3

    DRAWING TITLE

    PROJECT TITLE

    Drawing No.

    File Name

    Scale

    Sheet of

    Checked ByCadd Check

    Drawn By

    DATE REVISIONS APPR.

    Design By

    BY

    3792 NOVALEA DRIVE, HALIFAX NS

    AS NOTED

    JJ

    RB -

    1

    -

    DR. SAMUEL PRINCE MANOR

    UST REMOVAL, BOILER

    UPGRADE AND AHU

    REPLACEMENT

    07-10-2020 ISSUED FOR 50% REVIEW RBJJ

    SITE PLAN

    UST REMOVAL

    1

    NO.

    A0

    REFERENCE NOTES:

    SEE NMS SPEC FOR TANK REMOVAL / DEMO DETAILS.

    SEE NMS SPEC FOR BACKFILL DETAILS.

    OIL LINES AND ASSOCIATED PUMPS INSIDE BUILDING BOILER

    ROOM TO BE REMOVED. SEE MECHANICAL DRAWING MB-3.

    1

    2

    3

    4

    5

    6

    7

    GENERAL NOTES:

    LOCATIONS OF ALL SERVICES AND UNDERGROUND UTILITIES

    INCLUDING TANK ARE APPROXIMATE AND MUST BE CONFIRMED

    PRIOR TO SITE WORK.

    -

    -

    -

    A

    B

    C

    D

    TANK REMOVAL

    SITE LEGEND

    A1 08-07-2020 ISSUED FOR 90% REVIEW

    KEY PLAN

    AREA OF WORK

    NOVA SCOTIAProperty & Facilities

    A2 09-15-2020 ISSUED FOR 100% REVIEW

    RBJJ

    RBJJ

    1

    -

    3"=1'-0"

    SITE PLAN - UST REMOVAL

    CS-1

    CS-1.DWG

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 30 of 347

  • EXISTING MAKE UP AIR (MUA)

    STARTER TO BE DEMOLISHED

    EXISTING 200A 208V PANEL 'C'

    TO BE DEMOLISHED

    EXISTING PUMP #1 STARTER

    (EP-4) TO BE DEMOLISHED

    EXISTING PUMP #2 STARTER

    (EP-3) TO BE DEMOLISHED

    EXISTING

    MUA

    EP-3

    EP-4

    EXISTING SPLITTER TO REMAIN

    1

    2

    3

    EXISTING 200A DISCONNECT

    FOR SPLITTER TO REMAIN

    EXISTING ELEVATOR 2

    DISCONNECT TO REMAIN

    EXISTING ELEVATOR 1

    DISCONNECT TO REMAIN

    EXISTING #3 STARTER TO

    REMAIN

    REFERENCE NOTES:

    LUMINIARES CIRCUITED TO PANEL 'C' CIRCUIT 27, TO BE

    DEMOLISHED.

    LUMINAIRES SWITCHED AS SHOWN, CIRCUITED TO PANEL 'C'

    CIRCUIT 23, AND SWITCH TO BE DEMOLISHED.

    WALL MOUNTED LUMINAIRE SWITCHED AS SHOWN, CIRCUITED TO

    PANEL 'C' CIRCUIT 23, AND SWITCH TO BE DEMOLISHED.

    1

    2

    3

    5 6

    B

    A2

    B2

    A1

    A1

    B1

    B1

    B2

    B1 B1

    B1

    P-4A

    P-4B

    1

    MAU-1

    B2

    3

    4

    EXISTING SPLITTER TO REMAIN

    EXISTING 200A DISCONNECT

    FOR SPLITTER TO REMAIN

    EXISTING ELEVATOR 2

    DISCONNECT TO REMAIN

    EXISTING ELEVATOR 1

    DISCONNECT TO REMAIN

    EXISTING #3 STARTER TO

    REMAIN

    MAKEUP AIR UNIT FUSED

    DISCONNECT RATED 100A, 90A FUSE

    REFERENCE NOTES:

    ALL NEW LUMINAIRES IN PENTHOUSE SHALL BE CIRCUITED TO

    PANEL 'C' CIRCUIT 23 AND CONTROLLED BY NEW SWITCH SHOWN.

