Track Occupation Protocol
L1-XXX-XXX-
XXXRevision: 02
Effective from xx April
2011
Page 1 of 20
Approval
Name Position Signature/Date
Compiled
byDocument
Author
Bill
KreykesAdam
Graves
Network Program
Planning Manager,
Timetables
Endorsed by(Author)
Bill Kreykes Manager,Timetables
Approval Norm Grady NetworkPlanning andDevelopmentManager
Style Definition: Heading 3 Char:Font: 11 pt, Not Bold, Font color: Auto
Style Definition ... [1]
Style Definition ... [2]
Style Definition ... [3]
Style Definition ... [4]
Style Definition ... [5]
Style Definition ... [6]
Style Definition ... [7]
Style Definition ... [8]
Style Definition ... [9]
Style Definition ... [10]
Style Definition: Heading 3: Font: 11pt, Not Bold, Font color: Auto, Linespacing: Multiple 1.15 li, Outlinenumbered + Level: 3 + NumberingStyle: 1, 2, 3, + Start at: 1 +
Alignment: Left + Aligned at: 0 cm +Tab after: 1.27 cm + Indent at: 1.27cm
Style Definition: Heading 2: Font: 11pt, Font color: Auto, Space Before: 10pt, Line spacing: Multiple 1.15 li,Outline numbered + Level: 2 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 0 cm+ Tab after: 1.27 cm + Indent at:1.27 cm
Style Definition: Heading 1: Font: 12pt, Font color: Auto, Space Before: 8pt, Line spacing: Multiple 1.15 li,Outline numbered + Level: 1 +Numbering Style: 1, 2, 3, + Start at:0 + Alignment: Left + Aligned at: 0 cm+ Tab after: 1.27 cm + Indent at:
1.27 cm
Style Definition: Normal: Indent:Left: 1.27 cm, Space Before: 6 pt,
After: 6 pt, Line spacing: Multiple 1.15li
Formatted: Font: 12 pt, Underline
Formatted: Heading 1
Formatted: Font: Not Bold
Formatted: Normal, Left
Formatted Table
Formatted: Table Heading
Formatted: Font: Not Bold
Formatted: Font: Not Bold
Formatted: Font: Not Bold
Formatted: Table Heading, Left
-
7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003
2/22
Metropol itan Railway Network
Track Occupation Protocol
L1-XXX-XXX-
XXXRevision: 02
Effective from xx April
2011
Page 2 of 20
Document
Endorsers
Scott Short
Manager Network
Scheduling and
Strategy
Karen WilsonCommercial
Contracts Manager
Approving
ManagerRobb van Toledo
Manager NetworkPlanning and
Development
Amendment Record
Approval Date Vers ion Descript ion
xx April 2011 01
1. Initial issue under MTM. Replace CONNEX documentcml-8.13-pr-469
2. Revised the responsibilities of various positions.
3. Reviewed and revised the Reference section.
4. Revised the format of the procedure.
5. Updated the Protocol with new SQE documentationnumbering system
6. The Commercial Department has submitted an
Access Arrangement Renewal to the Essential Services
Commission on 31 March 2011. This revision will
incorporate any changes made in the submission.
10/08/2012 02
1.6. Reviewed and revised the protocol following a peerreview.
7. Changed the frequency of the Protocol Committeemeetings.
8. Commercial Department has submitted the revisedprotocol to the Essential Services Commission forapproval and this revision incorporates changes (ifany) made by the Essential Services Commission.
Formatted: Font: 12 pt
Formatted: Heading 2
Formatted: Font: 12 pt, Underline
Formatted: Font: Not Bold
Formatted: Normal, Left
Formatted Table
Formatted: Table Text, Left
Formatted: Table Text, No bullets ornumbering
Formatted: Bullets and Numbering
-
7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003
3/22
Metropol itan Railway Network
Track Occupation Protocol
L1-XXX-XXX-
XXXRevision: 02
Effective from xx April
2011
Page 3 of 20
Table of Contents
1. Purpo se and Scope ..................................................................................................... 42. Definition ...................................................................................................................... 43. Occupation Commit tee ............................................................................................... 64. Functions of Occupation Committee ......................................................................... 65. Meetings o f the Occupations Committ ee: ................................................................. 76. Noti ce Of Track Occupations ..................................................................................... 76.1. Contents of Notice of Track Occupation ........................................................................ 7
6.2. Types of Track Occupations .......................................................................................... 7
6.3. Consideration of Notice of Track Occupation ................................................................ 8
7. Implementat ion of Track Occupation ........................................................................ 97.1. Operator's Agreement .................................................................................................... 9
7.2. Track Occupation Management ..................................................................................... 9
8. Regulat ions and Safeworkin g Ar rangement ........................................................... 109. Cancellation of Approved Track Occupations ........................................................ 1010. Job Titl es and Posi tio n Names ................................................................................. 1111. References .................................................................................................................. 1112. Documents ................................................................................................................. 1112.1. Minutes of meetings ..................................................................................................... 11
12.2. Schedules of Train Paths ............................................................................................. 11
13. Note ............................................................................................................................. 11
-
7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003
4/22
Metropol itan Railway Network
Track Occupation Protocol
L1-XXX-XXX-
XXXRevision: 02
Effective from xx April
2011
Page 4 of 20
1.Purpose and Scope Formatted: Bullets and Numbering
-
7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003
5/22
Metropol itan Railway Network
Track Occupation Protocol
L1-XXX-XXX-
XXXRevision: 02
Effective from xx April
2011
Page 5 of 20
1. Purpose
1.1. This procedure describes the processes by which all Track Occupations (other than
Mandatory Occupations) are planned and implemented on the Access Provider's
Network. It This procedure describes the implementation of the Train Operating
Protocol, Scheduling to the Track Access Agreement and the representation of the
Track Occupation Protocol Committee.
