PLANILLA DE METRADO DE ACERO - CISTERNA Y TANQUE ELEVADO
PROYECTO AMPLIACIÓN Y MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E.P. 72360 “HÉROES DEL PACÍFICO" - HUAYRAPATA
UBICACIÓN HUAYRAPATA- MOHO - PUNO
CLIENTE MUNICIPALIDAD DISTRITAL DE HUAYRAPATA
FECHA NOVIEMBRE 2010
ELEMENTOS DESCRIPCION ø NRO VECES NRO BARRAS LONGITUD LONG. EMPLAME6mm 8mm 1/4" 3/8" 1/2" 5/8"
ACERO EN CISTERNA
FONDO ACERO LONGI. 1/2 1 13 7.4 96.20
1/2 1 10 1.4 14.00
1/2 1 10 2.3 23.00
1/2 2 13 1.1 28.60
ACERO TRANS. 1/2 1 40 3.8 152.00
1/2 1 4 3.4 13.60
PAREDES VERTICALES 3/8 2 8 3 48.00
3/8 2 8 3 48.00
3/8 2 19 3 114.00
3/8 2 19 3 114.00
HORIZONTALES 3/8 2 16 3.1 99.20
3/8 2 16 3.1 99.20
3/8 2 16 6 192.00
3/8 2 16 6 192.00
TECHO 3/8 2 28 3.1 173.60
3/8 2 13 6.2 161.20
1/2 2 2 1.65 6.60
1/2 2 2 2 8.00
0.22 0.49 0.25 0.58 1.02 1.55
0.00 0.00 0.00 1,241.20 342.00 0.00
0.00 0.00 0.00 719.90 348.84 0.00
0.00 0.00 0.00 138.00 38.00 0.00
PESO TOTAL 8.00 Kg
ELEMENTOS DESCRIPCION ø NRO VECES NRO BARRAS LONGITUD LONG. EMPLAME6mm 3/4" 1/4" 3/8" 1/2" 5/8"
ACERO DE REFUERZO EN COLUMNAS TANQUE ELEVADO
C-1 ACERO LONGI. 3/4 4 8 14.2 454.40
ESTRIBOS 3/8 4 86 1.6 550.40
ESTRIBOS 3/8 4 86 1.3 447.20
COLUMNETAS ACERO LONGI. 1/2 3 2 2.7 16.20
ESTRIBOS 6 3 13 0.3 11.70
CA-1 ACERO LONGI. 3/8 6 4 2.7 64.80
6 6 13 0.8 62.40
3/8 2 4 2.7 21.60
6 2 11 0.8 17.60
0.22 2.24 0.25 0.58 1.02 1.55
91.70 454.40 0.00 1,084.00 16.20 0.00
20.17 1,017.86 0.00 628.72 16.52 0.00
10.00 50.00 0.00 120.00 2.00 0.00
PESO TOTAL 21.60 Kg
ELEMENTOS DESCRIPCION ø NRO VECES NRO BARRAS LONGITUD LONG. EMPLAME6mm 8mm 1/4" 3/8" 1/2" 5/8"
ACERO DE REFUERZO EN VIGAS
VIGAS
ACERO LONG. 5/8 4 4 11.5 184.00
ESTRIBOS 3/8 4 44 1.6 281.60
0.22 0.49 0.25 0.58 1.02 1.55
0.00 0.00 0.00 281.60 0.00 184.00
0.00 0.00 0.00 163.33 0.00 285.20
0.00 0.00 0.00 31.00 0.00 20.00
LONG. POR ø EN ML.
PESO POR ø / ML.
LONG. TOTAL POR øPESO TOTAL POR ø
NUMERO VARILLAS POR ø
LONG. POR ø EN ML.
PESO POR ø / ML.
LONG. TOTAL POR ø
PESO TOTAL POR ø
NUMERO VARILLAS POR ø
LONG. POR ø EN ML.
PESO POR ø / ML.
LONG. TOTAL POR øPESO TOTAL POR ø
NUMERO VARILLAS POR ø
PLANILLA DE METRADO DE ACERO - CISTERNA Y TANQUE ELEVADO
PROYECTO AMPLIACIÓN Y MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E.P. 72360 “HÉROES DEL PACÍFICO" - HUAYRAPATA
UBICACIÓN HUAYRAPATA- MOHO - PUNO
CLIENTE MUNICIPALIDAD DISTRITAL DE HUAYRAPATA
FECHA NOVIEMBRE 2010
ELEMENTOS DESCRIPCION ø NRO VECES NRO BARRAS LONGITUD LONG. EMPLAME6mm 8mm 1/4" 3/8" 1/2" 5/8"
ACERO DE REFUERZO, LOSA
LOSA
SUP 3/8 1 12 2.4 28.80
SUP 3/8 1 11 2.6 28.60
INF 3/8 1 6 2.4 14.40
INF 3/8 1 6 2.6 15.60
0.22 0.49 0.25 0.58 1.02 1.55
0.00 0.00 0.00 87.40 0.00 0.00
0.00 0.00 0.00 50.69 0.00 0.00
0.00 0.00 0.00 10.00 0.00 0.00
PESO TOTAL 14.40 Kg
ELEMENTOS DESCRIPCION ø NRO VECES NRO BARRAS LONGITUD LONG. EMPLAME6mm 8mm 1/4" 3/8" 1/2" 5/8"
ACERO DE REFUERZO, TANQUE ELEVADO
FONDO 3/8 2 12 3.20 76.80
3/8 2 10 3.3 66.00
PAREDES VERTICAL 3/8 2 20 2.77 110.80
3/8 2 18 2.77 99.72
PAREDES HORIZONTAL 3/8 2 14 11.10 310.80
3/8 4 6 1.25 30.00
TECHO INFERIOR 3/8 1 12 3.20 38.40
3/8 1 11 3.3 36.30
SUPERIOR 3/8 1 6 3.20 19.20
3/8 1 7 3.3 23.10
TAPA 1/2 1 2 2.03
1/2 2 2 1.65
3/8 4 1 0.95 3.80
3/8 2 4 0.3 2.40
3/8 2 2 0.30 1.20
0.22 0.49 0.25 0.58 1.02 1.55
0.00 0.00 0.00 818.52 0.00 0.00
0.00 0.00 0.00 474.74 0.00 0.00
LONG. POR ø EN ML.