    NEW PANELBOARD 'C' SHALL HAVE CIRCUIT BREAKERS TO MATCH

    THAT OF THE PREVIOUSLY DEMOLISHED PANELBOARD, WITH

    UPDATED BRANCH CIRCUIT SIZING FOR NEW PUMPS AS INDICATED

    IN MECHANICAL EQUIPMENT SCHEDULE ON DRAWING EA-2.

    PROVIDE NEW BRANCH CIRCUIT BREAKERS AND RECONNECT

    EXISTING WIRING TO DEVICES PREVIOUSLY FED FROM PANEL.

    TRACE ALL EXISTING CIRCUITS AND EXTEND WIRING AS REQUIRED.

    SURFACE MOUNTED TO WALL, 8' A.F.F.

    SURFACE MOUNTED TO SIDE OF MAKE UP AIR UNIT, COORDINATE

    MOUNTING HEIGHT BETWEEN 8' AND 10' WITH FINAL EQUIPMENT

    ARRANGEMENT.

    SURFACE MOUNTED TO CEILING.

    1

    2

    3

    4

    5

    P-3A 208V 30A DISCONNECT

    P-3B 208V 30A DISCONNECT

    NEW 225A 208V 60CCT PANEL 'C'2

    5

    5 6

    B

    DISCONNECT, SEE MECHANICAL EQUIPMENT SCHEDULE

    SURFACE MOUNT PANELBOARD

    MOTOR STARTER, SEE MECHANICAL EQUIPMENT SCHEDULE

    LEGEND

    LINEAR LUMINAIRE 1'x4'

    LINEAR LUMINAIRE 1'x4' MOUNTED VERTICALLY

    PENDANT OR FLUSH MOUNTED LUMINAIRE

    15A, 120V TOGGLE SWITCH, 3 INDICATES THREE WAY SWITCH

    LED LINEAR STRIP LUMINAIRE

    WALL MOUNTED LUMINAIRE

    DIRECT CONNECTION, SEE MECHANICAL EQUIPMENT SCHEDULE

    DASHED LINETYPE INDICATES TO BE DEMOLISHED

    GENERAL NOTES:

    1

    ALL CUTTING, PATCHING & REFINISHING OF FLOORS, WALLS,

    CEILINGS & ROOFING BY CONSTRUCTION MANAGER.

    2

    ALL ELECTRICAL DEVICES AND ASSOCIATED CONDUIT AND WIRING

    SHOWN ON DEMOLITION PLANS SHALL BE REMOVED UNLESS

    OTHERWISE NOTED.

    3

    ALL LIGHT FIXTURES AND ASSOCIATED CONDUIT AND WIRING

    SHALL BE REMOVED FROM PENTHOUSE (EXCLUDING THE

    ELEVATOR MACHINE ROOM). CONFIRM EXISTING CONDITIONS ON

    SITE PRIOR TO COMMENCEMENT OF WORK.

    4

    DEVICES IDENTIFIED FOR DEMOLITION SHALL HAVE ANY CONDUIT

    AND WIRE REMOVED TO LAST POINT OF CONNECTION IN USE

    (PANELBOARD/LUMINAIRE/JUNCTION BOX). SEAL ALL

    PENETRATIONS.

    LED LINEAR STRIP LUMINAIRE, MOUNTED VERTICALLY

    DRAWING TITLE

    PROJECT TITLE

    Drawing No.

    File Name

    Scale

    Sheet of

    Checked ByCadd Check

    Drawn By

    NO. DATE REVISIONS APPR.

    Design By

    BY

    3792 NOVALEA DRIVE, HALIFAX NS

    AS NOTED

    BG

    DD PM

    2

    BG

    DR. SAMUEL PRINCE MANOR

    UST REMOVAL, BOILER

    UPGRADE AND AHU

    REPLACEMENT

    A0 07-10-2020 ISSUED FOR 50% REVIEW DDBG

    ELECTRICAL

    DEMOLITION PLAN

    AND POWER & LIGHTING PLAN

    PENTHOUSE

    NOVA SCOTIAProperty & Facilities

    EA-1

    EA-1.DWG

    1

    1

    -

    1/4"=1'-0"

    DEMOLITION PLAN - MECHANICAL PENTHOUSE

    2

    -

    1/4"=1'-0"

    POWER & LIGHTING PLAN - MECHANICAL PENTHOUSE

    A1 08-07-2020 ISSUED FOR 90% REVIEW DDBG

    KEY PLAN

    AREA OF WORK

    A2 09-16-2020 ISSUED FOR 100% REVIEW DDBG

    3

    -

    N.T.S.