2. Scope
2.1. The scope of this procedure highlights the objective of the Track Occupation process
and associated procedures to maximise the essential work that can be carried out
within a Track Occupation, whilstwhile avoiding or minimising the delay to Services
and hence to reduce the severity and number of Track Occupations required.
2.Definition
3. Abbreviations and Acronyms
PTV: Public Transport Victoria - a statutory department established under the
Transport Act - formerly the Department of Transport (DoT).
VLP: V/Line Pty Ltd, Bourke Street, Melbourne. It is the regional public transport
operator in the State of Victoria.
4. Definitions
Access Agreement: An agreement between an Operator and the Access Provider
pursuant to which the Operator is given access to the Access Provider's Network.
Access Provider: Metro Trains Melbourne (MTM).
Director:The Director of Public Transport under the Transport Act.
Lease Agreement:The lease titled Infrastructure Lease Train between the
Director, VicTrack and the Access Provider dated 31 August 2009, as amended.
Mandatory Occupation :A Track Occupation by the lessor of the Access Provider's
Network occurring pursuant to the Lease Agreement.
Formatted
Formatted: Indent: Left: 0 cm,Hanging: 1.27 cm, Space Before: 0 pt,Outline numbered + Level: 2 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Tab stops: 1.27 cm, List tab+ Not at 2.54 cm
Formatted
Formatted
Formatted: Font: Arial
Formatted
Formatted
Formatted: Bullets and Numbering
Formatted: Font: Bold
Formatted: Font: Bold
Formatted: Font: 11 pt
Formatted: Font: 11 pt
Formatted: Font: Bold
-
7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003
6/22
Metropol itan Railway Network
Track Occupation Protocol
L1-XXX-XXX-
XXXRevision: 02
Effective from xx April
2011
Page 6 of 20
Metropolitan Master Timetable:In relation to the Access Provider's Network, the
timetable showing all Scheduled Train Paths for Trains on the Network, as amended
from time to time by the Access Provider.
Network: In relation to the Access Provider, the land and infrastructure leased by the
Access Provider under its Lease Agreement from time to time, including all rail trackand support infrastructure, electrical infrastructure for traction and other power
including overhead lines and lighting systems, signalling systems for regulating and
control of traffic, communication systems for operational and administrative purposes
including passenger information, bridges, culverts, pedestrian overpasses and
underpasses, equipment relating to car parks and control centres for the control of
power, signalling and traffic operations, but excluding:
Formatted: Font: Bold
Formatted: Font: Italic
-
7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003
7/22
Metropol itan Railway Network
Track Occupation Protocol
L1-XXX-XXX-
XXXRevision: 02
Effective from xx April
2011
Page 7 of 20
buildings
Buildings (including stations, platforms, stops, advertising hoarding, sheds and
shelters);
carCar parks;
terminalsTerminals, storage and receival facilities;
workshopsWorkshops, locomotive depots and fuel points; and
privatePrivate sidings that are not leased to the Access Provider, but includes
any infrastructure leased to the Access Provider which passes through, or is
immediately adjacent to, any of the infrastructure or facilities referred to in
paragraphs (a) to (e) above.
Operator: A person operatingTrainstrains on the Access Provider's Network, other
than the Access Provider.
DoT: Department of Transport, a statutory department established under the
Transport Act.
Rolling Stock: Any vehicle that operates on or /uses a railway track including a
locomotive, light inspection vehicle, road/rail vehicle, trolley, carriage, diesel multiple
unit and wagon (but does not include a vehicle designed to operate both on and off a
railway track when the vehicle is not operating on a railway track).
Scheduled Train Paths:In relation to the Access Provider's Network, an Operator's
or the Access Provider's Train Paths on the Network set out in the Metropolitan
Master Working Timetable, as those Scheduled Train Paths are permanently varied
from time to time.
Service:A service for the carrying of freight or passengers by railway provided by the
Access Provider or an Operator on the Access Provider's Network.
Track Occupation: In relation toAbsolute Occupation of a defined section ofthe
Access Provider's Network, access in order to carry out inspections, repairs,
Formatted: Indent: Left: 1.27 cm,Bulleted + Level: 1 + Aligned at: 1.9cm + Tab after: 2.54 cm + Indent at:2.54 cm, Tab stops: 1.9 cm, List tab +
Not at 2.54 cm
Formatted: Left
-
7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003
8/22
Metropol itan Railway Network
Track Occupation Protocol
L1-XXX-XXX-
XXXRevision: 02
Effective from xx April
2011
Page 8 of 20
maintenance, up-grade work, improvements, additions or any other works which
could interfere with the Access Provider's or an Operator's Services on the Network.
