method statement for butt fusion welding 13apr14

69

Upload: ansarisaeed

Post on 25-Nov-2015

650 views

Category:

Documents


118 download

DESCRIPTION

Detail of HDPE Wielding. This covers only Butt Fusion. it includes manpower required, the type of machine used, a very detailed process of butt fusion including precaution that need to be taken. It also contain technical manual of the machine itself.