PESO POR ø / ML.
LONG. TOTAL POR øPESO TOTAL POR ø
NUMERO VARILLAS POR ø
LONG. POR ø EN ML.
PESO POR ø / ML.
LONG. TOTAL POR øPESO TOTAL POR ø
HOJAS DE METRADOS - TANQUE ELEVADO Y CISTERNA
PROYECTO MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN EL INSTITUTO SUPERIOR TECNOLOGICO CHUPA, DISTRITO DE CHUPA - AZANGARO - PUNO
UBICACIÓN CHUPA - AZANGARO - PUNO
CLIENTE MUNICIPALIDAD DISTRITAL DE CHUPA
FECHA AGOSTO 2011
ITEM DESCRIPCION UNID. CANT.MEDIDAS
PARCIAL TOTALLARGO ANCHO ALTURA AREA
TRABAJOS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.00.00 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES01.02.02 TRAZOS, NIVELES Y REPLANTEOS01.02.03 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2 22.34
1.00 22.34 22.3401.01.02 REPLANTEO DURANTE EL PROCESO M2 22.34
1.00 22.34 22.34
ESTRUCTURA
01.03 MOVIMIENTO DE TIERRAS02.01.00 NIVELACION DE TERRENO02.01.01 NIVELACION M2 22.34 22.34
02.02.00 EXCAVACIONES02.02.01 EXCAVACIONES SIMPLES
02.02.01.01 EXCAVACION DE ZANJAS EN CISTERNA 37.44M3 1 6.00 3.20 1.95 37.44
02.03.00 RELLENOS02.03.01 RELLENO CON MATERIAL PROPIO
PAREDES DE CISTERNA M3 1 15.00 0.20 1.45 4.35BASE INFERIOR 1 5.80 3.00 0.50 8.70
2 1.64 1.60 0.35 1.84
02.04.00 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 4 KM 28.19EXCAVACION M3 1 37.44RELLENO 1 14.89
1 FACTOR 1.25 22.55
02.05.00 NIVELACION INTERIOR Y COMPACTADO 8.50VEREDA PERIMETRAL
M2 1 8.50 8.50
03.00.00 CONCRETO ARMADO
03.01.00 COLUMNAS03.01.01 CONCRETO EN COLUMNAS F'C= 210 KG/CM2 7.65
C1 M3 4 0.40 0.40 10.60 6.78COLUMNETAS P/TABLEROS 3 0.33 0.10 2.50 0.25CA1 6 0.25 0.13 2.50 0.49CA1 2 0.25 0.13 2.00 0.13
03.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 82.29caras
C1 M2 4 0.40 4.00 10.60 67.84COLUMNETAS P/TABLEROS 3 0.33 2.00 2.50 4.95CA1 6 0.25 2.00 2.50 7.50CA1 2 0.25 2.00 2.00 2.00
03.01.03 ACERO DE REFUERZO EN COLUMNAS KG. 1 21.60
03.02.00 VIGAS03.02.01 CONCRETO EN VIGAS F'C =210 KG/CM2 M3 4.00
VIGAS 4 8.00 0.25 0.50 4.00
03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 40.00VIGAS 4 8.00 0.25 0.50 40.00
03.02.03 ACERO DE REFUERZO EN VIGAS KG. 1 281.60
03.03.00 LOSAS03.03.01 LOSAS MACIZAS03.03.01.01 CONCRETO EN LOSA F'C=210KG/CM2 M3 0.60
LOSA EN TANQUE ELEVADO 1 2.10 1.90 0.15 0.60
03.03.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA M2 3.99LOSA EN TANQUE ELEVADO 1 2.10 1.90 3.99
03.03.01.03 ACERO EN LOSA KG. 1 14.40
HOJAS DE METRADOS - TANQUE ELEVADO Y CISTERNA
PROYECTO MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN EL INSTITUTO SUPERIOR TECNOLOGICO CHUPA, DISTRITO DE CHUPA - AZANGARO - PUNO
UBICACIÓN CHUPA - AZANGARO - PUNO
03.04.00 CISTERNA03.04.01 CONCRETO F'=210KG/CM2 EN CISTERNA M3 19.00
BASE INFERIOR 1 5.80 3.00 0.5 8.702 1.64 1.60 0.35 1.841 2.10 0.60 0.2 0.25
PAREDES LATERALES 2 5.40 0.20 2 4.322 2.10 0.20 2 1.68
PINTO DE COLUMNAS 4 0.40 0.20 2 0.64TECHO 1 5.00 2.10 0.15 1.58
03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN CISTERNA M2 89.35BASE INFERIOR 1 17.60 0.50 8.80
2 6.48 0.35 4.541 5.40 0.20 1.08
PAREDES LATERALES 2 11.20 2.00 44.802 4.60 2.00 18.40
PINTO DE COLUMNAS 4 1.20 2.00 9.60TECHO 1 14.20 0.15 2.13