Train:Rolling Stock coupled together to operate as a single unit.
TrainPath:The particular time interval, including an entry time and day and an exit
time and day, through which aTraintrainmay travel over a segment of the AccessProvider's Network from an origin to a destination and may include stopping points.
5. VLP: V/Line Pty Ltd , Bourke Street,Roles and Responsibili ties
The Manager - Network Planning and Development, Metro Trains Melbourne. It is
(MTM), and any party seeking access to theregional public transport operatorMTM
Network are responsible to ensure all roles and responsibilities identified in the State
of Victoria.
Formatted: Indent: Left: 0 cm
-
7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003
9/22
Metropol itan Railway Network
Track Occupation Protocol
L1-XXX-XXX-
XXXRevision: 02
Effective from xx April
2011
Page 9 of 20
this procedure are undertaken.
Copies of documents are available electronically within MTMs organisation and to
third parties on request to the Manager - Network Planning and Development. All
parties shall ensure their hard copy of this procedure is at the latest, correct, version.
Suspected errors and omissions or requests for change shall be reported to the
Manager - Network Planning and Development.
6. Process
6.1. Occupation Protocol Committee
Metro must have an OccupationsOccupation Protocol Committee comprising:
Chairperson of the Committee
Program Planning ManagerAccess/Scheduling- Operations, Metro Trains; or
delegates;
Members of the Committee:
Representatives of Metro infrastructure divisions;
One representative of each Operator;
MetroTrainsTrains Rail Safety representative
Optional Committee Attendees (as requested by the Chair)
Representatives of Metro Infrastructure divisions
MTM Project Managers for selected major projects, and;.
Rail Safety Officer, Metro Trains.
6.2. Functions of Occupation Protocol Committee
TheOccupationsOccupation Protocol Committee is a forum to enable the Access
Provider to liaise with Operators in relation to proposed Track Occupations and Track
Occupations generally so as to:. The Occupation Protocol Committee is not to be
confused with the MTM Occupations Committee, or T-12+Planning Forum, which
provide an internal forum for the planning and management of the integrated
Formatted: Font: 11 pt
Formatted: Heading 2, Indent: Left:0 cm, Hanging: 1.27 cm, Space Before:0 pt, Outline numbered + Level: 2 +
Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Keep lines together, Tabstops: 1.27 cm, List tab + Not at 2.54cm
Formatted: Font: 11 pt
Formatted: Indent: Left: 0 cm, Right:
-0.19 cm, Keep with next, Keep linestogether, Tab stops: 1.27 cm, Left
Formatted: Indent: Left: 1.9 cm,Keep with next, Keep lines together
Formatted: Bulleted + Level: 1 +Aligned at: 1.9 cm + Tab after: 2.54cm + Indent at: 2.54 cm, Keep withnext, Keep lines together
Formatted: Indent: Left: 1.9 cm
Formatted: Bullets and Numbering
Formatted: Bulleted + Level: 1 +Aligned at: 1.9 cm + Tab after: 2.54cm + Indent at: 2.54 cm
Formatted: Bulleted + Level: 1 +Aligned at: 1.9 cm + Tab after: 2.54
cm + Indent at: 2.54 cmFormatted: Bullets and Numbering
Formatted: Font: 11 pt
Formatted: Heading 2, Indent: Left:0 cm, Hanging: 1.27 cm, Space Before:0 pt, Outline numbered + Level: 2 +
Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Tab stops: 1.27 cm, List tab+ Not at 2.54 cm
Formatted: Font: 11 pt
-
7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003
10/22
Metropol itan Railway Network
Track Occupation Protocol
L1-XXX-XXX-
XXXRevision: 02
Effective from xx April
2011
Page 10 of 20
Occupations Schedule. The function of the Occupation Protocol Committee is
explained in section 6.2.1 6.2.3.
6.2.1. Enable Operators to communicate their interests in Track Occupation planning and
implementation to the Access Provider.
6.2.2. Facilitate agreement being reached between the Access Provider and an Operator onany aspect of a planned Track Occupation where the Operator's Access Agreement
provides that the Operator's agreement is required in relation to that aspect of the
planned Track Occupation before it can be implemented; and.
6.2.3. Otherwise facilitate agreement between the Access Provider and all Operators on
matters relating to Track Occupations including the following (recognising that such
matters are ultimately in at the discretion of the Access Provider, subject to any
Access Agreement):
theThe number of Track Occupations taken on any line section in any one year;
theThe timing of Track Occupations and amendments made to the Operator's
Scheduled Train Paths as a consequence of Track Occupations;
leadThe times for requesting Track Occupations and providing detailed works
plans for Track Occupations.
