metropolitan park - amazon web services · public realm incorporate nature connectivity embrace...
TRANSCRIPT
METROPOLITAN PARK PHASES 6 / 7 / 8
County Board Hearing14 DECEMBER 2019
/ 2County Board Hearing / 14 December 2019 METROPOLITAN PARK PHASES 6 / 7 / 8
PART OF THE NEIGHBORHOOD, NOT A CAMPUS
Engage the Neighborhood
Enrich the Public Realm
Incorporate Nature
Connectivity Embrace Diversity in the Built Environment
Open & Welcoming
Celebrate the Unique Aspects of the Site
Be Resilient Be Accessible Delight and Surprise
/ 3METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
500 feet500 feet
REAGANNATIONAL AIRPORT
POTOMACRIVER
LONG BRIDGEPARK
PENTAGON
INTERSTATE 395
PENTAGONCENTER
FASHION CENTER
MALL
U.S
... R
OU
TE
1
VIRGINIAHIGHLANDS
PARKCRYSTAL CITY585,000 SF / Stage I
PEN PLACE2.1 Million SF / Stage III
METROPOLITAN PARK2.1 Million SF / Stage II
10 MIN.
5 MIN.
15 MIN.
CONTEXT / PATH OF GROWTH
WALK
WALK
WALK
PHASE 6 / 7 / 8
/ 4METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
CONTEXT / METROPOLITAN PARK
/ 5METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
DESIGN / MASSING APPROACH
/ 6METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
DESIGN / MASSING APPROACH
/ 7METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
DESIGN / MASSING APPROACH
/ 8METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
DESIGN / MASSING APPROACH
/ 9METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
DESIGN / MASSING APPROACH
/ 10METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
DESIGN / MASSING APPROACH
/ 11METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
DESIGN / MASSING APPROACH
/ 12METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
DESIGN / METROPOLITAN PARK EVOLUTION
13
Framework Plan
Lower building elements along South Fern Street
Three tall buildings in theproject core will anchor the site and compliment existing development to the east
Lower building heights at 15th street will complimentresidential development on the opposite side of the streetand provide variety at the site edges
Revised as of February 10, 2004
APPROVED DESIGN GUIDELINES FRAMEWORK PLAN
PROPOSED DESIGN GUIDELINES FRAMEWORK PLAN
MET PARK - TAPERINGJune 27, 2019
The
Gra
mer
cyTh
e Ac
adia
The
Mill
enni
umThe Bartlett
Phase 7/8Phase 6
The
Gra
mer
cyTh
e Ac
adia
The
Mill
enni
um
The BartlettPhase 7/8
Phase 6
22stories
22 stories
18stories
11
4 stories
3 stories
14stories
2
38
2
3
13
18stories
3 11 18
APPROVED DESIGN GUIDELINES FRAMEWORK PLAN
PROPOSED DESIGN GUIDELINES FRAMEWORK PLAN
MET PARK - TAPERINGJune 27, 2019
The
Gra
mer
cyTh
e Ac
adia
The
Mill
enni
um
The BartlettPhase 7/8
Phase 6
The
Gra
mer
cyTh
e Ac
adia
The
Mill
enni
um
The BartlettPhase 7/8
Phase 6
22stories
22 stories
18stories
11
4 stories
3 stories
14stories
2
38
2
3
13
18stories
3 11 18
APPROVED DESIGN GUIDELINES FRAMEWORK PLAN
PROPOSED DESIGN GUIDELINES FRAMEWORK PLAN
MET PARK - TAPERINGJune 27, 2019
The
Gra
mer
cyTh
e Ac
adia
The
Mill
enni
um
The BartlettPhase 7/8
Phase 6
The
Gra
mer
cyTh
e Ac
adia
The
Mill
enni
um
The BartlettPhase 7/8
Phase 6
22stories
22 stories
18stories
11
4 stories
3 stories
14stories
2
38
2
3
13
18stories
3 11 18
APPROVED DESIGN GUIDELINES FRAMEWORK PLAN
PROPOSED DESIGN GUIDELINES FRAMEWORK PLAN
MET PARK - TAPERINGJune 27, 2019
The
Gra
mer
cyTh
e Ac
adia
The
Mill
enni
um
The BartlettPhase 7/8
Phase 6
The
Gra
mer
cyTh
e Ac
adia
The
Mill
enni
umThe Bartlett
Phase 7/8Phase 6
22stories
22 stories
18stories
11
4 stories
3 stories
14stories
2
38
2
3
13
18stories
3 11 18
APPROVED JUNE 28, 2016ORIGINAL PROPOSEDThe B
artlett
The Bartlett
Phase 4
/5Th
e G
ram
ercy
The
Gra
mer
cy
Pha
se 1
NEW PUBLIC OPEN SPACE - 61,200 SF NEW PUBLIC OPEN SPACE - 64,300 SF
Phase 6
Phase 6
Phase 6
The
Mill
enni
um
The
Mill
enni
um
Pha
se 2
Phase 7/8
Phase 7/8
Phase 7/8
The
Aca
dia
The
Aca
dia
Pha
se 3
Height Concentration
Planned Park Extents
New Public Open Space
/ 13METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
RETAILRETAIL
DAY CARE
BIKEBIKE
LOADING
LOADING
PAR
KIN
G
LOBBY
EV
EN
T
B.O.H..........
RE
TAIL
LOBBY
RE
TAIL
KIO
SK
PARKING
LOBBY
DESIGN / GROUND FLOOR
MET 7/8 MET 6
SOUTH FERN STREET
SOUTH FAIR STREET
EAST ELM STREET
SOUTH ELM STREET SOUTH ELM STREET
15T
H S
TR
EE
T S
OU
TH
13T
H S
TR
EE
T S
OU
TH
14T
H S
TR
EE
T
THE GRAMERCY(EXISTING RESIDENTIAL) THE MILLENNIUM
(EXISTING RESIDENTIAL)THE ACADIA
(EXISTING RESIDENTIAL)
THE BARTLETT(EXISTING RESIDENTIAL)OPEN
SPACE
OPENSPACE
PARKEXTENSION
SOUTH EADS STREET
12T
H S
TR
EE
T S
OU
TH
/ 14METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
DESIGN / RETAIL CONCEPTS
Full Service Restaurants
Quick-Service Restaurants & Cafes
Coffee & Specialty FoodsDog Care
Fitness / Service
MET 7/8 MET 6
SOUTH FERN STREET
SOUTH FAIR STREET
SOUTH ELM STREET SOUTH ELM STREET
15T
H S
TR
EE
T S
OU
TH
13T
H S
TR
EE
T S
OU
TH
12T
H S
TR
EE
T S
OU
TH
THE GRAMERCY(EXISTING RESIDENTIAL) THE MILLENNIUM
(EXISTING RESIDENTIAL)THE ACADIA
(EXISTING RESIDENTIAL)
THE BARTLETT(EXISTING RESIDENTIAL)
SOUTH EADS STREET
/ 15METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
PARK EXTENSION(24,400 SF / 0.56 ACRES)OPEN
SPACE(14,700 SF)
OPEN SPACE (6,400 SF)
LINEAR PARK (8,600 SF)LINEAR PARK (10,200 SF)
PARK(13,500 SF / 0.31 ACRES)
CENTRAL GREEN(57,900 SF / 1.33 ACRES)
LINEAR PARK (5,000 SF)
PARK(12,600 SF / 0.29 ACRES)
CAFE SEATING(14,600 SF)
EAST ELM STREET(FLUSH CURB)
Pentagon City Mall
Crystal City
NEW PUBLIC OPEN SPACE
NEW STREETSPACE
EXISTING PUBLIC OPEN SPACE
CAFE SEATINGZONE
POST 4.1 PARK MASTERPLAN
14TH
STR
EE
T SO
UTH
(F
LUS
H C
UR
B)
DESIGN / OPEN SPACE
/ 16METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
DESIGN / OPEN SPACE
Mets 678 Design Update | 8 February 2019OPEN SPACE DESIGNSTUDIO39
Plaza: Precedent Imagery
FESTIVE EVENINGS SUNNY SEATING GARAGE ACCESS
URBAN RESPITE
MOVIE LAWN
PASSIVE USE LAWN
FOOD TRUCK PARKING
CREATIVE SEATING
SHADY SEATING
GAMES + RECREATION
ENGAGING LANDFORMS
10
/ 17METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
OPEN SPACE / TERRACES
PENTHOUSE
GREEN ROOFLEVEL 12
TERRACELEVEL 4
TERRACELEVEL 15
RO
OF
LE
VE
L 2
2TERRACELEVEL 19
CAFE TERRACELEVEL 3
CAFE TERRACELEVEL 3
TERRACELEVEL 19
GREEN ROOFLEVEL 19
DO
G P
AR
KL
EV
EL
14
GR
EE
N R
OO
FL
EV
EL
4
DOG PARK LEVEL 9
PENTHOUSE
ROOF LEVEL 22
GREEN ROOF
LEVEL 12
GREEN ROOF
LEVEL 4
GREEN ROOF
LEVEL 4
PARK EXTENSION
OPENSPACE
OPENSPACE
/ 18METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
DESIGN / TRANSPORTATION
Met 7/8 Met 6 The Bartlett
Eads Street
15th
Str
eet
N
• 2,800 linear feet (0.53 miles) of upgraded protected bike lanes
• 3 new protected intersections along S. Eads Street (13th-15th)
/ 19METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
TRANSPORTATION / PARKING AND TDM MEASURES
• Office parking ratio amongst the lowest in the county (1 /1,125)
• Employees will receive a monthly commuter benefit to allow them to take advantage of the area’s public transportation system
• Carpool/Vanpool parking will be provided free of charge and located in convenient locations
• 2% of spaces will be reserved for electric vehicles and provided with charging stations. Building capacity is sized to accomodate increased demand.