03.04.03 ACERO DE REFUERZO EN CISTERNA KG 1 8.00
03.05.00 TANQUE ELEVADO03.05.01 CONCRETO EN TANQUE ELEVADO F'C=210KG/CM2 M3 5.18
FONDO 1 2.50 2.25 0.20 1.13PAREDES 2 2.10 0.20 1.68 1.41
2 1.90 0.20 1.68 1.284 0.20 0.20 1.68 0.27
TECHO 1 2.85 2.60 0.15 1.11TAPA -1 0.63 0.63 0.15 -0.06
2 0.83 0.10 0.15 0.022 0.63 0.10 0.15 0.02
03.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN TANQUE ELEVADO M2 42.52PRIMER NIVELFONDO 1 2.40 2.20 5.28PAREDES EXT 2 4.00 1.73 13.84PAREDES INT 2 4.50 1.73 15.53TECHO 1 2.40 2.25 5.40
2 5.40 0.15 1.62TAPA -1 0.63 0.63 -0.40
4 0.63 0.30 0.764 0.83 0.15 0.50
03.05.03 ACERO DE REFUERZO EN TANQUE ELEVADO KG. 1 2.40
04.00.00 VARIOS04.01.00 ADITIVO DESMOLDANTE PARA ENCOFRADOS DE MADERA M2 1 258.15 258.15
04.02.00 ADITIVO CURADOR DE CONCRETO PARA OBRA M2 1 258.15 258.15
ARQUITECTURA
05.00.00 MUROS Y TABIQUES DE ALBAÑILERIA05.01.00 MURO DE SOGA LADRILLO KING - KONG CON CEMENTO - ARENA M2 1 3.94 1.75 6.90 12.13
1 1.70 1.20 2.042 0.84 1.90 3.19
06.00.00 REVOQUES Y REVESTIMIENTOS06.01.00 TARRAJEO EN MURO INTERIOR Y EXTERIOR M2 40.80
INTERIOR DE CASETA 1 2.5 2.05 5.131 2.55 2.05 5.231 1.2 2.05 2.461 2.2 1.6 3.52
EXTERIOR DE CASETA 1 2.1 1.6 3.362 1.9 2.05 7.791 1.4 2.05 2.87
EN COLUMNAS EXTERIORES 4 1 2.6 10.4
06.02.00 TARRAJEO DE COLUMNAS M2 39.90C-1 4 0.4 0.4 6.23 39.872
06.03.00 TARRAJEO DE VIGAS M2 67.10TECHO DE CUARTO DE MAQUINAS 2 2.2 0.15 0.35 2.2
2 1.9 0.15 0.35 1.9PARTE EXTERIOR 2 2.2 0.5 2.2
HOJAS DE METRADOS - TANQUE ELEVADO Y CISTERNA
PROYECTO MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN EL INSTITUTO SUPERIOR TECNOLOGICO CHUPA, DISTRITO DE CHUPA - AZANGARO - PUNO
UBICACIÓN CHUPA - AZANGARO - PUNO
2 1.9 0.5 1.9VIGAS INTERMEDIAS 2 8.2 0.25 0.5 24.6FONDO DE TANQUE ELEVADO 1 8.2 0.25 0.35 4.92PARTE EXT DE FONDO 1 8.2 0.5 4.1TARRAJEO DE MUROS EXTERIOR A PARTIR DEL 2DO PISOEXTERIOR TANQUE ELEVADO 1 11.5 2.2 25.3
06.04.00 TARRAJEO CON IMPERMEABILIZANTE M2 75.30CISTERNAPISO 1 5.44 2.1 11.424PAREDES 1 14.2 1.85 26.27CIELO RASO 1 5 2.1 10.5TANQUE ELEVADOPISO 1 2.45 2.25 5.5125PAREDES 1 9.1 1.65 15.015CIELO RASO 1 2.45 2.7 6.615
06.05.00 VESTIDURA DE DERRAMES ML 10.301 10.3 10.3
06.06.00 BRUÑAS ML 70.10ELEVACION PRINCIPAL 2 1.9 3.8
2 9.4 18.81 3.7 3.71 6.4 6.42 8 162 2 4
INTERIOR DE CASETA 2 8.7 17.4
07.00.00 CIELORRASOS07.01.00 TARRAJEO EN CIELORRASO CON MEZCLA DE CEMENTO ARENA M2 11.30
CUARTO DE MAQUINAS 1 2.5 2.25 5.625FONDO DE TANQUE ELEVADO 1 2.5 2.25 5.625
08.00.00 PISOS Y PAVIMENTOS08.01.00 FALSO PISO DE 4" DE CONCRETO 1:8 M2 5.39 5.40
1 2.45 2.2 5.39
08.02.00 PISO DE CEMENTO PULIDO 2" M2 7.142 2.55 1.4 7.14
08.03.00 VEREDAS F'C=175 KG/CM2 M2 2 5.6 0.755 8.456 22.701 14.22 14.22
09.00.00 ZOCALOS Y CONTRAZOCALOZOCALO DE CERAMICO DE H=20CM M2 4.30
EXTERIOR 1 11.8 0.2 2.36INTERIOR 1 9.75 0.2 1.95
10.00.00 COBERTURASCUBIERTA LADRILLO PASTELERO ASENTADO EN TORTA DE BARRO 3 cm + FRA M2 16.80
2 3 2.8 16.8
11.00.00 CARPINTERIA METALICA11.01.00 PUERTA CASETA ELECTROBOMBA (2.05X0.70) UND 1.00
1 2.05 0.7 1.435
11.02.00 VENTANA DE REJILLA METALICA M2 1.10V-20 1 2.1 0.5 1.05
11.03.00 ESCALERA DE GATO DE TUBO F°G° DE 1 1/2" Y 1" ML 10.101 10.04 10.04