Formatted
Formatted: Indent: Left: 0 cm,Hanging: 1.27 cm, Space Before: 0 pt,Outline numbered + Level: 3 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.9
cm + Tab after: 3.81 cm + Indent at:2.79 cm, Tab stops: Not at 3.81 cm
Formatted
Formatted
Formatted
Formatted: Indent: Left: 0 cm,Hanging: 1.27 cm, Space Before: 0 pt,Outline numbered + Level: 3 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.9cm + Tab after: 3.81 cm + Indent at:2.79 cm, Tab stops: Not at 3.81 cm
Formatted
Formatted
Formatted: Normal, Indent: Left:1.27 cm, Space Before: 0 pt, Bulleted+ Level: 1 + Aligned at: 1.9 cm + Tabafter: 2.54 cm + Indent at: 2.54 cm,Tab stops: 1.9 cm, List tab + Not at2.54 cm
Formatted: Normal, Indent: Left:1.27 cm, Space Before: 0 pt, Bulleted+ Level: 1 + Aligned at: 1.9 cm + Tabafter: 2.54 cm + Indent at: 2.54 cm,Tab stops: 1.9 cm, List tab + Not at2.54 cm
Formatted: Normal, Indent: Left:1.27 cm, Space Before: 0 pt, Bulleted+ Level: 1 + Aligned at: 1.9 cm + Tab
after: 2.54 cm + Indent at: 2.54 cm,Tab stops: 1.9 cm, List tab + Not at2.54 cm
-
7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003
11/22
Metropol itan Railway Network
Track Occupation Protocol
L1-XXX-XXX-
XXXRevision: 02
Effective from xx April
2011
Page 11 of 20
6.3. Meetings of the OccupationsOccupation Protocol Committee:
The Occupations Committee will meet weekly at a time and place advised by the
Access Provider to all members of the Occupations Committee.
The Occupation Protocol Committee will meet on a frequency to be determined by
the membership but at intervals not greater than monthly. The recommended
frequency is fortnightly. Any urgent or important matters will continue to be
communicated via email.
6.4. Notice OfofTrack Occupations
Subject to section 6.2, If the Access Provider wishes to have a Track Occupation on
the relevant Access Provider's Network, the Access Provider must notify each
Operatorwho haswith access pursuant to Scheduled Train Paths to any part of the
Network which is the subject of the proposed Track Occupation a reasonable timeprior to the Track Occupation being implemented (or if relevant lead times for all
Track Occupations have been agreed by the OccupationsOccupation Protocol
Committee, in accordance with such agreed lead times).
6.5. Contents of Notice of Track Occupation
Any notice of a Track Occupation must specify:
the areaArea of the proposed Track Occupation (the boundaries of which are not
necessarily limited to the work site and may extend to signalling boundaries or
locations whereTrainstrains can switch to another track or route);
the timingTiming of the proposed Track Occupation; and
the conditionsConditions under which the relevant works will be carried out as
listed in section 6.2 below.:
6.2.Types of Track Occupations
Formatted: Font: 11 pt
Formatted: Heading 2, Indent: Left:0 cm, Hanging: 1.27 cm, Space Before:0 pt, Outline numbered + Level: 2 +
Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Tab stops: 1.27 cm, List tab+ Not at 2.54 cm
Formatted: Font: 11 pt
Formatted: Font: 11 pt
Formatted: Font: 11 pt
Formatted: Heading 2, Indent: Left:0 cm, Hanging: 1.27 cm, Space Before:0 pt, Outline numbered + Level: 2 +
Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Tab stops: 1.27 cm, List tab+ Not at 2.54 cm
Formatted: Font: 11 pt
Formatted: Font: 11 pt
Formatted: Indent: Left: 0 cm,Hanging: 1.27 cm, Space Before: 0 pt,Outline numbered + Level: 2 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Tab stops: 1.27 cm, List tab+ Not at 2.54 cm
Formatted: Indent: Left: 1.27 cm,Bulleted + Level: 1 + Aligned at: 1.9cm + Tab after: 2.54 cm + Indent at:2.54 cm, Tab stops: 1.9 cm, List tab +Not at 2.54 cm
Formatted: Bullets and Numbering
-
7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003
12/22
Metropol itan Railway Network
Track Occupation Protocol
L1-XXX-XXX-
XXXRevision: 02
Effective from xx April
2011
Page 12 of 20
Infrastructure work may be carried out under any of the following conditions:
6.2.1.Under Own Protection (Non-Occupation)
Infrastructure work may be performed between Scheduled Train Paths. It is common
for work to be done in this manner without affecting Train running, however,at times,
some delays may arise from reducing speed through or around the work site.
(i) Closedown Track Occupation
A Closedown Track Occupation is a major prolonged Track Occupation that
impacts onServices conducted at the following times:
Formatted: Bullets and Numbering
Formatted: Heading 4, Indent: Left:1.9 cm, Space Before: 0 pt, Tab stops:2.86 cm, Left
Formatted: Indent: Left: 2.86 cm,Tab stops: 2.86 cm, Left
-
7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003
13/22
Metropol itan Railway Network
Track Occupation Protocol
L1-XXX-XXX-
XXXRevision: 02
Effective from xx April
2011
Page 13 of 20
Trains arriving or /departing from Richmond Station or North Melbourne
Station between 0701 hours and 0930 hours; or
Trains arriving or /departing Richmond Station or North Melbourne
Station between 1501 hours and 1900 hours.
(ii) Total Track Occupation and All Lines Closed
A Total Track Occupation is a Track Occupation of all tracks, or the track on
single lines, with no alternative route around the work site.
(iii) Diversion
A Diversion occurs when Track Occupations occur in multiple track areas,
(i.e. 2two or more tracks) where alternative routing can be set up around the
work site using unaffected adjacent tracks.
(iv) Re-routing
Re-routing occurs when it becomes necessary to operateTrainstrains via an
alternative rail corridor to reach their normal destinations. This may arise
from a Track Occupation closing all lines or where there is insufficient track
capacity to divert allTrainstrains past the work site, hence requiring some
Trainstrains to be re-routed.
6.2.6.Booking Out (Non Occupation)
This process is applied for urgent or short notice work and involves the supervisor of
the works arranging with signallers to re-route Trains or to prevent Trains proceeding
whilst works are in progress.
In each case the impact to Services will vary and where a Track Occupation is
necessary the impact will depend on any specific conditions which may apply to the
Track Occupation.
Formatted: Indent: Left: 2.86 cm,Bulleted + Level: 1 + Aligned at: 1.9cm + Tab after: 2.54 cm + Indent at:2.54 cm, Tab stops: 3.49 cm, List tab+ Not at 2.54 cm
Formatted: Heading 4, Indent: Left:1.9 cm, Space Before: 0 pt, Tab stops:2.86 cm, Left
Formatted: Indent: Left: 2.86 cm,Tab stops: 2.86 cm, Left
Formatted: Heading 4, Indent: Left:1.9 cm, Space Before: 0 pt, Tab stops:2.86 cm, Left
Formatted: Indent: Left: 2.86 cm,Tab stops: 2.86 cm, Left
Formatted: Heading 4, Indent: Left:1.9 cm, Space Before: 0 pt, Keep linestogether, Tab stops: 2.86 cm, Left
Formatted: Indent: Left: 2.86 cm,Keep with next, Keep lines together,Tab stops: 2.86 cm, Left
Formatted: Bullets and Numbering
-
7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003
14/22
Metropol itan Railway Network
Track Occupation Protocol
L1-XXX-XXX-
XXXRevision: 02
Effective from xx April
2011
Page 14 of 20
6.6. Consideration of Notice of Track Occupation
Any notice of/change to a Track Occupation must be reviewed and discussed at a
subsequent meeting of the OccupationsOccupation Protocol Committee.
Formatted: Font: 11 pt
Formatted: Indent: Left: 0 cm,Hanging: 1.27 cm, Space Before: 0 pt,Outline numbered + Level: 2 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Tab stops: 1.27 cm, List tab+ Not at 2.54 cm
Formatted: Left
-
7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003
15/22
Metropol itan Railway Network
Track Occupation Protocol
L1-XXX-XXX-
XXXRevision: 02
Effective from xx April
2011
Page 15 of 20
7. Implementation of Track Occupation
7.1. Operator's Agreement
The Access Provider may only implement a Track Occupation:
If permitted, and on the conditions set, by any relevant Access Agreement; and
On the conditions (if any) to which it and all Operators affected by the Track
Occupation have agreed to in the OccupationsOccupation Protocol Committee in
accordance with Function ofOccupationsOccupation Protocol Committee.
7.2. Track Occupation Management
The management of With respect toTrack Occupations on the Access Provider'sNetwork is provided by the Manager, Access/Scheduling and the Manager, Rail
Safety of, the Access Provider, who are is responsible for the following:items outlined
in sections 7.2.1 7.2.8.
7.2.1. To document and maintain current Track Occupation requests and approved Track
Occupations;.
7.2.2. To determineTraintrain movements to and /from Track Occupation sites in
conjunction with the affected Operators;.
7.2.3. To arrange with Operators for worksTraintrainand track machine movements
associated with the Track Occupation;.
7.2.4. To maintain a works order registration system;.
Formatted: Font: Arial, 12 pt
Formatted: Indent: Hanging: 1.27cm, Space Before: 6 pt, Don't addspace between paragraphs of the samestyle, Outline numbered + Level: 1 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 0.63cm + Tab after: 1.27 cm + Indent at:1.27 cm, Tab stops: Not at 1.27 cm
Formatted: Font: 11 pt
Formatted: Indent: Left: 0 cm,Hanging: 1.27 cm, Space Before: 0 pt,Outline numbered + Level: 2 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Tab stops: 1.27 cm, List tab+ Not at 2.54 cm
Formatted: Left, Indent: Left: 1.27cm, Bulleted + Level: 1 + Aligned at:1.9 cm + Tab after: 2.54 cm + Indentat: 2.54 cm, Tab stops: 1.9 cm, Listtab + Not at 2.54 cm
Formatted: Font: 11 pt
Formatted: Indent: Left: 0 cm,Hanging: 1.27 cm, Space Before: 0 pt,Outline numbered + Level: 2 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Tab stops: 1.27 cm, List tab+ Not at 2.54 cm
Formatted
Formatted ... [11]
Formatted
Formatted
Formatted ... [12]
FormattedFormatted
Formatted
Formatted
Formatted ... [13]
Formatted
Formatted
Formatted
Formatted ... [14]
Formatted
-
7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003
16/22
Metropol itan Railway Network
Track Occupation Protocol
L1-XXX-XXX-
XXXRevision: 02
Effective from xx April
2011
Page 16 of 20
7.2.5. To determine safe workingSafeWorking requirements of a Track Occupation and
obtain all necessary approvals;.