    LEGEND AND GENERAL NOTES

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 31 of 347

    AutoCAD SHX TextS

    AutoCAD SHX TextS

    AutoCAD SHX TextS

    AutoCAD SHX TextDN

    AutoCAD SHX TextELEVATOR MACHINE ROOM

    AutoCAD SHX TextMECHANICAL PENTHOUSE

    AutoCAD SHX TextROOF

    AutoCAD SHX TextROOF

    AutoCAD SHX TextROOF

    AutoCAD SHX TextROOF

    AutoCAD SHX TextUP

    AutoCAD SHX TextS

    AutoCAD SHX TextS

    AutoCAD SHX TextUP

    AutoCAD SHX TextDN

    AutoCAD SHX TextELEVATOR MACHINE ROOM

    AutoCAD SHX TextMECHANICAL PENTHOUSE

    AutoCAD SHX TextROOF

    AutoCAD SHX TextROOF

    AutoCAD SHX TextROOF

    AutoCAD SHX TextROOF

    AutoCAD SHX TextS

  • LUMINAIRE SCHEDULE

    TYPE DESCRIPTION MANUFACTURER LAMP VOLTAGE

    A1

    3' LED STRIP LIGHT, FROSTED DIFFUSER, SURFACE MOUNTED TO

    UNDERSIDE OF ELEVATOR MACHINE ROOM

    SIGNIFY CFI:

    FSS330L840

    OR EQUIVALENT

    3000 LUMENS

    25 WATTS

    4000 K

    120V

    B1

    4' LED STRIP LIGHT, FROSTED DIFFUSER, CHAIN SUSPENDED TO 14'

    A.F.F.

    SIGNIFY CFI:

    FSS445L840

    OR EQUIVALENT

    5700 LUMENS

    45 WATTS

    4000 K

    120V

    B2

    4' LED STRIP LIGHT, FROSTED DIFFUSER, SURFACE MOUNTED AS

    INDICATED ON DRAWING

    SIGNIFY CFI:

    FSS445L840

    OR EQUIVALENT

    5700 LUMENS

    45 WATTS

    4000 K

    120V

    NOTES:

    1.

    ELECTRICAL EQUIPMENT SCHEDULE

    ID DESCRIPTION VOLTAGE LOAD BREAKER FEEDER CCT ID CONTROLS DISCONNECT NOTES

    MAU-1 MAKE UP AIR UNIT 208V 15HP

    90A, 3P

    (FUSED)

    3#3 + #8 BOND IN 35mmC - VFD

    100A, 3P, FUSED AT

    90A

    1

    P-4A PUMP 208V 2HP15A, 3P

    3#12 + #12 BOND IN 21mmC

    PANEL C

    -32,34,36

    VFD30A, 3P 2, 3

    P-4B PUMP 208V 2HP15A, 3P

    3#12 + #12 BOND IN 21mmC

    PANEL C

    -33,35,37

    VFD30A, 3P 2, 3

    NOTES:

    1. VFD INTEGRAL TO MAU, PROVIDED BY DIVISION 23.

    2. VFD INTEGRAL TO PUMP, PROVIDED BY DIVISION 23.

    3. FINAL CONNECTION TO EQUIPMENT SHALL BE TECK90, MAXIMUM LENGTH 3000mm.

    CONTROLS LEGEND:

    MS - MANUAL STARTER C/W OVERLOAD PROTECTION AND LOCKOUT PROVISION

    MSR-MANUAL STARTER C/W OVERLOAD PROTECTION, LOCKOUT PROVISION AND RELAY (CONFIRM

    CONTROL COIL VOLTAGE WITH MECHANICAL CONTRACTOR)

    HOA - MAGNETIC STARTER C/W DISCONNECT, CONTROL RELAYS AND HAND, OFF,AUTO SELECTOR SWITCH.

