RESUMEN GENERAL DE METRADOS Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA ITEM DESCRIPCION O3 AULAS SSHH PATIO CERCO TANQUE ESCALERA S/. 0.00 S/. 0.00 01 OBRAS PROVISIONALES S/. 0.00 S/. 0.00 01.01 ALMACEN, OFICINA Y CASETA DE GUARDIANIA 99.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 01.02 CARTEL METALICO DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M 1.00 S/. 0.00 S/. 0.00 S/. 0.00 335.60 S/. 0.00 S/. 0.00 01.03 SERVICIOS HIGIENICOS 15.75 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 02 TRABAJOS PRELIMINARES S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 2.01 LIMPIEZA DE TERRENO MANUAL 354.65 348.65 210.04 81.92 467.16 335.60 2.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 2.04 TRAZO Y REPLANTEO PRELIMINAR 354.65 348.65 210.04 81.92 467.16 335.60 S/. 0.00 S/. 0.00 03 MOVIMIENTO DE TIERRAS S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 03.01 EXCAVACION DE ZANJAS Y ZAPATAS 191.31 194.56 109.08 54.25 S/. 0.00 182.86 67.37 33.00 S/. 0.00 03.02 CORTE DE TERRENO HASTA 0.50 M SIN APISONADO 297.19 296.69 181.00 76.87 467.16 S/. 0.00 S/. 0.00 S/. 0.00 03.03 RELLENO Y COMP. MANUAL- MAT. DE AFIRMADO 99.13 99.13 90.51 27.29 233.58 S/. 0.00 1.28 17.38 S/. 0.00 03.04 ACARREO INTERNO DE MAT. PROCEDENTE DE EXC. 372.22 375.88 199.58 81.55 233.58 210.29 S/. 0.00 S/. 0.00 03.05 RELLENO CON MATERIAL GRANULAR 1/2" 03.06 RELLENO CON MATERIAL GRANULAR 2" 03.07 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA 372.22 375.88 239.50 97.86 280.30 210.29 84.22 S/. 0.00 S/. 0.00 04 CONCRETO SIMPLE S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 04.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 1.51 1.77 5.04 6.15 S/. 0.00 166.25 S/. 0.00 4.96 04.02 SOBRECIMIENTO FC=175 KG/CM2 + 25% PM 3.94 6.49 S/. 0.00 S/. 0.00 S/. 0.00 9.28 S/. 0.00 15.92 04.03 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO 50.60 86.46 S/. 0.00 28.52 S/. 0.00 123.74 S/. 0.00 57.82 04.04 FALSO PISO MEZCLA 1:8 e=4" 152.79 152.79 111.09 79.12 S/. 0.00 S/. 0.00 S/. 0.00 43.74 04.05 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON 84.09 81.84 S/. 0.00 1.00 S/. 0.00 S/. 0.00 13.20 S/. 0.00 04.06 CONCRETO EN PATIO DE FORMACION F'C=175 KG/CM2 S/. 0.00 53.65 S/. 0.00 S/. 0.00 S/. 0.00 04.07 ENCOFRADO DE PATIO DE FORMACION S/. 0.00 57.37 S/. 0.00 S/. 0.00 S/. 0.00 04.08 CONCRETO F’C=210 KG/CM2 05 OBRAS DE CONCRETO ARMADO S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 05.01.01 ZAPATAS, CONCRETO F'C=210 KG/CM2 44.31 43.11 27.81 4.93 S/. 0.00 S/. 0.00 S/. 0.00 05.01.02 ZAPATAS, ACERO FY=4200KG/CM2 885.37 861.31 559.55 100.98 S/. 0.00 S/. 0.00 S/. 0.00 05.02.01 VIGA DE CIMENTACION FC=210 KG/CM2 14.76 14.76 16.48 4.03 S/. 0.00 S/. 0.00 1.60 4.78 05.02.02 VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO 98.43 98.43 94.18 32.24 S/. 0.00 S/. 0.00 17.61 38.00 05.02.03 VIGAS DE CIMENTACION, ACERO FY=4200KG/CM2 1853.25 1853.25 853.04 544.39 S/. 0.00 S/. 0.00 35.19 501.82 05.03.01 SOBREC. REF. CONCRETO 175 kg/cm2 7.11 7.11 9.63 5.94 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 05.03.02 SOBREC. REF., ENCOFRADO DESENCOFRADO 56.90 56.90 66.64 91.00 S/. 0.00 S/. 0.00 S/. 0.00 05.03.03 SOBREC. REF., ACERO FY=4200KG/CM2 124.32 124.32 476.89 1832.66 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 05.04.01 COLUMNAS, CONCRETO 175 kg/cm2 (COLUMNETAS) 3.11 3.11 1.42 S/. 0.00 12.25 S/. 0.00 S/. 0.00 05.04.02 COLUMNAS, CONCRETO 210 kg/cm2, (1er. PISO) 17.13 16.78 13.37 2.72 S/. 0.00 S/. 0.00 7.38 05.04.03 COLUMNAS, CONCRETO 210 kg/cm2, (2er. PISO) 13.58 13.22 S/. 0.00 S/. 0.00 S/. 0.00 7.09 S/. 0.00 05.04.04 COLUMNAS, ENCOFRADO DESENCOFRADO 381.90 366.21 164.92 26.54 S/. 0.00 137.20 57.60 116.28 05.04.05 COLUMNAS, ACERO FY=4200KG/CM2 5353.53 5247.51 2129.87 494.94 S/. 0.00 2145.15 815.46 1243.92 05.05.01 GARGOLAS DE CONCRETO, TERMINADO S/DISEÑO 0.02 0.02 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0.02 05.06.01 VIGAS, CONCRETO 175 kg/cm2 (VIGUETAS AMARRE) 1.12 1.12 0.35 1.21 S/. 0.00 7.70 S/. 0.00 0.10 05.06.02 VIGAS, CONCRETO 210 kg/cm2, (1er. PISO) 19.69 17.78 9.32 9.50 S/. 0.00 S/. 0.00 3.86 05.06.03 VIGAS, CONCRETO 210 kg/cm2, (2er. PISO) 21.43 21.43 S/. 0.00 S/. 0.00 S/. 0.00 0.81 1.68 05.06.04 VIGAS, ENCOFRADO DESENCOFRADO 337.82 337.82 61.70 67.67 S/. 0.00 30.81 13.00 65.80 05.06.05 VIGAS, ACERO FY=4200KG/CM2 3066.87 3066.87 1176.29 1196.41 S/. 0.00 672.08 301.72 1084.58 Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA ADM+BIBIB L+SUM COCINA - COMEDOR POZO SÉPTICO

Upload: dante-hartman-cieza-leon

Post on 20-Feb-2016

223 views

Category:

Documents


2 download

DESCRIPTION

archivo subido para el cochino programa de scrib me deje descargar una hoja excel para pdoer hacer mi trabajo de alcantarillas

TRANSCRIPT

Page 1: Metrado General Checopon

RESUMEN GENERAL DE METRADOSProyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

ITEM DESCRIPCION SSHH PATIO CERCO TANQUE ESCALERA TOTAL

S/. 0.00 S/. 0.0001 OBRAS PROVISIONALES S/. 0.00 S/. 0.0001.01 ALMACEN, OFICINA Y CASETA DE GUARDIANIA 99.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 99.0001.02 CARTEL METALICO DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M 1.00 S/. 0.00 S/. 0.00 S/. 0.00 335.60 S/. 0.00 S/. 0.00 336.6001.03 SERVICIOS HIGIENICOS 15.75 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 15.7502 TRABAJOS PRELIMINARES S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.002.01 LIMPIEZA DE TERRENO MANUAL 354.65 348.65 210.04 81.92 467.16 335.60 8.51 3.69 1810.222.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 1.002.04 TRAZO Y REPLANTEO PRELIMINAR 354.65 348.65 210.04 81.92 467.16 335.60 S/. 0.00 S/. 0.00 8.51 3.69 1810.2203 MOVIMIENTO DE TIERRAS S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.0003.01 EXCAVACION DE ZANJAS Y ZAPATAS 191.31 194.56 109.08 54.25 S/. 0.00 182.86 67.37 33.00 S/. 0.00 11.27 6.33 850.0303.02 CORTE DE TERRENO HASTA 0.50 M SIN APISONADO 297.19 296.69 181.00 76.87 467.16 S/. 0.00 S/. 0.00 S/. 0.00 1318.9103.03 RELLENO Y COMP. MANUAL- MAT. DE AFIRMADO 99.13 99.13 90.51 27.29 233.58 S/. 0.00 1.28 17.38 S/. 0.00 10.56 578.8603.04 ACARREO INTERNO DE MAT. PROCEDENTE DE EXC. 372.22 375.88 199.58 81.55 233.58 210.29 S/. 0.00 S/. 0.00 1473.1003.05 RELLENO CON MATERIAL GRANULAR 1/2" 2.63 2.6303.06 RELLENO CON MATERIAL GRANULAR 2" 0.30 0.3003.07 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA 372.22 375.88 239.50 97.86 280.30 210.29 84.22 S/. 0.00 S/. 0.00 0.89 7.91 1669.0604 CONCRETO SIMPLE S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.0004.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 1.51 1.77 5.04 6.15 S/. 0.00 166.25 S/. 0.00 4.96 0.30 185.9804.02 SOBRECIMIENTO FC=175 KG/CM2 + 25% PM 3.94 6.49 S/. 0.00 S/. 0.00 S/. 0.00 9.28 S/. 0.00 15.92 35.6304.03 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO 50.60 86.46 S/. 0.00 28.52 S/. 0.00 123.74 S/. 0.00 57.82 347.1404.04 FALSO PISO MEZCLA 1:8 e=4" 152.79 152.79 111.09 79.12 S/. 0.00 S/. 0.00 S/. 0.00 43.74 539.5304.05 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON 84.09 81.84 S/. 0.00 1.00 S/. 0.00 S/. 0.00 13.20 S/. 0.00 180.1304.06 CONCRETO EN PATIO DE FORMACION F'C=175 KG/CM2 S/. 0.00 53.65 S/. 0.00 S/. 0.00 S/. 0.00 53.6504.07 ENCOFRADO DE PATIO DE FORMACION S/. 0.00 57.37 S/. 0.00 S/. 0.00 S/. 0.00 57.3704.08 CONCRETO F’C=210 KG/CM2 0.11 0.1105 OBRAS DE CONCRETO ARMADO S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.0005.01.01 ZAPATAS, CONCRETO F'C=210 KG/CM2 44.31 43.11 27.81 4.93 S/. 0.00 S/. 0.00 S/. 0.00 120.1705.01.02 ZAPATAS, ACERO FY=4200KG/CM2 885.37 861.31 559.55 100.98 S/. 0.00 S/. 0.00 S/. 0.00 2407.2105.02.01 VIGA DE CIMENTACION FC=210 KG/CM2 14.76 14.76 16.48 4.03 S/. 0.00 S/. 0.00 1.60 4.78 56.4105.02.02 VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO 98.43 98.43 94.18 32.24 S/. 0.00 S/. 0.00 17.61 38.00 378.8905.02.03 VIGAS DE CIMENTACION, ACERO FY=4200KG/CM2 1853.25 1853.25 853.04 544.39 S/. 0.00 S/. 0.00 35.19 501.82 5640.9405.03.01 SOBREC. REF. CONCRETO 175 kg/cm2 7.11 7.11 9.63 5.94 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 29.7905.03.02 SOBREC. REF., ENCOFRADO DESENCOFRADO 56.90 56.90 66.64 91.00 S/. 0.00 S/. 0.00 S/. 0.00 271.4405.03.03 SOBREC. REF., ACERO FY=4200KG/CM2 124.32 124.32 476.89 1832.66 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 2558.1905.04.01 COLUMNAS, CONCRETO 175 kg/cm2 (COLUMNETAS) 3.11 3.11 1.42 S/. 0.00 12.25 S/. 0.00 S/. 0.00 19.8905.04.02 COLUMNAS, CONCRETO 210 kg/cm2, (1er. PISO) 17.13 16.78 13.37 2.72 S/. 0.00 S/. 0.00 7.38 57.3705.04.03 COLUMNAS, CONCRETO 210 kg/cm2, (2er. PISO) 13.58 13.22 S/. 0.00 S/. 0.00 S/. 0.00 7.09 S/. 0.00 33.8905.04.04 COLUMNAS, ENCOFRADO DESENCOFRADO 381.90 366.21 164.92 26.54 S/. 0.00 137.20 57.60 116.28 1250.6505.04.05 COLUMNAS, ACERO FY=4200KG/CM2 5353.53 5247.51 2129.87 494.94 S/. 0.00 2145.15 815.46 1243.92 17430.3805.05.01 GARGOLAS DE CONCRETO, TERMINADO S/DISEÑO 0.02 0.02 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0.02 0.0605.06.01 VIGAS, CONCRETO 175 kg/cm2 (VIGUETAS AMARRE) 1.12 1.12 0.35 1.21 S/. 0.00 7.70 S/. 0.00 0.10 11.6005.06.02 VIGAS, CONCRETO 210 kg/cm2, (1er. PISO) 19.69 17.78 9.32 9.50 S/. 0.00 S/. 0.00 3.86 60.1505.06.03 VIGAS, CONCRETO 210 kg/cm2, (2er. PISO) 21.43 21.43 S/. 0.00 S/. 0.00 S/. 0.00 0.81 1.68 45.3505.06.04 VIGAS, ENCOFRADO DESENCOFRADO 337.82 337.82 61.70 67.67 S/. 0.00 30.81 13.00 65.80 914.6205.06.05 VIGAS, ACERO FY=4200KG/CM2 3066.87 3066.87 1176.29 1196.41 S/. 0.00 672.08 301.72 1084.58 10564.82

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

O3 AULAS

ADM+BIBIBL+SUM

COCINA - COMEDOR

POZO SÉPTICO

BIODIGESTOR

POZO PERCOLAD

OR

Page 2: Metrado General Checopon

RESUMEN GENERAL DE METRADOSProyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

ITEM DESCRIPCION SSHH PATIO CERCO TANQUE ESCALERA TOTAL

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

O3 AULAS

ADM+BIBIBL+SUM

COCINA - COMEDOR

POZO SÉPTICO

BIODIGESTOR

POZO PERCOLAD

OR

05.07.01 LOSA ALIGERADA, CONCRETO 210 kg/cm2 30.21 30.21 16.41 9.62 S/. 0.00 S/. 0.00 11.90 98.3505.07.02 LOSA ALIGERADA, ENCOFRADO DESENCOFRADO 411.68 411.68 159.46 79.79 S/. 0.00 S/. 0.00 S/. 0.00 144.52 1207.1305.07.03 LOSA ALIGERADA, ACERO FY=4200KG/CM2 2122.51 2122.51 154.39 467.66 S/. 0.00 S/. 0.00 S/. 0.00 705.02 5572.0905.07.04 LOSA ALIGERADA, LADR. HUECO 15x30X30 1420.74 1420.74 1561.81 664.86 S/. 0.00 S/. 0.00 S/. 0.00 226.74 5294.8905.07.05 LOSA ALIGERADA, LADR. HUECO 12x30X30 1911.57 1911.57 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 815.80 4638.9405.08.01 ESCALERAS, CONCRETO 210 kg/cm2 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 5.86 5.8605.08.02 ESCALERAS, ENCOFRADO DESENCOFRADO S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 55.80 55.8005.08.03 ESCALERAS, ACERO FY=4200KG/CM2 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 569.52 569.5205.09.01 CISTERNA, CONCRETO 210 kg/cm2 S/. 0.00 8.06 9.47 S/. 0.00 17.5305.09.02 CISTERNA, ENCOFRADO DESENCOFRADO S/. 0.00 49.61 41.09 S/. 0.00 90.7005.09.03 CISTERNA, ACERO FY=4200KG/CM2 S/. 0.00 516.06 770.52 S/. 0.00 1286.5805.10.01 TANQUE, CONCRETO 210 kg/cm2 3.73 3.7305.10.02 TANQUE, ENCOFRADO DESENCOFRADO S/. 0.00 43.06 S/. 0.00 43.0605.10.03 TANQUE, ACERO FY=4200KG/CM2 S/. 0.00 369.00 S/. 0.00 369.0005.11.01 GRADAS EN PISO, CONCRETO 175 kg/cm2 S/. 0.00 S/. 0.00 4.73 S/. 0.00 S/. 0.00 S/. 0.00 0.56 5.2905.11.02 GRADAS EN PISO, ENCOFRADO DESENCOFRADO S/. 0.00 S/. 0.00 7.94 S/. 0.00 S/. 0.00 S/. 0.00 2.66 10.6005.11.03 BIODIGECTOR, BASE DE CONCRETO - MEZCLA C:H=1:10, E=0.10m 2.69 2.6905.11.04 BIODIGESTOR, ACERO DE REFUERZO FY=4200 KG/CM2 14.53 14.5305.11.05 POZO PERCOLADOR, CONCRETO F’C=210 KG/CM2 0.23 0.2305.11.06 POZO PERCOLADOR, ENCOFRADO Y DESENCOFRADO 2.27 2.2705.11.07 POZO PERCOLADOR, ACERO DE REFUERZO FY=4200 KG/CM2 21.44 21.4406 MUROS Y TABIQUES DE ALBAÑILERIA S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.0006.01 MURO DE LADRILLO KK TIPO IV CABEZA M: 1:4,J:1.5CM 187.60 187.60 50.72 26.73 S/. 0.00 S/. 0.00 69.71 S/. 0.00 141.86 664.2206.02 MURO DE LADRILLO KK TIPO IV SOGA M: 1:4,J:1.5CM 69.20 101.02 45.16 162.26 S/. 0.00 515.58 205.41 53.96 1152.5906.03 ALAMBRE # 8REFUERZO HORIZONTAL EN MUROS 114.68 114.68 39.17 27.07 S/. 0.00 S/. 0.00 S/. 0.00 36.04 331.6406.04 MURO DE LADRILLO DE ARCILLA CORRIENTE, MORTERO C:A=1:5, APAREJO DE SOGA, SIN JUNTAS V S/. 0.00 5.45 5.4507 REVOQUES ENLUCIDOS Y MOLDURAS S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.0007.01 TARRAJEO PRIMARIO, MORTERO C:A 1:5 S/. 0.00 S/. 0.00 175.47 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 175.4707.02 TARRAJEO EN MURO: INTERIOR Y EXTERIOR 347.69 411.34 191.72 216.85 S/. 0.00 1031.15 57.60 298.48 2554.8307.03 TARRAJEO EN MUROS EXT. A PARTIR DE 2do.PISO 136.85 136.85 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 21.53 S/. 0.00 295.2307.04 TARRAJEO CON IMPERMEABILIZANTE EN CISTERNA 11.40 26.74 38.1407.05 TARRAJEO CON IMPERMEABILIZANTE EN TANQUE 27.78 27.7807.06 TARRAJEO DE COLUMNAS 285.33 279.45 164.92 26.22 S/. 0.00 137.20 116.28 1009.4007.07 TARRAJEO DE VIGAS 272.06 272.06 61.70 53.11 S/. 0.00 61.61 13.00 41.78 775.3207.08 VESTIDURA DE DERRAMES (1:5) 231.00 231.00 97.50 80.60 S/. 0.00 S/. 0.00 S/. 0.00 33.04 673.1407.09 VESTIDURA DE DERRAMES CON BORDES BOLEADOS M:1:2 23.28 23.28 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 33.66 80.2207.10 BRUÑAS SEGUN DETALLE (1 x 1 cm) 519.60 519.60 40.21 246.42 S/. 0.00 S/. 0.00 S/. 0.00 60.72 1386.5507.11 PIZARRA CEMENTO 5x1.2 SIN TICERO 4.00 3.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 7.0007.12 REPELLADO DE CONCRETO - MEZCLA C:A=1:3 16.00 16.0008 CIELO RASOS S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.0008.01 CIELO RASO CON MEZCLA C:A 1:5 413.43 413.43 184.32 110.32 S/. 0.00 S/. 0.00 S/. 0.00 149.62 1271.1208.02 VESTIDURA EN FONDO DE ESCALERAS S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 29.70 29.7009 PISOS Y PAVIMENTOS S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.0009.01 PISO DE CEMENTO PULIDO Y BRUÑADO E=2" S/COLOREAR 29.27 29.27 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 24.10 82.6409.02 PISO DE CERAMICA DE ALTO TRANSITO PRIMER PISO 151.76 151.76 107.44 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 410.9609.03 PISO DE CERAMICA DE ALTO TRANSITO SEGUNDO PISO 151.76 151.76 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 303.52

Page 3: Metrado General Checopon

RESUMEN GENERAL DE METRADOSProyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

ITEM DESCRIPCION SSHH PATIO CERCO TANQUE ESCALERA TOTAL

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

O3 AULAS

ADM+BIBIBL+SUM

COCINA - COMEDOR

POZO SÉPTICO

BIODIGESTOR

POZO PERCOLAD

OR

09.04 PATIO Y VEREDA CONCRETO 175 kg/cm2 E=4" FROT. Y BRUÑADO 83.55 83.55 47.43 97.94 S/. 0.00 S/. 0.00 S/. 0.00 33.82 346.2909.05 CONTRAPISO DE 40 mm S/. 0.00 S/. 0.00 47.92 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 47.9209.06 PISO LOSETA VENECIANA 30x30 COLOR CLARO S/. 0.00 S/. 0.00 47.92 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 47.9209.07 CANALETA "MEDIA CAÑA" EN CIRCULACION 21.68 21.68 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 18.14 61.5009.08 CANALETA DE EVACUAION PLUVIAL FC=175 KG/CM2 C/REJILLA 52.95 52.19 31.24 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 18.14 154.5210 CONTRAZOCALOS S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.0010.01 CONTR. S/COLOREAR H=20 cm MZ 1:2 e=1.5 cm 101.30 101.30 79.00 43.60 S/. 0.00 20.54 S/. 0.00 37.70 383.4411 ZOCALOS S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.0011.01 ZOCALO DE MAYOLICA BLANCA 20x20 (1a.) S/. 0.00 S/. 0.00 175.47 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 175.4712 REVESTIMIENTO DE GRADAS Y ESCALERAS S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.0012.01 REVEST. C/CEMENTO PULIDO PASO Y CONTRAPASO S/. 0.00 S/. 0.00 48.90 S/. 0.00 S/. 0.00 S/. 0.00 70.40 119.3012.02 ACABADO DE DESCANSO CEMENTO PULIDO Y BRUÑADO S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 11.76 11.7612.03 CONTRAZOCALO RECTO DE ESCALERAS S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 37.12 37.1213 CUBIERTAS S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.0013.01 IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA 227.94 227.94 187.54 103.28 S/. 0.00 S/. 0.00 S/. 0.00 90.86 837.5613.02 COBERTURA CON TEJA DE ARCILLA 42X20 ASENTADO C/MEZCLA 227.94 227.94 214.32 103.28 S/. 0.00 S/. 0.00 S/. 0.00 90.86 864.3413.03 CUMBRERA DE TEJA DE ARCILLA 42X20 ASENTADO C/MEZCLA 23.67 23.67 16.36 9.14 S/. 0.00 S/. 0.00 S/. 0.00 7.54 80.3814 CARPINTERIA DE MADERA S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.0014.01 PUERTA CEDRO TIPO TABLERO C/TRAGALUZ - AULAS 19.80 19.80 10.40 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 5.40 55.4014.02 PUERTA CEDRO MACHIMBRADA S/. 0.00 S/. 0.00 12.60 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 12.6014.03 PUERTA CON TRIPLAY 9mm P/SSHH. S/. 0.00 S/. 0.00 10.08 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 10.0814.04 VENTANA CEDRO-AULAS C/SEG 91.20 91.20 32.08 11.71 S/. 0.00 S/. 0.00 S/. 0.00 3.92 230.1114.05 TICERO DE MADERA CEDRO (L=5 m) BARNIZADO 3.00 3.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 4.0014.06 MESA BATIENTE DE MADERA S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 1.0015 CARPINTERIA METALICA Y HERRERIA S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.0015.01 PASAMANO DE TUBO FºGº DE 2" EN ESCALERA S/. 0.00 S/. 0.00 5.20 S/. 0.00 S/. 0.00 S/. 0.00 29.60 34.8015.02 CANTONERA DE ALUMINIO EN ESCALERA S/. 0.00 S/. 0.00 48.90 S/. 0.00 S/. 0.00 S/. 0.00 72.60 121.5016 CERRAJERIA S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.0016.01 BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA 24.00 24.00 24.00 24.00 S/. 0.00 S/. 0.00 S/. 0.00 12.00 108.0016.02 BISAGRA DE ACERO ALUMINIZADO DE 2.5" PESADA EN PUERTA/VENTANA 192.00 192.00 84.00 124.00 S/. 0.00 S/. 0.00 S/. 0.00 16.00 608.0016.03 CERRADURA DOS GOLPES EN PUERTA 6.00 6.00 3.00 6.00 S/. 0.00 S/. 0.00 S/. 0.00 2.00 23.0016.04 CERROJO "SAPITO" SEGURIDAD BAT.VENTANA 96.00 96.00 21.00 44.00 S/. 0.00 S/. 0.00 S/. 0.00 4.00 261.0016.05 MANIJA DE BRONCE 4" PARA PUERTAS 6.00 6.00 4.00 18.00 S/. 0.00 S/. 0.00 S/. 0.00 2.00 36.0016.06 CERROJO DE 3" ALUMINIZADO PARA PUERTA S/. 0.00 S/. 0.00 12.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 12.0016.07 CERROJO DE 10" ALUMINIZADO PARA PUERTA 8.00 8.0017 VIDRIOS, CRISTALES Y SIMILARES S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.0017.01 VIDRIOS SEMIDOBLES IMPORTADO 981.58 981.58 32.08 125.99 S/. 0.00 S/. 0.00 S/. 0.00 31.28 2152.5118 PINTURA S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.0018.01 PINTURA LATEX 2 MANOS EN CIELO RASO 413.43 413.43 184.32 110.32 S/. 0.00 S/. 0.00 21.53 149.62 1124.4418.02 PINTURA OLEO 2 MANOS EN VIGAS 272.06 272.06 61.70 53.11 S/. 0.00 61.61 13.00 41.78 775.3218.03 PINTURA OLEO 2 MANOS EN MUROS Y COLUMNA 769.87 827.64 356.64 243.07 S/. 0.00 1168.35 57.60 414.76 3837.9318.04 PINT. ANTICOR. ESMALTE 2 MANOS EN BARRAS DE SEGURIDAD 304.96 304.96 111.92 18.00 S/. 0.00 S/. 0.00 S/. 0.00 43.44 783.2818.05 PINTURA BARNIZ EN CARP.DE MADERA 414.62 414.62 150.02 34.39 S/. 0.00 S/. 0.00 S/. 0.00 9.32 1022.9718.06 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H=20 101.30 101.30 79.00 43.60 S/. 0.00 20.54 S/. 0.00 37.70 383.4419 VARIOS, LIMPIEZA Y JARDINERIA S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.0019.01 LIMPIEZA PERMANENTE DE LA OBRA 1.00 1.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 2.00

Page 4: Metrado General Checopon

RESUMEN GENERAL DE METRADOSProyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

ITEM DESCRIPCION SSHH PATIO CERCO TANQUE ESCALERA TOTAL

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

O3 AULAS

ADM+BIBIBL+SUM

COCINA - COMEDOR

POZO SÉPTICO

BIODIGESTOR

POZO PERCOLAD

OR

19.02 JUNTA DE DILATACION CON ESPUMA PLASTICA+JEBE MICROPOROSO 15.40 15.40 S/. 0.00 S/. 0.00 30.8019.03 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" 101.30 101.30 16.00 106.88 382.49 S/. 0.00 S/. 0.00 707.9719.04 TAPAJUNTA METALICA EN PISOS 15.40 15.40 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 30.8019.05 TAPAJUNTA METALICA ENTRE MODULOS (VERTICAL) 12.80 12.80 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 25.6019.06 CAJA DE REGISTRO PARA DESAGUE 24" x 24 " 1.00 1.0019.07 INSTALACIÓN DE TANQUE BIODIGESTOR 3000LTS 1.00 1.0019.08 SUMINISTRO Y COLOCACIÓN DE TUBERÍA PVC SAL Ø4" 4.00 4.0019.09 REGISTRO DE BRONCE ROSCADO Ø4" 1.00 1.0019.10 ACCESORIOS PVC DESAGÜE 1.00 1.0019.11 ASAS DE TORNILLOS EN "U" 2.00 2.0020 EQUIPAMIENTO S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.0020.01 MOBILIARIO ESCOLAR PARA SECUNDARIA SEGUN DISEÑO S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.0020.02 ESCRITORIO DE MADERA TORNILLO S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.0020.03 MODULO P/COMPUTADORAS S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.0020.04 MODULO P/LABORATORIOS FQB S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 20.00