7.2.6. To undertake the necessary steps for any Variations to timetables required due to a
Track Occupation;
7.2.7. To prepare and issue the necessaryTraintrainnotices and circulars; and.
7.2.8. To record key performance indicators, (e.g. overruns, cancelled Track Occupations
and Train delays).
Formatted
Formatted: Heading 2, Indent: Left:0 cm, Hanging: 1.27 cm, Space Before:0 pt, Outline numbered + Level: 3 +
Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.9cm + Tab after: 3.81 cm + Indent at:2.79 cm, Tab stops: Not at 3.81 cm
Formatted
Formatted
Formatted
Formatted: Heading 2, Indent: Left:0 cm, Hanging: 1.27 cm, Space Before:0 pt, Outline numbered + Level: 3 +
Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.9cm + Tab after: 3.81 cm + Indent at:2.79 cm, Tab stops: Not at 3.81 cm
Formatted
Formatted
Formatted: Heading 2, Indent: Left:0 cm, Hanging: 1.27 cm, Space Before:0 pt, Outline numbered + Level: 3 +
Numbering Style: 1, 2, 3, + Start at:
1 + Alignment: Left + Aligned at: 1.9cm + Tab after: 3.81 cm + Indent at:2.79 cm, Tab stops: Not at 3.81 cm
Formatted
Formatted
Formatted
Formatted: Heading 2, Indent: Left:0 cm, Hanging: 1.27 cm, Space Before:0 pt, Outline numbered + Level: 3 +
Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.9cm + Tab after: 3.81 cm + Indent at:2.79 cm, Tab stops: Not at 3.81 cm
Formatted
-
7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003
17/22
Metropol itan Railway Network
Track Occupation Protocol
L1-XXX-XXX-
XXXRevision: 02
Effective from xx April
2011
Page 17 of 20
8. Regulations and SafeworkingSafeWorking Arrangement
8.1. The safety of rail traffic and workers within work sites under altered Train
operationsOperations is essential and all works and Track Occupations must be
conducted in accordance with any Law from time to time and any safety requirements
as they arise.
8.2. The Manager, Rail Safety of the Access Provider is responsible for determining all
safeworkingSafeWorkingrequirements applying to each Track Occupation on the
Access Provider's Network and will arrange for their publication and distribution to the
relevant parties.
8.3. Applicable regulations and special instructions relating to Train operationsOperations
affecting a Track Occupation on the Access Provider's Network, as well as site
protection requirements for infrastructure workers, must be set out in the special
circulars and issued to the relevant parties by the Manager, Rail Safety of the Access
Provider.
8.4. The Access Provider's Manager, Rail Safety must determine all
safeworkingSafeWorkingrequirements applying to a Track Occupation and must
issue to all relevant persons involved in a Track Occupation a special circular
specifying all the applicable safeworkingSafeWorkingrequirements (including any
applicable regulations, special instructions and site protection requirements for
infrastructure workers).
9. Cancellation of Approved Track Occupations
9.1. The Access Provider may cancel a Track Occupation of which notice has been given
under this Protocol only if extreme circumstances require the cancellation and:
The works manager has informed the respective MTM Occupations Management
team and, if cancellation is to occur after the O circular has been issued, the
works manager must also inform the Access Providers Senior Network Controller
(METROL, Current Operations)
Notice is given to each affected Operator; and
Formatted: Font: 12 pt
Formatted: Indent: Hanging: 1.27cm, Space Before: 6 pt, Don't addspace between paragraphs of the samestyle, Outline numbered + Level: 1 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 0.63cm + Tab after: 1.27 cm + Indent at:1.27 cm, Keep lines together, Tab
stops: Not at 1.27 cm
Formatted: Font: 12 pt
Formatted
Formatted: Indent: Left: 0 cm,Hanging: 1.27 cm, Space Before: 0 pt,Outline numbered + Level: 2 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Keep lines together, Tabstops: 1.27 cm, List tab + Not at 2.54cm
Formatted
Formatted
Formatted
Formatted
Formatted: Indent: Left: 0 cm,Hanging: 1.27 cm, Space Before: 0 pt,Outline numbered + Level: 2 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Tab stops: 1.27 cm, List tab+ Not at 2.54 cm
Formatted
Formatted
Formatted
Formatted
Formatted ... [15]
Formatted
FormattedFormatted
Formatted
Formatted ... [16]
Formatted
Formatted
Formatted
Formatted: Font: 12 pt
Formatted ... [17]
Formatted
Formatted ... [18]
-
7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003
18/22
Metropol itan Railway Network
Track Occupation Protocol
L1-XXX-XXX-
XXXRevision: 02
Effective from xx April
2011
Page 18 of 20
If VLP is an affected Operator and is not given notice of the cancellation ator
/earlier than midday on the day which is eight days before the day of the
cancelled Track Occupation, the Access Provider agrees to reimburse VLP for
any direct costs incurred by such parties in planning for alternative means of
transport for their passengers for the period of the planned Track Occupation
upon proof of such costs being incurred being provided.