    SS - SOFT START

    VFD - VARIABLE FREQUENCY DRIVE, C/W LOCK OUT PROVISIONS

    PANEL "D" 120/208V

    225A MAINS, 35 KAIC

    60 CCT

    3#3/0 RW90 +

    #8 BOND,

    63mm PVC

    SPLITTER TROUGH

    200A, 3PH, 4W

    200A

    200A

    EXISTING 4 350MCM

    ALUMINUM TECK 90

    100A

    90A

    3#3 RW90 +

    #8 BOND,

    35mm PVC

    EXISTING

    ELEVATOR

    DISCONNECTS

    DRAWING TITLE

    PROJECT TITLE

    Drawing No.

    File Name

    Scale

    Sheet of

    Checked ByCadd Check

    Drawn By

    NO. DATE REVISIONS APPR.

    Design By

    BY

    3792 NOVALEA DRIVE, HALIFAX NS

    AS NOTED

    BG

    DD PM

    2

    BG

    DR. SAMUEL PRINCE MANOR

    UST REMOVAL, BOILER

    UPGRADE AND AHU

    REPLACEMENT

    A0 07-10-2020 ISSUED FOR 50% REVIEW DDBG

    ELECTRICAL

    SCHEDULES

    PENTHOUSE

    NOVA SCOTIAProperty & Facilities

    EA-2

    EA-2.DWG

    2

    A1 08-07-2020 ISSUED FOR 90% REVIEW DDBG

    1

    -

    N.T.S.MECHANICAL EQUIPMENT SCHEDULE

    2

    -

    N.T.S.

    PANEL SCHEDULE - PANEL 'C'

    3

    -

    N.T.S.

    LUMINAIRE SCHEDULE

    A2 09-16-2020 ISSUED FOR 100% REVIEW DDBG

    4

    -

    N.T.S.

    PARTIAL SINGLE LINE DIAGRAM

    MET20-125 UST Removal, Boiler Upgrade, AHU Replacement in Halifax Page 32 of 347

  • BLEND PUMP #1 STARTER EBP-1

    TO BE DEMOLISHED

    BLEND PUMP #2 STARTER EBP-2

    TO BE DEMOLISHED

    EXISTING 100A 208V PANEL 'F'

    TO BE DEMOLISHED

    BOILER #2 DISCONNECT EB-2

    TO BE DEMOLISHED

    BOILER #1 DISCONNECT EB-1

    TO BE DEMOLISHED

    DOMESTIC CIRCULATION

    PUMP STARTER EP-6

    200A 208V PANEL 'D' AND

    WIRING BACK TO MAIN

    SWITCHBOARD TO BE

    DEMOLISHED

    CIRCULATOR 1 STARTER EP-1

    TO BE DEMOLISHED

    CIRCULATOR 2 STARTER EP-2

    TO BE DEMOLISHED

    EB-2

    EB-1

    EP-5

    EBP-1

    EP-2

    EP-1

    EBP-2

    EP-6

    EXISTING MAIN

    SWITCHBOARD

    OIL PUMPS

    EXHAUST FAN

    EXHAUST FAN

    1 2 3

    B

    SWITCH TO BE DEMOLISHED

    STARTER SWITCHES

    TO BE DEMOLISHED

    OIL PUMP STARTER

    TO BE DEMOLISHED

    EXHAUST FAN STARTER

    SWITCH (X4) TO BE

    DEMOLISHED

    REFERENCE NOTES:

    EXISTING FEEDERS AND CONDUIT BACK TO SWITCHBOARD SHALL

    BE DEMOLISHED.

    1

    1

    BP-1 208V 30A DISCONNECT

    BP-2 208V 30A DISCONNECT

    B-2 120V 30A DISCONNECT

    B-1 120V 30A DISCONNECT

    P-6 120V 0.125HP STARTER

    208V, 225A, 60CCT

    PANEL 'D'

    P-1A 208V 30A DISCONNECT

    P-1B 208V 30A DISCONNECT

    1

    A2 A2 A2

    A2A2A2

    A2 A2 A2

    BP-2

    BP-1

    P-5B

    P-2A

    P-1A

    P-6

    B-2

    B-1

    3

    3

    P-2B

    P-1B

    P-5A

    P-2A 208V 30A DISCONNECT

    P-2B 208V 30A DISCONNECT

    P-5A 208V 30A DISCONNECT

    P-5B 208V 30A DISCONNECT

    2

    EXISTING MAIN

    SWITCHBOARD

    REFERENCE NOTES: