Thomas C. Lambert PRESIDENT and CEO METRO BOARD OF DIRECTORS COMMITTEE MEMBERS Capital and Strategic Planning Agenda Christof Spieler, Chair Working Committee Meeting Sanjay Ramabhadran Board Room, 1900 Main, 2 nd Floor Jim Robinson Tuesday, August 18, 2015, 9:00 AM Cindy Siegel Barron Wallace Page | 1 ACTION 1. Request Board authorization for the President and CEO to execute a construction agreement with Union Pacific Railroad (UPRR) for the Harrisburg Overpass. R. Trevino 2. Request Board authorization for the President and CEO to complete the purchase agreement with the University of Houston Downtown per the memorandum of understanding dated February 17, 2011 for the North Corridor project. C. Harbert 3. Request Board authorization for the President and CEO to extend the Atkins Inc. contract term for a one (1) year optional period from September 30, 2015 to September 30, 2016. R. Trevino 4. Request Board authorization for the President and CEO to execute a sole source contractor with MACTON Corporation for the purchase of equipment needed to modify the lifts at both the Service and Inspection and Rail Operations Center maintenance facilities, to be able to hoist both the H1 and H3 light rail vehicles. R. Trevino COMMITTEE APPROVAL 5. Anticipated Procurement Report M. Kyme BRIEFINGS 6. Monthly Planning, Engineering and Construction Presentation R. Trevino 7. Unsolicited proposal for development at the Southeast Transit Center C. Harbert

Upload: others

Post on 22-Mar-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

  Thomas C. Lambert PRESIDENT and CEO

METRO BOARD OF DIRECTORS COMMITTEE MEMBERS Capital and Strategic Planning Agenda Christof Spieler, Chair Working Committee Meeting Sanjay Ramabhadran Board Room, 1900 Main, 2nd Floor Jim Robinson Tuesday, August 18, 2015, 9:00 AM Cindy Siegel Barron Wallace

Page | 1  

ACTION 1. Request Board authorization for the President and CEO to execute a construction agreement with Union Pacific

Railroad (UPRR) for the Harrisburg Overpass. R. Trevino 2. Request Board authorization for the President and CEO to complete the purchase agreement with the University

of Houston Downtown per the memorandum of understanding dated February 17, 2011 for the North Corridor project.

C. Harbert 3. Request Board authorization for the President and CEO to extend the Atkins Inc. contract term for a one (1) year

optional period from September 30, 2015 to September 30, 2016. R. Trevino 4. Request Board authorization for the President and CEO to execute a sole source contractor with MACTON

Corporation for the purchase of equipment needed to modify the lifts at both the Service and Inspection and Rail Operations Center maintenance facilities, to be able to hoist both the H1 and H3 light rail vehicles.

R. Trevino

COMMITTEE APPROVAL

5. Anticipated Procurement Report M. Kyme

BRIEFINGS 6. Monthly Planning, Engineering and Construction Presentation

R. Trevino

7. Unsolicited proposal for development at the Southeast Transit Center C. Harbert

rp14
Typewritten Text
1

Harrisburg Overpass

August 2015

Metropolitan Transit Authority of Harris County, Texas

UPRR Construction Agreement

2

Harrisburg Overpass

2

A Union Pacific Railroad (UPRR) Construction Agreement is

required to construct the Harrisburg Overpass over the UPRR

Railroad tracks located just west of Hughes Road.

Union Pacific Railroad will require METRO to pay for work

associated with this project.

Union Pacific Railroad will install new crossing panels for

revised at-grade frontage roads and adjust the crossing gates

to clear the overpass structure.

No Small Business participation is anticipated since Union

Pacific Railroad self performs their own work.

3

UPRR Construction Agreement

3

• Authorize President & CEO to execute a Construction

Agreement with Union Pacific Railroad for a not-to-exceed

amount of $275,000.00 for the construction of the Harrisburg

Overpass.

• Estimate cost per Union Pacific Railroad is $228,635.00. Since

METRO must pay actual cost not estimated cost, a contingency

of approximately 20% is fair and reasonable for a total not-to-

exceed amount of $275,000.00.

• Total requested contract value is within METRO’s established

budget.

4

Recommendation

4

rp14
Typewritten Text
2
rp14
Typewritten Text
2

August 2015

Metropolitan Transit Authority of Harris County, Texas

2

• METRO is completing the acquisition process for a parcel of land owned by the University of Houston – Downtown (UHD) on the east side of Main Street south of Naylor Street

• The parcel to be acquired is approximately 14,373 sq. ft.

• This parcel provides right-of way for a signalized, dedicated left-turn lane at Naylor and Main Streets (completed), which provides greater accessibility to the UHD parking area and the Wellington Fisher Partnership property

• This acquisition is included in the FY 2015 MRE CIP budget

3

METRO did not anticipate acquisition of this parcel, as UHD planned to trade the subject property to the City of Houston, and in return, UHD would receive Shea Street right-of-way owned by the City of Houston, one block to the south

This acquisition is necessary and guided by the terms in the February 17, 2011, Memorandum of Understanding (MOU) between University of Houston Downtown (UHD) and METRO

After the MOU between METRO and UHD was signed, the City of Houston discovered that the Shea Street right-of-way was owned by TxDOT. TxDOT chose not to participate in the trade

4

5

Execute Purchase & Sale Agreement

Execute closing documents

rp14
Typewritten Text
3

METRO Rail Expansion

Program Controls Atkins Contract Renewal

August 2015

Capital and Strategic Planning

Background

• METRO Rail Expansion (MRE) Program Control Services which includes the monitoring and evaluation ofscheduling, cost control, and estimating for the Rail Expansion Program.

• Total Contract Value is $7.5M. Contract commenced in 2010 with a Period of Performance of 4 years with two(2) each additional one-year option periods.

• Expenditures thru June 2015 are $6.406M.

• There is $918,874.02 remaining in the contract. This amount is also included in METRO’s capital budget forFY2015 and FY2016. Therefore, no additional funding is required.

• Current period of performance expires September 30, 2015. Proposing to exercise the second one-yearoption period.

• This second one-year option period is primarily due to the delay’s by HRT for the axle counter issues and theconstruction delays at Burnett Plaza. Anticipated expenditures for this work is $403,400.00.

• Additional capacity to be used should support be necessary for assistance, contractual dispute, or litigation.

• Previous Extensions:– September 26, 2013

– August 28, 2014

• Under this contract, as of September, 30, 2015, METRO will be reducing the contractor headcount by three.Leaving one full time scheduler and one part-time Senior Transit System Engineer.

2

Recommendation

• Authorize President and CEO to extend the Atkins Inc. contract term for a

one (1) year optional period from September 30, 2015 to September 30,

2016.

3

rp14
Typewritten Text
4
rp14
Typewritten Text
4

Service & Inspection (S&I) and Rail Operations Center

(ROC) Lift Modifications

August 2015

Metropolitan Transit Authority of Harris County, Texas

2

• The CAF H3 LRV was delivered with different lifting points than the existing LRV fleet vehicles

• CAF was to design the lifting points of the H3 to match METRO’s existing H1 fleet. The lifts for the ROC expansion and the S&I were all designed to work for the H1

• The lifts for the Rail Operations Center (ROC) expansion and the Service and Inspection (S&I) were supposed to be able to lift both the Houston-1 (H1) and the Houston-3 (H3) Light Rail Vehicles (LRV)

• CAF has denied responsibility for the lift issue, and METRO has thus far been unable

to reconcile the problem. To properly maintain the H3 LRV fleet, METRO needs to move forward with the lift modifications and collect from CAF through the Dispute Resolution process

3

• Authorize President & CEO to purchase equipment needed to modify

the new lifts at both the Service and Inspection and Rail Operations

Center maintenance facilities, to be able to hoist CAF H3 LRVs, for a

not-to-exceed amount of $1,025,000.00 which includes a 10% owner

controlled contingency to cover unknown conditions that may occur.

• This will be a sole source purchase from MACTON Corporation, the

manufacturers of the lifts.

to be completed by Small Business

oordination to Complete Action

Planning, Engineering & Construction

Anticipated Procurement Report

May 04, 2015 June 2015

Procurement & Materials

Michael Kyme

Approve items on the Anticipated Procurement Report.

No 0.00

Yes 0.00

Yes 0.00

Yes 0.00

0.00 0.00 0.00 0.00 0.00

Specific funding for projects will be addressed when individual items are presented to the Board for approval.

There is no small business requirement.

Debbie Sechler

rp14
Typewritten Text
5

ANTICIPATED PROCUREMENT PROJECTS

Solicitations over $50K

August Consent List

FY2015

Q3 - Q4

NO.