If an occupation is to be cancelled at late notice, the works manager must inform the
respective Projects or Infrastructure Occupations Management. If this occurs after the
O circular has been issued, the works manager must also inform METROL and MTM
operations.
9.2 Parties responsible for a Track Occupation or other parties undertaking
supplementary works within a Track Occupation must ensure the appropriate
resourcing of their activities is made, including the supply of locomotives and
Traintrain crews to undertake the planned works.
Formatted: Indent: Left: 1.27 cm,Bulleted + Level: 1 + Aligned at: 1.9cm + Tab after: 2.54 cm + Indent at:2.54 cm, Tab stops: 1.9 cm, List tab +Not at 2.54 cm
Formatted: Normal, Indent: Hanging:1.27 cm, Right: -0.19 cm, SpaceBefore: 0 pt
-
7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003
19/22
METROPOLITAN RAILWAY NETWORK
TRACK OCCUPATION PROTOCOL
L2-NPD-PRO-001 Version: 1 Effective from: 10/08/2012
Approving Manager: Manager Network Planning andDevelopment
Approval Date: 10/08/2012 Next Review Date 31/07/2013
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 19of20
Formatted: Font: 8 pt
If a Track Occupation is disrupted whilstwhile it is in force due to the works
not proceeding as planned or an Operator's request, due to an unrelated disruption,
theAccess Providers Senior TrainNetwork Controller (METROL) responsible for the
site of the planned Track Occupation, is to be notified. A decision must then be made
by theAccess Provider s SeniorTrainNetwork Controller(METROL) in
accordance with the Train Operating Protocol to cancel the balance of the Track
Occupation or, with the concurrenceagreementfrom affected Operators, continue to
run the Track Occupation but with an extended Variation to the timetable for the
affected Trainstrains.
10. Job Titles and Posit ion Names
A reference to a position or title refers also to any replacement for that position or title
or any person fulfilling substantially the same role.
11.References
11. Records and Enquiry
Nil.
12. Related Documents
To assist in the application of this Protocol, reference may be made to the following
documents:
Train Operating Protocol;
1994 Book of Rules & Operating Procedures 1994;
Addenda to the Metropolitan Master Working Timetable;
Metropolitan Master Working Timetable.
12.Documents
12.1.Minutes of meetings
12.2.Schedules of Train Paths
13.Note
Formatted: Bottom: 1.5 cm, Headerdistance from edge: 1 cm, Footerdistance from edge: 0.8 cm
Formatted: Normal, Space Before: 0pt
Formatted: Font: Bold
Formatted: Font: Bold
Formatted: Font: Bold
Formatted: Font: 12 pt
Formatted: Indent: Hanging: 1.27cm, Space Before: 6 pt, Don't addspace between paragraphs of the samestyle, Outline numbered + Level: 1 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 0.63cm + Tab after: 1.27 cm + Indent at:1.27 cm, Keep lines together, Tabstops: Not at 1.27 cm
Formatted: Keep with next, Keep linestogether
Formatted: Bullets and Numbering
Formatted: Indent: Left: 1.27 cm,Bulleted + Level: 1 + Aligned at: 1.9cm + Tab after: 2.54 cm + Indent at:2.54 cm, Tab stops: 1.9 cm, List tab +Not at 2.54 cm
Formatted: Bullets and Numbering
Formatted: Bullets and Numbering
Formatted: Bullets and Numbering
-
7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003
20/22
METROPOLITAN RAILWAY NETWORK
TRACK OCCUPATION PROTOCOL
L2-NPD-PRO-001 Version: 1 Effective from: 10/08/2012
Approving Manager: Manager Network Planning andDevelopment
Approval Date: 10/08/2012 Next Review Date 31/07/2013
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 20of20
Formatted: Font: 8 pt
13.1.This version 1 of the protocol updated the changes in responsibilities and the documentdocument is re-formatted to align with the Metros new SQE documentationrequirement.
13.2.The review and amendment of this Protocol must align with the Access ArrangementRenewal carried out the Commercial Department with Essential ServicesCommission. Therefore, any future review / amendment on this Protocol internallyinternally must check and confirm with Commercial Department.
- End of Document -
L1-PRJ -PRO-003: Occupations Management Procedure.
13. References and Legislation
Nil.