Page 5: Metrado General Checopon

RESUMEN GENERAL DE METRADOS

UND

m2undm2

m2GLBm2

m3m2m3m3

m3

m3m3m2m2m2m3m2m3

m3kgm3m2kgm3m2kgm3m3m3m2kgm3m3m3m3m2kg

Page 6: Metrado General Checopon

RESUMEN GENERAL DE METRADOS

UND

m3m2kgundundm3m2kgm3m2kgm3m2kgm3m2m2kgm3m2kg

m2m2kgm2

m2m2m2m2m2m2m2mmmpzam2

m2m2

m2m2m2

Page 7: Metrado General Checopon

RESUMEN GENERAL DE METRADOS

UND

m2m2m2mm

m

m2

mm2m

m2m2m

m2m2m2m2undund

mm

pzapzapzapzapzapzapza

p2

m2m2m2mm2m

GLB

Page 8: Metrado General Checopon

RESUMEN GENERAL DE METRADOS

UND

mmundundmundGLBund

undundundund

Page 9: Metrado General Checopon

METRADO (04 AULAS )

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

01 OBRAS PROVISIONALES01.01 ALMACEN, OFICINA Y CASETA DE GUARDIANIA 99.00 m2

Almacén 1 14.00 5.00 70.00Oficina 1 4.00 5.00 20.00

Caseta guardiania 1 3.00 3.00 9.00

01.02 CARTEL METALICO DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M 1.00 und1 1.00

01.03 SERVICIOS HIGIENICOS 15.75 m2Para obreros 1 7.50 1.50 11.25

Para personal planta 1 3.00 1.50 4.50

01.04 AGUA PARA LA CONSTRUCCION 1.00 GLB1 1.00

02 TRABAJOS PRELIMINARES02.01 LIMPIEZA DE TERRENO MANUAL 354.65 354.65 m2

02.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA GLB

02.04 FLETE TERRESTRE GLB

02.05 TRAZO Y REPLANTEO PRELIMINAR 354.65 m2Aulas 1

354.65Vereda delantera 1Vereda posterior 1

Vereda lateral 1Cuneta 1

03 MOVIMIENTO DE TIERRAS03.01 EXCAVACION DE ZANJAS Y ZAPATAS 191.31 m3

ZapatasZ1 13 2.10 2.10 1.55 88.86

1 2.10 2.10 1.55 6.84Z2 1 2.50 2.10 1.55 8.14Z3 2 3.45 1.50 1.55 16.04Z4 3 1.50 1.50 1.55 10.46

Vigas cimentacionEje 1-1 6 1.50 0.60 1.50 8.10Eje 3-3 6 1.50 0.60 1.50 8.10

Eje B-B/D-D/F-F 3 5.27 0.60 1.50 14.23Eje C-C/E-E/G-G 6 1.89 0.60 1.50 10.18

EjeA-A 1 0.59 0.60 1.50 0.53EjeA-A 1 1.69 1.26 1.50 3.18EjeA-A 1 0.42 0.18 1.50 0.11

Entre Eje1-1, Eje H-H, Eje I-I 1 2.39 0.60 1.50 2.15Entre Eje1'-1', Eje H-H, Eje I-I /Entre Eje2'-2', Eje H-H, Eje I- 2 3.34 0.60 1.50 6.02

EjeH-H 1 1.69 0.60 1.50 1.52EjeH-H 2 1.24 0.60 1.50 2.23

Cimiento corridoEntre Eje1-1, Eje1'-1' 1 2.41 0.50 1.25 1.51

2 2.07 0.60 1.25 3.11

03.02 CORTE DE TERRENO HASTA 0.40 M SIN APISONADO 297.19 m2Aulas 1 21.84 7.36 160.74

Vereda delantera 1 23.65 2.10 49.67Vereda posterior 1 23.65 1.25 29.56

Vereda lateral 2 7.82 1.00 15.64Cuneta 1 83.15 0.50 41.58

03.03 RELLENO Y COMP. MANUAL- MAT. DE AFIRMADO e= 0.40 m 99.13 m3aulas 1 21.84 7.36 0.40 64.30

vereda delantera 1 23.65 2.10 0.40 19.87verada posterior 1 23.65 1.25 0.40 11.83

vereda lateral 1 7.82 1.00 0.40 3.13

03.04 ACARREO INTERNO DE MAT. PROCEDENTE DE EXC. 372.22 m3item 3.1 191.31 1.20 229.57item 3.2 118.88 1.20 142.65

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

Page 10: Metrado General Checopon

METRADO (04 AULAS )

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

3.07 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA 372.22 m3item 3.1 229.57 1.00 229.57item 3.2 142.65 1.00 142.65

04 CONCRETO SIMPLE04.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 1.51 m3

Cimiento corridoEntre Eje1-1, Eje1'-1' 1 2.41 0.50 1.25 1.51

04.02 SOBRECIMIENTO Fc=175 KG/CM2 + 25% PM 3.94 m3sobrecimiento

eje 1-1 6 2.30 0.13 1.10 1.97eje 3-3 6 2.30 0.13 1.10 1.97

04.03 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO 50.60 m2sobrecimiento

eje 1-1 10 2.30 1.10 25.30eje 3-3 10 2.30 1.10 25.30

04.04 FALSO PISO MEZCLA 1:8 e=4" 152.79 m2entre eje 1-1/3-3 eje a-a/e-e 3 6.92 7.36 152.79

04.05 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON 84.09 m2zapatas

Z1 14 2.1 2.1 61.740 0 0

Z2 1 2.5 2.1 5.25Z3 2 3.45 1.5 10.35Z4 3 1.5 1.5 6.75

05 OBRAS DE CONCRETO ARMADO05.01 ZAPATAS, CONCRETO F'c=210 KG/CM2 44.31 m3

zapatasZ1 10 2.1 2.1 0.60 26.46

4 2.1 2.1 0.60 10.58Z2 1 2.5 2.1 0.60 3.15Z3 2 3.45 1.5 0.60 6.21Z4 3 1.5 1.5 0.60 4.05

05.02 ZAPATAS, ACERO FY=4200KG/CM2 885.37 kgacero principal veces cant. long. coef.

Z1 ==> 1/2" 14 24 1.95 0.99 648.65Z2 ==> 1/2" LONG 1 12 2.35 0.99 27.92

TRANSV 1 14 1.95 0.99 27.03Z4 ==> 1/2" 3 18.00 1.35 0.99 72.17

Z3 ==> 1/2" LONG 2 9.00 3.30 0.99 58.81TRANSV 2 19.00 1.35 0.99 50.79

05.03 VIGA DE CIMENTACION FC=210 KG/CM2 14.76 m3vigas cimentacion

eje 1-1 1 21.65 0.30 0.45 2.92eje 3-3 1 21.65 0.30 0.45 2.92

eje a-a 1 7.62 0.30 0.45 1.03eje a´-a´ 1 7.62 0.30 0.70 1.60eje b´-b´ 1 7.62 0.30 0.45 1.03eje b-b 1 7.62 0.30 0.70 1.60eje c-c 1 7.62 0.30 0.45 1.03eje d-d 1 7.62 0.30 0.70 1.60eje e-e 1 7.62 0.30 0.45 1.03

05.04 VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO 98.43 m2vigas cimentacion

eje 1-1 2 21.65 0.45 19.49eje 3-3 2 21.65 0.45 19.49

eje a-a 2 7.62 0.45 6.86eje a´-a´ 2 7.62 0.70 10.67eje b´-b´ 2 7.62 0.45 6.86eje b-b 2 7.62 0.70 10.67eje c-c 2 7.62 0.45 6.86eje d-d 2 7.62 0.70 10.67

Page 11: Metrado General Checopon

METRADO (04 AULAS )

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

eje e-e 2 7.62 0.45 6.86

Page 12: Metrado General Checopon

METRADO (04 AULAS )

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

05.05 VIGAS DE CIMENTACION, ACERO FY=4200KG/CM2 1853.25 kgacero principal veces cant. long. coef.

5/8" 2 6.00 22.20 1.55 412.925/8" 1 7.00 8.00 1.55 86.805/8" 3 8.00 8.00 1.55 297.605/8" 2 8.00 8.00 1.55 198.405/8" 1 8.00 8.00 1.55 99.20

estribos3/8" 2 112.00 2.65 0.56 332.423/8" 7 41.00 2.65 0.56 425.91

05.06 SOBREC. REF. CONCRETO 175 kg/cm2 7.11 m3

eje a-a 2 2.97 0.25 1.15 1.71eje b´-b´ 2 3.12 0.25 1.15 1.79eje c-c 2 3.30 0.25 1.15 1.90eje e-e 2 2.98 0.25 1.15 1.71

05.07 SOBREC. REF., ENCOFRADO DESENCOFRADO 56.90 m2

eje a-a 4 2.97 1.15 13.66eje b´-b´ 4 3.12 1.15 14.35eje c-c 4 3.30 1.15 15.18eje e-e 4 2.98 1.15 13.71

05.08 SOBREC. REF., ACERO FY=4200KG/CM2 124.32 kgveces cant. long. coef.

h 3 4.00 8.00 0.56 53.76v 3 28.00 1.50 0.56 70.56

05.09 COLUMNAS, CONCRETO 175 kg/cm2 (COLUMNETAS) 3.11 m3primer piso

eje 1-1 12 0.25 0.13 1.95 0.76eje 3-3 12 0.25 0.13 1.95 0.76

segundo pisoeje 1-1 12 0.25 0.13 1.30 0.51eje 3-3 12 0.25 0.13 1.30 0.51

en parapeto 16 0.25 0.13 1.10 0.57

05.10 COLUMNAS, CONCRETO 210 kg/cm2, (1er. PISO) Factor Area 17.13 m3CL 4 1.00 0.22 4.80 4.22CT 10 1.00 0.24 4.80 11.52C2 4 1.00 0.07 4.80 1.38

05.11 COLUMNAS, CONCRETO 210 kg/cm2, (2do. PISO) Factor Area 13.58 m3CL 4 1.00 0.22 3.70 3.26CT 10 1.00 0.24 3.70 8.88C2 4 1.00 0.07 5.00 1.44

05.12 COLUMNAS, ENCOFRADO DESENCOFRADO 381.90 m2

primer piso perim.CL 4 2.10 4.80 40.32CT 10 2.30 4.80 110.40C2 4 1.08 4.80 20.74

segundo pisoCL 4 2.10 3.70 31.08CT 10 2.30 3.70 85.10C2 4 1.08 5.00 21.60

columnetas primer pisoeje 1-1 12 0.76 1.95 17.78eje 3-3 12 0.76 1.95 17.78

Page 13: Metrado General Checopon

METRADO (04 AULAS )

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

columnetas segundo pisoeje 1-1 12 0.76 1.30 11.86eje 3-3 12 0.76 1.30 11.86

en parapeto 16 0.76 1.10 13.38

05.13 COLUMNAS, ACERO FY=4200KG/CM2 5353.53 kgprimer piso veces cant. long. coef.

acero principalCL ==> 3/4" 4 6.00 5.10 2.24 274.18CL ==> 5/8" 4 6.00 5.10 1.55 189.72CT ==> 3/4" 10 4.00 5.10 2.24 456.96CT ==> 5/8" 10 8.00 5.10 1.55 632.40C2 ==> 5/8" 6 4.00 5.10 1.55 189.72C6 ==> 3/8" 24 6.00 2.45 0.56 197.57

estribos CL ==> 3/8" 8 28.00 1.41 0.56 176.87CT ==> 3/8" 20 28.00 1.41 0.56 442.18C2 ==> 3/8" 4 28.00 1.00 0.56 62.72C6 ==> 1/4" 24 18.00 0.65 0.25 70.20

segundo pisoacero principal

CL ==> 3/4" 4 6.00 5.00 2.24 268.80CL ==> 5/8" 4 6.00 5.00 1.55 186.00CT ==> 3/4" 10 4.00 5.00 2.24 448.00CT ==> 5/8" 10 8.00 5.00 1.55 620.00C2 ==> 5/8" 6 4.00 6.30 1.55 234.36C6 ==> 3/8" 24 6.00 1.80 0.56 145.15

parapeto C6 ==> 3/8" 16 6.00 1.30 0.56 69.89estribos

CL ==> 3/8" 8 24.00 1.41 0.56 151.60CT ==> 3/8" 20 24.00 1.41 0.56 379.01C2 ==> 3/8" 4 30.00 1.00 0.56 67.20C6 ==> 1/4" 24 14.00 0.65 0.25 54.60

parapetos C6 ==> 1/4" 16 14.00 0.65 0.25 36.40

05.17 GARGOLAS DE CONCRETO, TERMINADO S/DISEÑO volum. 0.02 m3segun plano 3 0.01 0.02

05.18 VIGAS, CONCRETO 175 kg/cm2 (VIGUETAS AMARRE) 1.12 m3primer piso 12 2.61 0.13 0.10 0.41

segundo piso 12 2.61 0.13 0.10 0.41parapeto 1 23.25 0.13 0.10 0.30

05.19 VIGAS, CONCRETO 210 kg/cm2, (1er. PISO) 19.69 m3v-1 2 21.68 0.25 0.45 4.88v-2 1 21.68 0.10 0.40 0.87v-3 7 2.10 0.35 0.48 2.47v-4 5 7.80 0.30 0.70 8.19v-5 2 7.80 0.30 0.70 3.28

05.20 VIGAS, CONCRETO 210 kg/cm2, (2do. PISO) 21.43 m3v-1 2 21.68 0.25 0.45 4.88v-8 8 2.10 0.35 0.65 3.82

8 4.25 0.25 0.45 3.834 7.80 0.25 0.50 3.90

v-9 6 2.10 0.25 0.45 1.426 3.79 0.35 0.45 3.58

05.21 VIGAS, ENCOFRADO DESENCOFRADO 337.82 m2primer piso perim.

v-1 2 21.71 1.30 56.45v-2 1 21.70 0.90 19.53v-3 7 2.10 1.31 19.26

Page 14: Metrado General Checopon

METRADO (04 AULAS )

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

v-4 4 7.80 0.64 19.97v-5 3 7.80 1.45 33.93

segundo pisov-1 2 21.71 1.30 56.45v-8 8 2.10 1.65 27.72

8 3.68 0.64 18.844 7.28 0.64 18.64

v-9 6 2.10 1.65 20.796 3.79 1.25 28.43

viguetas de amarreprimer piso 24 2.74 0.10 6.58

segundo piso 24 2.74 0.10 6.58parapeto 2 23.25 0.10 4.65

05.22 VIGAS, ACERO FY=4200KG/CM2 3066.87 kgacero principal

primer piso veces cant. long. coef.v-1 ==> 5/8" 2 4.00 23.81 1.55 295.24v-1 ==> 1/2" 2 1.00 23.81 0.99 47.14v-2 ==> 1/2" 1 2.00 23.81 0.99 47.14v-3 ==> 5/8" 5 4.00 2.65 1.55 82.15v-4 ==> 1/2" 4 4.00 9.00 0.99 142.56v-5 ==>3/4" 3 4.00 9.00 2.24 241.92v-5 ==>5/8" 3 4.00 9.00 1.55 167.40

segundo pisov-1 ==> 5/8" 2 4.00 23.81 1.55 295.24v-1 ==> 1/2" 2 1.00 23.81 0.99 47.14v-8 ==> 3/8" 7 4.00 5.50 0.56 86.24v-8 ==> 5/8" 7 2.00 3.45 1.55 74.87v-8 ==> 1/2" 7 2.00 2.80 0.99 38.81v-8 ==> 3/8" 4 4.00 8.30 0.56 74.37v-9 ==> 3/4" 5 2.00 6.90 2.24 154.56v-9 ==> 5/8" 5 2.00 6.30 1.55 97.65v-9 ==> 1/2" 5 2.00 2.45 0.99 24.26

vigas de amarrepiso 1 3/8" 12 2.00 2.80 0.56 37.63piso 2 3/8" 12 2.00 2.80 0.56 37.63parapeto 1 2.00 30.78 0.56 34.47

estribosprimer piso veces cant. long. coef.

v-1 ==> 3/8" 8 20.00 1.41 0.56 126.34v-2 ==> 1/4" 4 34.00 0.50 0.25 17.00v-3 ==> 3/8" 5 11.00 1.71 0.56 52.67v-4 ==> 1/4" 8 20.00 0.79 0.25 31.60v-5 ==> 3/8" 3 40.00 1.71 0.56 114.91

segundo pisov-1 ==> 3/8" 8 20.00 1.41 0.56 126.34v-8 ==> 1/4" 7 20.00 0.74 0.25 25.90v-8 ==> 1/4" 7 20.00 0.74 0.25 25.90v-8 ==> 1/4" 7 11.00 4.00 0.25 77.00v-9 ==> 3/8" 5 24.00 1.51 0.99 179.39v-9 ==> 3/8" 5 11.00 4.00 0.99 217.80

vigas de amarrepiso 1 3/8" 12 28.00 0.20 0.25 16.80piso 2 3/8" 12 28.00 0.20 0.25 16.80parapeto 1 240.00 0.20 0.25 12.00

05.23 LOSA ALIGERADA, CONCRETO 210 kg/cm2 30.21 m3primer piso 6 7.63 3.28 0.20 30.03

6 3.17 2.00 0.20 7.61-8.333 0.01 150.16 -16.89-8.333 0.01 38.04 -4.28

segundo piso 12 3.79 3.28 0.17 25.3612 2.00 3.17 0.17 12.93

Page 15: Metrado General Checopon

METRADO (04 AULAS )

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

aleros 6 3.79 0.60 0.17 2.32-8.333 0.01 149.17 -16.78-8.333 0.01 76.08 -8.56-8.333 0.01 13.64 -1.53

05.24 LOSA ALIGERADA, ENCOFRADO DESENCOFRADO 411.68 m2primer piso 6 7.91 3.28 155.67

6 3.17 1.40 26.63segundo piso 12 3.79 3.28 149.17

12 1.75 3.17 66.57aleros 6 3.79 0.60 13.64

05.25 LOSA ALIGERADA, ACERO Fy=4200KG/CM2 2122.51 kgprimer piso veces cant. long. coef.

(+) 1/2" 33 1.00 15.28 0.99 499.20(-) 1/2" 33 1.00 6.35 0.99 207.45(-) 3/8" 33 2.00 1.20 0.56 44.35

1/4" 75 1.00 9.63 0.25 180.56segundo piso

(+) 1/2" 42 1.00 15.28 0.99 635.34(-) 1/2" 42 1.00 6.35 0.99 264.03(-) 3/8" 42 2.00 1.20 0.56 56.45

1/4" 75 2.00 6.27 0.25 235.13

05.26 LOSA ALIGERADA, LADR. HUECO 15x30X30 1420.74 undprimer piso 8.3333 6 7.31 3.28 1198.84

8.3333 6 3.17 1.40 221.90

05.27 LOSA ALIGERADA, LADR. HUECO 12x30X30 1911.57 undsegundo piso 8.3333 12 3.79 3.28 1243.12

8.3333 12 1.75 3.17 554.758.3333 6 3.79 0.60 113.70

05.28 ESCALERAS, CONCRETO 210 kg/cm2 m305.29 ESCALERAS, ENCOFRADO DESENCOFRADO m205.30 ESCALERAS, ACERO FY=4200KG/CM2 kg05.31 GRADAS EN PISO, CONCRETO 175 kg/cm2 m305.32 GRADAS EN PISO, ENCOFRADO DESENCOFRADO m206 MUROS Y TABIQUES DE ALBAÑILERIA06.01 MURO DE LADRILLO KK TIPO IV CABEZA M: 1:4,J:1.5CM 187.60 m2

primer pisoeje A-A/ C-C / E-E 8 3.35 3.10 83.08

segundo pisoeje A-A/ C-C / E-E 8 3.35 3.90 104.52

06.02 MURO DE LADRILLO KK TIPO IV SOGA M: 1:4,J:1.5CM 69.20 m2primer piso

eje 1-1/ 3-3 9 2.11 0.85 16.14eje 3-3 3 1.02 0.85 2.60

segundo pisoeje 1-1/ 3-3 9 2.11 1.20 22.79

eje 3-3 3 1.02 1.20 3.67parapetos 1 24.00 1.00 24.00

06.03 ALAMBRE # 8REFUERZO HORIZONTAL EN MUROS 114.68 kgde cabeza veces cant. long. coef.

primer piso 8 11.00 3.85 0.12 40.66segundo piso 8 13.00 3.85 0.12 48.05

de sogaprimer piso 12 4.00 2.61 0.12 15.03

segundo piso 12 5.00 1.52 0.12 10.94

07 REVOQUES ENLUCIDOS Y MOLDURAS07.01 TARRAJEO PRIMARIO, MORTERO C:A 1:5 m207.02 TARRAJEO EN MURO: INTERIOR Y EXTERIOR 347.69 m2

Page 16: Metrado General Checopon

METRADO (04 AULAS )

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

primer pisoeje 1-1 12 2.11 0.85 21.52eje 3-3 6 2.11 0.85 10.76

6 1.02 0.85 5.20eje a-a 8 3.35 3.10 83.08eje c-c 4 3.35 3.10 41.54eje e-e 4 3.35 3.10 41.54

segundo pisoeje 1-1 6 2.11 1.20 15.19eje 3-3 3 2.11 1.20 7.60

3 1.02 1.20 3.67eje a-a 3 3.35 3.90 39.20eje c-c 4 3.35 3.90 52.26eje e-e 2 3.35 3.90 26.13

07.03 TARRAJEO EN MUROS EXT. A PARTIR DE 2do.PISO 136.85 m2segundo piso

eje 1-1 6 2.11 1.20 15.19eje 3-3 3 2.11 1.20 7.60

3 1.02 1.20 3.67eje a-a 4 3.35 3.90 52.26eje e-e 2 3.35 3.90 26.13

parapeto 2 16.00 1.00 32.00

07.04 TARRAJEO DE COLUMNAS 285.33 m2primer piso perim.

CL1 4 1.55 4.80 29.76CT1 6 1.80 4.80 51.84CT1 4 1.50 4.80 28.80C1 8 1.50 4.80C2 4 0.60 4.80 11.52

segundo pisoCL1 4 1.55 3.70 22.94CT1 6 1.80 3.70 39.96CT1 4 1.50 3.70 22.20C1 8 1.50 3.70C2 4 0.60 5.00 12.00

columnetas primer pisoeje 1-1 12 0.76 1.95 17.78eje 3-3 12 0.76 1.95 17.78

columnetas segundo pisoeje 1-1 12 0.63 1.30 9.83eje 3-3 12 0.63 1.30 9.83

en parapeto 16 0.63 1.10 11.09primer piso perim.

P1 6 3.18 4.80segundo piso

P2 6 3.18 3.70

07.05 TARRAJEO DE VIGAS 272.06 m2primer piso perim.

v-1 2 14.55 1.30 37.83v-2 1 14.55 0.90 13.10v-3 5 1.50 1.31 9.83v-4 4 7.80 0.64 19.97v-5 3 7.80 1.45 33.93

segundo pisov-1 2 14.55 1.30 37.83v-8 7 2.10 1.65 24.26

7 3.68 0.64 16.494 7.28 0.64 18.64

v-9 5 2.10 1.65 17.335 3.79 1.25 23.69

viguetas de amarreprimer piso 24 2.74 0.10 6.58

segundo piso 24 2.74 0.10 6.58parapeto 2 30.00 0.10 6.00

07.06 VESTIDURA DE DERRAMES (1:5) 231.00 mprimer piso

P1 3 6.70 20.10

Page 17: Metrado General Checopon

METRADO (04 AULAS )

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

V1 9 8.50 76.50V2 3 6.30 18.90

segundo pisoP1 3 6.70 20.10V1 9 8.50 76.50V2 3 6.30 18.90

07.07 VESTIDURA DE DERRAMES CON BORDES BOLEADOS M:1:2 23.28 mparapeto 1 23.28 23.28

07.08 BRUÑAS SEGUN DETALLE (1 x 1 cm) 519.60 mprimer piso

muroseje 1-1 2 17.23 34.46

12 0.80 9.606 2.14 12.84

eje 3-3 2 17.23 34.4612 0.80 9.603 2.14 6.423 1.06 3.18

eje a-a/e-e 24 2.88 69.1212 3.33 39.966 6.43 38.58

eje c-c 2 6.43 12.86segundo piso

eje 1-1 2 17.23 34.4612 1.20 14.406 2.14 12.84

eje 3-3 2 17.23 34.4612 1.20 14.403 2.14 6.423 1.06 3.18

eje a-a/e-e 3 3.20 9.603 4.60 13.806 6.43 38.58

eje c-c 2 6.43 12.86parapeto 12 3.16 37.92

12 0.85 10.206 0.90 5.40

08 CIELO RASOS08.01 CIELO RASO CON MEZCLA C:A 1:5 413.43 m2

primer piso 6 7.31 3.28 143.866 3.17 1.40 26.63

segundo piso 12 3.79 3.28 149.1712 1.75 3.17 66.57

aleros 6 3.79 0.60 13.64frisos 6 6.00 0.17 6.12

2 21.87 0.17 7.44

08.02 VESTIDURA EN FONDO DE ESCALERAS m209 PISOS Y PAVIMENTOS09.01 PISO DE CEMENTO PULIDO Y BRUÑADO E=2" S/COLOREAR 29.27 m2

segundo piso 1 21.68 1.35 29.27

09.02 PISO DE CERAMICA DE ALTO TRANSITO 151.76 m2entre eje 1-1/3-3 eje a-a/e-e 3 6.92 7.31 151.76

09.03 PISO DE CERAMICA DE ALTO TRANSITO 151.76 m2entre eje 1-1/3-3 eje a-a/e-e 3 6.92 7.31 151.76

09.04 VEREDA CONCRETO 175 kg/cm2 E=4" FROT. Y BRUÑADO 83.55 m2frontal 1 2.10 22.66 47.59lateral 1 1.00 7.63 7.63

posterios 1 1.25 22.66 28.33

09.05 CONTRAPISO DE 40 mm m209.06 PISO CERAMICA DE ALTO TRANSITO 30x30 m209.07 CANALETA "MEDIA CAÑA" EN CIRCULACION 21.68 m

segundo piso 1 21.68 21.68

09.08 CANALETA DE EVACUACION PLUVIAL FC=175 KG/CM2 C/REJILLA 52.95 mfrontal 1 22.66 22.66lateral 1 7.63 7.63

Page 18: Metrado General Checopon

METRADO (04 AULAS )

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

posterios 1 22.66 22.66

10 CONTRAZOCALOS10.01 CONTR. S/COLOREAR H=20 cm MZ 1:2 e=1.5 cm 101.30 m

primer pisoeje 1-1 1 22.80 22.80eje 3-3 1 18.90 18.90

eje a-a/ e-e 2 7.85 15.70segundo piso 1.00

eje 3-3 1 18.90 18.90parapeto 1 24.00 24.00

10.02 CONTRAZOCALO DE MAD CEDRO 3/4" X 4" RODON DE 3/4" m

11 ZOCALOS11.01 ZOCALO DE MAYOLICA BLANCA 20x20 (1a.) m212 REVESTIMIENTO DE GRADAS Y ESCALERAS12.01 REVEST. C/CEMENTO PULIDO PASO Y CONTRAPASO m12.02 ACABADO DE DESCANSO CEMENTO PULIDO Y BRUÑADO m212.03 CONTRAZOCALO RECTO DE ESCALERAS m13 CUBIERTAS13.01 IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA 227.94 m2

segundo piso 1 23.67 9.63 227.94

13.02 COBERTURA C/TEJA ARCILLA EN CERCO DE LADRILLO m13.03 COBERTURA CON TEJA DE ARCILLA 42X20 ASENTADO C/MEZCLA 227.94 m2

segundo piso 1 23.67 9.63 227.94

13.04 CUMBRERA DE TEJA DE ARCILLA 42X20 ASENTADO C/MEZCLA 23.67 m1 23.67 23.67

14 CARPINTERIA DE MADERA14.01 PUERTA CEDRO TIPO TABLERO C/TRAGALUZ - AULAS 19.80 m2

primer piso 3 1.10 3.00 9.90segundo piso 3 1.10 3.00 9.90

14.02 PUERTA CEDRO MACHIMBRADA m214.03 PUERTA CON TRIPLAY 9mm P/SSHH. m214.04 VENTANA CEDRO-AULAS C/SEG 91.20 m2

v1 18 2.65 1.60 76.32v2 6 1.55 1.60 14.88

14.05 TICERO DE MADERA CEDRO (L=5 m) BARNIZADO 3.00 und3 3.00

14.06 MESA BATIENTE DE MADERA und

15 CARPINTERIA METALICA Y HERRERIA15.01 PASAMANO DE TUBO FºGº DE 2" EN ESCALERA m15.02 CANTONERA DE ALUMINIO EN ESCALERA m16 CERRAJERIA16.01 BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA 24.00 pza

P1 24 24.00

Page 19: Metrado General Checopon

METRADO (04 AULAS )