PROJECT

DESCRIPTION

PROCUREMENT

METHOD

(RFP, RFQ, IFB)

ANTICIPATED

SMALL

BUSINESS

GOAL

ANTICIPATED

ADVERTISEMENT

MONTH

ANTICIPATED

AMOUNT COMMENTS

BOARD

COMMITTEE

PREVIOUS

BOARD

COMMITTEE

CONCUR

Y

1 Healthcare Benefits

Consultant Services

RFP 35% September $3,104,580 Three (3) Year Contract with one 2-

Year Option

Administration

Committee

2 Multi Bus Operating

Facility Fire Alarm &

Life Safety System

Rehabilitation

IFB 35% September $1,922,686 Rehabilitate Systems at Kashmere,

Hiram Clarke, Polk & Northwest

Bus Operating Facilities

Capital and

Strategic

Planning

Committee

3 Installation of

Maction Lifts at ROC

and S&I Facilities

IFB N/A September $300,000 One (1) Year Contract Capital and

Strategic

Planning

Committee

4 Landscaping Services

for All METRORail

Locations

IFB 35% September $1,413,033 Three (3) Year Contract Public Safety,

Customer

Service &

Operations

Committee

5 ThermoKing AC

Parts for Siemens H1

HVAC Overhaul

IFB N/A September $624,000 Kits to Overhaul 39 HVAC Units on

the Siemens H1 Trains

Public Safety,

Customer

Service &

Operations

Committee

Revised 08/04/15

rp14
Highlight

ANTICIPATED PROCUREMENT PROJECTS

Solicitations over $50K

August Consent List

FY2015

Q3 - Q4

NO.

PROJECT

DESCRIPTION

PROCUREMENT

METHOD

(RFP, RFQ, IFB)

ANTICIPATED

SMALL

BUSINESS

GOAL

ANTICIPATED

ADVERTISEMENT

MONTH

ANTICIPATED

AMOUNT COMMENTS

BOARD

COMMITTEE

PREVIOUS

BOARD

COMMITTEE

CONCUR

Y

6 Allison Hybrid

Battery Refresher

Kits and Cables

IFB N/A September $2,075,445 One (1) year requirements

contract for parts needed to

support routine maintenance of

the hybrid battery systems on the

MCI transit vehicles.

Public Safety,

Customer

Service &

Operations

Committee

7 Allison Transmission

Parts

IFB N/A September $234,436 One (1) year requirements

contract for parts needed to

support routine maintenance of

the Allison's transmissions on

METRO fleet of transit vehicles.

Public Safety,

Customer

Service &

Operations

Committee

8 Paper Towels (Terri

Wipes)

IFB N/A September $100,776 Two (2) year requirements

contract for paper towels used at

METRO's facilities

Public Safety,

Customer

Service &

Operations

Committee

9 Water Treatment

Chemicals & Related

Services

IFB N/A September $75,000 Two (2) year contract Public Safety,

Customer

Service &

Operations

Committee

10 Rail Grinding IFB N/A September $252,000 Three (3) year contract Public Safety,

Customer

Service &

Operations

Committee

Revised 08/04/15

ANTICIPATED PROCUREMENT PROJECTS

Solicitations over $50K

August Consent List

FY2015

Q3 - Q4

NO.

PROJECT

DESCRIPTION

PROCUREMENT

METHOD

(RFP, RFQ, IFB)

ANTICIPATED

SMALL

BUSINESS

GOAL

ANTICIPATED

ADVERTISEMENT

MONTH

ANTICIPATED

AMOUNT COMMENTS

BOARD

COMMITTEE

PREVIOUS

BOARD

COMMITTEE

CONCUR

Y

11 Vendor Managed

Inventory of

Fasteners

IFB N/A September $116,000 Three (3) year contract for

fasteners for Bus, NRV and Rail

Public Safety,

Customer

Service &

Operations

Committee

12 Purchase of 20 Clean

Diesel Low Floor 60-

Foot Articulated

Transit Buses in

FY2016

IFB N/A September $15,524,000 60-Foot Low Floor Articulated

Transit Buses are included in the

current 5-year Capital

Improvement Plan

Public Safety,

Customer

Service &

Operations

Committee

Revised 08/04/15

BOARD BRIEFING SUMMARY

SUBJECT: AGENDA ITEM #:

AGENDA DATE:

DEPARTMENT: PRESENTER:

SUMMARY:

Monthly Board Presentation for Engineering and Construction Projects

6/25/15

Planning, Engineering and Construction Roberto Treviño, P.E.

The purpose of this item is to brief the Capital Programs Committee on the monthly progress of Planning, Engineering andConstruction Projects.

rp14
Typewritten Text
6

Metropolitan Transit Authority of Harris County, Texas

August 2015

Metropolitan Transit Authority of Harris County, Texas

2

METRO Rail Expansion

• Southeast/Downtown Line opened for revenue services May 24, 2015.

• East End Line opened for revenue service May 24, 2015.

• Continued contract closeout:

• HRT/MEC completing punch list work, to include axle counter

resolution.

• Small Business Program closeout

• QA/QC Program closeout

• Vehicle Program closeout

3

June – July 2015 - HRT formally reached out to wheel sensing devise manufacturers for

proposals

July – October 2015 - HRT will design and install different products at select locations on the

lines to determine best product

October 2015 – March 2016 - Monitor performance of wheel sensing devices

April 2016 – December 2016 (Est.)