11.04.00 ESCALERA DE ALUMINIO EN CISTERNA UND 1 1 1.00
11.05.00 TAPA DE FIERRO EN CISTERNA UND 1 1 1.00
11.06.00 TAPA DE FIERRO EN TANQUE ELEVADO UND 1 1 1.00
12.00.00 CERRAJERIA
12.01.00 BISAGRA DE FIERRO DE 4" PZA 8.00P-9 1 8 8
12.02.00 CERRADURA DOS GOLPES PZA 1.00P-9 1 1 1
HOJAS DE METRADOS - TANQUE ELEVADO Y CISTERNA
PROYECTO MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN EL INSTITUTO SUPERIOR TECNOLOGICO CHUPA, DISTRITO DE CHUPA - AZANGARO - PUNO
UBICACIÓN CHUPA - AZANGARO - PUNO
12.03.00 PICAPORTE DE 12" DE FIERRO PZA 2.00P-9 1 2 2
12.04.00 CANDADO TIPO FORTE 60MM PZA 2 2 2.00
13.00.00 PINTURA
13.01.00 PINTURA LATEX DOS MANOS EN VIGAS Y COLUMNAS M2 67.10TARRAJEO DE VIGAS 1 67.1 67.1
13.02.00 PINTURA LATEX EN CIELO RASO 2 MANOS M2 11.30TARRAJEO EN CIELORRASO CON MEZCLA DE CEMENTO ARENA 1 11.3 11.3
13.03.00 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS M2 65.20TARRAJEO DE COLUMNAS 1 39.9 39.9
TARRAJEO DE MUROS EXTERIOR A PARTIR DEL 2DO PISO 1 25.3 25.3
13.04.00 PINTURA LATEX EN MUROS INTERIORES 2 MANOS 40.80TARRAJEO EN MURO INTERIOR Y EXTERIOR 1 40.8 40.8
13.05.00 PINTURA ANTICORROSIVA Y ESMALTE EN CARP.METAL. M2 4.00P-9 1 2.05 0.7 2 2.87V-20 1 2.1 0.5 1 1.05
INSTALACIONES SANITARIAS
SISTEMA DE AGUA FRIA RED DE DITRIBUCION
31.00 31.00
TUBERIA DE SUCCION PVC SAP - 1 1/4" M 2.00
TUBERIA DE IMPULSION FºGº 1" M 10.50 10.50
10.50 10.50
10.50 10.50
0.75
ACCESORIOS 6.00
20.00 20.00
UNION UNIVERSAL FºGº 3/4" 2.00 2.00
UNION UNIVERSAL FºGº 1 1/4" 1.00 1.00
UNION UNIVERSAL FºGº 1" 3.00 3.00
3.00
2.00
4.00
2.00
INSTALACIONES ELECTRICAS Y MECANICAS
15.00.00 SALIDAS PARA ALUMBRADOS Y TOMACORRIENTES
15.01.00 SALIDAS15.01.01 SALIDA DE TECHO (CENTRO DE LUZ) PTO 1.00 1.00
15.01.02 SALIDA PARA BRAQUETE (PARED) PTO 1.00 1.00
15.01.03 SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA PTO 1.00 1.00
15.02.00 TABLEROS 15.02.01 TD 02 UND 1.00 1.00
14.00.00 14.01.00 14.01.01 RED DE ALIMENTACION PVC SAP - 3/4" MEDIDOR-CISTERNA M
14.01.02 2.00
14.01.03
14.01.04 TUBERIA DE ALIMENTACION FºGº 2" M
14.01.05 TUBERIA DE REBOSE Y LIMPIEZA FºGº 2" M
14.01.06 TUBERIA DE REBOSE CISTERNA FºGº 4" M 0.75
14.02.00 14.02.01 ROMPE AGUA UND 6.00
14.02.02 ABRAZADERAS DE FIJACION DE TUBO PZA
14.02.03 UND
14.02.04 UND
14.02.05 UND
14.02.06 UNION UNIVERSAL FºGº 2 " UND 3.00
14.02.07 VALVULA CHECK DE BRONCE 1 " UND 2.00
14.02.08 VALVULA COMPUERTA DE BRONCE DE 1" UND 4.00
14.02.09 VALVULA COMPUERTA DE BRONCE DE 2" UND 2.00
HOJAS DE METRADOS - TANQUE ELEVADO Y CISTERNA
PROYECTO MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN EL INSTITUTO SUPERIOR TECNOLOGICO CHUPA, DISTRITO DE CHUPA - AZANGARO - PUNO
UBICACIÓN CHUPA - AZANGARO - PUNO
16.00.00 ARTEFACTOS DE ILUMINACION
16.01.00 ART. BRAQ. C/SOCKET DE PORCELANA Y LAMP. 50W UND 1.00 1.00
16.02.00 ART RSP-2 CON 2 LAMP.AHORRADORES 18W UND 1.00 1.00
16.03.00 ELECTROBOMBA 1.2 HP UND 2.00 2.00
16.04.00 INTERRUPTOR DE CONTROL DE NIVEL DE AGUA UND 1.00 1.00
HOJAS DE METRADOS - TANQUE ELEVADO Y CISTERNA
PROYECTO MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN EL INSTITUTO SUPERIOR TECNOLOGICO CHUPA, DISTRITO DE CHUPA - AZANGARO - PUNO