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

16.02 BISAGRA DE ACERO ALUMINIZADO DE 2.5" PESADA EN PUERTA/VENTANA 192.00 pzaV1 144 144.00V2 48 48.00

16.03 CERRADURA DOS GOLPES EN PUERTA 6.00 pzaP1 6 6.00

16.04 CERROJO "SAPITO" SEGURIDAD BAT.VENTANA 96.00 pzaV1 72 72.00V2 24 24.00

16.05 MANIJA DE BRONCE 4" PARA PUERTAS 6.00 pzaP1 6 6.00

16.06 CERROJO DE 3" ALUMINIZADO PARA PUERTA pza17 VIDRIOS, CRISTALES Y SIMILARES17.01 VIDRIOS SEMIDOBLES IMPORTADO coef. 981.58 p2

v1 18 10.76 2.65 1.60 821.43v2 6 10.76 1.55 1.60 160.15

18 PINTURA18.01 PINTURA LATEX 2 MANOS EN CIELO RASO 413.43 m2

idem partida 08.01 413.43 413.43

18.02 PINTURA OLEO 2 MANOS EN VIGAS 272.06 m2idem partida 7.05 272.06 272.06

18.03 PINTURA OLEO 2 MANOS EN MUROS Y COLUMNA 769.87 m2idem partida 7.02 347.69 347.69idem partida 7.03 136.85 136.85idem partida 7.04 285.33 285.33

18.04 PINT. ANTICOR. ESMALTE 2 MANOS EN BARRAS DE SEGURIDAD 304.96 mv1 96 2.66 255.36v2 32 1.55 49.60

18.05 PINTURA BARNIZ EN CARP.DE MADERA 414.62 m2idem partida 14.01 19.80 19.80idem partida 14.04 91.20 91.20idem partida 10.02 0.00 0.10 0.10idem partida 9.02 151.76 151.76idem partida 9.03 151.76 151.76

18.06 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H=20 101.30 midem partida 10.01 101.30 101.30

19 VARIOS, LIMPIEZA Y JARDINERIA19.01 LIMPIEZA PERMANENTE DE LA OBRA 1.00 GLB

1 1.00

19.02 JUNTA DE DILATACION CON ESPUMA PLASTICA+JEBE MICROPOROSO 15.40 msegundo nivel techo 2 6.95 13.90

segundo nivel pasadizo 1 1.50 1.50

19.03 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" 101.30 mentre muro y veredas

eje 1-1 1 22.80 22.80eje 3-3 1 18.90 18.90

eje a-a/ e-e 2 7.85 15.70en veredas

frontal 7 1.50 10.50lateral 3 1.00 3.00

posterior 7 1.00 7.00entre vereda y canal pluvial 1 23.40 23.40

19.04 TAPAJUNTA METALICA EN PISOS 15.40 msegundo nivel techo 2 6.95 13.90

segundo nivel pasadizo 1 1.50 1.50

19.05 TAPAJUNTA METALICA ENTRE MODULOS (VERTICAL) 12.80 m

Page 20: Metrado General Checopon

METRADO (04 AULAS )

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

4 3.20 12.80

19.06 PIZARRA CEMENTO 5x1.2 SIN TISERO 4.00 pza4 4.00

20.00 EQUIPAMIENTO No Alum Aulas S.Comp. Biblio. Administ.No de Alumnos / Aulas / Sala de cómputo /Biblioteca/Administrativos 33 4 1 1 5

20.01 MOBILIARIO ESCOLAR PARA PRIMARIA SEGUN DISEÑO S/. 0.00 und

Mesa de madera 2.40x1.20x0.90m 4.00 1.00 1.00 5.00 11.00Sillas de madera 4.00 1.00 1.00 15.00 21.00Estante de madera tornillo de 1.8x1.2m 4.00 1.00 1.00 10.00 16.00Escritorios para Ambientes administrativos 5.00 5.00Carpetas para aulas 42 42.00

20.02 ESCRITORIO DE MADERA TORNILLO S/. 0.00 undEscritorios para aulas 4.00 4.00Sillas de madera 4.00 4.00

20.03 MODULO P/COMPUTADORAS und

Escritorio para computadoras 11 11.00Computadoras (incluye cables y accesorrios) 11 11.00

20.04 MODULO P/BIBLIOTECA DE LECTURA und

Mesa de madera 2.40x1.20x0.90m 4.00 4.00Sillas de madera 20.00 20.00Estante de madera tornillo de 1.8x1.2m 4.00 4.00

Page 21: Metrado General Checopon

METRADO (BIBLIOTECA+ADM.+SUM+SRU)

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

01 OBRAS PROVISIONALES01.01 ALMACEN, OFICINA Y CASETA DE GUARDIANIA m2

Almacén Oficina

Caseta guardiania

01.02 CARTEL METALICO DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und

01.03 SERVICIOS HIGIENICOS m2Para obreros

Para personal planta

01.04 AGUA PARA LA CONSTRUCCION GLB

02 TRABAJOS PRELIMINARES02.01 LIMPIEZA DE TERRENO MANUAL 348.65 348.65 m2

02.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA GLB

02.04 FLETE TERRESTRE GLB

02.05 TRAZO Y REPLANTEO PRELIMINAR 348.65 m2Pabellon General 1

348.65Vereda delantera 1Vereda posterior 1

Vereda lateral 1Canaleta 1

03 MOVIMIENTO DE TIERRAS03.01 EXCAVACION DE ZANJAS Y ZAPATAS 194.56 m3

ZapatasZ1 14 2.10 2.10 1.55 95.70Z2 1 2.50 2.10 1.55 8.14Z3 2 3.45 1.50 1.55 16.04Z4 2 1.50 1.50 1.55 6.98

Vigas cimentacionEje 1-1 6 1.45 0.60 1.50 7.83Eje 3-3 6 1.45 0.60 1.50 7.83

Eje B-B/D-D/F-F 3 5.27 0.60 1.50 14.23Eje C-C/E-E/G-G 6 1.89 0.60 1.50 10.18

EjeA-A 1 0.59 0.60 1.50 0.53EjeA-A 1 1.69 1.26 1.50 3.18EjeA-A 1 0.42 0.18 1.50 0.11

Entre Eje1-1, Eje H-H, Eje I-I 1 2.34 0.60 1.50 2.10Entre Eje1'-1', Eje H-H, Eje I-I /Entre Eje2'-2', Eje H-H, Eje I- 2 3.34 0.60 1.50 6.02

EjeH-H 1 1.69 0.60 1.50 1.52EjeH-H 2 1.24 0.60 1.50 2.23

Cimiento corridoEntre Eje1-1, Eje1'-1' 1 2.41 0.50 1.25 1.51

2 2.07 0.60 1.25 3.11Entre eje J 1 8.60 0.50 1.25 5.38

Entre ejes 9 y 10 1 3.10 0.50 1.25 1.94

03.02 CORTE DE TERRENO HASTA 0.40 M SIN APISONADO 296.69 m2Aulas 1 21.84 7.36 160.74

Vereda delantera 1 23.65 2.10 49.67Vereda posterior 1 23.65 1.25 29.56

Vereda lateral 2 7.82 1.00 15.64Cuneta 1 82.15 0.50 41.08

03.03 RELLENO Y COMP. MANUAL- MAT. DE AFIRMADO e= 0.40 m 99.13 m3aulas 1 21.84 7.36 0.40 64.30

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

Page 22: Metrado General Checopon

METRADO (BIBLIOTECA+ADM.+SUM+SRU)

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

vereda delantera 1 23.65 2.10 0.40 19.87verada posterior 1 23.65 1.25 0.40 11.83

vereda lateral 1 7.82 1.00 0.40 3.13

03.04 ACARREO INTERNO DE MAT. PROCEDENTE DE EXC. 375.88 m3item 3.1 194.56 1.20 233.47item 3.2 118.68 1.20 142.41

3.07 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA 375.88 m3item 3.1 233.47 1.00 233.47item 3.2 142.41 1.00 142.41

04 CONCRETO SIMPLE04.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 1.77 m3

Cimiento corridoEntre Eje1-1, Eje1'-1' 1 2.41 0.50 0.25 0.30

Entre eje J 1 8.60 0.50 0.25 1.08Entre ejes 9 y 10 1 3.10 0.50 0.25 0.39

04.02 SOBRECIMIENTO Fc=175 KG/CM2 + 25% PM 6.49 m3sobrecimiento

eje 1-1 6 2.30 0.15 1.10 2.28eje 3-3 6 2.30 0.15 1.10 2.28

Entre eje J 1 8.60 0.15 1.10 1.42Entre ejes 9 y 10 1 3.10 0.15 1.10 0.51

04.03 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO 86.46 m2sobrecimiento

eje 1-1 12 2.30 1.10 30.36eje 3-3 12 2.30 1.10 30.36

Entre eje J 2 8.60 1.10 18.92Entre ejes 9 y 10 2 3.10 1.10 6.82

04.04 FALSO PISO MEZCLA 1:8 e=4" 152.79 m2entre eje 1-1/3-3 eje a-a/e-e 3 6.92 7.36 152.79

04.05 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON 81.84 m2zapatas

Z1 14 2.10 2.10 61.74Z2 1 2.50 2.10 5.25Z3 2 3.45 1.50 10.35Z4 2 1.50 1.50 4.50

05 OBRAS DE CONCRETO ARMADO05.01 ZAPATAS, CONCRETO F'c=210 KG/CM2 43.11 m3

zapatasZ1 10 2.10 2.10 0.60 26.46

4 2.10 2.10 0.60 10.58Z2 1 2.50 2.10 0.60 3.15Z3 2 3.45 1.50 0.60 6.21Z4 2 1.50 1.50 0.60 2.70

05.02 ZAPATAS, ACERO FY=4200KG/CM2 861.31 kgacero principal veces cant. long. coef.

Z1 ==> 1/2" 14 24 1.95 0.99 648.65Z2 ==> 1/2" LONG 1 12 2.35 0.99 27.92

TRANSV 1 14 1.95 0.99 27.03Z4 ==> 1/2" 2 18.00 1.35 0.99 48.11

Z3 ==> 1/2" LONG 2 9.00 3.30 0.99 58.81TRANSV 2 19.00 1.35 0.99 50.79

05.03 VIGA DE CIMENTACION FC=210 KG/CM2 14.76 m3

Page 23: Metrado General Checopon

METRADO (BIBLIOTECA+ADM.+SUM+SRU)

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

vigas cimentacion

eje 1-1 1 21.65 0.30 0.45 2.92eje 3-3 1 21.65 0.30 0.45 2.92

eje a-a 1 7.62 0.30 0.45 1.03eje a´-a´ 1 7.62 0.30 0.70 1.60eje b´-b´ 1 7.62 0.30 0.45 1.03eje b-b 1 7.62 0.30 0.70 1.60eje c-c 1 7.62 0.30 0.45 1.03eje d-d 1 7.62 0.30 0.70 1.60eje e-e 1 7.62 0.30 0.45 1.03

05.04 VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO 98.43 m2vigas cimentacion

eje 1-1 2 21.65 0.45 19.49eje 3-3 2 21.65 0.45 19.49

eje a-a 2 7.62 0.45 6.86eje a´-a´ 2 7.62 0.70 10.67eje b´-b´ 2 7.62 0.45 6.86eje b-b 2 7.62 0.70 10.67eje c-c 2 7.62 0.45 6.86eje d-d 2 7.62 0.70 10.67eje e-e 2 7.62 0.45 6.86

05.05 VIGAS DE CIMENTACION, ACERO FY=4200KG/CM2 1853.25 kgacero principal veces cant. long. coef.

5/8" 2 6.00 22.20 1.55 412.925/8" 1 7.00 8.00 1.55 86.805/8" 3 8.00 8.00 1.55 297.605/8" 2 8.00 8.00 1.55 198.405/8" 1 8.00 8.00 1.55 99.20

estribos3/8" 2 112.00 2.65 0.56 332.423/8" 7 41.00 2.65 0.56 425.91

05.06 SOBREC. REF. CONCRETO 175 kg/cm2 7.11 m3

eje a-a 2 2.97 0.25 1.15 1.71eje b´-b´ 2 3.12 0.25 1.15 1.79eje c-c 2 3.30 0.25 1.15 1.90eje e-e 2 2.98 0.25 1.15 1.71

05.07 SOBREC. REF., ENCOFRADO DESENCOFRADO 56.90 m2

eje a-a 4 2.97 1.15 13.66eje b´-b´ 4 3.12 1.15 14.35eje c-c 4 3.30 1.15 15.18eje e-e 4 2.98 1.15 13.71

05.08 SOBREC. REF., ACERO FY=4200KG/CM2 124.32 kgveces cant. long. coef.

h 3 4.00 8.00 0.56 53.76v 3 28.00 1.50 0.56 70.56

05.09 COLUMNAS, CONCRETO 175 kg/cm2 (COLUMNETAS) 3.11 m3primer piso

eje 1-1 12 0.25 0.13 1.95 0.76eje 3-3 12 0.25 0.13 1.95 0.76

segundo piso

Page 24: Metrado General Checopon

METRADO (BIBLIOTECA+ADM.+SUM+SRU)

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

eje 1-1 12 0.25 0.13 1.30 0.51eje 3-3 12 0.25 0.13 1.30 0.51

en parapeto 16 0.25 0.13 1.10 0.57

05.10 COLUMNAS, CONCRETO 210 kg/cm2, (1er. PISO) Factor Area 16.78 m3CL 4 1.00 0.22 4.80 4.22CT 10 1.00 0.24 4.80 11.52C2 3 1.00 0.07 4.80 1.04

05.11 COLUMNAS, CONCRETO 210 kg/cm2, (2do. PISO) Factor Area 13.22 m3CL 4 1.00 0.22 3.70 3.26CT 10 1.00 0.24 3.70 8.88C2 3 1.00 0.07 5.00 1.08

05.12 COLUMNAS, ENCOFRADO DESENCOFRADO 366.21 m2

primer piso perim.CL 4 1.95 4.80 37.44CT 10 2.30 4.80 110.40C2 3 1.08 4.80 15.55

segundo pisoCL 4 1.95 3.70 28.86CT 10 2.30 3.70 85.10C2 3 1.08 5.00 16.20

columnetas primer pisoeje 1-1 12 0.76 1.95 17.78eje 3-3 12 0.76 1.95 17.78

columnetas segundo pisoeje 1-1 12 0.76 1.30 11.86eje 3-3 12 0.76 1.30 11.86

en parapeto 16 0.76 1.10 13.38

05.13 COLUMNAS, ACERO FY=4200KG/CM2 5247.51 kgprimer piso veces cant. long. coef.

acero principalCL ==> 3/4" 4 6.00 5.10 2.24 274.18CL ==> 5/8" 4 6.00 5.10 1.55 189.72CT ==> 3/4" 10 4.00 5.10 2.24 456.96CT ==> 5/8" 10 8.00 5.10 1.55 632.40C2 ==> 5/8" 6 3.00 5.10 1.55 142.29C6 ==> 3/8" 24 6.00 2.45 0.56 197.57

estribos CL ==> 3/8" 8 28.00 1.41 0.56 176.87CT ==> 3/8" 20 28.00 1.41 0.56 442.18C2 ==> 3/8" 4 28.00 1.00 0.56 62.72C6 ==> 1/4" 24 18.00 0.65 0.25 70.20

segundo pisoacero principal

CL ==> 3/4" 4 6.00 5.00 2.24 268.80CL ==> 5/8" 4 6.00 5.00 1.55 186.00CT ==> 3/4" 10 4.00 5.00 2.24 448.00CT ==> 5/8" 10 8.00 5.00 1.55 620.00C2 ==> 5/8" 6 3.00 6.30 1.55 175.77C6 ==> 3/8" 24 6.00 1.80 0.56 145.15

parapeto C6 ==> 3/8" 16 6.00 1.30 0.56 69.89estribos

CL ==> 3/8" 8 24.00 1.41 0.56 151.60CT ==> 3/8" 20 24.00 1.41 0.56 379.01C2 ==> 3/8" 4 30.00 1.00 0.56 67.20C6 ==> 1/4" 24 14.00 0.65 0.25 54.60

parapetos C6 ==> 1/4" 16 14.00 0.65 0.25 36.40

Page 25: Metrado General Checopon

METRADO (BIBLIOTECA+ADM.+SUM+SRU)

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

05.17 GARGOLAS DE CONCRETO, TERMINADO S/DISEÑO volum. 0.02 m3segun plano 3 0.01 0.02

05.18 VIGAS, CONCRETO 175 kg/cm2 (VIGUETAS AMARRE) 1.12 m3primer piso 12 2.61 0.13 0.10 0.41

segundo piso 12 2.61 0.13 0.10 0.41parapeto 1 23.25 0.13 0.10 0.30

05.19 VIGAS, CONCRETO 210 kg/cm2, (1er. PISO) 17.78 m3v-1 2 21.71 0.25 0.45 4.88v-2 1 21.71 0.10 0.40 0.87v-3 7 2.10 0.35 0.48 2.47v-4 4 7.80 0.25 0.70 5.46v-5 3 7.80 0.25 0.70 4.10

05.20 VIGAS, CONCRETO 210 kg/cm2, (2do. PISO) 21.43 m3v-1 2 21.71 0.25 0.45 4.88v-8 8 2.10 0.35 0.65 3.82

8 4.25 0.25 0.45 3.834 7.80 0.25 0.50 3.90

v-9 6 2.10 0.25 0.45 1.426 3.79 0.35 0.45 3.58

05.21 VIGAS, ENCOFRADO DESENCOFRADO 337.82 m2primer piso perim.

v-1 2 21.71 1.30 56.45v-2 1 21.70 0.90 19.53v-3 7 2.10 1.31 19.26v-4 4 7.80 0.64 19.97v-5 3 7.80 1.45 33.93

segundo pisov-1 2 21.71 1.30 56.45v-8 8 2.10 1.65 27.72

8 3.68 0.64 18.844 7.28 0.64 18.64

v-9 6 2.10 1.65 20.796 3.79 1.25 28.43

viguetas de amarreprimer piso 24 2.74 0.10 6.58

segundo piso 24 2.74 0.10 6.58parapeto 2 23.25 0.10 4.65

05.22 VIGAS, ACERO FY=4200KG/CM2 3066.87 kgacero principal

primer piso veces cant. long. coef.v-1 ==> 5/8" 2 4.00 23.81 1.55 295.24v-1 ==> 1/2" 2 1.00 23.81 0.99 47.14v-2 ==> 1/2" 1 2.00 23.81 0.99 47.14v-3 ==> 5/8" 5 4.00 2.65 1.55 82.15v-4 ==> 1/2" 4 4.00 9.00 0.99 142.56v-5 ==>3/4" 3 4.00 9.00 2.24 241.92v-5 ==>5/8" 3 4.00 9.00 1.55 167.40

segundo pisov-1 ==> 5/8" 2 4.00 23.81 1.55 295.24v-1 ==> 1/2" 2 1.00 23.81 0.99 47.14v-8 ==> 3/8" 7 4.00 5.50 0.56 86.24v-8 ==> 5/8" 7 2.00 3.45 1.55 74.87v-8 ==> 1/2" 7 2.00 2.80 0.99 38.81v-8 ==> 3/8" 4 4.00 8.30 0.56 74.37v-9 ==> 3/4" 5 2.00 6.90 2.24 154.56

Page 26: Metrado General Checopon

METRADO (BIBLIOTECA+ADM.+SUM+SRU)

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

v-9 ==> 5/8" 5 2.00 6.30 1.55 97.65v-9 ==> 1/2" 5 2.00 2.45 0.99 24.26

vigas de amarrepiso 1 3/8" 12 2.00 2.80 0.56 37.63piso 2 3/8" 12 2.00 2.80 0.56 37.63parapeto 1 2.00 30.78 0.56 34.47

estribosprimer piso veces cant. long. coef.

v-1 ==> 3/8" 8 20.00 1.41 0.56 126.34v-2 ==> 1/4" 4 34.00 0.50 0.25 17.00v-3 ==> 3/8" 5 11.00 1.71 0.56 52.67v-4 ==> 1/4" 8 20.00 0.79 0.25 31.60v-5 ==> 3/8" 3 40.00 1.71 0.56 114.91

segundo pisov-1 ==> 3/8" 8 20.00 1.41 0.56 126.34v-8 ==> 1/4" 7 20.00 0.74 0.25 25.90v-8 ==> 1/4" 7 20.00 0.74 0.25 25.90v-8 ==> 1/4" 7 11.00 4.00 0.25 77.00v-9 ==> 3/8" 5 24.00 1.51 0.99 179.39v-9 ==> 3/8" 5 11.00 4.00 0.99 217.80

vigas de amarrepiso 1 3/8" 12 28.00 0.20 0.25 16.80piso 2 3/8" 12 28.00 0.20 0.25 16.80parapeto 1 240.00 0.20 0.25 12.00

05.23 LOSA ALIGERADA, CONCRETO 210 kg/cm2 30.21 m3primer piso 6 7.63 3.28 0.20 30.03

6 3.17 2.00 0.20 7.61-8.333 0.01 150.16 -16.89-8.333 0.01 38.04 -4.28

segundo piso 12 3.79 3.28 0.17 25.3612 2.00 3.17 0.17 12.93

aleros 6 3.79 0.60 0.17 2.32-8.333 0.01 149.17 -16.78-8.333 0.01 76.08 -8.56-8.333 0.01 13.64 -1.53

05.24 LOSA ALIGERADA, ENCOFRADO DESENCOFRADO 411.68 m2primer piso 6 7.91 3.28 155.67

6 3.17 1.40 26.63segundo piso 12 3.79 3.28 149.17

12 1.75 3.17 66.57aleros 6 3.79 0.60 13.64

05.25 LOSA ALIGERADA, ACERO Fy=4200KG/CM2 2122.51 kgprimer piso veces cant. long. coef.

(+) 1/2" 33 1.00 15.28 0.99 499.20(-) 1/2" 33 1.00 6.35 0.99 207.45(-) 3/8" 33 2.00 1.20 0.56 44.35

1/4" 75 1.00 9.63 0.25 180.56segundo piso

(+) 1/2" 42 1.00 15.28 0.99 635.34(-) 1/2" 42 1.00 6.35 0.99 264.03(-) 3/8" 42 2.00 1.20 0.56 56.45

1/4" 75 2.00 6.27 0.25 235.13

05.26 LOSA ALIGERADA, LADR. HUECO 15x30X30 1420.74 undprimer piso 8.3333 6 7.31 3.28 1198.84

8.3333 6 3.17 1.40 221.90

05.27 LOSA ALIGERADA, LADR. HUECO 12x30X30 1911.57 und

Page 27: Metrado General Checopon

METRADO (BIBLIOTECA+ADM.+SUM+SRU)

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

segundo piso 8.3333 12 3.79 3.28 1243.128.3333 12 1.75 3.17 554.758.3333 6 3.79 0.60 113.70

05.28 ESCALERAS, CONCRETO 210 kg/cm2 m305.29 ESCALERAS, ENCOFRADO DESENCOFRADO m205.30 ESCALERAS, ACERO FY=4200KG/CM2 kg05.31 GRADAS EN PISO, CONCRETO 175 kg/cm2 m305.32 GRADAS EN PISO, ENCOFRADO DESENCOFRADO m206 MUROS Y TABIQUES DE ALBAÑILERIA06.01 MURO DE LADRILLO KK TIPO IV CABEZA M: 1:4,J:1.5CM 187.60 m2

primer pisoeje A-A/ C-C / E-E 8 3.35 3.10 83.08

segundo pisoeje A-A/ C-C / E-E 8 3.35 3.90 104.52

06.02 MURO DE LADRILLO KK TIPO IV SOGA M: 1:4,J:1.5CM 101.02 m2primer piso

eje 1-1/ 3-3 9 2.11 0.85 16.14eje 3-3 3 1.02 0.85 2.60

adm 1 8.55 2.60 22.23adm 1 3.69 2.60 9.59

segundo pisoeje 1-1/ 3-3 9 2.11 1.20 22.79

eje 3-3 3 1.02 1.20 3.67parapetos 1 24.00 1.00 24.00

06.03 ALAMBRE # 8REFUERZO HORIZONTAL EN MUROS 114.68 kgde cabeza veces cant. long. coef.

primer piso 8 11.00 3.85 0.12 40.66segundo piso 8 13.00 3.85 0.12 48.05

de sogaprimer piso 12 4.00 2.61 0.12 15.03

segundo piso 12 5.00 1.52 0.12 10.94

07 REVOQUES ENLUCIDOS Y MOLDURAS07.01 TARRAJEO PRIMARIO, MORTERO C:A 1:5 m207.02 TARRAJEO EN MURO: INTERIOR Y EXTERIOR 411.34 m2

primer pisoeje 1-1 12 2.11 0.85 21.52eje 3-3 6 2.11 0.85 10.76

6 1.02 0.85 5.20eje a-a 8 3.35 3.10 83.08eje c-c 4 3.35 3.10 41.54eje e-e 4 3.35 3.10 41.54adm 2 8.55 2.60 44.46adm 2 3.69 2.60 19.19

segundo pisoeje 1-1 6 2.11 1.20 15.19eje 3-3 3 2.11 1.20 7.60

3 1.02 1.20 3.67eje a-a 3 3.35 3.90 39.20eje c-c 4 3.35 3.90 52.26eje e-e 2 3.35 3.90 26.13

07.03 TARRAJEO EN MUROS EXT. A PARTIR DE 2do.PISO 136.85 m2segundo piso

eje 1-1 6 2.11 1.20 15.19eje 3-3 3 2.11 1.20 7.60

3 1.02 1.20 3.67eje a-a 4 3.35 3.90 52.26eje e-e 2 3.35 3.90 26.13

Page 28: Metrado General Checopon

METRADO (BIBLIOTECA+ADM.+SUM+SRU)

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

parapeto 2 16.00 1.00 32.00

07.04 TARRAJEO DE COLUMNAS 279.45 m2primer piso perim.

CL1 4 1.55 4.80 29.76CT1 6 1.80 4.80 51.84CT1 4 1.50 4.80 28.80C1 8 1.50 4.80C2 3 0.60 4.80 8.64

segundo pisoCL1 4 1.55 3.70 22.94CT1 6 1.80 3.70 39.96CT1 4 1.50 3.70 22.20C1 8 1.50 3.70C2 3 0.60 5.00 9.00

columnetas primer pisoeje 1-1 12 0.76 1.95 17.78eje 3-3 12 0.76 1.95 17.78

columnetas segundo pisoeje 1-1 12 0.63 1.30 9.83eje 3-3 12 0.63 1.30 9.83

en parapeto 16 0.63 1.10 11.09primer piso perim.