Formatted: Bullets and Numbering
Formatted: Bullets and Numbering
-
7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003
21/22
Page 1: [1] Style Definition gwen.vivian
Bullets 1: Indent: Left: 0.63 cm, Hanging: 0.63 cm, Tab stops: 1.27 cm, List tab +Not at 1
cm
Page 1: [2] Style Definition gwen.vivian
Comment Subject: Indent: Left: 1.27 cm, Space Before: 6 pt, After: 6 pt, Line spacing:
Multiple 1.15 li
Page 1: [3] Style Definition gwen.vivian
Comment Text: Indent: Left: 1.27 cm, Space Before: 6 pt, After: 6 pt, Line spacing:
Multiple 1.15 li
Page 1: [4] Style Definition gwen.vivian
Balloon Text: Indent: Left: 1.27 cm, Space Before: 6 pt, After: 6 pt, Line spacing: Multiple
1.15 li
Page 1: [5] Style Definition gwen.vivian
TOC 1: Font: Arial Bold, 10 pt, Bold, Indent: Left: 1.27 cm, Space Before: 3 pt, After: 3 pt,
Line spacing: Multiple 1.15 li, Tab stops: 2.5 cm, Left + 15.98 cm, Right,Leader: +Not at
0.85 cm + 16.98 cm
Page 1: [6] Style Definition gwen.vivian
TOC 2: Font: 10 pt, Do not check spelling or grammar, Indent: Left: 1.27 cm, Space Before:
0 pt, After: 0 pt, Line spacing: Multiple 1.15 li, Tab stops: 2.5 cm, Left + 15.98 cm,
Right,Leader: +Not at 2.12 cm + 16.98 cm
Page 1: [7] Style Definition gwen.vivian
TOC 3: Font: 10 pt, Indent: Left: 1.27 cm, Space Before: 0 pt, After: 0 pt, Line spacing:
Multiple 1.15 li, Tab stops: 2.5 cm, Left + 15.98 cm, Right,Leader:
Page 1: [8] Style Definition gwen.vivian
Footer: Font: Arial Narrow, 8 pt, Centered, Space Before: 0 pt, After: 0 pt
Page 1: [9] Style Definition gwen.vivian
Header: Indent: Left: 1.27 cm, Space Before: 6 pt, After: 6 pt, Line spacing: Multiple 1.15 li
Page 1: [10] Style Definition gwen.vivian
Heading 4: Font: 11 pt, Not Bold, Underline, Space Before: 6 pt, Line spacing: Multiple 1.15
li, Outline numbered +Level: 4 +Numbering Style: 1, 2, 3, +Start at: 1 +Alignment: Left
+Aligned at: 0 cm +Indent at: 0 cm
Page 15: [11] Formatted Author
Heading 2, Indent: Left: 0 cm, Hanging: 1.27 cm, Space Before: 0 pt, Outline numbered +
Level: 3 +Numbering Style: 1, 2, 3, +Start at: 1 +Alignment: Left +Aligned at: 1.9 cm +
Tab after: 3.81 cm +Indent at: 2.79 cm, Tab stops: Not at 3.81 cm
-
7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003
22/22
Page 15: [12] Formatted Author
Heading 2, Indent: Left: 0 cm, Hanging: 1.27 cm, Space Before: 0 pt, Outline numbered +
Level: 3 +Numbering Style: 1, 2, 3, +Start at: 1 +Alignment: Left +Aligned at: 1.9 cm +
Tab after: 3.81 cm +Indent at: 2.79 cm, Tab stops: Not at 3.81 cm
Page 15: [13] Formatted Author
Heading 2, Indent: Left: 0 cm, Hanging: 1.27 cm, Space Before: 0 pt, Outline numbered +
Level: 3 +Numbering Style: 1, 2, 3, +Start at: 1 +Alignment: Left +Aligned at: 1.9 cm +
Tab after: 3.81 cm +Indent at: 2.79 cm, Tab stops: Not at 3.81 cm
Page 15: [14] Formatted Author
Heading 2, Indent: Left: 0 cm, Hanging: 1.27 cm, Space Before: 0 pt, Outline numbered +
Level: 3 +Numbering Style: 1, 2, 3, +Start at: 1 +Alignment: Left +Aligned at: 1.9 cm +
Tab after: 3.81 cm +Indent at: 2.79 cm, Tab stops: Not at 3.81 cm
Page 17: [15] Formatted Author
Indent: Left: 0 cm, Hanging: 1.27 cm, Space Before: 0 pt, Outline numbered +Level: 2 +
Numbering Style: 1, 2, 3, +Start at: 1 +Alignment: Left + Aligned at: 1.27 cm +Tab after:
2.54 cm +Indent at: 2.03 cm, Tab stops: 1.27 cm, List tab + Not
Page 17: [16] Formatted Author
Indent: Left: 0 cm, Hanging: 1.27 cm, Space Before: 0 pt, Outline numbered +Level: 2 +
Numbering Style: 1, 2, 3, +Start at: 1 +Alignment: Left + Aligned at: 1.27 cm +Tab after:
2.54 cm +Indent at: 2.03 cm, Tab stops: 1.27 cm, List tab + Not
Page 17: [17] Formatted Author
Indent: Hanging: 1.27 cm, Space Before: 6 pt, Don't add space between paragraphs of the
same style, Outline numbered +Level: 1 +Numbering Style: 1, 2, 3, + Start at: 1 +
Alignment: Left +Aligned at: 0.63 cm +Tab after: 1.27 cm +Indent at: 1.27
Page 17: [18] Formatted Author
Indent: Left: 0 cm, Hanging: 1.27 cm, Space Before: 0 pt, Outline numbered +Level: 2 +
Numbering Style: 1, 2, 3, +Start at: 1 +Alignment: Left + Aligned at: 1.27 cm +Tab after:
2.54 cm +Indent at: 2.03 cm, Tab stops: 1.27 cm, List tab + Not