UBICACIÓN CHUPA - AZANGARO - PUNO
CLIENTE MUNICIPALIDAD DISTRITAL DE CHUPA
FECHA AGOSTO 2011
ITEM DESCRIPCION UNID. CANT.MEDIDAS
PARCIAL TOTALLARGO ANCHO ALTURA AREA
TRABAJOS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.00.00 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES01.02.02 TRAZOS, NIVELES Y REPLANTEOS01.02.03 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2 22.34
1.00 22.34 22.3401.01.02 REPLANTEO DURANTE EL PROCESO M2 22.34
1.00 22.34 22.34
ESTRUCTURA
01.03 MOVIMIENTO DE TIERRAS
01.03.01 EXCAVACIONESEXCAVACIONES SIMPLESEXCAVACION DE ZANJAS EN CISTERNA 37.44
M3 1 6.00 3.20 1.95 37.44
01.03.02 RELLENOSRELLENO CON MATERIAL PROPIO PAREDES DE CISTERNA M3 1 15.00 0.20 1.45 4.35BASE INFERIOR 1 5.80 3.00 0.50 8.70
01.03.03 NIVELACION DE TERRENONIVELACION M2 22.34 22.34
NIVELACION INTERIOR Y COMPACTADO 8.50VEREDA PERIMETRAL
M2 1 8.50 8.50
01.03.06 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 4 KM 30.49EXCAVACION M3 1 37.44RELLENO 1 13.05
1 FACTOR 1.25 24.39
01.05 CONCRETO ARMADO
01.05.03 COLUMNAS01.05.03.01 CONCRETO EN COLUMNAS F'C= 210 KG/CM2 7.65
C1 M3 4 0.40 0.40 10.60 6.78COLUMNETAS P/TABLEROS 3 0.33 0.10 2.50 0.25CA1 6 0.25 0.13 2.50 0.49CA1 2 0.25 0.13 2.00 0.13
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 82.29caras
C1 M2 4 0.40 4.00 10.60 67.84COLUMNETAS P/TABLEROS 3 0.33 2.00 2.50 4.95CA1 6 0.25 2.00 2.50 7.50CA1 2 0.25 2.00 2.00 2.00
01.05.03.03 ACERO DE REFUERZO EN COLUMNAS KG. 1 21.60
01.05.04 VIGAS03.02.01 CONCRETO EN VIGAS F'C =210 KG/CM2 M3 4.00
VIGAS 4 8.00 0.25 0.50 4.00
03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 40.00VIGAS 4 8.00 0.25 0.50 40.00
03.02.03 ACERO DE REFUERZO EN VIGAS KG. 1 281.60
03.03.00 LOSAS03.03.01 LOSAS MACIZAS03.03.01.01 CONCRETO EN LOSA F'C=210KG/CM2 M3 0.60
LOSA EN TANQUE ELEVADO 1 2.10 1.90 0.15 0.60
03.03.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA M2 3.99
HOJAS DE METRADOS - TANQUE ELEVADO Y CISTERNA
PROYECTO MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN EL INSTITUTO SUPERIOR TECNOLOGICO CHUPA, DISTRITO DE CHUPA - AZANGARO - PUNO
UBICACIÓN CHUPA - AZANGARO - PUNO
LOSA EN TANQUE ELEVADO 1 2.10 1.90 3.99
03.03.01.03 ACERO EN LOSA KG. 1 14.40
03.04.00 CISTERNA03.04.01 CONCRETO F'=210KG/CM2 EN CISTERNA M3 19.00
BASE INFERIOR 1 5.80 3.00 0.5 8.702 1.64 1.60 0.35 1.841 2.10 0.60 0.2 0.25
PAREDES LATERALES 2 5.40 0.20 2 4.322 2.10 0.20 2 1.68
PINTO DE COLUMNAS 4 0.40 0.20 2 0.64TECHO 1 5.00 2.10 0.15 1.58
03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN CISTERNA M2 89.35BASE INFERIOR 1 17.60 0.50 8.80
2 6.48 0.35 4.541 5.40 0.20 1.08
PAREDES LATERALES 2 11.20 2.00 44.802 4.60 2.00 18.40
PINTO DE COLUMNAS 4 1.20 2.00 9.60TECHO 1 14.20 0.15 2.13
03.04.03 ACERO DE REFUERZO EN CISTERNA KG 1 8.00
03.05.00 TANQUE ELEVADO03.05.01 CONCRETO EN TANQUE ELEVADO F'C=210KG/CM2 M3 5.18
FONDO 1 2.50 2.25 0.20 1.13PAREDES 2 2.10 0.20 1.68 1.41
2 1.90 0.20 1.68 1.284 0.20 0.20 1.68 0.27
TECHO 1 2.85 2.60 0.15 1.11TAPA -1 0.63 0.63 0.15 -0.06
2 0.83 0.10 0.15 0.022 0.63 0.10 0.15 0.02