P1 6 3.18 4.80segundo piso

P2 6 3.18 3.70

07.05 TARRAJEO DE VIGAS 272.06 m2primer piso perim.

v-1 2 14.55 1.30 37.83v-2 1 14.55 0.90 13.10v-3 5 1.50 1.31 9.83v-4 4 7.80 0.64 19.97v-5 3 7.80 1.45 33.93

segundo pisov-1 2 14.55 1.30 37.83v-8 7 2.10 1.65 24.26

7 3.68 0.64 16.494 7.28 0.64 18.64

v-9 5 2.10 1.65 17.335 3.79 1.25 23.69

viguetas de amarreprimer piso 24 2.74 0.10 6.58

segundo piso 24 2.74 0.10 6.58parapeto 2 30.00 0.10 6.00

07.06 VESTIDURA DE DERRAMES (1:5) 231.00 mprimer piso

P1 3 6.70 20.10V1 9 8.50 76.50V2 3 6.30 18.90

segundo pisoP1 3 6.70 20.10V1 9 8.50 76.50V2 3 6.30 18.90

07.07 VESTIDURA DE DERRAMES CON BORDES BOLEADOS M:1:2 23.28 mparapeto 1 23.28 23.28

07.08 BRUÑAS SEGUN DETALLE (1 x 1 cm) 519.60 mprimer piso

muros

Page 29: Metrado General Checopon

METRADO (BIBLIOTECA+ADM.+SUM+SRU)

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

eje 1-1 2 17.23 34.4612 0.80 9.606 2.14 12.84

eje 3-3 2 17.23 34.4612 0.80 9.603 2.14 6.423 1.06 3.18

eje a-a/e-e 24 2.88 69.1212 3.33 39.966 6.43 38.58

eje c-c 2 6.43 12.86segundo piso

eje 1-1 2 17.23 34.4612 1.20 14.406 2.14 12.84

eje 3-3 2 17.23 34.4612 1.20 14.403 2.14 6.423 1.06 3.18

eje a-a/e-e 3 3.20 9.603 4.60 13.806 6.43 38.58

eje c-c 2 6.43 12.86parapeto 12 3.16 37.92

12 0.85 10.206 0.90 5.40

08 CIELO RASOS08.01 CIELO RASO CON MEZCLA C:A 1:5 413.43 m2

primer piso 6 7.31 3.28 143.866 3.17 1.40 26.63

segundo piso 12 3.79 3.28 149.1712 1.75 3.17 66.57

aleros 6 3.79 0.60 13.64frisos 6 6.00 0.17 6.12

2 21.87 0.17 7.44

08.02 VESTIDURA EN FONDO DE ESCALERAS m209 PISOS Y PAVIMENTOS09.01 PISO DE CEMENTO PULIDO Y BRUÑADO E=2" S/COLOREAR 29.27 m2

segundo piso 1 21.68 1.35 29.27

09.02 PISO DE CERAMICA DE ALTO TRANSITO 151.76 m2entre eje 1-1/3-3 eje a-a/e-e 3 6.92 7.31 151.76

09.03 PISO DE CERAMICA DE ALTO TRANSITO 151.76 m2entre eje 1-1/3-3 eje a-a/e-e 3 6.92 7.31 151.76

09.04 VEREDA CONCRETO 175 kg/cm2 E=4" FROT. Y BRUÑADO 83.55 m2frontal 1 2.10 22.66 47.59lateral 1 1.00 7.63 7.63

posterios 1 1.25 22.66 28.33

09.05 CONTRAPISO DE 40 mm m209.06 PISO CERAMICA DE ALTO TRANSITO 30x30 m209.07 CANALETA "MEDIA CAÑA" EN CIRCULACION 21.68 m

segundo piso 1 21.68 21.68

09.08 CANALETA DE EVACUACION PLUVIAL FC=175 KG/CM2 C/REJILLA 52.19 mfrontal 1 21.90 21.90lateral 1 7.63 7.63

posterios 1 22.66 22.66

Page 30: Metrado General Checopon

METRADO (BIBLIOTECA+ADM.+SUM+SRU)

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

10 CONTRAZOCALOS10.01 CONTR. S/COLOREAR H=20 cm MZ 1:2 e=1.5 cm 101.30 m

primer pisoeje 1-1 1 22.80 22.80eje 3-3 1 18.90 18.90

eje a-a/ e-e 2 7.85 15.70segundo piso 1.00

eje 3-3 1 18.90 18.90parapeto 1 24.00 24.00

10.02 CONTRAZOCALO DE MAD CEDRO 3/4" X 4" RODON DE 3/4" m

11 ZOCALOS11.01 ZOCALO DE MAYOLICA BLANCA 20x20 (1a.) m212 REVESTIMIENTO DE GRADAS Y ESCALERAS12.01 REVEST. C/CEMENTO PULIDO PASO Y CONTRAPASO m12.02 ACABADO DE DESCANSO CEMENTO PULIDO Y BRUÑADO m212.03 CONTRAZOCALO RECTO DE ESCALERAS m13 CUBIERTAS13.01 IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA 227.94 m2

segundo piso 1 23.67 9.63 227.94

13.02 COBERTURA C/TEJA ARCILLA EN CERCO DE LADRILLO m13.03 COBERTURA CON TEJA DE ARCILLA 42X20 ASENTADO C/MEZCLA 227.94 m2

segundo piso 1 23.67 9.63 227.94

13.04 CUMBRERA DE TEJA DE ARCILLA 42X20 ASENTADO C/MEZCLA 23.67 m1 23.67 23.67

14 CARPINTERIA DE MADERA14.01 PUERTA CEDRO TIPO TABLERO C/TRAGALUZ - AULAS 19.80 m2

primer piso 3 1.10 3.00 9.90segundo piso 3 1.10 3.00 9.90

14.02 PUERTA CEDRO MACHIMBRADA m214.03 PUERTA CON TRIPLAY 9mm P/SSHH. m214.04 VENTANA CEDRO-AULAS C/SEG 91.20 m2

v1 18 2.65 1.60 76.32v2 6 1.55 1.60 14.88

14.05 TICERO DE MADERA CEDRO (L=5 m) BARNIZADO 3.00 und3 3.00

14.06 MESA BATIENTE DE MADERA und

15 CARPINTERIA METALICA Y HERRERIA15.01 PASAMANO DE TUBO FºGº DE 2" EN ESCALERA m15.02 CANTONERA DE ALUMINIO EN ESCALERA m16 CERRAJERIA16.01 BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA 24.00 pza

P1 24 24.00

16.02 BISAGRA DE ACERO ALUMINIZADO DE 2.5" PESADA EN PUERTA/VENTANA 192.00 pzaV1 144 144.00V2 48 48.00

Page 31: Metrado General Checopon

METRADO (BIBLIOTECA+ADM.+SUM+SRU)

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

16.03 CERRADURA DOS GOLPES EN PUERTA 6.00 pzaP1 6 6.00

16.04 CERROJO "SAPITO" SEGURIDAD BAT.VENTANA 96.00 pzaV1 72 72.00V2 24 24.00

16.05 MANIJA DE BRONCE 4" PARA PUERTAS 6.00 pzaP1 6 6.00

16.06 CERROJO DE 3" ALUMINIZADO PARA PUERTA pza17 VIDRIOS, CRISTALES Y SIMILARES17.01 VIDRIOS SEMIDOBLES IMPORTADO coef. 981.58 p2

v1 18 10.76 2.65 1.60 821.43v2 6 10.76 1.55 1.60 160.15

18 PINTURA18.01 PINTURA LATEX 2 MANOS EN CIELO RASO 413.43 m2

idem partida 08.01 413.43 413.43

18.02 PINTURA OLEO 2 MANOS EN VIGAS 272.06 m2idem partida 7.05 272.06 272.06

18.03 PINTURA OLEO 2 MANOS EN MUROS Y COLUMNA 827.64 m2idem partida 7.02 411.34 411.34idem partida 7.03 136.85 136.85idem partida 7.04 279.45 279.45

18.04 PINT. ANTICOR. ESMALTE 2 MANOS EN BARRAS DE SEGURIDAD 304.96 mv1 96 2.66 255.36v2 32 1.55 49.60

18.05 PINTURA BARNIZ EN CARP.DE MADERA 414.62 m2idem partida 14.01 19.80 19.80idem partida 14.04 91.20 91.20idem partida 10.02 0.00 0.10 0.10idem partida 9.02 151.76 151.76idem partida 9.03 151.76 151.76

18.06 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H=20 101.30 midem partida 10.01 101.30 101.30

19 VARIOS, LIMPIEZA Y JARDINERIA19.01 LIMPIEZA PERMANENTE DE LA OBRA 1.00 GLB

1 1.00

19.02 JUNTA DE DILATACION CON ESPUMA PLASTICA+JEBE MICROPOROSO 15.40 msegundo nivel techo 2 6.95 13.90

segundo nivel pasadizo 1 1.50 1.50

19.03 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" 101.30 mentre muro y veredas

eje 1-1 1 22.80 22.80eje 3-3 1 18.90 18.90

eje a-a/ e-e 2 7.85 15.70en veredas

frontal 7 1.50 10.50lateral 3 1.00 3.00

posterior 7 1.00 7.00

Page 32: Metrado General Checopon

METRADO (BIBLIOTECA+ADM.+SUM+SRU)

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

entre vereda y canal pluvial 1 23.40 23.40

19.04 TAPAJUNTA METALICA EN PISOS 15.40 msegundo nivel techo 2 6.95 13.90

segundo nivel pasadizo 1 1.50 1.50

19.05 TAPAJUNTA METALICA ENTRE MODULOS (VERTICAL) 12.80 m4 3.20 12.80

19.06 PIZARRA CEMENTO 5x1.2 SIN TISERO 3.00 pza3 3.00

19.07 MOBILIARIO ESCOLAR PARA PRIMARIA SEGUN DISEÑO S/. 0.00 und

19.08 ESCRITORIO DE MADERA TORNILLO S/. 0.00 und

19.09 MODULO P/COMPUTADORAS und19.10 MODULO P/BIBLIOTECA DE LECTURA und20 APARATOS SANITARIOS Y ACCESORIOS20.01 INODORO BLANCO D/LOSA 1era NAC.+T.ALTO DE PCV INC. ACCESSORIOS pza20.02 INODORO TANQUE BAJO DE LOSA 1ra CALIDAD ADULTO (NAC. BLANCO) pza20.03 DUCHA CROMADA 1 LLAVE INCL.ACCESORIOS und20.04 LAVATORIO DE PARED BLANCO 1 LLAVE pza20.05 URINARIO CORRIDO SEGUN DISEÑO REV. C/MAYOLICA DE 20x20 m20.06 BEBEDERO CORRIDO DE CONCRETO REVEST. C/MAYOLICA DE 20x20 m20.07 FALSA COLUMNA/PROTECCION TUBERIA BAJADA FC=175 KG/CM2 0.15 m3

2 0.20 0.25 1.50 0.15

21 INSTALACIONES SANITARIAS21.01 SALIDA DE DESAGUE EN PVC pto21.02 SALIDA PARA VENTILACION pto21.03 CANALETA DE FIERRO GALVANIZADO 47.40 m

2 23.70 47.4021.04 TUBERIA DE PVC SAL 2" m21.05 TUBERIA DE PVC SAL 4" m21.06 TUBERIA DE PVC SAP 3" P/LLUVIAS 14.80 m

2 7.40 14.8021.07 REGISTRO DE BRONCE 3" und21.08 REGISTRO DE BRONCE 4" und21.09 REJILLA DE BRONCE 3" und21.10 REJILLA DE BRONCE 4" und21.11 CAJA SUMIDERO CON REJILLA DE FIERRO und21.12 CAJA DE REG. ALB. 12"x24" C/TAPA CONCRETO und23 INSTALACIONES ELECTRICAS23.01 SALIDA DE TECHO (CENTRO DE LUZ) 32.00 pto

24 24.008 8.00

23.02 SALIDA PARA BRAQUETE (PARED) pto23.03 SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA 12.00 pto

12 12.00

23.04 POZO PUESTA A TIERRA INC. CABLE-2004 P-2 (R<5 0HMS) und

25 CAJAS25.01 CAJAS DE PASE FºGº 6"x6"x3" und26 TABLEROS Y CUCHILLAS (LLAVES)26.01 TAB. AUT. 1-3X125A, 1-3X20A, 2-3X15A, 1-3X50A, 1-2X10A, 1-2X15A und26.02 TAB. AUT. 1-3X20A,5-2X10A, 01 Int dif 10A 1.00 und

1 1.00

Page 33: Metrado General Checopon

METRADO (BIBLIOTECA+ADM.+SUM+SRU)

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

06 AULASITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

26.03 TAB. AUT. 1-3X15A,2-2X10A, 1-2X20A, 01 Int dif 20A und26.04 TAB. AUT. 1-3X50A,2-2X10A, 2-2X35A, 02 Int dif 35A und26.05 TAB. AUT. 1-2X15A,2-2X10A und26.06 TAB. AUT. 1-2X15A, 3-2X10A, 01 Int dif 10A und26.07 TAB. AUT. 1-3X15A, 2-2X10A, 1-2X15A, 01 Int dif 10A und27 ARTEFACTOS27.01 ART. FLUORESCENTE 2/36W (SIM. E JOSFEL) C/SOPORTE und27.02 ART. FLUORESCENTE 3/36W (SIM. E JOSFEL) C/SOPORTE 24.00 und

24 24.00

27.03 ART. FLUORESCENTE 2/18W (SIM. E JOSFEL) 6.00 und6 6.00

27.04 ART. FLUOR. 2/20W EMPOTRADO MARCO ALUM(DIF. PLAS) 6.00 und6 6.00

27.05 ART. T/PLASTICO CUADRADO C/LAMP. FLUORESC. CIRC. 32W und27.06 ART. BRAQ. C/SOCKET DE PORCELANA Y LAMP. 36W und

Page 34: Metrado General Checopon

METRADO COCINA-COMEDOR

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND01 OBRAS PROVISIONALES01.01 ALMACEN, OFICINA Y CASETA DE GUARDIANIA m201.02 CARTEL METALICO DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und01.03 SERVICIOS HIGIENICOS m201.04 AGUA PARA LA CONSTRUCCION GLB02 TRABAJOS PRELIMINARES02.01 LIMPIEZA DE TERRENO MANUAL 210.04 210.04 m202.02 DEMOLICION CIMIENTOS DE ADOBE Y PIEDRA m302.03 TRANSPORTE DE EQUIPO Y MAQUINARIA GLB02.04 | ton02.05 TRAZO Y REPLANTEO PRELIMINAR 210.04 m2

cocina - comedor 1 14.56 7.63 111.09vereda delantera 1 14.56 2.10 30.58vereda posterior 1 14.56 1.20 17.47veredas laterales 2 10.93 1.00 21.86

Cuneta 1 58.07 0.50 29.04

03 MOVIMIENTO DE TIERRAS03.01 EXCAVACION DE ZANJAS Y ZAPATAS 109.08 m3

zapatasZ1 10 2.10 2.10 1.55 68.36Z2 3 1.50 1.50 1.55 10.46

viga de cimentacioneje A-A 4 1.45 0.60 1.50 5.22eje C-C 4 1.45 0.60 1.50 5.22

eje 1-1 /4-4/ 5-5 3 3.80 0.60 1.50 10.26eje 2-2/ 3-3 2 5.31 0.60 1.50 9.56

03.02 CORTE DE TERRENO HASTA 0.50 M SIN APISONADO 181.00 m2cocina - comedor 1 14.56 7.63 111.09vereda delantera 1 14.56 2.10 30.58vereda posterior 1 14.56 1.20 17.47veredas laterales 2 10.93 1.00 21.86

03.03 RELLENO Y COMP. MANUAL- MAT. DE AFIRMADO 90.51 m3cocina - comedor 1 14.56 7.63 0.50 55.55vereda delantera 1 14.56 2.10 0.50 15.29vereda posterior 1 14.56 1.20 0.50 8.74veredas laterales 2 10.93 1.00 0.50 10.93

03.04 ACARREO INTERNO DE MAT. PROCEDENTE DE EXC. 199.58 m3item 3.1 109.08 109.08item 3.2 181.00 0.50 90.50

3.07 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA 239.50 m3item 3.1 109.08 1.20 130.90item 3.2 90.50 1.20 108.60

04 CONCRETO SIMPLE

4.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 5.04 m3cimientos

eje A-A 4 1.45 0.60 0.25 0.87eje C-C 4 1.45 0.60 0.25 0.87

eje 1-1 / 4-4 /5-5 3 3.79 0.60 0.25 1.71eje 2-2/3-3 2 5.31 0.60 0.25 1.59

4.02 SOBRECIMIENTO Fc=175 KG/CM2 + 25% PM 0.00 m3eje A-A 4 2.93 0.13 1.10eje C-C 4 2.93 0.13 1.10

eje 1-1 / 4-4 /5-5 3 3.07 0.24 1.10

4.03 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO 0.00 m2eje A-A 8 2.93 1.10eje C-C 8 2.93 1.10

eje 1-1 / 4-4 /5-5 6 3.07 1.10

Page 35: Metrado General Checopon

METRADO COCINA-COMEDOR

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND4.04 FALSO PISO MEZCLA 1:8 e=4" 111.09 m2

cocina comedor 1 14.56 7.63 111.09

4.05 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m34.06 SUBCIMIENTO FC=100 KG/CM2 m34.07 CONCRETO EN LOSA DEPORTIVA F'C=175 KG/CM2 m2

04.08 ENCOFRADO DE LOSAS DEPORTIVA05 OBRAS DE CONCRETO ARMADO05.01 ZAPATAS, CONCRETO F'C=210 KG/CM2 27.81 m3

Z1 10 2.10 2.10 0.60 26.46Z2 3 1.50 1.50 0.60 4.05

05.02 ZAPATAS, ACERO FY=4200KG/CM2 559.55 kgacero principal veces cant. long. coef.

Z1==> 1/2" 10 24 1.95 0.99 463.32Z2==> 1/2" 3 24 1.35 0.99 96.23

05.03 VIGA DE CIMENTACION CONCRETO FC=210 KG/CM2 16.48 m3eje A-A/ C-C 2 14.56 0.35 0.70 7.13

eje 1-1/ 2-2/ 3-3/ 4-4/ 5-5 5 7.63 0.35 0.70 9.35

05.04 VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO 94.18 m24 14.56 0.70 40.77

10 7.63 0.70 53.41

05.05 VIGAS DE CIMENTACION, ACERO FY=4200KG/CM2 853.04 kgacero principal veces cant. long. coef.

5/8" 2 7.00 7.63 1.55 165.571/2" 3 7.00 7.63 0.99 158.631/2" 2 7.00 14.56 0.99 201.80

estribos3/8" 2 41.00 1.60 0.56 73.473/8" 3 41.00 1.60 0.56 110.213/8" 8 20.00 1.60 0.56 143.36

05.06 SOBREC. REF. CONCRETO 175 kg/cm2 9.63 m3eje A-A 4 2.37 0.24 1.10 2.50eje C-C 4 2.73 0.24 1.10 2.88

eje 1-1/5-5 4 3.07 0.24 1.10 3.24eje 4-4 2 3.07 0.15 1.10 1.01

05.07 SOBREC. REF., ENCOFRADO DESENCOFRADO 66.64 m2eje A-A 8 2.37 1.10 20.86eje C-C 4 2.73 1.10 12.01

eje 1-1/5-5 8 3.07 1.10 27.02eje 4-4 2 3.07 1.10 6.75

05.08 SOBREC. REF., ACERO FY=4200KG/CM2 476.89 kgacero principal veces cant. long. coef.

V = 3/8" 6 20 2.93 0.56 196.906 21 2.93 0.56 206.74

H = 3/8" 6 4 2.38 0.56 31.996 4 3.07 0.56 41.26

05.09 COLUMNAS, CONCRETO 175 kg/cm2 (COLUMNETAS) 1.42 m3eje 1-1/3-3 8 0.25 0.15 2.35 0.71

8 0.25 0.15 2.35 0.71

05.10 COLUMNAS, CONCRETO 210 kg/cm2, (1er. PISO) Area 13.37 m3CL 4 0.22 5.10 4.49CT 6 0.24 5.10 7.34C1 3 0.08 6.85 1.54

05.11 COLUMNAS, CONCRETO 210 kg/cm2, (2er. PISO) m305.12 COLUMNAS, ENCOFRADO DESENCOFRADO 164.92 m2

CL 4 2.10 5.10 42.84CT 6 2.30 5.10 70.38C1 3 1.10 6.55 21.62

columnetas 16 0.80 2.35 30.08

05.13 COLUMNAS, ACERO FY=4200KG/CM2 2129.87 kgacero principal veces cant. long. coef.

CL ==> 5/8" 4 12.00 5.10 1.55 379.44CT ==> 3/4" 6 4.00 5.10 2.55 312.12CT ==> 5/8" 6 8.00 5.10 2.55 624.24C1 ==> 5/8" 3 6.00 6.55 0.56 66.02

Columetas ==> 3/8" 16 6.00 2.50 0.25 60.00

Page 36: Metrado General Checopon

METRADO COCINA-COMEDOR

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UNDestribos

CL==> 3/8" 4 31.00 1.41 0.56 97.91CL==> 3/8" 4 31.00 1.78 0.56 123.60CT==> 3/8" 6 31.00 1.88 0.56 195.82CT==> 3/8" 6 31.00 1.30 0.56 135.41C1 ==> 3/8" 3 38.00 1.08 0.56 68.95C3 ==> 1/4" 16 19.00 0.86 0.25 65.36

Columnetas ==> 1/4" 1.00

05.17 GARGOLAS DE CONCRETO, TERMINADO S/DISEÑO m305.18 VIGAS, CONCRETO 175 kg/cm2 (VIGUETAS AMARRE) 0.35 m3

6 2.88 0.13 0.15 0.341 0.72 0.13 0.15 0.01

05.19 VIGAS, CONCRETO 210 kg/cm2, (1er. PISO) 9.32 m3v-1 2 14.56 0.25 0.45 3.28v-8 2 7.13 0.30 0.50 2.14

2 1.60 0.30 0.80 0.774 4.28 0.30 0.15 0.77

v-9 6 5.95 0.25 0.15 1.34viga 2-2 8 3.28 0.15 0.15 0.59viga 1-1 8 3.28 0.10 0.15 0.39

4 0.60 0.10 0.15 0.04

05.20 VIGAS, CONCRETO 210 kg/cm2, (2er. PISO) m305.21 VIGAS, ENCOFRADO DESENCOFRADO 61.70 m2

v-1 8 3.28 0.45 11.818 3.28 0.45 11.818 3.28 0.10 2.62

v-8 8 3.07 0.45 11.054 3.07 0.05 0.612 1.60 0.30 0.964 1.60 0.30 1.92

v-9 6 5.35 0.25 8.033 1.60 0.45 2.166 1.60 0.25 2.40

viguetas amarre 12 2.87 0.20 6.892 1.22 0.20 0.49

viga 1-1 2 15.75 0.20 0.15 0.95

05.22 VIGAS, ACERO FY=4200KG/CM2 1176.29 kgacero principal veces cant. long. coef.

v1 ==> 5/8" 2 4.00 14.56 1.55 180.54v1 ==> 1/2" 2 1.00 14.56 0.99 28.83v8 ==> 5/8" 2 4.00 11.01 1.55 136.52v8 ==> 1/2" 2 2.00 11.01 0.99 43.60v8 ==> 1/2" 4 6.00 5.95 0.99 141.37v9 ==> 1/2" 6 6.00 5.95 0.99 212.06

viga 1-1 2 2.00 15.75 0.99 62.37viguetas amarre 3/8" 6 4.00 2.87 0.25 17.22

estribos 1 4.00 1.22 0.25 1.22v1 ==> 3/8" 2 126.00 0.85 0.56 119.95v8 ==> 1/4" 8 30.00 0.80 0.25 48.00v8 ==> 1/4" 4 36.00 0.80 0.25 28.80v9 ==> 3/8" 6 30.00 1.51 0.56 152.21

viguetas amarre 6 12.00 0.20 0.25 3.60

05.23 LOSA ALIGERADA, CONCRETO 210 kg/cm2 16.41 m32 15.75 5.95 0.20 37.49

-8.333 187.43 0.01 -21.08

05.24 LOSA ALIGERADA, ENCOFRADO DESENCOFRADO 159.46 m28 5.95 3.25 154.70

frisos 4 5.95 0.20 4.76

05.25 LOSA ALIGERADA, ACERO FY=4200KG/CM2 154.39 kgacero principal veces cant. long. coef.

3/8" 1 1.00 16.35 0.56 9.161/2" 1 1.00 16.35 0.99 16.191/4" 1 31.00 16.65 0.25 129.04

05.26 LOSA ALIGERADA, LADR. HUECO 15x30X30 1561.81 und2 15.75 5.95 8.33 1561.81

05.27 LOSA ALIGERADA, LADR. HUECO 12x30X30 m205.28 ESCALERAS, CONCRETO 210 kg/cm2 m305.29 ESCALERAS, ENCOFRADO DESENCOFRADO m205.30 ESCALERAS, ACERO FY=4200KG/CM2 kg05.31 GRADAS EN PISO, CONCRETO 175 kg/cm2 m305.32 GRADAS EN PISO, ENCOFRADO DESENCOFRADO m2

Page 37: Metrado General Checopon

METRADO COCINA-COMEDOR

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

06 MUROS Y TABIQUES DE ALBAÑILERIA06.01 MURO DE LADRILLO KK TIPO IV CABEZA M: 1:4,J:1.5CM 50.72 m2

eje 1-1/ 5-5 4 3.07 3.24 39.792 3.07 1.78 10.93

06.02 MURO DE LADRILLO KK TIPO IV SOGA M: 1:4,J:1.5CM 45.16 m2eje A-A /C-C 6 2.37 1.80 25.60

1 0.70 1.80 1.261 1.31 1.80 2.36

eje 4-4 1 3.21 2.94 9.441 2.21 2.94 6.50

06.03 ALAMBRE # 8 REFUERZO HORIZONTAL EN MUROS 39.17 kgsoga veces cant. long. coef.

6 4.00 2.97 0.12 8.551 4.00 1.00 0.12 0.481 4.00 1.61 0.12 0.77

Cabeza 4 15.00 3.67 0.12 26.42soga 2 4.00 3.07 0.12 2.95

07 REVOQUES ENLUCIDOS Y MOLDURAS07.01 TARRAJEO PRIMARIO, MORTERO C:A 1:5 m207.02 TARRAJEO EN MURO: INTERIOR Y EXTERIOR 191.72 m2

eje 1-1/ 5-5 8 3.07 3.24 79.574 3.07 1.78 21.86

eje A-A/ C-C 12 2.37 1.80 51.192 0.70 1.80 2.522 1.31 1.80 4.72

eje 4-4 2 3.21 2.94 18.872 2.21 2.94 12.99

07.03 TARRAJEO EN MUROS EXT. A PARTIR DE 2do.PISO m207.04 TARRAJEO DE COLUMNAS 164.92 m2

CL 4 2.1 5.10 42.84CT 6 2.3 5.10 70.38C1 3 1.1 6.55 21.62

columnetas 16 0.8 2.35 30.08

07.05 TARRAJEO DE VIGAS 61.70 m2v-1 8 3.28 0.45 11.81

8 3.28 0.45 11.818 3.28 0.1 2.62

v-8 8 3.07 0.45 11.054 3.07 0.05 0.612 1.6 0.3 0.964 1.6 0.3 1.92

v-9 6 5.35 0.25 8.033 1.6 0.45 2.166 1.6 0.25 2.4

viguetas amarre 12 2.87 0.2 6.892 1.22 0.2 0.49

viga 1-1 2 15.75 0.2 0.95

07.06 VESTIDURA DE DERRAMES (1:5) perim. 97.50 mP01 2 3.00 6.00

1 1.10 1.10P09 2 3.00 6.00

1 1.60 1.60V01 4 2.90 11.60

4 1.30 5.20V02 8 2.80 22.40

8 1.30 10.40V03 2 1.80 3.60

2 0.90 1.80V06 2 1.30 2.60

2 1.20 2.40V10 4 1.10 4.40

4 2.00 8.00VA2 4 2.00 8.00

4 0.60 2.40

07.07 VESTIDURA DE DERRAMES CON BORDES BOLEADOS M:1:2 m07.08 BRUÑAS SEGUN DETALLE (1 x 1 cm) 40.21 m

posterior 8 1.45 11.601 2.37 2.372 2.30 4.601 2.39 2.39

principal 2 1.85 3.701 1.32 1.324 1.46 5.841 2.39 2.39

Page 38: Metrado General Checopon

METRADO COCINA-COMEDOR

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND1 0.72 0.722 1.45 2.901 2.38 2.38

Page 39: Metrado General Checopon

METRADO COCINA-COMEDOR

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

08 CIELO RASOS08.01 CIELO RASO CON MEZCLA C:A 1:5 184.32 m2

2 14.56 5.95 173.262 15.76 0.20 6.304 5.95 0.20 4.76

08.02 VESTIDURA EN FONDO DE ESCALERAS m209 PISOS Y PAVIMENTOS09.01 PISO DE CEMENTO PULIDO Y BRUÑADO E=2" S/COLOREAR m209.02 MACHIEHEMBRADO DE MADERA PRIMER PISO 107.44 m2

1 14.17 7.31 103.583 7.15 0.18 3.86

09.03 MACHIEHEMBRADO DE MADERA SEGUNDO PISO m209.04 PATIO Y VEREDA CONCRETO 175 kg/cm2 E=4" FROT. Y BRUÑADO 47.43 m2

frontal 1 15.76 1.50 23.64lateral 2 9.23 0.50 9.23

posterior 1 14.56 1.00 14.56

09.05 CONTRAPISO DE 40 mm m209.06 PISO LOSETA VENECIANA 30x30 COLOR CLARO m209.07 CANALETA "MEDIA CAÑA" EN CIRCULACION m09.08 CANALETA DE EVACUAION PLUVIAL FC=175 KG/CM2 C/REJILLA 31.24 m

posterior 1 20.31 20.31lateral 1 10.93 10.93

10 CONTRAZOCALOS10.01 CONTR. S/COLOREAR H=20 cm MZ 1:2 e=1.5 cm 79.00 m

Eje A-A 2 11.48 22.96Eje C-C 2 8.73 17.46

Eje 1-1/ 4-4/ 5-5 6 6.43 38.58

10.02 CONTRAZOCALO DE MAD CEDRO 3/4" X 4" RODON DE 3/4" m

11 ZOCALOS11.01 ZOCALO DE MAYOLICA BLANCA 20x20 (1a.) m212 REVESTIMIENTO DE GRADAS Y ESCALERAS12.01 REVEST. C/CEMENTO PULIDO PASO Y CONTRAPASO m12.02 ACABADO DE DESCANSO CEMENTO PULIDO Y BRUÑADO m212.03 CONTRAZOCALO RECTO DE ESCALERAS m13 CUBIERTAS13.01 IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA 187.54 m2

2 15.76 5.95 187.54

13.02 COBERTURA C/TEJA ARCILLA EN CERCO DE LADRILLO m13.03 COBERTURA CON TEJA DE ARCILLA 42X20 ASENTADO C/MEZCLA 214.32 m2