- Selection of product, design and final installation of product

AXLE COUNTER RESOLUTION TIMELINE

4

Harrisburg Overpass

Board Approval: June 2014

Funding Source: Local Funds

-Phase 1 Construction underway:

-Traffic control, Public & Private utility work, at-grade frontage roads, driveways and sidewalks.

-Continued coordination with Center Point Electric is critical to project completion

-Bridge Completion: May 2016.

-Rail System Operational / Revenue ready by September 2016.

-Schedule Progress:

--Planned Schedule Progress = 9.3%

--Actual Schedule Progress = 7.2%

5

Houston First (George R. Brown Convention Center)

Board Approval: January 2014

Funding Source: Reimbursable by HFC

- Garage structure erection started April

23, 2015

- Construction over guideway completed

in August 2015

-Bus bridge activities associated with

George R. Brown construction

concluded August 6. Continuing to

coordinate construction as there may be

other closings in the future.

Burnett Plaza Transit Center

Board Approval: April 2013

Funding Source: Full Funding Grant Agreement

-Notice to Proceed issued on September 2014.

-Substantially Complete / began METRO Bus

Operations July 16, 2015.

-Final completion August 2015

6

7

Burnett Street Improvements

Board Approval: March 2013

Funding Source: Full Funding Grant Agreement

& Surface Transportation (STP) Grant

-Construction contract awarded October 2014.

-Construction Notice to Proceed issued on January 5, 2015.

-Substantial completion date set for June 2014.

-Notice to Proceed issued on January 5, 2015.

- Substantially Complete / began METRO Bus Operations July 16, 2015.

-Final completion September 2015.

8

El Dorado Park & Ride

Board Approval: April 2013

Funding Source: 75/25 Split (Grant & Local)

-Finalizing 3rd party agreements with pipeline and utility companies.

-Board approved construction contract with SpawGlass Civil Construction on July 23, 2015.

-Executed agreement with ExxonMobil for release of easement on July 24, 2015.

-Anticipate issuing Notice to Proceed in mid-September 2015.

9

Northwest Transit Center Parking Upgrade

Briefed Board in July 2014

Design Funding Source: Local Funds

Construction Funding Source: Planned Grant Funds

-TxDOT Multiple Use Agreement (MUA) is partially executed and signed by METRO

-METRO is evaluating the difference between FTA and FHWA Buy America clauses prior to executing the reimbursement agreement

-Construction is planned for 1st quarter of FY2016

Uptown Projects

Post Oak Boulevard Bus Rapid Transit (BRT) and Bellaire Uptown Transit

Center:

• METRO continues to coordinate the service plan, design of the Bellaire Uptown

Transit Center (BUTC) and access to BUTC with Uptown

• Uptown has submitted a revised CE for BUTC to the Federal Transit Administration

(FTA) on June 10, 2015

• METRO continues to coordinate several outstanding issues including circulation at

the proposed BUTC, access across HCTRA right-of-way and proposed new signal

near South Rice on Westpark

• HCTRA has raised concerns regarding crossing of their right-of-way for access to

BUTC

• METRO has provided comments on 60 percent design drawings for Post Oak

Boulevard to Uptown

• METRO is preparing a revised travel demand forecast

10 9

BOARD BRIEFING SUMMARY

SUBJECT: AGENDA ITEM #:

AGENDA DATE:

DEPARTMENT: PRESENTER:

SUMMARY:

Unsolicited Proposal for Development at the Southeast Transit Center

8/15/15

Planning, Engineering & Construction Clint Harbert

The Southeast Transit Center has been a candidate for housing development on unutilized property surrounding the facility.

METRO has recently received interest from the Harris County Houston Authority to purchase portions of the Southeast TransitCenter for transit oriented development.

Staff seeks Board guidance on how to proceed with transit oriented development opportunities.

rp14
Typewritten Text
7

August 2015

Metropolitan Transit Authority of Harris County, Texas

2

• The Southeast Transit Center is located at Scottcrest and Old Spanish Trail

7.6 acres

Acquired in 1985

Price of $3 M

Includes FTA funding

• With the launch of the New Bus Network, the Southeast Transit Center will

be served by six routes (one red, two blue, three green)

• New service provides 439 daily bus trips through the facility

METRO has recently received interest from The Harris County Housing Authority to purchase portions of the Southeast Transit Center for Transit Oriented Development

METRO’s policy for unsolicited proposals follows FTA guidelines

METRO Procurement rules and FTA guidelines expect competition to satisfy the requirement for full and open competition

METRO Staff believes that there is an opportunity for Transit Oriented Development at Southeast Transit Center and should the Board agree, Staff will move forward with a Request for Proposal based on Board guidance

3

Receive Board Committee input and move forward as directed

4