03.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN TANQUE ELEVADO M2 42.52PRIMER NIVELFONDO 1 2.40 2.20 5.28PAREDES EXT 2 4.00 1.73 13.84PAREDES INT 2 4.50 1.73 15.53TECHO 1 2.40 2.25 5.40
2 5.40 0.15 1.62TAPA -1 0.63 0.63 -0.40
4 0.63 0.30 0.764 0.83 0.15 0.50
03.05.03 ACERO DE REFUERZO EN TANQUE ELEVADO KG. 1 2.40
04.00.00 VARIOS04.01.00 ADITIVO DESMOLDANTE PARA ENCOFRADOS DE MADERA M2 1 258.15 258.15
04.02.00 ADITIVO CURADOR DE CONCRETO PARA OBRA M2 1 258.15 258.15
ARQUITECTURA
05.00.00 MUROS Y TABIQUES DE ALBAÑILERIA05.01.00 MURO DE SOGA LADRILLO KING - KONG CON CEMENTO - ARENA M2 1 3.94 1.75 6.90 12.13
1 1.70 1.20 2.042 0.84 1.90 3.19
06.00.00 REVOQUES Y REVESTIMIENTOS06.01.00 TARRAJEO EN MURO INTERIOR Y EXTERIOR M2 40.80
INTERIOR DE CASETA 1 2.5 2.05 5.131 2.55 2.05 5.231 1.2 2.05 2.461 2.2 1.6 3.52
EXTERIOR DE CASETA 1 2.1 1.6 3.362 1.9 2.05 7.791 1.4 2.05 2.87
EN COLUMNAS EXTERIORES 4 1 2.6 10.4
06.02.00 TARRAJEO DE COLUMNAS M2 39.90C-1 4 0.4 0.4 6.23 39.872
06.03.00 TARRAJEO DE VIGAS M2 67.10
HOJAS DE METRADOS - TANQUE ELEVADO Y CISTERNA
PROYECTO MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN EL INSTITUTO SUPERIOR TECNOLOGICO CHUPA, DISTRITO DE CHUPA - AZANGARO - PUNO
UBICACIÓN CHUPA - AZANGARO - PUNO
TECHO DE CUARTO DE MAQUINAS 2 2.2 0.15 0.35 2.22 1.9 0.15 0.35 1.9
PARTE EXTERIOR 2 2.2 0.5 2.22 1.9 0.5 1.9
VIGAS INTERMEDIAS 2 8.2 0.25 0.5 24.6FONDO DE TANQUE ELEVADO 1 8.2 0.25 0.35 4.92PARTE EXT DE FONDO 1 8.2 0.5 4.1TARRAJEO DE MUROS EXTERIOR A PARTIR DEL 2DO PISOEXTERIOR TANQUE ELEVADO 1 11.5 2.2 25.3
06.04.00 TARRAJEO CON IMPERMEABILIZANTE M2 75.30CISTERNAPISO 1 5.44 2.1 11.424PAREDES 1 14.2 1.85 26.27CIELO RASO 1 5 2.1 10.5TANQUE ELEVADOPISO 1 2.45 2.25 5.5125PAREDES 1 9.1 1.65 15.015CIELO RASO 1 2.45 2.7 6.615
06.05.00 VESTIDURA DE DERRAMES ML 10.301 10.3 10.3
06.06.00 BRUÑAS ML 70.10ELEVACION PRINCIPAL 2 1.9 3.8
2 9.4 18.81 3.7 3.71 6.4 6.42 8 162 2 4
INTERIOR DE CASETA 2 8.7 17.4
07.00.00 CIELORRASOS07.01.00 TARRAJEO EN CIELORRASO CON MEZCLA DE CEMENTO ARENA M2 11.30
CUARTO DE MAQUINAS 1 2.5 2.25 5.625FONDO DE TANQUE ELEVADO 1 2.5 2.25 5.625
08.00.00 PISOS Y PAVIMENTOS08.01.00 FALSO PISO DE 4" DE CONCRETO 1:8 M2 5.39 5.40
1 2.45 2.2 5.39
08.02.00 PISO DE CEMENTO PULIDO 2" M2 7.142 2.55 1.4 7.14
08.03.00 VEREDAS F'C=175 KG/CM2 M2 2 5.6 0.755 8.456 22.701 14.22 14.22
09.00.00 ZOCALOS Y CONTRAZOCALOZOCALO DE CERAMICO DE H=20CM M2 4.30
EXTERIOR 1 11.8 0.2 2.36INTERIOR 1 9.75 0.2 1.95
10.00.00 COBERTURASCUBIERTA LADRILLO PASTELERO ASENTADO EN TORTA DE BARRO 3 cm + FRA M2 16.80
2 3 2.8 16.8
11.00.00 CARPINTERIA METALICA11.01.00 PUERTA CASETA ELECTROBOMBA (2.05X0.70) UND 1.00
1 2.05 0.7 1.435
11.02.00 VENTANA DE REJILLA METALICA M2 1.10V-20 1 2.1 0.5 1.05
11.03.00 ESCALERA DE GATO DE TUBO F°G° DE 1 1/2" Y 1" ML 10.101 10.04 10.04
11.04.00 ESCALERA DE ALUMINIO EN CISTERNA UND 1 1 1.00
11.05.00 TAPA DE FIERRO EN CISTERNA UND 1 1 1.00
11.06.00 TAPA DE FIERRO EN TANQUE ELEVADO UND 1 1 1.00
12.00.00 CERRAJERIA
12.01.00 BISAGRA DE FIERRO DE 4" PZA 8.00P-9 1 8 8
HOJAS DE METRADOS - TANQUE ELEVADO Y CISTERNA