2 16.36 6.55 214.32

13.04 CUMBRERA DE TEJA DE ARCILLA 42X20 ASENTADO C/MEZCLA 16.36 m1 16.36 16.36

14 CARPINTERIA DE MADERA14.01 PUERTA CEDRO TIPO TABLERO C/TRAGALUZ - AULAS 10.40 m2

P01 1 1.10 3.00 3.30P09 1 1.60 3.00 4.80P05 1 1.00 2.30 2.30

14.02 PUERTA CEDRO MACHIMBRADA m214.03 PUERTA CON TRIPLAY 9mm P/SSHH. m214.04 VENTANA CEDRO-AULAS C/SEG 32.08 m2

V01 2 2.90 1.30 7.54V02 4 2.80 1.30 14.56V03 1 1.80 0.90 1.62V06 1 1.30 1.20 1.56V10 2 2.00 1.10 4.40VA2 2 2.00 0.60 2.40

14.05 TICERO DE MADERA CEDRO (L=5 m) BARNIZADO und14.06 MESA BATIENTE DE MADERA und15 CARPINTERIA METALICA Y HERRERIA15.01 PASAMANO DE TUBO FºGº DE 2" EN ESCALERA m15.02 CANTONERA DE ALUMINIO EN ESCALERA m16 CERRAJERIA16.01 BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA 24.00 pza

P01 1 6.00 6.00P09 1 12.00 12.00P05 1 6.00 6.00

16.02 BISAGRA DE ACERO ALUMINIZADO DE 2.5" PESADA EN PUERTA/VENTANA 84.00 pza

Page 40: Metrado General Checopon

METRADO COCINA-COMEDOR

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UNDV01 2 8.00 16.00V02 4 8.00 32.00V03 1 4.00 4.00

Page 41: Metrado General Checopon

METRADO COCINA-COMEDOR

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UNDV06 1 8.00 8.00V10 2 8.00 16.00VA2 2 4.00 8.00

16.03 CERRADURA DOS GOLPES EN PUERTA 3.00 pzaP01 1 1.00 1.00P09 1 1.00 1.00P05 1 1.00 1.00

16.04 CERROJO "SAPITO" SEGURIDAD BAT.VENTANA 21.00 pzaV01 2 2.00 4.00V02 4 2.00 8.00V03 1 1.00 1.00V06 1 2.00 2.00V10 2 2.00 4.00VA2 2 1.00 2.00

16.05 MANIJA DE BRONCE 4" PARA PUERTAS 4.00 pzaP01 1 1.00P09 2 2.00P05 1 1.00

16.06 CERROJO DE 3" ALUMINIZADO PARA PUERTA pza16.06 CERROJO DE 10" ALUMINIZADO PARA PUERTA 8.00 pza

P01 2 2.00 4.00P09 2 2.00 4.00

17 VIDRIOS, CRISTALES Y SIMILARES17.01 VIDRIOS SEMIDOBLES IMPORTADO 32.08 p2

V01 2 2.90 1.30 7.54V02 4 2.80 1.30 14.56V03 1 1.80 0.90 1.62V06 1 1.30 1.20 1.56V10 2 2.00 1.10 4.40VA2 2 2.00 0.60 2.40

18 PINTURA18.01 PINTURA LATEX 2 MANOS EN CIELO RASO 184.32 m2

idem partida 08.01 184.32 184.32

18.02 PINTURA OLEO 2 MANOS EN VIGAS 61.70 m2idem partida 7.05 61.70 61.70

18.03 PINTURA OLEO 2 MANOS EN MUROS Y COLUMNA 356.64 m2idem partida 7.02 191.72 191.72idem partida 7.04 164.92 164.92

18.04 PINT. ANTICOR. ESMALTE 2 MANOS EN BARRAS DE SEGURIDAD 111.92 mV01 8 2.90 1.30 30.16V02 8 2.80 1.30 29.12V03 8 1.80 0.90 12.96V06 8 1.30 1.20 12.48V10 8 2.00 1.10 17.60VA2 8 2.00 0.60 9.60

18.05 PINTURA BARNIZ EN CARP.DE MADERA 150.02 m2idem partida 14.01 10.40 10.40idem partida 14.04 32.08 32.08idem partida 10.02 0.00 0.10 0.10idem partida 9.02 107.44 107.44

18.06 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H=20 79.00 midem partida 10.01 79.00 79.00

19 VARIOS, LIMPIEZA Y JARDINERIA19.01 LIMPIEZA PERMANENTE DE LA OBRA GLB19.02 JUNTA DE DILATACION CON ESPUMA PLASTICA+JEBE MICROPOROSO m19.03 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" 16.00 m

vereda frontal 4 1.50 6.00vereda alteral 6 1.00 6.00

vereda posterior 4 1.00 4.00

19.04 TAPAJUNTA METALICA EN PISOS m19.05 TAPAJUNTA METALICA ENTRE MODULOS (VERTICAL) m19.06 PIZARRA CEMENTO 4x1.2 SIN TISERO pza19.07 MOBILIARIO ESCOLAR PARA PRIMARIA SEGUN DISEÑO und19.08 ESCRITORIO DE MADERA TORNILLO und19.09 MODULO P/COMPUTADORAS und19.10 MODULO P/BIBLIOTECA DE LECTURA und20 APARATOS SANITARIOS Y ACCESORIOS20.01 INODORO BLANCO D/LOSA 1era NAC.+T.ALTO DE PCV INC. ACCESSORIOS pza20.02 INODORO TANQUE BAJO DE LOSA 1ra CALIDAD ADULTO (NAC. BLANCO) pza

Page 42: Metrado General Checopon

METRADO COCINA-COMEDOR

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND20.03 DUCHA CROMADA 1 LLAVE INCL.ACCESORIOS und20.04 LAVATORIO DE PARED BLANCO 1 LLAVE 1.00 pza

1 1.00

Page 43: Metrado General Checopon

METRADO COCINA-COMEDOR

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

20.05 URINARIO CORRIDO SEGUN DISEÑO REV. C/MAYOLICA DE 20x20 m20.06 BEBEDERO CORRIDO DE CONCRETO REVEST. C/MAYOLICA DE 20x20 m20.07 FALSA COLUMNA/PROTECCION TUBERIA BAJADA FC=175 KG/CM2 m321 INSTALACIONES SANITARIAS21.01 SALIDA DE DESAGUE EN PVC pto21.02 SALIDA PARA VENTILACION pto21.03 CANALETA DE FIERRO GALVANIZADO 29.12 m

2 14.56 29.12

21.04 TUBERIA DE PVC SAL 2" m21.05 TUBERIA DE PVC SAL 4" m21.06 TUBERIA DE PVC SAP 3" P/LLUVIAS 27.20 m

4 6.80 27.20

21.07 REGISTRO DE BRONCE 3" und21.08 REGISTRO DE BRONCE 4" und21.09 REJILLA DE BRONCE 3" und21.10 REJILLA DE BRONCE 4" und21.11 CAJA SUMIDERO CON REJILLA DE FIERRO und21.12 CAJA DE REG. ALB. 12"x24" C/TAPA CONCRETO und22 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO22.01 SALIDA DE AGUA FRIA-PVC pto22.02 VALVULA DE COMPUERTA DE BRONCE 1/2" und22.03 TUBERIA PVC CLASE 10 - 1/2" m22.04 TUBERIA PVC CLASE 10 - 1" m22.05 TUBERIA PVC CLASE 10 - 3/4" m22.06 VALVULA DE COMPUERTA DE BRONCE 3/4" und22.07 VALVULA CHECK DE BRONCE 1" und22.08 VALVULA DE COMPUERTA DE BRONCE 1" und22.09 VALVULA GLOBO 1/2" und22.10 CAJA DE MADERA PARA VALVULA pza22.11 CAJA PARA VALVULA (NICHO DE MAYOLICA) und22.12 CAJA BYPASS DE CONCRETO und23 INSTALACIONES ELECTRICAS23.01 SALIDA DE TECHO (CENTRO DE LUZ) 8.00 pto

8 8.00

23.02 SALIDA PARA BRAQUETE (PARED) pto23.03 SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA 4.00 pto

4 4.00

23.04 POZO PUESTA A TIERRA INC. CABLE-2004 P-2 (R<5 0HMS) und24 SALIDA PARA COMUNICACIONES Y SEÑALES24.01 SALIDA PARA RED DATA pto25 CAJAS25.01 CAJAS DE PASE FºGº 6"x6"x3" und26 TABLEROS Y CUCHILLAS (LLAVES)26.01 TAB. AUT. 1-3X125A, 1-3X20A, 2-3X15A, 1-3X50A, 1-2X10A, 1-2X15A und26.02 TAB. AUT. 1-3X20A,5-2X10A, 01 Int dif 10A und26.03 TAB. AUT. 1-3X15A,2-2X10A, 1-2X20A, 01 Int dif 20A und26.04 TAB. AUT. 1-3X50A,2-2X10A, 2-2X35A, 02 Int dif 35A und26.05 TAB. AUT. 1-2X15A,2-2X10A und26.06 TAB. AUT. 1-2X15A, 3-2X10A, 01 Int dif 10A und26.07 TAB. AUT. 1-3X15A, 2-2X10A, 1-2X15A, 01 Int dif 10A 1.00 und

1 1.00

27 ARTEFACTOS27.01 ART. FLUORESCENTE 2/36W (SIM. E JOSFEL) C/SOPORTE und27.02 ART. FLUORESCENTE 3/36W (SIM. E JOSFEL) C/SOPORTE 6.00 und

6 6.00

27.03 ART. FLUORESCENTE 2/18W (SIM. E JOSFEL) und27.04 ART. FLUOR. 2/20W EMPOTRADO MARCO ALUM(DIF. PLAS) 2.00 und

2 2.00

27.05 ART. T/PLASTICO CUADRADO C/LAMP. FLUORESC. CIRC. 32W und27.06 ART. BRAQ. C/SOCKET DE PORCELANA Y LAMP. 36W und28 CONEXION A RED EXTERNA Y MEDIDORES28.01 ALIM. CAB. NYY (3-1X25 + 1-1X1(N)+ 1-1X16(T)) mm2 m28.02 ALIM. CAB TW (4-1X4) mm2 m28.03 ALIM. CAB TW (4-1X10) mm2 m28.04 ALIM. CAB TW (3-1X4) mm2 m28.05 ALIM. CAB TW (3-1X10) mm2 m28.06 CABLE COBRE DESNUDO1x16mm2. diam 20mm PVC-P m29 CANALIZACIONES Y/O TUBERIAS29.01 TUBERIA PVC-P 35mm m29.02 TUBERIA PVC-P 25mm m

Page 44: Metrado General Checopon

METRADO SS.HH. ALUMNOS

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

01 OBRAS PROVISIONALES01.01 ALMACEN, OFICINA Y CASETA DE GUARDIANIA m201.02 CARTEL METALICO DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und01.03 SERVICIOS HIGIENICOS m201.04 AGUA PARA LA CONSTRUCCION GLB02 TRABAJOS PRELIMINARES02.01 LIMPIEZA DE TERRENO MANUAL 81.92 81.92 m202.02 DEMOLICION CIMIENTOS DE ADOBE Y PIEDRA m302.03 TRANSPORTE DE EQUIPO Y MAQUINARIA GLB02.04 FLETE TERRESTRE ton02.05 TRAZO Y REPLANTEO PRELIMINAR 81.92 m2

1.00 12.10 6.77 81.92

03 MOVIMIENTO DE TIERRAS03.01 EXCAVACION DE ZANJAS Y ZAPATAS 54.25 m3

Z1 10 1.00 1.00 1.55 15.50 EJE 1-1. 2-2 2 7.56 0.25 1.35 5.10 CIMENTACION S.H. ACCESIBLES 6 1.33 0.50 1.25 4.99 CIMENTACION S.H. ACCESIBLES 2 1.39 0.50 1.25 1.74 CIMENTACION S.H. ACCESIBLES 4 0.45 0.50 1.25 1.13 EJE A-A /B-B/C-C/D-D/E-E 5 2.29 0.25 1.35 3.86

EXTERIORESLATERALES 2 6.75 0.50 1.10 7.43POSTERIOR 2 12.00 0.50 1.10 13.20

RAMPA 2 1.80 0.40 0.90 1.3003.02 CORTE DE TERRENO 76.87 m2

EXTERIORES HASTA 0.40 M SIN APISONADOLATERALES 1 6.75 1.00 6.75LATERALES 1 6.75 1.50 10.13POSTERIOR 1 11.56 1.00 11.56DELANTE 1 11.56 2.20 25.43

INTERNO HASTA 0.25 M SIN APISONADO 1 23.00 1.00 23.0003.03 RELLENO Y COMPACTACION. MANUAL- MAT. DE AFIRMADO 27.29 m3

EXTERIORES HASTA 0.40 M LATERALES 1 6.75 1.00 0.40 2.70LATERALES 1 6.75 1.50 0.40 4.05POSTERIOR 1 11.56 1.00 0.40 4.62DELANTE 1 11.56 2.20 0.40 10.17

INTERNO HASTA 0.25 M 1 23.00 0.25 5.75

03.04 ACARREO INTERNO DE MAT. PROCEDENTE DE EXC. 81.55 m3item 3.1 54.25 54.25item 3.2 53.87 0.40 21.55item 3.2 23.00 0.25 5.75

3.07 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA 97.86 m3ESPONJAMIENTO 0,20 54.25 1.20 65.10ESPONJAMIENTO 0,20 27.30 1.20 32.76

04 CONCRETO SIMPLE04.01 CIMIENTOS CORRIDOS 6.15 m3

SSHHMEZCLA 1:10 CEMENTO-HORMIGON EJE 1-1. 2-2 2.00 7.56 0.25 0.10 0.38 EJE A-A /B-B/C-C/D-D/E-E 5.00 2.29 0.25 0.10 0.29 MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA CIMENTACION S.H. ACCESIBLES 6.00 1.33 0.50 0.50 2.00 CIMENTACION S.H. ACCESIBLES 2.00 1.39 0.50 0.50 0.70 CIMENTACION S.H. ACCESIBLES 4.00 0.45 0.50 0.50 0.45

UÑAS DE VEREDAS (h=0,30) 1.00 36.62 0.06 2.33

04.02 SOBRECIMIENTO FC=175 KG/CM2 + 25% PM m304.03 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO 28.52 m2

CIMENTACION S.H. ACCESIBLES 6.00 1.33 2.00 1.05 16.76 CIMENTACION S.H. ACCESIBLES 2.00 1.39 2.00 1.05 5.84 CIMENTACION S.H. ACCESIBLES 4.00 0.45 1.00 1.05 1.89 CIMENTACION S.H. ACCESIBLES 4.00 0.96 1.00 1.05 4.03

Page 45: Metrado General Checopon

METRADO SS.HH. ALUMNOS

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND04.04 FALSO PISO MEZCLA 1:8 e=4" AREA 79.12 m2

EXTERIORES HASTA 0.40 M LATERALES 1.00 6.75 1.00 6.75

Page 46: Metrado General Checopon

METRADO SS.HH. ALUMNOS

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UNDLATERALES 1.00 6.75 1.50 10.13POSTERIOR 1.00 11.56 1.00 11.56DELANTE 1.00 11.56 2.20 25.43

INTERNO HASTA 0.25 M 1.00 25.25 25.25

04.05 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:10 CEMENTO-HORMIGON 1.00 m3 Z1 ( SOLADO ZAPATAS 4'') 10.00 1.00 1.00 0.10 1.00

04.06 SUBCIMIENTO FC=100 KG/CM2 m304.07 CONCRETO EN LOSA DEPORTIVA F'C=175 KG/CM2 m304.08 ENCOFRADO DE LOSAS DEPORTIVA m2

05 OBRAS DE CONCRETO ARMADO05.01 ZAPATAS, CONCRETO F'C=210 KG/CM2 4.93 m3

Z1 10.00 1.00 1.00 0.60 6.00

05.02 ZAPATAS, ACERO FY=4200KG/CM2 100.98 kgveces cant. long. coef.

Z1 10.00 12.00 0.85 0.99 100.98

05.03 VIGA DE CIMENTACION FC=210 KG/CM2 4.03 m3 EJE 1-1. 2-2 2.00 10.31 0.25 0.45 2.32 EJE A-A /B-B/C-C/D-D/E-E 5.00 3.04 0.25 0.45 1.71

05.04 VIGAS DE CIMENTACION, ACERO FY=4200KG/CM2 544.39 kgveces cant. long. coef.

EJE 1-1 1 7.00 14.50 0.99 100.49 ESTRIBOS 1 64.00 1.35 0.56 48.38 EJE 2-2 1 7.00 14.50 0.99 100.49 ESTRIBOS 1 64.00 1.35 0.56 48.38 EJE A-A /B-B/C-C/D-D/E-E 5 7.00 4.50 0.99 155.93 ESTRIBOS 5 24.00 1.35 0.56 90.72

05.05 VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO 32.24 m2 EJE A-A /B-B/D-D/E-E 10 3.04 0.45 13.68 EJE 1-1 4 10.31 0.45 18.56 EJE 1-1

05.06 SOBREC. REF. CONCRETO 175 kg/cm2 5.94 m3SSHH

EJE 1-1. 2-2 2 8.60 0.15 1.15 2.97 EJE A-A /B-B/C-C/D-D/E-E 4 3.04 0.15 1.15 2.10

1 3.04 0.25 1.15 0.87

05.07 SOBREC. REF., ENCOFRADO DESENCOFRADO 91.00 m2SSHH

EJE A-A /B-B/C-C/D-D/E-E 8.00 3.04 1.15 27.972.00 3.04 1.15 6.99

EJE 1-1. 2-2 2.00 8.60 1.15 19.782.00 8.60 1.15 19.78

UÑAS DE VEREDAS 1.00 36.62 0.45 16.48

05.08 SOBREC. REF., ACERO FY=4200KG/CM2 1832.66 kgveces cant. long. coef.

EJE 1-1 2 4.00 9.50 0.56 42.56 ESTRIBOS 2 30.00 3.40 0.56 114.24

EJE 2-2 2 4.00 9.50 0.56 42.56 ESTRIBOS 2 30.00 3.40 0.56 114.24

EJE A-A /E-E 4 4.00 4.80 0.56 43.01 ESTRIBOS 4 13.00 3.40 0.56 99.01 ENTRE EJES A-A /E-E 2 4.00 4.80 0.56 21.50 ESTRIBOS 2 13.00 3.40 0.56 49.50 CIMENTACION S.H. ACCESIBLES 2 4.00 4.70 0.56 21.06 ESTRIBOS 2 15.00 3.40 0.56 57.12 BATEAS DE CIMENTACION 8 2.00 1.80 0.56 16.13

8 5.00 1.80 0.56 40.32EXTERIOR

LATERALES 8 7.00 13.00 0.56 407.688 29.00 2.00 0.56 259.84

POSTERIOR 4 7.00 13.00 0.56 203.844 50.00 2.00 0.56 224.00

RAMPA 4 10.00 1.75 0.56 39.204 7.00 2.35 0.56 36.85

Page 47: Metrado General Checopon

METRADO SS.HH. ALUMNOS

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

05.08 COLUMNAS, CONCRETO 210 kg/cm2, (1er. PISO) 2.72 m3 C1 10 0.25 0.25 4.35 2.72

05.09 COLUMNAS, ACERO FY=4200KG/CM2 494.94 kgveces cant. long. coef.

ESTRIBOS 2.00 17.00 0.84 0.56 15.99 C1 10.00 6.00 5.15 1.55 478.95

05.10 COLUMNAS, ENCOFRADO DESENCOFRADO 26.54 m2 EJE A-A /E-E 4 0.70 4.35 12.18

4 0.55 4.35 9.572 0.55 4.35 4.79

05.17 GARGOLAS DE CONCRETO, TERMINADO S/DISEÑO m305.18 VIGAS, CONCRETO 175 kg/cm2 (VIGUETAS AMARRE) 1.21 m3

VIGAS DE AMARRE FRONTIS 5-5 2 7.15 0.16 0.30 0.69 6-6 2 5.15 0.20 0.25 0.52

05.19 VIGAS, CONCRETO 210 kg/cm2, (1er. PISO) 9.50 m3 V-101 , EJE 1-1, 2-2 4 3.60 0.25 0.65 2.34

8 0.50 0.25 0.20 0.20 VS-2, EJE 1-1 2 3.20 0.13 0.20 0.17 VS-2, EJE 2-2 2 2.00 0.13 0.20 0.10

VS-2, S.H. ACCESIBLES 2 3.20 0.13 0.20 0.17 VIGA DE BORDE LATERALES 4 4.60 0.20 0.20 0.74

VIGA DE BORDE FRONTAL Y POSTERIOR 4 10.65 0.20 0.20 1.70 VIGA SOLERA VS-1 SUP 2 3.55 0.20 0.30 0.43 VIGA SOLERA VS-1 INF 2 3.55 0.24 0.20 0.34

V-102, EJE B-B 4 4.25 0.16 0.40 1.094 1.30 0.20 0.25 0.26

V-103, EJE A-A 4 4.25 0.25 0.40 1.704 1.30 0.20 0.25 0.26

05.21 VIGAS, ENCOFRADO DESENCOFRADO 67.67 m2 V-101 , EJE 1-1, 2-2 4 3.60 1.10 15.84

VS-2, EJE 1-1 2 3.20 0.40 2.56 VS-2, EJE 2-2 2 2.00 0.40 1.60

VS-2, S.H. ACCESIBLES 2 3.20 0.40 2.56 VIGA DE BORDE LATERALES 4 4.60 0.20 3.68

VIGA DE BORDE FRONTAL Y POSTERIOR 4 10.65 0.20 8.52 VIGA SOLERA VS-1 SUP 2 3.55 0.40 2.84 VIGA SOLERA VS-1 INF 2 3.55 0.20 1.42

V-102, EJE B-B 4 4.25 0.40 6.80 V-103, EJE A-A 4 4.25 0.40 6.80

VIGAS DE AMARRE FRONTIS 5-5 2 7.15 0.80 11.44 6-6 2 5.15 0.35 3.61

05.22 VIGAS, ACERO FY=4200KG/CM2 1196.41 kgveces cant. long. coef.

V-101 , EJE 1-1, 2-2 4 2.00 4.80 0.99 38.024 2.00 4.80 0.56 21.504 2.00 3.80 0.99 30.10

ESTRIBOS 4 24.00 2.50 0.56 134.40 ESTRIBOS 4 5.00 0.90 0.25 4.50

VS-2, EJE 1-1 2 4.00 3.90 0.56 17.47 ESTRIBOS 2 22.00 0.65 0.25 7.15

VS-2, EJE 2-2 2 4.00 2.60 0.56 11.65 ESTRIBOS 2 15.00 0.65 0.25 4.88

VS-2, S.H. ACCESIBLES 2 4.00 3.90 0.56 17.47 ESTRIBOS 2 30.00 0.65 0.25 9.75

VIGA DE BORDE LATERALES 4 4.00 11.00 0.56 98.56 ESTRIBOS INT 8 22.00 0.80 0.25 35.20 ESTRIBOS EXT 8 8.00 0.80 0.25 12.80

VIGA DE BORDE FRONTAL Y POSTERIOR 4 4.00 4.60 0.56 41.22 ESTRIBOS INT 4 18.00 0.80 0.25 14.40 ESTRIBOS EXT 8 5.00 0.80 0.25 8.00

VIGA SOLERA VS-1 SUP INT 2 4.00 3.90 0.56 17.472 4.00 3.90 0.99 30.89

VIGA SOLERA VS-1 SUP EXT 4 6.00 0.80 0.56 10.75 ESTRIBOS INT 2 20.00 3.80 0.56 85.12 ESTRIBOS EXT 4 4.00 2.35 0.56 21.06

Page 48: Metrado General Checopon

METRADO SS.HH. ALUMNOS

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND VIGA SOLERA VS-1 INF 2 4.00 3.90 0.56 17.47

ESTRIBOS INT 2 20.00 0.90 0.25 9.00 V-102, EJE B-B 4 2.00 12.40 0.99 98.21

4 2.00 2.15 0.56 9.63

Page 49: Metrado General Checopon

METRADO SS.HH. ALUMNOS

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND ESTRIBOS INT 4 26.00 1.90 0.56 110.66 ESTRIBOS EXT 4 4.00 1.55 0.25 6.20 V-103, EJE A-A 4 2.00 12.40 0.99 98.21

4 2.00 2.15 0.56 9.63 ESTRIBOS INT 4 26.00 1.35 0.56 78.62 ESTRIBOS EXT 4 4.00 1.55 0.25 6.20

VIGAS DE AMARRE FRONTIS 5-5 2 4.00 8.70 0.56 38.98 ESTRIBOS 4 21.00 1.15 0.25 24.15

6-6 4 2.00 3.10 0.56 13.89 ESTRIBOS 4 16.00 0.20 0.25 3.20

05.23 LOSA ALIGERADA, CONCRETO 210 kg/cm2 9.62 m32 6.95 5.74 0.20 15.96

32 5.50 0.10 0.15 2.64-8.333 79.79 0.01 -8.98

05.24 LOSA ALIGERADA, ENCOFRADO DESENCOFRADO 79.79 m22 6.95 5.74 79.79

05.25 LOSA ALIGERADA, ACERO FY=4200KG/CM2 467.66 kgveces cant. long. coef.

NEGATIVO 16 2.00 7.65 0.99 242.35 POSITVO 16 2.00 6.10 0.56 109.31

TEMPERATURA 4 20.00 5.80 0.25 116.00

05.26 LOSA ALIGERADA, LADR. HUECO 15x30X30 664.86 und2 6.95 5.74 8.33 664.86

05.27 LOSA ALIGERADA, LADR. HUECO 12x30X30 m205.28 ESCALERAS, CONCRETO 210 kg/cm2 m305.29 ESCALERAS, ENCOFRADO DESENCOFRADO m205.30 ESCALERAS, ACERO FY=4200KG/CM2 kg05.31 GRADAS EN PISO, CONCRETO 175 kg/cm2 area 4.73 m3

2 8.15 0.29 4.73

05.32 GRADAS EN PISO, ENCOFRADO DESENCOFRADO 7.94 m26 8.15 0.15 7.344 1.00 0.15 0.60

06 MUROS Y TABIQUES DE ALBAÑILERIA06.01 MURO DE LADRILLO KK TIPO IV CABEZA M: 1:4,J:1.5CM 26.73 m2

ENTRE EJE 1-1, 2-2 2 3.30 4.05 26.73

06.02 MURO DE LADRILLO KK TIPO IV SOGA M: 1:4,J:1.5CM 162.26 m2 EJE A-A 4 4.10 4.05 66.42 EJE B-B 4 2.55 2.05 20.91 EJE 1-1 2 3.20 2.05 13.12 EJE 2-2 2 1.90 2.05 7.79 S.H. ACCESIBLES 2 3.70 3.60 26.64 CUBICOLS DE BAÑOS 8 1.85 1.85 27.38

06.03 ALAMBRE # 8REFUERZO HORIZONTAL EN MUROS 27.07 kgveces cant. long. coef.

ENTRE EJE 1-1,2-2 4 14.00 0.60 0.12 4.03 EJE A-A 8 14.00 0.60 0.12 8.06 EJE B-B 4 14.00 0.60 0.12 4.03 EJE 1-1 4 7.00 0.60 0.12 2.02 EJE 2-2 4 7.00 0.60 0.12 2.02 S.H. ACCESIBLES 8 12.00 0.60 0.12 6.91

07 REVOQUES ENLUCIDOS Y MOLDURAS07.01 TARRAJEO PRIMARIO, MORTERO C:A 1:5 175.47 m2

BAÑOS S.H. ACCESIBLE 2 5.70 1.50 17.10 S.H. HOMBRES 2 17.10 1.50 51.30 S.H. MUJERES 2 23.50 1.50 70.50 BEBEDERO S.H. MUJERES 2 2.35 1.20 5.64

4 0.50 0.80 1.60 BEBEDERO S.H. EXTERIOR 2 3.60 3.15 22.68

6 0.15 0.38 0.348 0.40 0.50 1.60

Page 50: Metrado General Checopon

METRADO SS.HH. ALUMNOS

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND URINARIO VARONES 2 2.35 0.95 4.47

4 0.60 0.10 0.24

Page 51: Metrado General Checopon

METRADO SS.HH. ALUMNOS

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND07.02 TARRAJEO EN MURO: INTERIOR Y EXTERIOR 216.85 m2

BAÑOS INT. MURO INT. FRONTAL Y POSTERIOR 8 8.00 64.00 MURO INT. LATERALES 4 3.30 1.70 22.44 MURO CENTRAL SEPARADOR 4 3.30 2.45 32.34 MURO EN S.H, ACCESIBLE 4 3.80 15.20

4 1.70 2.12 14.42 MURETES SEPARADORES DE BAÑOS 6 3.80 0.30 6.84

6 0.24 1.442 2.90 0.30 1.742 0.18 0.36

P8 -6 1.00 2.10 -12.60V8 -6 1.00 0.47 -2.82V9 -4 2.45 0.50 -4.90V11 -2 2.51 0.50 -2.51V10 -2 1.48 0.50 -1.48 MURO EXT. POSTERIOR 4 11.65 46.60 MURO EXT. FRONTAL 4 1.75 7.00