• Employees will be charged for parking. SOVs will have the highest out-of-pocket commuting costs
• Bicycle storage and shower/locker facilities are located on ground floor and exceed county standards
• Annual contributions to Arlington County Commuter Services & ongoing work with Arlington Transportation Partners
DESIGN / 15TH & EADS
/ 20METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
DESIGN / 15TH & ELM
/ 21METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
DESIGN / CORNER OF 15TH & EADS
/ 22METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
DESIGN / EADS STREET RETAIL
/ 23METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
DESIGN / 14TH STREET GATEWAY
/ 24METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
DESIGN / 14TH STREET FROM CENTRAL GREEN
/ 25METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
DESIGN / VIEW NORTH FROM THE PLAZA
/ 26METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019
/ 27County Board Hearing / 14 December 2019 METROPOLITAN PARK PHASES 6 / 7 / 8
100
0
10
20
30
40
50
60
70
80
90
4.1 Submission Current
GOLD
PLATINUM
WATER
ENERGY
LOCATION
ENVIRONMENT
SUSTAINABILITY / LEED UPDATE
/ 28County Board Hearing / 14 December 2019 METROPOLITAN PARK PHASES 6 / 7 / 8
50%Water
Savings
20%Energy Savings
75%Carbon
Emissions Reduction
100%Local Offsite Renewable Energy by
2030
CO2
SUSTAINABILITY / PERFORMANCE GOALS
/ 29County Board Hearing / 14 December 2019 METROPOLITAN PARK PHASES 6 / 7 / 8
2020 2030 2040 2050
2035 100% Renewable
2024 80% Renewable
2030 100% Renewable
2040 Net Zero Carbon
2050 Carbon Neutral
SUSTAINABILITY / CLIMATE PLEDGE
ALIGNED ON CLIMATE GOALS
Arlington County Community Energy Plan
Amazon Climate Pledge
/ 30County Board Hearing / 14 December 2019 METROPOLITAN PARK PHASES 6 / 7 / 8
Affordable Housing /
Open Space /
Transportation /
Retail /
Meeting Space /
Sustainability /
Contribution towards the creation or preservation of local affordable housing.
1.5 acres of new public open space and improvements to the existing Metropolitan Park.
Transportation improvements including half a mile of protected bike lanes and pedestrian friendly intersection improve-ments.
69,000 SF of new retail including a daycare for 160 children.
County use of 700 person meeting center.
LEED Platinum buildings powered by 100% renewable energy by 2030.
COMMUNITY BENEFITS / SUMMARY
/ 31County Board Hearing / 14 December 2019 METROPOLITAN PARK PHASES 6 / 7 / 8
AMAZON’S ENGAGEMENT IN THE COMMUNITY
/ 32County Board Hearing / 14 December 2019 METROPOLITAN PARK PHASES 6 / 7 / 8
Require the highest labor standards from our project partners to deliver results for all workers and businesses and establish the process and controls to demonstrate positive economic impact.
Competitive Wages
Local Participation
Ensure Compliance
PROJECT LABOR OBJECTIVES
DESIGN / VIEW NORTH FROM THE PLAZA
/ 33METROPOLITAN PARK PHASES 6 / 7 / 8 County Board Hearing / 14 December 2019