PROYECTO MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN EL INSTITUTO SUPERIOR TECNOLOGICO CHUPA, DISTRITO DE CHUPA - AZANGARO - PUNO
UBICACIÓN CHUPA - AZANGARO - PUNO
12.02.00 CERRADURA DOS GOLPES PZA 1.00P-9 1 1 1
12.03.00 PICAPORTE DE 12" DE FIERRO PZA 2.00P-9 1 2 2
12.04.00 CANDADO TIPO FORTE 60MM PZA 2 2 2.00
13.00.00 PINTURA
13.01.00 PINTURA LATEX DOS MANOS EN VIGAS Y COLUMNAS M2 67.10TARRAJEO DE VIGAS 1 67.1 67.1
13.02.00 PINTURA LATEX EN CIELO RASO 2 MANOS M2 11.30TARRAJEO EN CIELORRASO CON MEZCLA DE CEMENTO ARENA 1 11.3 11.3
13.03.00 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS M2 65.20TARRAJEO DE COLUMNAS 1 39.9 39.9
TARRAJEO DE MUROS EXTERIOR A PARTIR DEL 2DO PISO 1 25.3 25.3
13.04.00 PINTURA LATEX EN MUROS INTERIORES 2 MANOS 40.80TARRAJEO EN MURO INTERIOR Y EXTERIOR 1 40.8 40.8
13.05.00 PINTURA ANTICORROSIVA Y ESMALTE EN CARP.METAL. M2 4.00P-9 1 2.05 0.7 2 2.87V-20 1 2.1 0.5 1 1.05
INSTALACIONES SANITARIAS
SISTEMA DE AGUA FRIA RED DE DITRIBUCION
31.00 31.00
TUBERIA DE SUCCION PVC SAP - 1 1/4" M 2.00
TUBERIA DE IMPULSION FºGº 1" M 10.50 10.50
10.50 10.50
10.50 10.50
0.75
ACCESORIOS 6.00
20.00 20.00
UNION UNIVERSAL FºGº 3/4" 2.00 2.00
UNION UNIVERSAL FºGº 1 1/4" 1.00 1.00
UNION UNIVERSAL FºGº 1" 3.00 3.00
3.00
2.00
4.00
2.00
INSTALACIONES ELECTRICAS Y MECANICAS
15.00.00 SALIDAS PARA ALUMBRADOS Y TOMACORRIENTES
15.01.00 SALIDAS15.01.01 SALIDA DE TECHO (CENTRO DE LUZ) PTO 1.00 1.00
15.01.02 SALIDA PARA BRAQUETE (PARED) PTO 1.00 1.00
15.01.03 SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA PTO 1.00 1.00
15.02.00 TABLEROS
14.00.00 14.01.00 14.01.01 RED DE ALIMENTACION PVC SAP - 3/4" MEDIDOR-CISTERNA M
14.01.02 2.00
14.01.03
14.01.04 TUBERIA DE ALIMENTACION FºGº 2" M
14.01.05 TUBERIA DE REBOSE Y LIMPIEZA FºGº 2" M
14.01.06 TUBERIA DE REBOSE CISTERNA FºGº 4" M 0.75
14.02.00 14.02.01 ROMPE AGUA UND 6.00
14.02.02 ABRAZADERAS DE FIJACION DE TUBO PZA
14.02.03 UND
14.02.04 UND
14.02.05 UND
14.02.06 UNION UNIVERSAL FºGº 2 " UND 3.00
14.02.07 VALVULA CHECK DE BRONCE 1 " UND 2.00
14.02.08 VALVULA COMPUERTA DE BRONCE DE 1" UND 4.00
14.02.09 VALVULA COMPUERTA DE BRONCE DE 2" UND 2.00
HOJAS DE METRADOS - TANQUE ELEVADO Y CISTERNA
PROYECTO MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN EL INSTITUTO SUPERIOR TECNOLOGICO CHUPA, DISTRITO DE CHUPA - AZANGARO - PUNO
UBICACIÓN CHUPA - AZANGARO - PUNO
15.02.01 TD 02 UND 1.00 1.00
16.00.00 ARTEFACTOS DE ILUMINACION
16.01.00 ART. BRAQ. C/SOCKET DE PORCELANA Y LAMP. 50W UND 1.00 1.00
16.02.00 ART RSP-2 CON 2 LAMP.AHORRADORES 18W UND 1.00 1.00
16.03.00 ELECTROBOMBA 1.2 HP UND 2.00 2.00
16.04.00 INTERRUPTOR DE CONTROL DE NIVEL DE AGUA UND 1.00 1.00
RESUMEN DE METRADOS: TANQUE ELEVADO Y CISTERNA
PROYECTO:
ITEM DESCRIPCION UND METRADO
02 OBRAS PRELIMINARES
02.01 LIMPIEZA DE TERRENO MANUAL M2 #REF!
02.02 TRANSPORTE DE HERRAMIENTAS Y MATERIALES VJE #REF!
02.03 TRAZO NIVELES Y REPLANTEO PRELIMINAR M2 #REF!
02.04 TRAZO DURANTE LA EJECUCION DE LA OBRA M2 #REF!
03 MOVIMIENTO DE TIERRAS
03.01 EXCAVACION DE ZANJAS EN CISTERNA M2 37.44
03.02 #REF! M3 #REF!
03.03 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 4 KM M3 28.19
03.04 #REF! M3 #REF!