4 2.17 8.68 MUROS LATERALES 2 3.05 6.10

2 3.20 2.58 16.51V11 -2 2.51 0.50 -2.51

07.03 TARRAJEO EN MUROS EXT. A PARTIR DE 2do.PISO m207.04 TARRAJEO DE COLUMNAS 26.22 m2

C3 2 0.60 3.30 3.96C2 4 0.25 4.05 4.05C5 2 0.90 3.30 5.94C1 4 0.75 3.30 9.90C6 2 0.46 2.58 2.37

07.05 TARRAJEO DE VIGAS 53.11 m2V-102,V-103 INT. 8 0.21 3.80 6.38V-102,V-103 EXT. 8 0.21 3.68 6.18VS-1 INT 4 0.21 3.28 2.76V-102,V-103 VOLADOS 8 0.40 1.15 3.68VIGA LONGITUDINAL EN FRONTIS 2 0.48 7.15 6.86VIGUETAS DE AMARRE EN FRONTIS 2 0.26 5.15 2.68V-101 4 1.35 4.55 24.57

07.06 VESTIDURA DE DERRAMES (1:5) 80.60 m P8, V8 6 6.15 36.90

V9 4 5.90 23.60V11 2 6.05 12.10V10 2 4.00 8.00

07.07 VESTIDURA DE DERRAMES CON BORDES BOLEADOS M:1:2 m07.08 BRUÑAS SEGUN DETALLE (1 x 1 cm) 246.42 m

S.H. ACCESIBLE INT 2 5.70 11.40 S.H. HOMBRES INT 2 17.10 34.20 S.H. MUJERES INT 2 23.50 47.00

FRONTIS 1.00 VIGAS SUP 4 3.65 14.60

2 7.15 14.30 COLUMNAS Y COLUMNETAS 4 0.65 2.60

4 0.83 3.324 1.73 6.928 0.65 5.20

CONTRAZOCALO 2 6.40 12.80POSTERIOR 1.00

VIGAS SUP 4 3.65 14.60 COLUMNAS 4 3.20 12.80

4 3.70 14.804 1.73 6.92

CONTRAZOCALO 2 8.18 16.36LATERAL 1.00

COLUMNAS 8 1.85 14.80 CONTRAZOCALO 4 2.70 10.80

08 CIELO RASOS08.01 CIELO RASO CON MEZCLA C:A 1:5 110.32 m2

Page 52: Metrado General Checopon

METRADO SS.HH. ALUMNOS

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND2 11.01 5.01 110.32

Page 53: Metrado General Checopon

METRADO SS.HH. ALUMNOS

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND08.02 VESTIDURA EN FONDO DE ESCALERAS m209 PISOS Y PAVIMENTOS09.01 PISO DE CEMENTO PULIDO Y BRUÑADO E=2" S/COLOREAR m209.02 MACHIEHEMBRADO DE MADERA PRIMER PISO m209.03 MACHIEHEMBRADO DE MADERA SEGUNDO PISO m209.04 PATIO Y VEREDA CONCRETO 175 kg/cm2 E=4" FROT. Y BRUÑADO 97.94 m2

LATERALES 4 5.80 1.20 27.84POSTERIOR 2 10.55 1.00 21.10

FRONTAL 2 8.15 2.20 35.86rampa 2 6.57 1.00 13.14

09.05 CONTRAPISO DE 40 mm area 47.92 m2 S.H. ACCESIBLE INT. 2 2.99 5.98 S.H. MUJERES INT. 2 9.05 18.10 S.H. MUJERES INT. 2 11.92 23.84

09.06 PISO LOSETA VENECIANA 30x30 COLOR CLARO area 47.92 m2 S.H. ACCESIBLE INT. 2.00 2.99 5.98 S.H. MUJERES INT. 2.00 9.05 18.10 S.H. MUJERES INT. 2.00 11.92 23.84

09.07 CANALETA "MEDIA CAÑA" EN CIRCULACION m09.08 CANALETA DE EVACUAION PLUVIAL FC=175 KG/CM2 C/REJILLA m10 CONTRAZOCALOS10.01 CONTR. S/COLOREAR H=20 cm MZ 1:2 e=1.5 cm 43.60 m

FRONTIS 2.00 6.40 12.80POSTERIOR 2 8.20 16.40LATERALES 4.00 3.60 14.40

10.02 CONTRAZOCALO DE MAD CEDRO 3/4" X 4" RODON DE 3/4" m11 ZOCALOS11.01 ZOCALO DE MAYOLICA BLANCA 20x20 (1a.) 175.47 m2

BAÑOS S.H. ACCESIBLE 2 5.70 1.50 17.10 S.H. HOMBRES 2 17.10 1.50 51.30 S.H. MUJERES 2 23.50 1.50 70.50 BEBEDERO S.H. MUJERES 2 2.35 1.20 5.64

4 0.50 0.80 1.60 BEBEDERO S.H. EXTERIOR 2 3.60 3.15 22.68

6 0.15 0.38 0.348 0.40 0.50 1.60

URINARIO VARONES 2 2.35 0.95 4.474 0.60 0.10 0.24

12 REVESTIMIENTO DE GRADAS Y ESCALERAS12.01 REVEST. C/CEMENTO PULIDO PASO Y CONTRAPASO 48.90 m

6 8.15 48.90

12.02 ACABADO DE DESCANSO CEMENTO PULIDO Y BRUÑADO m212.03 CONTRAZOCALO RECTO DE ESCALERAS m13 CUBIERTAS13.01 IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA 103.28 m2

4 4.57 5.65 103.28

13.02 COBERTURA C/TEJA ARCILLA EN CERCO DE LADRILLO m13.03 COBERTURA CON TEJA DE ARCILLA 42X20 ASENTADO C/MEZCLA 103.28 m2

4 4.57 5.65 103.28

13.04 CUMBRERA DE TEJA DE ARCILLA 42X20 ASENTADO C/MEZCLA 9.14 m2 4.57 9.14

14 CARPINTERIA DE MADERA14.01 PUERTA CEDRO TIPO TABLERO C/TRAGALUZ - AULAS m214.02 PUERTA CEDRO MACHIMBRADA 12.60 m2

P8 6.00 1.00 2.10 12.60

14.03 PUERTA CON TRIPLAY 9mm P/SSHH. 10.08 m2P7 12.00 0.60 1.40 10.08

14.04 VENTANA CEDRO-AULAS C/SEG 11.71 m2 V8 6.00 1.00 0.47 2.82

Page 54: Metrado General Checopon

METRADO SS.HH. ALUMNOS

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND V9 4.00 2.45 0.50 4.90

V10 2.00 2.51 0.50 2.51

Page 55: Metrado General Checopon

METRADO SS.HH. ALUMNOS

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND V11 2.00 1.48 0.50 1.48

14.05 TICERO DE MADERA CEDRO (L=5 m) BARNIZADO und14.06 MESA BATIENTE DE MADERA und15 CARPINTERIA METALICA Y HERRERIA15.01 PASAMANO DE TUBO FºGº DE 2" EN ESCALERA 5.20 m

4.00 1.30 5.20

15.02 CANTONERA DE ALUMINIO EN ESCALERA 48.90 m6.00 8.15 48.90

16 CERRAJERIA16.01 BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA 24.00 pza

P8 6.00 4.00 24.00

16.02 BISAGRA DE ACERO ALUMINIZADO DE 2.5" PESADA EN PUERTA/VENTANA 124.00 pza P7 12.00 3.00 36.00 V8 6.00 4.00 24.00 V9 4.00 8.00 32.00

V10 2.00 8.00 16.00 V11 2.00 8.00 16.00

16.03 CERRADURA DOS GOLPES EN PUERTA 6.00 pzaP8 6.00 6.00

16.04 CERROJO "SAPITO" SEGURIDAD BAT.VENTANA 44.00 pza V8 6.00 2.00 12.00 V9 4.00 4.00 16.00

V10 2.00 4.00 8.00 V11 2.00 4.00 8.00

16.05 MANIJA DE BRONCE 4" PARA PUERTAS 18.00 pzaP7 12.00 12.00P8 6.00 6.00

16.06 CERROJO DE 3" ALUMINIZADO PARA PUERTA 12.00 pza P7 12.00 12.00

17 VIDRIOS, CRISTALES Y SIMILARES17.01 VIDRIOS SEMIDOBLES IMPORTADO 125.99 p2

V8 6.00 1.00 10.76 0.47 30.34 V9 4.00 2.45 10.76 0.50 52.72

V10 2.00 2.51 10.76 0.50 27.01 V11 2.00 1.48 10.76 0.50 15.92

18 PINTURA18.01 PINTURA LATEX 2 MANOS EN CIELO RASO 110.32 m2

idem partida 08.01 110.32 110.32

18.02 PINTURA OLEO 2 MANOS EN VIGAS 53.11 m2idem partida 7.05 53.11 53.11

18.03 PINTURA OLEO 2 MANOS EN MUROS Y COLUMNA 243.07 m2idem partida 7.02 216.85 216.85idem partida 7.04 26.22 26.22

18.04 PINT. ANTICOR. ESMALTE 2 MANOS EN BARRAS DE SEGURIDAD 18.00 m V8 6.00 6.00 V9 4.00 4.00

V10 2.00 2.00 V11 2.00 2.00

baranda sshh minusvalidos 4.00 4.00

18.05 PINTURA BARNIZ EN CARP.DE MADERA 34.39 m2idem partida 14.02 12.60 12.60idem partida 14.03 10.08 10.08idem partida 14.04 11.71 11.71

Page 56: Metrado General Checopon

METRADO SS.HH. ALUMNOS

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND18.06 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H=20 43.60 m

idem partida 10.01 43.60 43.60

19 VARIOS, LIMPIEZA Y JARDINERIA19.01 LIMPIEZA PERMANENTE DE LA OBRA GLB19.02 JUNTA DE DILATACION CON ESPUMA PLASTICA+JEBE MICROPOROSO m19.03 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" 106.88 m

muros 2 11.73 23.464 6.57 26.28

rampa 4 2.20 8.80veredas 2 4.37 8.74

6 2.20 13.206 0.80 4.806 1.22 7.326 2.38 14.28

19.04 TAPAJUNTA METALICA EN PISOS m19.05 TAPAJUNTA METALICA ENTRE MODULOS (VERTICAL) m19.06 PIZARRA CEMENTO 4x1.2 SIN TISERO pza19.07 MOBILIARIO ESCOLAR PARA PRIMARIA SEGUN DISEÑO und19.08 ESCRITORIO DE MADERA TORNILLO und19.09 MODULO P/COMPUTADORAS und19.10 MODULO P/BIBLIOTECA DE LECTURA und20 APARATOS SANITARIOS Y ACCESORIOS20.01 INODORO BLANCO D/LOSA 1era NAC.+T.ALTO DE PCV INC. ACCESSORIOS 8.00 pza

8.00 8.00

20.02 INODORO TANQUE BAJO DE LOSA 1ra CALIDAD ADULTO (NAC. BLANCO) 4.00 pza4.00 4.00

20.03 DUCHA CROMADA 1 LLAVE INCL.ACCESORIOS und20.04 LAVATORIO DE PARED BLANCO 1 LLAVE 1 1.00 1.00 pza20.05 URINARIO CORRIDO SEGUN DISEÑO REV. C/MAYOLICA DE 20x20 3.70 m

3.70 3.70

20.06 BEBEDERO CORRIDO DE CONCRETO REVEST. C/MAYOLICA DE 20x20 10.90 m7.20 7.20

3.7 3.70

20.07 FALSA COLUMNA/PROTECCION TUBERIA BAJADA FC=175 KG/CM2 m3

Page 57: Metrado General Checopon

METRADO PATIO DE FORMACION

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

01 OBRAS PROVISIONALES01.01 ALMACEN, OFICINA Y CASETA DE GUARDIANIA m201.02 CARTEL METALICO DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und01.03 SERVICIOS HIGIENICOS m201.04 AGUA PARA LA CONSTRUCCION GLB02 TRABAJOS PRELIMINARES02.01 LIMPIEZA DE TERRENO MANUAL 467.16 467.16 m202.02 DEMOLICION CIMIENTOS DE ADOBE Y PIEDRA m302.03 TRANSPORTE DE EQUIPO Y MAQUINARIA GLB02.04 FLETE TERRESTRE ton02.05 TRAZO Y REPLANTEO PRELIMINAR Area 467.16 m2

1 467.16 1.00 467.16

03 MOVIMIENTO DE TIERRAS03.01 EXCAVACION DE ZANJAS Y ZAPATAS m303.02 CORTE DE TERRENO HASTA 0.50 M SIN APISONADO 467.16 m2

1 467.16 1 467.16

03.03 RELLENO Y COMP. MANUAL- MAT. DE AFIRMADO 233.58 m31 467.16 1 0.50 233.58

03.04 ACARREO INTERNO DE MAT. PROCEDENTE DE EXC. 233.58 m3item 3.2 467.16 0.50 233.58

3.07 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA 280.30 m3233.58 1.20 280.30

04 CONCRETO SIMPLE04.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m304.02 SOBRECIMIENTO FC=100 KG/CM2 + 25% PM m304.03 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO m204.04 FALSO PISO MEZCLA 1:8 e=4" m204.05 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m204.06 SUBCIMIENTO FC=100 KG/CM2 m304.07 CONCRETO EN LOSA DEPORTIVA F'c=175 KG/CM2 53.65 m3

losa 1 467.16 1 0.10 46.72uña 1 115.46 0.06 6.93

04.08 ENCOFRADO DE LOSAS DEPORTIVA 57.37 m21 382.49 0.15 57.37

19 VARIOS, LIMPIEZA Y JARDINERIA19.01 LIMPIEZA PERMANENTE DE LA OBRA GLB19.02 JUNTA DE DILATACION CON ESPUMA PLASTICA+JEBE MICROPOROSO m19.03 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" 382.49 m

1 382.49 382.49

19.04 TAPAJUNTA METALICA EN PISOS m19.05 TAPAJUNTA METALICA ENTRE MODULOS (VERTICAL) m19.06 PIZARRA CEMENTO 4x1.2 SIN TISERO pza19.07 MOBILIARIO ESCOLAR PARA PRIMARIA SEGUN DISEÑO und19.08 ESCRITORIO DE MADERA TORNILLO und19.09 MODULO P/COMPUTADORAS und19.10 MODULO P/BIBLIOTECA DE LECTURA und19.11 ARCO Y TABLERO DE FULBITO-BASKET und

19.12 NET CON SOPORTE F G und

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

Page 58: Metrado General Checopon

METRADO PATIO DE FORMACION

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

19.13 PINTURA ESMALTE EN LOS ADEPORTIVA m

20 APARATOS SANITARIOS Y ACCESORIOS20.01 INODORO BLANCO D/LOSA 1era NAC.+T.ALTO DE PCV INC. ACCESSORIOS pza20.02 INODORO TANQUE BAJO DE LOSA 1ra CALIDAD ADULTO (NAC. BLANCO) pza20.03 DUCHA CROMADA 1 LLAVE INCL.ACCESORIOS und20.04 LAVATORIO DE PARED BLANCO 1 LLAVE pza20.05 URINARIO CORRIDO SEGUN DISEÑO REV. C/MAYOLICA DE 20x20 m20.06 BEBEDERO CORRIDO DE CONCRETO REVEST. C/MAYOLICA DE 20x20 m20.07 FALSA COLUMNA/PROTECCION TUBERIA BAJADA FC=175 KG/CM2 m321 INSTALACIONES SANITARIAS21.01 SALIDA DE DESAGUE EN PVC pto21.02 SALIDA PARA VENTILACION pto21.03 CANALETA DE FIEROO GALVANIZADO m21.04 TUBERIA DE PVC SAL 2" m21.05 TUBERIA DE PVC SAL 4" m21.06 TUBERIA DE PVC SAP 3" P/LLUVIAS m21.07 REGISTRO DE BRONCE 3" und21.08 REGISTRO DE BRONCE 4" und21.09 REJILLA DE BRONCE 3" und21.10 REJILLA DE BRONCE 4" und21.11 CAJA SUMIDERO CON REJILLA DE FIERRO und21.12 CAJA DE REG. ALB. 12"x24" C/TAPA CONCRETO und22 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO22.01 SALIDA DE AGUA FRIA-PVC pto22.02 VALVULA DE COMPUERTA DE BRONCE 1/2" und22.03 TUBERIA PVC CLASE 10 - 1/2" m22.04 TUBERIA PVC CLASE 10 - 1" m22.05 TUBERIA PVC CLASE 10 - 3/4" m22.06 VALVULA DE COMPUERTA DE BRONCE 3/4" und22.07 VALVULA CHECK DE BRONCE 1" und22.08 VALVULA DE COMPUERTA DE BRONCE 1" und22.09 VALVULA GLOBO 1/2" und22.10 CAJA DE MADERA PARA VALVULA pza22.11 CAJA PARA VALVULA (NICHO DE MAYOLICA) und22.12 CAJA BYPASS DE CONCRETO und23 INSTALACIONES ELECTRICAS23.01 SALIDA DE TECHO (CENTRO DE LUZ) pto23.02 SALIDA PARA BRAQUETE (PARED) pto23.03 SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA pto23.04 POZO PUESTA A TIERRA INC. CABLE-2004 P-2 (R<5 0HMS) und24 SALIDA PARA COMUNICACIONES Y SEÑALES24.01 SALIDA PARA RED DATA pto25 CAJAS25.01 CAJAS DE PASE FºGº 6"x6"x3" und26 TABLEROS Y CUCHILLAS (LLAVES)26.01 TAB. AUT. 1-3X125A, 1-3X20A, 2-3X15A, 1-3X50A, 1-2X10A, 1-2X15A und26.02 TAB. AUT. 1-3X20A,5-2X10A, 01 Int dif 10A und26.03 TAB. AUT. 1-3X15A,2-2X10A, 1-2X20A, 01 Int dif 20A und26.04 TAB. AUT. 1-3X50A,2-2X10A, 2-2X35A, 02 Int dif 35A und26.05 TAB. AUT. 1-2X15A,2-2X10A und26.06 TAB. AUT. 1-2X15A, 3-2X10A, 01 Int dif 10A und26.07 TAB. AUT. 1-3X15A, 2-2X10A, 1-2X15A, 01 Int dif 10A und27 ARTEFACTOS27.01 ART. FLUORESCENTE 2/36W (SIM. E JOSFEL) C/SOPORTE und27.02 ART. FLUORESCENTE 3/36W (SIM. E JOSFEL) C/SOPORTE und27.03 ART. FLUORESCENTE 2/18W (SIM. E JOSFEL) und27.04 ART. FLUOR. 2/20W EMPOTRADO MARCO ALUM(DIF. PLAS) und27.05 ART. T/PLASTICO CUADRADO C/LAMP. FLUORESC. CIRC. 32W und27.06 ART. BRAQ. C/SOCKET DE PORCELANA Y LAMP. 36W und28 CONEXION A RED EXTERNA Y MEDIDORES28.01 ALIM. CAB. NYY (3-1X25 + 1-1X1(N)+ 1-1X16(T)) mm2 m28.02 ALIM. CAB TW (4-1X4) mm2 m28.03 ALIM. CAB TW (4-1X10) mm2 m28.04 ALIM. CAB TW (3-1X4) mm2 m28.05 ALIM. CAB TW (3-1X10) mm2 m

Page 59: Metrado General Checopon

METRADO PATIO DE FORMACION

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

28.06 CABLE COBRE DESNUDO1x16mm2. diam 20mm PVC-P m29 CANALIZACIONES Y/O TUBERIAS29.01 TUBERIA PVC-P 35mm m29.02 TUBERIA PVC-P 25mm m

Page 60: Metrado General Checopon

METRADO CERCO PERIMETRICO

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTALTOTAL UND

01 OBRAS PROVISIONALES01.01 ALMACEN, OFICINA Y CASETA DE GUARDIANIA m201.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und01.03 SERVICIOS HIGIENICOS m201.04 AGUA PARA LA CONSTRUCCION GLB02 TRABAJOS PRELIMINARES02.01 LIMPIEZA DE TERRENO MANUAL 335.60 335.60 m202.02 DEMOLICION CIMIENTOS DE ADOBE Y PIEDRA m302.03 TRANSPORTE DE EQUIPO Y MAQUINARIA GLB02.04 FLETE TERRESTRE ton02.05 TRAZO Y REPLANTEO PRELIMINAR 335.60 m2

1 223.73 1.50 335.60

03 MOVIMIENTO DE TIERRAS03.01 EXCAVACION DE ZANJAS Y ZAPATAS 182.86 m3

36 1.00 1.00 1.30 46.8017 1.27 1.00 1.30 28.07

1 166.14 0.50 1.30 107.99

03.02 CORTE DE TERRENO HASTA 0.50 M SIN APISONADO m203.03 RELLENO Y COMP. MANUAL- MAT. DE AFIRMADO m303.04 ACARREO INTERNO DE MAT. PROCEDENTE DE EXC. 210.29 m3

item 3.1 182.86 1.15 210.29

3.07 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA 210.29 m3210.29 210.29

04 CONCRETO SIMPLE04.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 166.25 m3

1 166.14 0.50 1.10 91.3836 1.00 1.00 1.30 46.8017 1.27 1.00 1.30 28.07

04.02 SOBRECIMIENTO FC=100 KG/CM2 + 25% PM 9.28 m31 206.23 0.15 0.30 9.28

04.03 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO 123.74 m22 206.23 0.30 123.74

04.04 FALSO PISO MEZCLA 1:8 e=4" m204.05 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m204.06 SUBCIMIENTO FC=100 KG/CM2 m304.07 CONCRETO EN LOSA DEPORTIVA F'C=175 KG/CM2 m304.08 ENCOFRADO DE LOSAS DEPORTIVA m205 OBRAS DE CONCRETO ARMADO05.01 ZAPATAS, CONCRETO F'C=210 KG/CM2 0.00 m3

05.02 ZAPATAS, ACERO FY=4200KG/CM2 0.00 kg

05.03 VIGA DE CIMENTACION FC=210 KG/CM2 m305.04 VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO m205.05 VIGAS DE CIMENTACION, ACERO FY=4200KG/CM2 kg05.06 SOBREC. REF. CONCRETO 175 kg/cm2 0.00 m3

1 206.23 0.15 0.30

05.07 SOBREC. REF., ENCOFRADO DESENCOFRADO 0.00 m22 206.23 0.30

05.08 SOBREC. REF., ACERO FY=4200KG/CM2 kgveces cant. long. coef.

V = 3/8" 1 1119 1.70 0.56H = 3/8" 1 5 236.16 0.56

05.09 COLUMNAS, CONCRETO 175 kg/cm2 (COLUMNETAS) 12.25 m370 0.25 0.25 2.80 12.25

Page 61: Metrado General Checopon

METRADO CERCO PERIMETRICO

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTALTOTAL UND05.10 COLUMNAS, CONCRETO 210 kg/cm2, (1er. PISO) m305.11 COLUMNAS, CONCRETO 210 kg/cm2, (2er. PISO) m305.12 COLUMNAS, ENCOFRADO DESENCOFRADO 137.20 m2

70 0.70 2.80 137.20

05.13 COLUMNAS, ACERO FY=4200KG/CM2 2145.15 kgveces cant. long. coef.

principal 1/2" 70 6 4.25 0.99 1767.15estribos 1/4" 70 24 0.90 0.25 378.00

05.14 PLACAS, CONCRETO 210 kg/cm2, (1er. PISO) m305.15 PLACAS, ENCOFRADO DESENCOFRADO m205.16 PLACAS, ACERO FY=4200KG/CM2 kg05.17 GARGOLAS DE CONCRETO, TERMINADO S/DISEÑO m305.18 VIGAS, CONCRETO 175 kg/cm2 (VIGUETAS AMARRE) b h long. 7.70 m3

0.25 0.15 205.38 7.7005.19 VIGAS, CONCRETO 210 kg/cm2, (1er. PISO) m305.20 VIGAS, CONCRETO 210 kg/cm2, (2er. PISO) m305.21 VIGAS, ENCOFRADO DESENCOFRADO long. h veces 30.81 m2

205.38 0.15 1.00 30.81

05.22 VIGAS, ACERO FY=4200KG/CM2 veces cant. long. coef. 672.08 kgprincipal 3/8" 1 4 236.16 0.56 529.00estribos 1/4" 49 16 0.73 0.25 143.08

05.23 LOSA ALIGERADA, CONCRETO 210 kg/cm2 m305.24 LOSA ALIGERADA, ENCOFRADO DESENCOFRADO m205.25 LOSA ALIGERADA, ACERO FY=4200KG/CM2 kg05.26 LOSA ALIGERADA, LADR. HUECO 15x30X30 und05.27 LOSA ALIGERADA, LADR. HUECO 12x30X30 m205.28 ESCALERAS, CONCRETO 210 kg/cm2 m305.29 ESCALERAS, ENCOFRADO DESENCOFRADO m205.30 ESCALERAS, ACERO FY=4200KG/CM2 kg05.31 GRADAS EN PISO, CONCRETO 175 kg/cm2 m305.32 GRADAS EN PISO, ENCOFRADO DESENCOFRADO m206 MUROS Y TABIQUES DE ALBAÑILERIA06.01 MURO DE LADRILLO KK TIPO IV CABEZA M: 1:4,J:1.5CM m206.02 MURO DE LADRILLO KK TIPO IV SOGA M: 1:4,J:1.5CM 515.58 m2

1 206.23 2.50 515.58

06.03 ALAMBRE # 8REFUERZO HORIZONTAL EN MUROS kg07 REVOQUES ENLUCIDOS Y MOLDURAS07.01 TARRAJEO PRIMARIO, MORTERO C:A 1:5 m207.02 TARRAJEO EN MURO: INTERIOR Y EXTERIOR 1031.15 m2

2 206.23 2.50 1031.15

07.03 TARRAJEO EN MUROS EXT. A PARTIR DE 2do.PISO m207.04 TARRAJEO DE COLUMNAS 137.20 m2

columnas 70 0.70 2.80 137.20

07.05 TARRAJEO DE VIGAS veces long. h 61.61 m22.00 205.38 0.15 61.611.00 205.38 0.10

07.06 VESTIDURA DE DERRAMES (1:5) m07.07 VESTIDURA DE DERRAMES CON BORDES BOLEADOS M:1:2 m07.08 BRUÑAS SEGUN DETALLE (1 x 1 cm) m10 CONTRAZOCALOS10.01 CONTR. S/COLOREAR H=20 cm MZ 1:2 e=1.5 cm 20.54 m

1 205.38 0.10 20.54

10.02 CONTRAZOCALO DE MAD CEDRO 3/4" X 4" RODON DE 3/4" m11 ZOCALOS11.01 ZOCALO DE MAYOLICA BLANCA 20x20 (1a.) m212 REVESTIMIENTO DE GRADAS Y ESCALERAS12.01 REVEST. C/CEMENTO PULIDO PASO Y CONTRAPASO m12.02 ACABADO DE DESCANSO CEMENTO PULIDO Y BRUÑADO m2

Page 62: Metrado General Checopon

METRADO CERCO PERIMETRICO

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAUbicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTALTOTAL UND12.03 CONTRAZOCALO RECTO DE ESCALERAS m13 CUBIERTAS13.01 IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA m213.02 COBERTURA C/TEJA ARCILLA EN CERCO DE LADRILLO m13.03 COBERTURA CON TEJA DE ARCILLA 42X20 ASENTADO C/MEZCLA m213.04 CUMBRERA DE TEJA DE ARCILLA 42X20 ASENTADO C/MEZCLA m18 PINTURA18.01 PINTURA LATEX 2 MANOS EN CIELO RASO m218.02 PINTURA OLEO 2 MANOS EN VIGAS 61.61 m2

idem partida 07.05 61.61 61.61

18.03 PINTURA OLEO 2 MANOS EN MUROS Y COLUMNA 1168.35 m2idem partida 7.02 1031.15 1031.15idem partida 7.04 137.20 137.20

18.04 PINT. ANTICOR. ESMALTE 2 MANOS EN BARRAS DE SEGURIDAD m18.05 PINTURA BARNIZ EN CARP.DE MADERA m218.06 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H=20 20.54 m

idem partida 10.01 20.54 20.54

19 VARIOS, LIMPIEZA Y JARDINERIA19.01 LIMPIEZA PERMANENTE DE LA OBRA GLB19.02 JUNTA DE DILATACION CON ESPUMA PLASTICA+JEBE MICROPOROSO 42.50 m

17 2.50 42.50

19.03 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" m19.04 TAPAJUNTA METALICA EN PISOS m19.05 TAPAJUNTA METALICA ENTRE MODULOS (VERTICAL) m19.06 PIZARRA CEMENTO 4x1.2 SIN TISERO pza19.07 MOBILIARIO ESCOLAR PARA PRIMARIA SEGUN DISEÑO und19.08 ESCRITORIO DE MADERA TORNILLO und19.09 MODULO P/COMPUTADORAS und19.10 MODULO P/BIBLIOTECA DE LECTURA und29 CANALIZACIONES Y/O TUBERIAS29.01 TUBERIA PVC-P 35mm m29.02 TUBERIA PVC-P 25mm m

Page 63: Metrado General Checopon

GERENCIA SUB REGIONAL - CHOTA

M. ERNESTO RUBIO MEDINAING. CIVIL CIP N° 98396

CONSTRUCCION Y EQUIPAMIENTO DE LA I. E. N° 10559 . CHALLUARACRA HUAMBOS CHOTA

20.00.00 TANQUE SÉPTICO

20.01.00 EXCAVACIÓNESTIPO ANCHO ALTURA LONGITUD Nº VECES VOLUMEN

TANQUE SEPTICOExc.Masiva 2.90 2.400 2.900 1 20.184

Tuberías de entrada y salida 0.50 1.500 40.420 1 30.315POZO PERCOLADOR

Exc.Masiva 3.00 2.500 3.000 1 16.875TOTAL 67.37 M3

20.02.00 ELIMINAC. MAT- EXCEDENTE HASTA 30.00 MT (a mano usando carretilla)84.22 M3

20.03.00 NIVELACION Y APISONADO, PARA LOASA DE FONDO, RELLENO ESTRUCTURAL, E=0.15 m.

Largo Ancho Altura relleno Nº DE VECES Coef. Compac Volumen

3.900 1.900 0.15 1 1.15 1.28 m3

TOTAL 1.28 m3

20.06.00 CONCRETO F'c 175 Kg/cm2 TIPO ANCHO ALTURA LONGITUD Nº VECES VOLUMEN

TANQUE SEPTICOLongitudinales 0.20 1.80 2.900 2 2.088

Laterales 0.20 1.80 1.500 2 1.080Losa de fondo 1.900 2.90 0.20 1 1.102Losa de fondo 0.500 2.90 0.25 2 0.725Losa de fondo 0.500 0.40 0.25 2 0.100Losa de techo 1.900 2.90 0.20 1 1.102

POZO PERCOLADORAnillo de Apoyo 0.25 0.15 2.500 9 0.844Losa de techo 3.600 0.10 1 3 1.019

TOTAL 8.060 M3

20.07.00 ENCOFRADO Y DESENCOFRADO (Muros)TIPO ALTURA LONGITUD Nº VECES AREA

TANQUE SEPTICO

Muros1.800 2.900 2 10.441.800 1.500 2 5.40

Losa de techo 1.900 2.900 1 5.51

POZO PERCOLADOR

Losa de techo 2.000 1 3 28.26TOTAL 49.610 M2

20.08.00 ACERO Tipo Ø Peso/ml (Kg) Longitud (m) Nº VECES Peso (Kg)

TANQUE SEPTICO

horizontales3/8" 0.58 9.60 18 100.22

verticales3/8" 0.58 2.50 42 60.90

Losa de fondo3/8" 0.58 2.25 12 15.663/8" 0.58 4.25 5 12.33

LOSA FIJA 3/8" 0.58 1.40 8 6.50LOSA FIJA 3/8" 0.58 1.05 12 7.31TAPA MOVIBLE 1/4" 0.25 1.40 10 3.50TAPA MOVIBLE 1/4" 0.25 0.60 16 2.40AGARRADERA 3/8" 0.58 0.40 2 0.46VIGA 3/8" 0.58 1.40 8 6.50VIGA 1/4" 0.25 0.54 26 3.51

POZO PERCOLADORAnillo de Apoyo 3/8" 0.58 7.00 12 48.72

1/4" 0.25 0.70 105 18.38

Losa de techo3/8" 0.58 132.00 3 229.68

Total (Kg) 516.06

Page 64: Metrado General Checopon

GERENCIA SUB REGIONAL - CHOTA

M. ERNESTO RUBIO MEDINAING. CIVIL CIP N° 98396

CONSTRUCCION Y EQUIPAMIENTO DE LA I. E. N° 10559 . CHALLUARACRA HUAMBOS CHOTA

20.12.00 TARRAJEO EN INT. CON IMPERMEABILIZANTES DE TANQUE SEPTICO

Tipo LONGITUD Altura ( m) Nºde veces AREA m2

Muros2.800 1.500 2 8.40

1.000 1.500 2 3.00

TOTAL TARRAJEO INTERIOR 11.40

21.08.00 MURO DE LADRILLO DE ARCILLA 9*13*23 CM, MEZCLA 1:5 APAREJO DE CABEZATipo LONG. Altura CANTIDAD Nº VECES Area

POZO PERCOLADOR 12.560 1.85 1 3 69.71TOTAL 69.708 M2

21.09.00 FILTRO DE GRAVA DE 1/2"(POZO PERCOLADOR)Diametro Area Altura CANTIDAD Nº VECES Volumen

1.8 2.540 0.10 1 3 2.292.8 6.150 0.15 1 3 8.30

TOTAL m3 10.59 M2

20.13.00 CAJA DE DISTRIBUCION CON CAJA DE CONCRETO 30 X 60 CM.Total 1.00 Und.

20.14.00 TUBERIA PVC DE 4" (ENTRADA) 6.88 ML

20.15.00 TUBERIA PVC DE 4" (SALIDA) 54.54 ML

Page 65: Metrado General Checopon

PLANILLA DE METRADO - ESTRUCTURAS, ARQUITECTURA Y ACEROCISTERNA Y TANQUE ELEVADO

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA03 MOVIMIENTO DE TIERRAS03.01.01 EXCAVACION PARA CISTERNA

AMBIENTE EJES TIPO CANTID. LARGO ANCHO ALTURA PARCIAL TOTAL 1 4.00 3.30 2.50 33.00 33.00

TOTAL EXCAVACION M3 33.00 03.03.01 RELLENO CON MATERIAL PROPIO

AMBIENTE EJES TIPO CANTID. LARGO ANCHO ALTURA PARCIAL TOTALRELLENO DE 2 4.00 0.40 2.50 8.00 8.00 RELLENO DE 2 2.50 0.75 2.50 9.38 9.38 TOTAL RELLENO CON MATERIAL PROPIO M3 17.38

04 OBRAS DE CONCRETO SIMPLE4.03 SOLADO EN CISTERNA E= 4"

AMBIENTE EJES TIPO CANTID. LARGO ANCHO ALTURA PARCIAL TOTAL SOLADO 1:10, E=.10M. EN CISTERNA 1 4.00 3.30 13.20 13.20 TOTAL SOLADO EN CISTERNA M2 13.20

05 OBRAS DE CONCRETO ARMADO05.06 COLUMNAS

05.06.01 CONCRETO DE f'c=210 KG/CM2 COLUMNASAMBIENTE EJES TIPO CANTIDAD LARGO ANCHO ALTURA PARCIAL TOTAL

COLUMNAS C-1 C - 1 4 0.40 0.40 11.08 7.09 7.09 C - 3 0.00

COLUMNAS C-3 C - 3 0.00 C - 3 0.00

COLUMNAS C-4 C - 4 0.00 C - 4 0.00

TOTAL CONCRETO EN COLUMNAS M3 7.09

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

Page 66: Metrado General Checopon

OBRAS DE CONCRETO ARMADO05.06.02 ENCOFRADO Y DESENCOFRADO - COLUMNAS

AMBIENTE EJES TIPO CANTIDAD ANCHO N° CARAS ALTURA PARCIAL TOTALCOLUMNAS C-1 X,Y C - 3 4 0.40 4.00 9.00 57.60 57.60

I,II C - 3 0.00 COLUMNAS C-3 X,Y C - 3 0.00

I,II C - 3 0.00 COLUMNAS C-4 X,Y C - 4 0.00

I,II C - 4 0.00 TOTAL ENCOFRADO Y DESENCOFRADO M2 57.60 OBRAS DE CONCRETO ARMADO

05.06.03 ACERO fy=4,200KG/CM2 COLUMNAS ELEMENTO LONGITUDES POR DIAMETRO

DESCRIPCION EJES DIAMET.1/4" 3/8" 1/2" 5/8" 3/4"

0.25 0.57 1.02 1.55 2.24

C-1 5/8" 4 8 11.30 361.60

ESTRIBO 3/8" 4 60 1.58 379.20ESTRIBO 0.00C-3 0.00

0.00ESTRIBO 0.00ESTRIBO 0.00C - 4 0.00ESTRIBO 0.00

Longitud total por diámetro 0.00 398.16 0.00 379.68 0.00kilogramos por diámetro 0.00 226.95 0.00 588.50 0.00

Nº de Varillas 0.00 44.24 0.00 42.19 0.00

TOTAL ACERO EN COLUMNAS TOTAL KG 815.46

CANT.

ELEMENT.

Nº PIEZA X

ELEMENTO

LONG. X

PIEZA

Page 67: Metrado General Checopon

OBRAS DE CONCRETO ARMADO05.07 VIGAS

05.07.01 CONCRETO DE f'c=210 KG/CM2 VIGAS AMBIENTE EJES TIPO CANTIDAD LARGO ANCHO ALTURA PARCIAL TOTAL

VIGA VA-101 (25x30) VA-101 3 2.50 0.25 0.30 0.19 0.56 VIGA VA-102 (25x20) VA-102 2 2.50 0.25 0.20 0.13 0.25

2.40 0.25 0.40 0.24 0.00 1.90 0.25 0.40 0.19 0.00

TOTAL CONCRETO EN VIGAS M3 0.81 OBRAS DE CONCRETO ARMADO

05.07.02 ENCOFRADO Y DESENCOFRADO - VIGASAMBIENTE EJES TIPO CANTIDAD ANCHO N° CARAS ALTURA PARCIAL TOTAL

VIGA VA-101 (25x30) lado VA-101 3 2.50 4.0 0.30 3.00 9.00 VIGA VA-102 (25x20) lado VA-102 2 2.50 4.0 0.20 2.00 4.00 VIGA 2 fondo V - 1 1.90 0.00 0.00 VIGA 2 lado V - 2 0.40 0.00 0.00 VIGA 2 lado V - 2 0.40 0.00 0.00 VIGA 3 fondo V - 2 1.90 0.00 0.00

TOTAL ENCOFRADO Y DESENCOFRADO M2 13.00 OBRAS DE CONCRETO ARMADO

05.07.03 ACERO fy=4,200KG/CM2 - VIGAS ELEMENTO LONGITUDES POR DIAMETRO

DESCRIPCION EJES DIAMET.1/4" 3/8" 1/2" 5/8" 3/4"0.25 0.57 1.02 1.55 2.24

VIGA VA-101 (25x30) 1/2" 6 6 3.75 135.00ESTRIBO 3/8" 3 14 1.45 60.90VIGA VA-102 (25x20) 1/2" 4 6 3.75 90.00ESTRIBO 3/8" 2 14 1.45 40.60

Longitud total por diámetro 0.00 106.58 236.25 0.00 0.00kilogramos por diámetro 0.00 60.75 240.98 0.00 0.00

Nº de Varillas 0.00 11.84 26.25 0.00 0.00

TOTAL ACERO EN VIGAS TOTAL KG 301.72

CANT. ELEMENT.

Nº PIEZA X ELEMENTO

LONG. X PIEZA

Page 68: Metrado General Checopon

OBRAS DE CONCRETO ARMADO05.11 CUARTO DE MAQUINAS

05.11.01 CONCRETO f'c=210 KG/CM2 - Cuarto de maquinasAMBIENTE EJES TIPO CANTIDAD LARGO ANCHO ALTURA PARCIAL TOTAL

Columnetas 8 0.25 0.15 2.20 0.08 0.66 Techo 1 2.50 2.50 0.15 0.94 0.94

TOTAL CONCRETO EN LOSA CTO DE MAQ M3 1.60 OBRAS DE CONCRETO ARMADO

05.11.02 ENCOFRADO Y DESENCOFRADO - LOSA ALIGERADAAMBIENTE TIPO CANTIDAD LARGO ANCHO CARAS PARCIAL TOTAL

Columnetas 8 2.20 0.25 3.00 1.65 13.20 Techo 1 2.10 2.10 1.00 4.41 4.41

TOTAL ENCOFRADO Y DESENCOFRADO M2 17.61 OBRAS DE CONCRETO ARMADO

05.11.03 ACERO fy=4200 KG/CM2 - Cuarto de maquinasELEMENTO LONGITUDES POR DIAMETRO

DESCRIPCION EJES DIAMET.1/4" 3/8" 1/2" 5/8" 3/4"0.25 0.57 1.02 1.55 2.24

Ø POSITIVO 3/8" 7 2 2.10 29.40Ø NEGATIVO 3/8" 7 2 2.10 29.40Acero de Temperatura 1/4" 0.00

Longitud total por diámetro 0.00 61.74 0.00 0.00 0.00kilogramos por diámetro 0.00 35.19 0.00 0.00 0.00

Nº de Varillas 0.00 6.86 0.00 0.00 0.00

TOTAL ACERO EN LOSA CTO MAQ TOTAL KG 35.19

CANT. ELEMENT.

Nº PIEZA X ELEMENTO

LONG. X PIEZA

Page 69: Metrado General Checopon

ELEMENTO05.11.04 LADRILLO STANDAR 09X13X24 - MUROS

ELEMENTO EJES MEDIDAS PARCIAL TOTAL DESCRIPCION TIPO L A H INDICE

LADRILLO STANDAR 09X13X24 - MUROS 1 2.5 2.2 37.35 205.41 205.41N° Lad / m2 = 37.348 und.

TOTAL DE LADRILLO TOTAL UNID 205.4105.12 CISTERNA

05.12.01 CONCRETO f'c=210 KG/CM2 CISTERNA AMBIENTE EJES TIPO CANTIDAD LARGO ANCHO ALTURA PARCIAL TOTALCisterna Fondo 1 4.00 3.30 0.40 5.28 5.28 Cisterna Paredes 4 2.80 0.20 1.45 0.81 3.25 Cisterna Techo 1 2.50 2.50 0.15 0.94 0.94 Cuarto de Máquinas Columnetas 0.00 0.00

Techo 0.00 0.00 0.00 0.00

TOTAL CONCRETO EN CISTERNA M3 9.47 OBRAS DE CONCRETO ARMADO

05.12.02 ENCOFRADO Y DESENCOFRADO - CISTERNAAMBIENTE EJES TIPO CANTIDAD ANCHO N° CARAS ALTURA PARCIAL TOTAL

Cisterna FondoCisterna Paredes 1 2.80 8 1.60 35.84 35.84 Cisterna Techo 1 2.50 1 2.10 5.25 5.25 Cisterna Techo 0.00 0.00 Cisterna Techo 0.00 0.00 Cisterna Tapa 0.00 0.00 Cisterna Tapa 0.00 0.00 TOTAL ENCOFRADO Y DESENCOFRADO M2 41.09

CANT. ELEMENT.

Page 70: Metrado General Checopon

OBRAS DE CONCRETO ARMADO05.12.03 ACERO fy=4,200KG/CM2 CISTERNA

ELEMENTO LONGITUDES POR DIAMETRO

DESCRIPCION EJES DIAMET.1/4" 3/8" 1/2" 5/8" 3/4"0.25 0.57 1.02 1.55 2.24

Fondo 1/2" 2 16 2.21 70.72Fondo 1/2" 1 16 1.70 27.20Fondo 1/2" 1 16 4.35 69.60Fondo 1/2" 2 20 2.65 106.00Paredes 1/2" 8 15 2.43 291.60Paredes 3/8" 8 9 2.65 190.80Techo 1/2" 2 9 2.65 47.70

1 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.00

Longitud total por diámetro 0.00 200.34 643.46 0.00 0.00kilogramos por diámetro 0.00 114.19 656.33 0.00 0.00

Nº de Varillas 0.00 22.26 71.50 0.00 0.00

TOTAL ACERO EN BASE DE CISTERNA TOTAL KG 770.52

CANT. ELEMENT.

Nº PIEZA X ELEMENTO

LONG. X PIEZA

Page 71: Metrado General Checopon

05.13 TANQUE ELEVADO05.13.01 CONCRETO f'c=210 KG/CM2 - TANQUE ELEVADO

AMBIENTE EJES TIPO CANTIDAD LARGO ANCHO ALTURA PARCIAL TOTALLosa de Fondo 1 2.50 2.50 0.15 0.94 0.94

Paredes Laterales 4 1.21 0.15 2.00 0.37 1.46

Paredes Laterales 4 0.70 0.15 2.00 0.21 0.85

Losa de Techo 1 2.50 2.50 0.10 0.63 0.63

Descontando tapa -1 0.60 0.60 0.40 0.14 -0.14 0.00 0.00

0.00 0.00 0.00 0.00

TOTAL CONCRETO EN LOSA TANQUE ELEVADO M3 3.73 OBRAS DE CONCRETO ARMADO

05.13.02 ENCOFRADO Y DESENCOFRADO - TANQUE ELEVADOAMBIENTE TIPO EJES CANTIDAD LARGO ANCHO CARAS PARCIAL TOTAL

Losa de Fondo 1 2.50 2.50 1 6.25 6.25

Paredes Laterales 8 1.21 2.00 1 2.42 19.36

Paredes Laterales 8 0.70 2.00 1 1.40 11.20

Losa de Techo 1 2.50 2.50 1 6.25 6.250.00 0.000.00 0.000.00 0.000.00 0.00

CONCRETO laterales lado 0.00 0.00 CONCRETO laterales lado 0.00 0.00

CONCRETO tapa lado 0.00 0.00 CONCRETO tapa lado 0.00 0.00

Page 72: Metrado General Checopon

TOTAL ENCOFRADO Y DESENCOFRADO M2 43.06

Page 73: Metrado General Checopon

OBRAS DE CONCRETO ARMADO05.13.03 ACERO fy=4,200KG/CM2 - TANQUE ELEVADO

ELEMENTO LONGITUDES POR DIAMETRO

DESCRIPCION EJES DIAMET.1/4" 3/8" 1/2" 5/8" 3/4"0.25 0.57 1.02 1.55 2.24

Losa de Fond As sup. 1/2" 2 10 3.0 60Losa de Fond As inf. 3/8" 2 10 3.0 60

Paredes latera As long 1/2" 2 32 2.23 142.72

Paredes latera As trans 3/8" 2 10 9 180

Techo Una capa 3/8" 1 10 2.23 22.3

Tapa 3/8" 1 10 2.23 22.3

Longitud total por diámetro 0.00 284.60 202.72 0.00 0.00kilogramos por diámetro 0.00 162.22 206.77 0.00 0.00

Nº de Varillas 0.00 31.62 22.52 0.00 0.00

TOTAL ACERO EN LOSA TANQUE ELEVADO TOTAL KG 369.00

08 REVOQUES Y ENLUCIDOSREVOQUES Y ENLUCIDOS

08.03 TARRAJEO EXTERIOR TANQUE ELEVADOAMBIENTE TIPO EJES CANTIDAD LARGO ANCHO CARAS PARCIAL TOTAL

Paredes Laterales 4 1.21 2.00 1 2.42 9.68

Paredes Laterales 4 0.70 2.00 1 1.40 5.60

Losa de Techo 1 2.50 2.50 1 6.25 6.25

CANT. ELEMENT.

Nº PIEZA X ELEMENTO

LONG. X PIEZA

Page 74: Metrado General Checopon
Page 75: Metrado General Checopon

TOTAL TARRAJEO M2 21.53 REVOQUES Y ENLUCIDOS

08.03 TARRAJEO EXTERIOR E INTERIOR DE CUARTO DE MAQUINASAMBIENTE EJES TIPO CANTIDAD LARGO ANCHO CARAS PARCIAL TOTAL

Paredes 4 2.50 2.50 2

Losa 1 2.50 2.50 1 6.25 6.25 TOTAL CIELORASO M2 6.25

08.04 TARRAJEO DE COLUMNASAMBIENTE EJES TIPO CANTIDAD ANCHO N° CARAS ALTURA PARCIAL TOTAL

COLUMNAS C-1 C - 1 4 0.40 4.00 9.00 14.40 57.60 C - 3 0.00 0.00

COLUMNAS C-3 C - 3 0.00 0.00 C - 3 0.00 0.00

COLUMNAS C-4 C - 4 0.00 0.00 C - 4 0.00 0.00

TOTAL TARRAJEO DE COLUMNAS M2 57.60 REVOQUES Y ENLUCIDOS

08.05 TARRAJEO DE VIGASAMBIENTE EJES TIPO CANTIDAD ANCHO N° CARAS ALTURA PARCIAL TOTAL

VIGA VA-101 (25x30) VA-101 3 2.50 4.0 0.30 3.00 9.00 VIGA VA-102 (25x20) VA-102 2 2.50 4.0 0.20 2.00 4.00

1.90 0.00 0.00 0.40 0.00 0.00 0.40 0.00 0.00 1.90 0.00 0.00

TOTAL TARRAJEO DE VIGAS M2 13.00 REVOQUES Y ENLUCIDOS

08.06.01 TARRAJEO CON IMPERMEABILIZANTE - CISTERNAAMBIENTE EJES TIPO CANTIDAD ANCHO N° CARAS ALTURA PARCIAL TOTAL

Cisterna Fondo 1 2.50 1 2.10 5.25 5.25 Cisterna Pared 2 2.80 1 1.45 4.06 8.12 Cisterna Pared 2 2.80 1 1.45 4.06 8.12 Cisterna Techo 1 2.50 1 2.10 5.25 5.25 Cisterna 0.00 0.00 Cisterna 0.00 0.00 Cisterna 0.00 0.00

Page 76: Metrado General Checopon

TOTAL TARRAJEO DE CISTERNA M2 26.74

Page 77: Metrado General Checopon

REVOQUES Y ENLUCIDOS08.06.02 TARRAJEO CON IMPERMEABILIZANTE - TANQUE ELEVADO

AMBIENTE TIPO EJES CANTIDAD LARGO ANCHO CARAS PARCIAL TOTALLosa de Fondo 1 2.50 2.50 1 6.25 6.25

Paredes Laterales 4 1.21 2.00 1 2.42 9.68

Paredes Laterales 4 0.70 2.00 1 1.40 5.60

Losa de Techo 1 2.50 2.50 1 6.25 6.25LOSA 2 superior fondo 1 0.00 0.00LOSA 2 superior fondo 1 0.00 0.00LOSA 2 superior fondo 1 0.00 0.00LOSA 2 superior fondo 1 0.00 0.00

CONCRETO laterales lado 1 0.00 0.00 CONCRETO laterales lado 1 0.00 0.00

CONCRETO tapa lado 2 0.00 0.00 CONCRETO tapa lado 2 0.00 0.00 TOTAL DE TARRAJEO M2 27.78

17 PINTURA17.02 PINTURA LATEX EN MURO EXTERIOR

AMBIENTE EJES TIPO CANTIDAD LARGO ANCHO CARAS PARCIAL TOTAL21.53 M2 21.53

17.04 PINTURA LATEX EN MURO COLUMNASAMBIENTE EJES TIPO CANTIDAD LARGO ANCHO CARAS PARCIAL TOTAL

57.6 M2 57.617.04 PINTURA LATEX EN VIGAS

AMBIENTE EJES TIPO CANTIDAD LARGO ANCHO CARAS PARCIAL TOTAL13 M2 13

Page 78: Metrado General Checopon

METRADO ESCALERA

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

01 OBRAS PROVISIONALES01.01 ALMACEN, OFICINA Y CASETA DE GUARDIANIA m201.02 CARTEL METALICO DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und01.03 SERVICIOS HIGIENICOS m201.04 AGUA PARA LA CONSTRUCCION GLB02 TRABAJOS PRELIMINARES02.01 LIMPIEZA DE TERRENO MANUAL 50.57 50.57 m202.02 DEMOLICION CIMIENTOS DE ADOBE Y PIEDRA m302.03 TRANSPORTE DE EQUIPO Y MAQUINARIA GLB02.04 FLETE TERRESTRE ton02.05 TRAZO Y REPLANTEO PRELIMINAR m2

1 10.32 4.90 50.57

03 MOVIMIENTO DE TIERRAS03.01 EXCAVACION DE ZANJAS Y ZAPATAS m3

Z1 4 2.10 2.10 1.90 8.38Z2 1 2.10 2.50 1.90 9.98Z3 4 1.50 1.50 1.90 17.10

eje 15-15 1 1.25 0.60 1.65 1.24eje 16-16 1 2.41 0.60 1.65 2.39eje 17-17 1 1.25 0.60 1.65 1.24

eje I-I 2 3.01 0.50 1.45 4.36eje J-J/ M-M 2 3.94 0.50 1.45 5.71

03.02 CORTE DE TERRENO HASTA 0.50 M SIN APISONADO m21 10.32 3.48 35.91

03.03 RELLENO Y COMP. MANUAL- MAT. DE AFIRMADO m31 10.32 3.48 0.50 17.96

03.04 ACARREO INTERNO DE MAT. PROCEDENTE DE EXC. m3item 3.1 0.00 1.00item 3.2 0.00 0.50 0.50

3.07 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA m3item3.1 1.00 1.20 1.20item 3.2 0.50 1.20 0.60

04 CONCRETO SIMPLE04.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 4.96 m3

eje 15-15 1 1.25 0.6 0.25 0.19eje 16-16 1 2.41 0.6 0.25 0.36eje 17-17 1 1.25 0.6 0.25 0.19

eje I-I 2 3.01 0.5 0.25 0.75eje J-J/ M-M 2 3.94 0.5 0.25 0.99

04.02 SOBRECIMIENTO FC=100 KG/CM2 + 25% PM 15.92 m3eje 15-15 1 4.66 0.6 0.7 1.96eje 16-16 1 2.78 0.6 0.7eje 17-17 1 4.66 0.6 0.7

eje I-I 2 4.28 0.5 0.7 3.00eje J-J/ M-M 2 4.28 0.5 0.7 3.00

04.03 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO 57.82 m2eje 15-15 2 4.66 0.70 6.52eje 16-16 2 2.78 0.70 3.89eje 17-17 2 4.66 0.70 6.52

eje I-I 2 4.28 0.70 5.99eje J-J/ M-M 2 4.28 0.70 5.99

04.04 FALSO PISO MEZCLA 1:8 e=4" 43.74 m21 4.96 4.41 21.87

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

Page 79: Metrado General Checopon

METRADO ESCALERA

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

04.05 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2Z1 4 2.1 2.1 17.64Z2 1 2.1 2.5 5.25Z3 4 1.5 1.5 9.00

04.06 SUBCIMIENTO FC=100 KG/CM2 m304.07 CONCRETO EN LOSA DEPORTIVA F'C=175 KG/CM2 m304.08 ENCOFRADO DE LOSAS DEPORTIVA m205 OBRAS DE CONCRETO ARMADO05.01 ZAPATAS, CONCRETO F'C=210 KG/CM2 m3

Z1 4 2.10 2.10 0.60 10.58Z2 1 2.10 2.50 0.60 3.15Z3 4 1.50 1.50 0.60 5.40

05.02 ZAPATAS, ACERO FY=4200KG/CM2 kgveces cant. long. coef.

Z1 4 28.00 1.96 0.99 217.32Z2 1 28.00 1.96 0.99 54.33Z3 4 20.00 1.35 0.99 106.92

05.03 VIGA DE CIMENTACION FC=210 KG/CM2 4.78 m3Eje 15-15 1 3.96 0.25 0.45 0.45Eje 17-17 1 3.96 0.25 0.45 0.45

Eje I-I/ J-J/ M-M 3 4.40 0.25 0.45 1.49

05.04 VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO 38.00 m2Eje 15-15 2 3.96 0.45 3.56Eje 17-17 2 3.96 0.45 3.56

Eje I-I/ J-J/ M-M 6 4.40 0.45 11.88

05.05 VIGAS DE CIMENTACION, ACERO FY=4200KG/CM2 501.82 kgveces cant. long. coef.

1/2" 4 6.00 3.96 0.99 94.091/2" 6 6.00 4.40 0.99 156.82

05.06 SOBREC. REF. CONCRETO 175 kg/cm2 m305.07 SOBREC. REF., ENCOFRADO DESENCOFRADO m205.08 SOBREC. REF., ACERO FY=4200KG/CM2 kg05.09 COLUMNAS, CONCRETO 175 kg/cm2 (COLUMNETAS) m305.10 COLUMNAS, CONCRETO 210 kg/cm2, (1er. PISO) 7.38 m3