03.05 NIVELACION INTERIOR Y COMPACTADO M3 8.50
05 OBRAS DE CONCRETO ARMADO
05.03 COLUMNAS
05.03.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 7.65
05.03.03 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 82.29
05.03.04 ACERO DE REFUERZO EN COLUMNAS KG 21.60
05.04 VIGAS
05.04.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 4.00
05.04.03 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 40.00
05.04.04 ACERO DE REFUERZO EN VIGAS KG 281.60
05.05 LOSAS MACIZAS
05.05.01 CONCRETO EN LOSAS F'C=210 KG/CM2 M3 0.60
05.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS M2 3.99
05.05.03 ACERO DE REFUERZO EN LOSAS KG 14.40
05.01 CISTERNA
CONCRETO F'=210KG/CM2 EN CISTERNA M3 19.00
ENCOFRADO Y DESENCOFRADO NORMAL EN CISTERNA M2 89.35
ACERO DE REFUERZO EN CISTERNA KG 8.00
TANQUE ELEVADO
CONCRETO EN TANQUE ELEVADO F'C=210KG/CM2 M3 5.18
ENCOFRADO Y DESENCOFRADO NORMAL EN TANQUE ELEVADO M2 42.52
ACERO DE REFUERZO EN TANQUE ELEVADO KG 2.40
05.08 VARIOS
05.08.01 ADITIVO DESMOLDANTE PARA ENCOFRADO DE MADERA M2 258.15
05.08.02 ADITIVO CURADOR DE CONCRETO PARA OBRA M2 258.15
06 ALBAÑILERIA
06.01 MURO DE SOGA LADRILLO KING - KONG CON CEMENTO-ARENA M2 12.13
07 REVOQUES, ENLUCIDOS Y MOLDURAS
07.01 TARRAJEO EN MURO INTERIOR Y EXTERIOR M2 40.80
07.02 TARRAJEO DE COLUMNAS M2 39.90
07.03 TARRAJEO DE VIGAS M2 67.10
AMPLIACIÓN Y MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E.P. 72360 “HÉROES DEL PACÍFICO” - HUAYRAPATA
RESUMEN DE METRADOS: TANQUE ELEVADO Y CISTERNA
PROYECTO:
ITEM DESCRIPCION UND METRADO
AMPLIACIÓN Y MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E.P. 72360 “HÉROES DEL PACÍFICO” - HUAYRAPATA
07.05 TARRAJEO CON IMPERMEABILIZANTE M2 75.30
07.06 VESTIDURA DE DERRAMES ML 10.30
BRUÑAS ML 70.10
CIELORRASOS
TARRAJEO EN CIELORRASO CON MEZCLA DE CEMENTO ARENA M2 11.30
07 PISOS Y PAVIMENTOS
09.01 #REF! M2 #REF!
09.02 FALSO PISO DE 4" DE CONCRETO 1:8 M2 5.40
ZOCALO DE CERAMICO DE H=20CM M2 4.30
VEREDAS
CONCRETO EN VEREDAS F'C=175 KG/CM2 m2 #REF!
ENCOFRADO Y DESENCOFRADO EN VEREDAS M2 #REF!
JUNTAS ASFALTICAS EN VEREDAS M #REF!
08 COBERTURAS
CUBIERTA LADRILLO PASTELERO ASENTADO EN TORTA DE BARRO 3 cm + FRAGUA CON MORTER M2 16.80
09 CARPINTERIA METALICA
PUERTA CASETA ELECTROBOMBA (2.05X0.70) UND 1.00
VENTANA DE REJILLA METALICA M2 1.10
ESCALERA DE GATO DE TUBO F°G° DE 1 1/2" Y 1" ML 10.10
ESCALERA DE ALUMINIO EN CISTERNA UND 1.00
TAPA DE FIERRO EN CISTERNA UND 1.00
TAPA DE FIERRO EN TANQUE ELEVADO UND 1.00
10 CERRAJERIA
13.01 BISAGRA DE FIERRO DE 4" PZA 8.00
13.02 CERRADURA DOS GOLPES PZA 1.00
PICAPORTE DE 12" DE FIERRO PZA 2.00
CANDADO TIPO FORTE 60MM PZA 2.00
11 PINTURA
15.01 PINTURA LATEX DOS MANOS EN VIGAS Y COLUMNAS M2 67.10
15.02 PINTURA LATEX EN CIELO RASO 2 MANOS M2 11.30
15.03 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS M2 65.20
15.04 PINTURA LATEX EN MUROS INTERIORES 2 MANOS M2 40.80
15.05 PINTURA ANTICORROSIVA Y ESMALTE EN CARP.METAL. M2 4.00
SISTEMA DE AGUA FRIA
RED DE ALIMENTACION PVC SAP - 3/4" MEDIDOR-CISTERNA M 31.00
TUBERIA DE SUCCION PVC SAP - 1 1/4" M 2.00
TUBERIA DE IMPULSION FºGº 1" M 10.50
TUBERIA DE ALIMENTACION FºGº 2" M 10.50
TUBERIA DE REBOSE Y LIMPIEZA FºGº 2" M 10.50
ROMPE AGUA UND 6.00
ABRAZADERAS DE FIJACION DE TUBO PZA 20.00
RESUMEN DE METRADOS: TANQUE ELEVADO Y CISTERNA
PROYECTO:
ITEM DESCRIPCION UND METRADO
AMPLIACIÓN Y MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E.P. 72360 “HÉROES DEL PACÍFICO” - HUAYRAPATA
#REF! #REF! #REF!
UNION UNIVERSAL FºGº 3/4" UND 2.00
UNION UNIVERSAL FºGº 1 1/4" UND 1.00
UNION UNIVERSAL FºGº 1" UND 3.00
UNION UNIVERSAL FºGº 2 " UND 3.00
VALVULA CHECK DE BRONCE 1 " UND 2.00
VALVULA COMPUERTA DE BRONCE DE 1" UND 4.00
VALVULA COMPUERTA DE BRONCE DE 2" UND 2.00
13 INSTALACIONES ELECTRICAS
16.01 SALIDA DE ALUMBRADO EN TECHO PTO 1.00
16.02 SALIDA DE ALUMBRADO EN PARED PTO 1.00
SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA PTO 1.00
14 TABLEROS
16.06 TABLERO TD2 UND 1.00