C3 2 0.24 0.30 4.72 0.68C3 4 0.24 0.30 7.14 2.06C7 2 0.25 0.20 7.14 0.71C7 1 0.25 0.20 4.72 0.24

05.11 COLUMNAS, CONCRETO 210 kg/cm2, (2er. PISO) m305.12 COLUMNAS, ENCOFRADO DESENCOFRADO perim. 116.28 m2

C3 2 1.08 4.72 10.20C3 4 1.08 7.14 30.84C7 2 0.90 7.14 12.85C7 1 0.90 4.72 4.25

05.13 COLUMNAS, ACERO FY=4200KG/CM2 1243.92 kgacero principal veces cant. long. coef.

C3 ==> 5/8' 0 4.00 4.72 1.55C3 ==> 1/2' 0 2.00 7.14 0.99C3 ==> 5/8' 6 4.00 7.14 1.55 265.61C3 ==> 5/8' 6 2.00 7.14 0.99 84.82C7 ==> 1/2" 2 4.00 7.14 0.99 56.55C7 ==> 1/2" 1 4.00 4.72 0.99 18.69

estribosC3 ==> 3/8' 3 44.00 1.00 0.56 73.92C3 ==> 3/8' 3 48.00 1.00 0.56 80.64C7 ==> 3/8" 1 48.00 0.81 0.56 21.77C7 ==> 3/8" 1 44.00 0.81 0.56 19.96

05.14 PLACAS, CONCRETO 210 kg/cm2, (1er. PISO) m305.15 PLACAS, ENCOFRADO DESENCOFRADO m205.16 PLACAS, ACERO FY=4200KG/CM2 kg

Page 80: Metrado General Checopon

METRADO ESCALERA

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

05.17 GARGOLAS DE CONCRETO, TERMINADO S/DISEÑO vol. 0.02 m3segun plano 1 0.01 0.01

05.18 VIGAS, CONCRETO 175 kg/cm2 (VIGUETAS AMARRE) 0.10 m31 3.77 0.13 0.10 0.05

05.19 VIGAS, CONCRETO 210 kg/cm2, (1er. PISO) 3.86 m3eje 15-15/ eje 17-17 2 6.13 0.20 0.20 0.49

eje 18-18 1 1.50 0.20 0.20eje H-H 1 4.42 0.10 0.20 0.09eje H-H 1 4.93 0.25 0.40eje I-I 1 4.42 0.25 0.40 0.44eje I-I 1 4.93 0.25 0.40eje J-J 1 4.42 0.25 0.40 0.44

eje M-M 1 4.42 0.20 0.40 0.35vigueta de amarre 1 3.28 0.15 0.25 0.12

05.20 VIGAS, CONCRETO 210 kg/cm2, (2er. PISO) 1.68 m3

eje 15-15/ eje 17-17 2 6.13 0.2 0.2 0.49eje 18-18 1 1.5 0.2 0.2eje H-H 1 4.42 0.1 0.2eje H-H 1 4.93 0.25 0.4eje I-I 1 4.42 0.25 0.4eje I-I 1 4.93 0.25 0.4eje J-J 1 4.42 0.25 0.4

eje M-M 1 4.42 0.2 0.4 0.35

05.21 VIGAS, ENCOFRADO DESENCOFRADO 65.80 m2primer piso

eje 15-15/ eje 17-17 4 6.13 0.20 4.90eje 18-18 2 1.50 0.20 0.60eje H-H 2 4.42 0.20 1.77eje H-H 2 4.93 0.40 3.94eje I-I 2 4.42 0.40 3.54eje I-I 2 4.93 0.40 3.94eje J-J 2 4.42 0.40 3.54

eje M-M 2 4.42 0.40 3.54vigueta de amarre 2 3.28 0.25 1.64

segundo pisoeje 15-15/ eje 17-17 2 6.13 0.20 2.45

eje 18-18 1 1.5 0.20eje H-H 1 4.42 0.20eje H-H 1 4.93 0.40eje I-I 1 4.42 0.40eje I-I 1 4.93 0.40eje J-J 1 4.42 0.40

eje M-M 1 4.42 0.40 1.77viga amarre parapeto

eje H-H 1 8.83 0.10 0.88eje I-I 1 3.93 0.10 0.39

05.22 VIGAS, ACERO FY=4200KG/CM2 1084.58 kgveces cant. long. coef.

primer pisosolera 1/2" 2 4.00 7.63 0.99 60.43solera 1/2" 1 4.00 2.37 0.99 9.39

estribos 1 40.00 0.71 0.56 15.90v-1 2 6.00 9.37 0.99 111.32

estribos 1 40.00 1.11 0.56 24.86v-4 1 4.00 5.20 0.56 11.65

estribos 1 20.00 0.70 0.56 7.84V-2 1 2.00 5.20 0.99 10.30

estribos 2 18.00 0.71 0.56 14.31segundo piso

solera 1/2" 2 4 7.63 0.99 60.43solera 1/2" 1 4 2.37 0.99 9.39

estribos 1 40 0.71 0.56 15.90V-3 2 6 9.37 0.99 111.32

Page 81: Metrado General Checopon

METRADO ESCALERA

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

estribos 1 40 1.11 0.56 24.86V-3 1 4 5.2 0.56 11.65

estribos 1 20 0.7 0.56 7.84V-2 2 2 5.2 0.99 20.59

estribos 2 18 0.71 0.56 14.31

05.23 LOSA ALIGERADA, CONCRETO 210 kg/cm2 11.90 m3pasadizo 1 9.07 1.50 0.20 2.72

-8.333 13.61 0.01 -1.531 4.90 1.98 0.20 1.94

-8.333 9.70 0.01 -1.09techo 1 8.90 5.50 0.17 8.32

-8.333 48.95 0.01 -4.411 4.17 3.20 0.17

-8.333 13.34 0.01

05.24 LOSA ALIGERADA, ENCOFRADO DESENCOFRADO 144.52 m2pasadizo 1 9.07 1.50 13.61

1 4.90 1.98 9.70techo 1 8.90 5.50 48.95

1 4.17 3.2005.25 LOSA ALIGERADA, ACERO FY=4200KG/CM2 705.02 kg

veces cant. long. coef.pasadizo 1 5.00 4.90 0.99 24.26

tempetaratura 1 6.00 5.20 0.25 7.80pasadizo 1 15.00 2.02 0.99 30.00

tempetaratura 1 6.00 15.30 0.25 22.95techo 1 30.00 5.50 0.99 163.35

1 15.00 3.20 0.99 47.52temperatura 1 31.00 5.50 0.25 42.63

1 16.00 3.50 0.25 14.00

05.26 LOSA ALIGERADA, LADR. HUECO 15x30X30 226.74 und8.333 9.07 1.50 113.37

05.27 LOSA ALIGERADA, LADR. HUECO 12x30X30 815.80 und8.333 8.90 5.50 407.908.333 4.17 3.20

05.28 ESCALERAS, CONCRETO 210 kg/cm2 area 5.86 m3tramo1 1 1.60 4.96 0.15 1.19

9 1.60 0.03 0.43tramo 2 1 1.60 5.23 0.15 1.26

10 1.60 0.03 0.05

05.29 ESCALERAS, ENCOFRADO DESENCOFRADO 55.80 m2tramo1 1 1.60 4.96 7.94

9 1.60 0.18 2.592 4.96 0.30 2.98

tramo 2 1 1.60 5.23 8.3710 1.60 0.18 2.88

2 5.23 0.30 3.14

05.30 ESCALERAS, ACERO FY=4200KG/CM2 569.52 kgtramo 1 veces cant. long. coef.

1 8.00 7.00 0.99 55.441 8.00 6.00 0.99 47.522 22.00 1.60 0.56 39.42

tramo 2 1 8.00 7.00 0.99 55.441 8.00 6.00 0.99 47.522 22.00 1.60 0.56 39.42

05.31 GRADAS EN PISO, CONCRETO 175 kg/cm2 area 0.56 m3deposito 1 1.55 0.18 0.28

05.32 GRADAS EN PISO, ENCOFRADO DESENCOFRADO 2.66 m23 1.55 0.20 0.932 1.00 0.20 0.40

06 MUROS Y TABIQUES DE ALBAÑILERIA06.01 MURO DE LADRILLO KK TIPO IV CABEZA M: 1:4,J:1.5CM 141.86 m2

eje 15-15/17-17 2 4.91 6.73 66.09

Page 82: Metrado General Checopon

METRADO ESCALERA

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

ejeM-M 1 4.40 1.10 4.84

06.02 MURO DE LADRILLO KK TIPO IV SOGA M: 1:4,J:1.5CM 53.96 m2parapeto descanso escalera 1 4.40 1.10 4.84

eje J-J 1 4.40 1.10 4.84eje I-I 1 1.37 2.75 3.77

parapeto pasadizo 2 3.30 2.05 13.53

06.03 ALAMBRE # 8REFUERZO HORIZONTAL EN MUROS 36.04 kgveces cant. long. coef.

parapeto descanso escalera 1 3.00 4.55 0.12 1.64eje J-J 1 20.00 4.55 0.12 10.92eje I-I 1 10.00 1.67 0.12 2.00

parapeto pasadizo 2 4.00 3.60 0.12 3.46

07 REVOQUES ENLUCIDOS Y MOLDURAS07.01 TARRAJEO PRIMARIO, MORTERO C:A 1:5 m207.02 TARRAJEO EN MURO: INTERIOR Y EXTERIOR 298.48 m2

cabezaeje 15-15/17-17 3 4.91 6.73 99.13

ejeM-M 2 4.4 1.1 9.68soga

parapeto descanso escalera 2 4.4 1.1 9.68eje J-J 2 4.4 1.1 9.68eje I-I 2 1.37 2.75 7.54

parapeto pasadizo 2 3.3 2.05 13.53

07.03 TARRAJEO EN MUROS EXT. A PARTIR DE 2do.PISO m207.04 TARRAJEO DE COLUMNAS 116.28 m2

C3 2 1.08 4.72 10.2C3 4 1.08 7.14 30.84C7 2 0.9 7.14 12.85C7 1 0.9 4.72 4.25

07.05 TARRAJEO DE VIGAS 41.78 m2primer piso

eje 15-15/ eje 17-17 4 6.13 0.2 4.90eje 18-18 2 1.5 0.2 0.60eje H-H 2 4.42 0.2 1.77eje H-H 2 4.93 0.4eje I-I 2 4.42 0.4 3.54eje I-I 2 4.93 0.4eje J-J 2 4.42 0.4

eje M-M 2 4.42 0.4vigueta de amarre 2 3.28 0.25 1.64

segundo pisoeje 15-15/ eje 17-17 2 6.13 0.2 2.45

eje 18-18 1 1.5 0.2 0.30eje H-H 1 4.42 0.2 0.88eje H-H 1 4.93 0.4eje I-I 1 4.42 0.4 1.77eje I-I 1 4.93 0.4eje J-J 1 4.42 0.4 1.77

eje M-M 1 4.42 0.4viga amarre parapeto

eje H-H 1 8.83 0.1 0.88eje I-I 1 3.93 0.1 0.39

07.06 VESTIDURA DE DERRAMES (1:5) 33.04 mP06 1 6.90 6.90V05 1 9.62 9.62

07.07 VESTIDURA DE DERRAMES CON BORDES BOLEADOS M:1:2 33.66 mparapeto descanso escalera 1 3.35 3.35

parapeto pasadizo 1 13.48 13.48

Page 83: Metrado General Checopon

METRADO ESCALERA

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

07.08 BRUÑAS SEGUN DETALLE (1 x 1 cm) 60.72 meje 17-17 1 19.74 19.74eje m-m 1 10.62 10.62

08 CIELO RASOS08.01 CIELO RASO CON MEZCLA C:A 1:5 149.62 m2

pasadizo 1 9.07 1.50 13.611 4.90 2.50 12.25

techo 1 8.90 5.50 48.951 4.17 6.50

08.02 VESTIDURA EN FONDO DE ESCALERAS 29.70 m2tramo 1 1 4.60 1.60 7.36tramo 2 1 4.68 1.60 7.49

09 PISOS Y PAVIMENTOS09.01 PISO DE CEMENTO PULIDO Y BRUÑADO E=2" S/COLOREAR 24.10 m2

deposito 1 1.43 3.23 4.621 1.53 1.53 2.34

pasadizo 2do piso 1 3.77 1.35 5.09

09.02 MACHIEHEMBRADO DE MADERA PRIMER PISO m209.03 MACHIEHEMBRADO DE MADERA SEGUNDO PISO m209.04 PATIO Y VEREDA CONCRETO 175 kg/cm2 E=4" FROT. Y BRUÑADO 33.82 m2

frontal 1 9.07 1.50 13.61posterior 1 5.50 0.60 3.30

09.05 CONTRAPISO DE 40 mm m209.06 PISO LOSETA VENECIANA 30x30 COLOR CLARO m209.07 CANALETA "MEDIA CAÑA" EN CIRCULACION 18.14 m

pasadizo 2do piso 1 9.07 9.07

09.08 CANALETA DE EVACUACION PLUVIAL FC=175 KG/CM2 C/REJILLA 18.14 m1 9.07 9.07

10 CONTRAZOCALOS10.01 CONTR. S/COLOREAR H=20 cm MZ 1:2 e=1.5 cm 37.70 m

5 3.77 18.85

10.02 CONTRAZOCALO DE MAD CEDRO 3/4" X 4" RODON DE 3/4" m11 ZOCALOS11.01 ZOCALO DE MAYOLICA BLANCA 20x20 (1a.) m212 REVESTIMIENTO DE GRADAS Y ESCALERAS12.01 REVEST. C/CEMENTO PULIDO PASO Y CONTRAPASO 70.40 m

22 1.60 35.20

12.02 ACABADO DE DESCANSO CEMENTO PULIDO Y BRUÑADO 11.76 m21 3.23 1.82 5.88

12.03 CONTRAZOCALO RECTO DE ESCALERAS 37.12 mtramo 1 2 4.60 9.20tramo 2 2 4.68 9.36

13 CUBIERTAS13.01 IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA 90.86 m2

1 8.26 5.50 45.431 4.17 6.50

13.02 COBERTURA C/TEJA ARCILLA EN CERCO DE LADRILLO m13.03 COBERTURA CON TEJA DE ARCILLA 42X20 ASENTADO C/MEZCLA 90.86 m2

1 8.26 5.50 45.431 4.17 6.50

13.04 CUMBRERA DE TEJA DE ARCILLA 42X20 ASENTADO C/MEZCLA 7.54 m1 3.77 3.77

14 CARPINTERIA DE MADERA14.01 PUERTA CEDRO TIPO TABLERO C/TRAGALUZ - AULAS 5.40 m2

P06 1 0.90 3.00 2.70

14.02 PUERTA CEDRO MACHIMBRADA m214.03 PUERTA CON TRIPLAY 9mm P/SSHH. m214.04 VENTANA CEDRO-AULAS C/SEG 3.92 m2

Page 84: Metrado General Checopon

METRADO ESCALERA

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

V05 1 4.36 0.45 1.96

14.05 TICERO DE MADERA CEDRO (L=5 m) BARNIZADO und14.06 MESA BATIENTE DE MADERA und15 CARPINTERIA METALICA Y HERRERIA15.01 PASAMANO DE TUBO FºGº DE 2" EN ESCALERA 29.60 m

tramo 1 2 3.70 7.40tramo 2 2 3.70 7.40

15.02 CANTONERA DE ALUMINIO EN ESCALERA 72.60 m22.00 1.65 36.30

16 CERRAJERIA16.01 BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA 12.00 pza

P06 6 6.00

16.02 BISAGRA DE ACERO ALUMINIZADO DE 2.5" PESADA EN PUERTA/VENTANA 16.00 pzaV05 8 8.00

16.03 CERRADURA DOS GOLPES EN PUERTA 2.00 pza1 1.00

16.04 CERROJO "SAPITO" SEGURIDAD BAT.VENTANA 4.00 pza2 2.00

16.05 MANIJA DE BRONCE 4" PARA PUERTAS 2.00 pza1 1.00

16.06 CERROJO DE 3" ALUMINIZADO PARA PUERTA pza17 VIDRIOS, CRISTALES Y SIMILARES17.01 VIDRIOS SEMIDOBLES IMPORTADO 31.28 p2

V05 1 3.23 10.76 0.45 15.64

18 PINTURA18.01 PINTURA LATEX 2 MANOS EN CIELO RASO 149.62 m2

idem partida 08.01 149.62 149.62

18.02 PINTURA OLEO 2 MANOS EN VIGAS 41.78 m2idem partida 7.05 41.78 41.78

18.03 PINTURA OLEO 2 MANOS EN MUROS Y COLUMNA 414.76 m2idem partida 7.02 298.48 298.48idem partida 7.04 116.28 116.28

18.04 PINT. ANTICOR. ESMALTE 2 MANOS EN BARRAS DE SEGURIDAD 43.44 mBARANDAS 2 3.70 7.40

2 3.70 7.40V05 2 3.46 6.92

18.05 PINTURA BARNIZ EN CARP.DE MADERA 9.32 m2idem partida 14.01 5.40 5.40idem partida 14.04 3.92 3.92

18.06 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H=20 37.70 midem partida 10.01 37.70 37.70

20 APARATOS SANITARIOS Y ACCESORIOS

20.01 INODORO BLANCO D/LOSA 1era NAC.+T.ALTO DE PCV INC. ACCESSORIOS pza20.02 INODORO TANQUE BAJO DE LOSA 1ra CALIDAD ADULTO (NAC. BLANCO) pza20.03 DUCHA CROMADA 1 LLAVE INCL.ACCESORIOS und20.04 LAVATORIO DE PARED BLANCO 1 LLAVE pza20.05 URINARIO CORRIDO SEGUN DISEÑO REV. C/MAYOLICA DE 20x20 m20.06 BEBEDERO CORRIDO DE CONCRETO REVEST. C/MAYOLICA DE 20x20 m20.07 FALSA COLUMNA/PROTECCION TUBERIA BAJADA FC=175 KG/CM2 m3

2 0.20 0.25 1.50 0.15

21 INSTALACIONES SANITARIAS21.01 SALIDA DE DESAGUE EN PVC pto21.02 SALIDA PARA VENTILACION pto21.03 CANALETA DE FIEROO GALVANIZADO m

2 3.77 7.54

Page 85: Metrado General Checopon

METRADO ESCALERA

Ubicación: Localidad: RACARRUMI Distrito: LLAMA Provincia: CHOTA Región: CAJAMARCA

ITEM DESCRIPCION # VECES LARGO ANCHO ALTURA SUBTOTAL TOTAL UND

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCA

21.04 TUBERIA DE PVC SAL 2" m21.05 TUBERIA DE PVC SAL 4" m21.06 TUBERIA DE PVC SAP 3" P/LLUVIAS m

2 7.00 14.00

21.07 REGISTRO DE BRONCE 3" und21.08 REGISTRO DE BRONCE 4" und21.09 REJILLA DE BRONCE 3" und21.10 REJILLA DE BRONCE 4" und21.11 CAJA SUMIDERO CON REJILLA DE FIERRO und21.12 CAJA DE REG. ALB. 12"x24" C/TAPA CONCRETO und23 INSTALACIONES ELECTRICAS23.01 SALIDA DE TECHO (CENTRO DE LUZ) 2.00 pto

1 1.00

23.02 SALIDA PARA BRAQUETE (PARED) pto23.03 SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA pto23.04 POZO PUESTA A TIERRA INC. CABLE-2004 P-2 (R<5 0HMS) und24 SALIDA PARA COMUNICACIONES Y SEÑALES24.01 SALIDA PARA RED DATA pto25 CAJAS25.01 CAJAS DE PASE FºGº 6"x6"x3" und27 ARTEFACTOS27.01 ART. FLUORESCENTE 2/36W (SIM. E JOSFEL) C/SOPORTE und27.02 ART. FLUORESCENTE 3/36W (SIM. E JOSFEL) C/SOPORTE 2.00 und

1 1.00

27.03 ART. FLUORESCENTE 2/18W (SIM. E JOSFEL) und27.04 ART. FLUOR. 2/20W EMPOTRADO MARCO ALUM(DIF. PLAS) und27.05 ART. T/PLASTICO CUADRADO C/LAMP. FLUORESC. CIRC. 32W und27.06 ART. BRAQ. C/SOCKET DE PORCELANA Y LAMP. 36W und28 CONEXION A RED EXTERNA Y MEDIDORES28.01 ALIM. CAB. NYY (3-1X25 + 1-1X1(N)+ 1-1X16(T)) mm2 m28.02 ALIM. CAB TW (4-1X4) mm2 m28.03 ALIM. CAB TW (4-1X10) mm2 m28.04 ALIM. CAB TW (3-1X4) mm2 m28.05 ALIM. CAB TW (3-1X10) mm2 m28.06 CABLE COBRE DESNUDO1x16mm2. diam 20mm PVC-P m29 CANALIZACIONES Y/O TUBERIAS29.01 TUBERIA PVC-P 35mm m29.02 TUBERIA PVC-P 25mm m

Page 86: Metrado General Checopon

METRADOSCódigo del Proyecto:

Revisión:

Especialidad: ESTRUCTURAS Proyecto:

Proyecto: MEJORAMIENTO DEL SERVICIO EDUCATIVO PRIMARIO I.E N° 101099 - RACARRUMI, DISTRITO DE LLAMA, PROVINCIA DE CHOTA-CAJAMARCAElaboración: ECCh

INSTALACIÓN DE TANQUE BIODIGESTOR 3000 LITROS ( 1 UND )

ITEM DESCRIPCION UND MEDIDAS PARCIALES

LARGO ANCHO ALTO ÁREA VOLUMEN

INSTALACIÓN DE TANQUE BIODIGESTOR 3000 LITROSESTRUCTURAS - ARQUITECTURA

2.00 TRABAJOS PRELIMINALES02.01. LIMPIEZA DE TERRENO MANUAL M2 8.51 8.51

BIODIGESTOR (DIÁMETRO) 1.00 3.00 - - 7.07CAJA DE LODOS 1.00 1.20 1.20 - 1.44

02.04. TRAZO Y REPLANTEO PRELIMINAR M2 8.51 8.51 8.5103.00. MOVIMIENTO DE TIERRAS

03.01. EXCAVACION DE ZANJAS Y ZAPATAS M3 11.27 11.27BIODIGESTOR (RADIO MAYOR/RADIO MENOR) 1.00 1.50 0.925 2.15 10.12

CAJA DE LODOS 1.00 1.20 1.20 0.80 1.15NIVELACIÓN Y APISONADO INTERIOR MANUAL M2 4.13

BIODIGESTOR (RADIO MENOR) 1.00 0.925 - - 2.69CAJA DE LODOS 1.00 1.20 1.20 - 1.44

03.04. RELLENO Y COMP. MANUAL- MAT. DE AFIRMADO M3 10.56 10.56VOLUMEN EXCAVCIÓN 1.00 10.12

DESCUENTO VOLUMEN TANQUE -3.69 -3.6903.07. ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA M3 1.25 0.89 0.89 0.89

05.00.00. PLANTILLA DE FONDO05.11.03. BIODIGECTOR, BASE DE CONCRETO - MEZCLA C:H=1:10, E=0.10m M2 2.69 2.69

BIODIGESTOR (RADIO MENOR) 1.00 0.925 - - 2.6905.11.04. BIODIGESTOR, ACERO DE REFUERZO FY=4200 KG/CM2 KG 14.53 14.53

07.00. REVOQUES ENLUCIDOS Y MOLDURAS07.12. REPELLADO DE CONCRETO - MEZCLA C:A=1:3 M2 16.00 16.00

ÁREA LATERAL (RADIO MAYOR/RADIO MENOR/GENERATRIZ) 1.00 1.50 0.925 2.10 16.0019.00. CAJAS DE INSPECCIÓN Y/O REGISTRO

19.06. CAJA DE REGISTRO PARA DESAGUE 24" x 24 " UND 1.00 1.00 1.00 1.00TANQUE BIODIGESTOR

19.07. INSTALACIÓN DE TANQUE BIODIGESTOR 3000LTS UND 1.00 1.00 1.00 1.00

Consultor:

Descripcióndel Trabajo:

PESO/FACTOR

N° DEVECES

CANTIDAD PARCIAL

CANTIDAD TOTAL

Page 87: Metrado General Checopon

METRADOSCódigo del Proyecto:

Revisión:

Especialidad: ESTRUCTURAS Proyecto:

Elaboración: ECCh

POZO PERCOLADOR TIPO 2 - PARA MÓDULO 2 ( 1 UND )

ITEM DESCRIPCION UND MEDIDAS PARCIALES

LARGO ANCHO ALTO ÁREA VOLUMEN

ARRASTRE HIDRÁULICOPOZO PERCOLADOR TIPO 2 - PARA MÓDULO 2

02.00. TRABAJOS PRELIMINALES02.01. LIMPIEZA DE TERRENO MANUAL M2 3.69 3.69

ZANJA 1.00 3.00 0.40 - 1.20POZO (RADIO) 1.00 0.89 - - 2.49

02.04. TRAZO Y REPLANTEO PRELIMINAR M2 3.69 3.69 3.6903.00. MOVIMIENTO DE TIERRAS

03.01. EXCAVACION MANUAL EN TERRENO NATURAL M3 6.33 6.33ZANJA 1.00 3.00 0.40 0.40 0.48

POZO (RADIO) 1.00 0.89 - 2.35 5.8503.01. RELLENO CON MATERIAL GRANULAR 1/2" M3 2.63 2.63

EXCAVACIÓN TOTAL (RADIO) 1.00 0.89 - 2.35 5.85DESCUENTO VOLUMEN INTERIOR (RADIO) -1.00 0.69 - 2.15 -3.22

03.05. RELLENO CON MATERIAL GRANULAR 2" M3 1.25 0.30 0.30VOLUMEN DE GRAVA (RADIO) 1.00 0.49 - 0.40 0.30

03.06. ELIMINACIÓN DE MATERIAL EXCEDENTE (CARGUÍO MANUAL) HASTA D.PROM=30m M3 1.25 7.91 7.91 7.9104.00. OBRAS DE CONCRETO SIMPLE

04.01. CIMIENTO CORRIDO - MEZCLA C:H=1:10 + 30% PM M3 0.30 0.30BASE TOTAL (RADIO) 1.00 0.69 - 0.40 0.60

DESCUENTO VOLUMEN INTERIOR GRAVA (RADIO) -1.00 0.49 - 0.40 -0.3004.09. CONCRETO F’C=210 KG/CM2 M3 0.11 0.11

ANILLO - VOLUMEN TOTAL (RADIO) 2.00 0.69 - 0.10 0.30DESCUENTO VOLUMEN INTERIOR VACÍO (RADIO) -2.00 0.55 - 0.10 -0.19

05.00.00. OBRAS DE CONCRETO ARMADO05.11.05. POZO PERCOLADOR, CONCRETO F’C=210 KG/CM2 M3 0.23 0.23

LOSA SUPERIOR (RADIO) 1.00 0.69 - 0.15 0.22TAPA DE ACCESO (RADIO) 1.00 0.35 - 0.10 0.04

DESCUENTO POR ORIFICIO DE ACCESO (RADIO) -1.00 0.25 - 0.15 -0.0305.11.06. POZO PERCOLADOR, ENCOFRADO Y DESENCOFRADO M2 2.27 2.27

BASE DE LOSA SUPERIOR (RADIO) 1.00 0.69 - - 1.50LOSA SUPERIOR (BORDE INTERNO) 1.00 1.57 - 0.175 0.27

LOSA SUPERIOR (BORDE PARA TAPA) 1.00 1.88 - 0.025 0.05BASE DE TAPA DE ACCESO (RADIO) 1.00 0.35 - - 0.38

TAPA DE ACCESO (BORDE EXTERNO) 1.00 2.20 - 0.10 0.22TAPA DE ACCESO (BORDE INTERNO) 1.00 1.88 - 0.025 0.05

DESCUENTO EN BASE DE LOSA POR ORIFICIO DE ACCESO -1.00 0.25 - - -0.2005.11.07. POZO PERCOLADOR, ACERO DE REFUERZO FY=4200 KG/CM2 KG 21.44 21.44

06.00. MUROS Y TABIQUES DE ALBAÑILERIA

06.04. M2 5.45 5.45

MURO DE LADRILLO (RADIO) 1.00 3.90 - 1.40 5.4519.00. VARIOS, LIMPIEZA Y JARDINERIA

19.08. SUMINISTRO Y COLOCACIÓN DE TUBERÍA PVC SAL Ø4" M 1.00 4.00 - - 4.00 4.00 4.0019.09. REGISTRO DE BRONCE ROSCADO Ø4" UND 1.00 1.00 1.00 1.0019.10. ACCESORIOS PVC DESAGÜE GLB 1.00 1.00 1.00 1.0019.11. ASAS DE TORNILLOS EN "U" UND 2.00 2.00 2.00 2.00

"MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE ABASTECIMIENTO DE AGUA POTABLE Y SANEAMIENTO BASICO EN EL CENTRO POBLADO SHITABAMBA, DISTRITO DE SAN ANDRES DE CUTERVO, PROVINCIA DE CUTERVO, REGION CAJAMARCA"

Consultor:

Descripcióndel Trabajo:

PESO/FACTOR

N° DEVECES

CANTIDAD PARCIAL

CANTIDAD TOTAL

MURO DE LADRILLO DE ARCILLA CORRIENTE, MORTERO C:A=1:5, APAREJO DE SOGA, SIN JUNTAS VERTICALES