SAFE WORK METHOD STATEMENT
PROJECT :BANK NEGARA MALAYSIA
ITEM : FLOOR/SLAB OPENING FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
1.0 GENERAL
1.1 To provide slab/floor opening information Site-coordinator
(size & location) to C & S contractor.
2.0 PHYSICAL WORK
2.1 Identify the information regarding size and location Site-coordinator
from the approved shop drawing.
2.2 Forwad the information to Main Contractor. Site-coordinator
2.3 Fabricate the opening frame according to the size of Normal site hazard Expose to mechanical toolsUse proper PPE and Site-coordinator / Safety
the opening. injury. proper tools. Officer
Normal site risk
2.4 Forwad the frame to C & S contractor complete with Site-coordinator
all necessary information.
2.5 Assist Main Contractor upon installation of the frame. Normal site hazard Normal site risk Use proper PPE. Site-coordinator / Safety
3.0 AFTER WORK COMPLETE
3.1 Evaluate the openings to ensure sufficient space for Normal site hazard Normal site risk Ensure proper alignment Site-coordinator /
further ductworks and piping works. upon installation. Safety officer
4.0 PREVENTIVE MAINTENANCE
8
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : AIR HANDLING UNITS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
1.0 GENERAL
1.1 To properly install, operate and maintain the Air Site-coordinator
Handling Units (AHU).
1.2 To provide carefull testing & commissioning for the Site-coordinator
installed Air Handling Units.
1.3 AHU are to be delivered complete with blower, blower
motor, coils, insulated casing, hinged access doors
and filters.
2.0 PHYSICAL WORK
Site-coordinator
2.1 Identify all necessary information from the approved
shop drawing.
2.2 Evaluate site condition to ensure sufficient space for Normal site hazard. Expose to mechanical tools Site-coordinator /
installation of AHU and it's accersories. injury. Safety officer
2.3 Selected AHU then shift to the designated location Normal site hazard. Normal site risk. Site-coordinator /
using tower crane or mobile crane. Hoisting canvas Safety officer
sling is used at every corner or the AHU to avoid
damage to the AHU panels.
2.4 The neoprene pad then inserted below each corner
of the AHU once it is lower to the concrete plinth.
2.5 Properly align and connect chilled water pipe to the Hotwork hazard. Fire explosion. Proper grounding for Site-coordinator /
AHU complete with vavle etc. The pipe connection electrical mechinary. Safety officer
between the AHU and pipework shall have flexible Provide fire extinguisher
rubber joint/coupling. near working area.
2.6 Properly align and connect the flexible canvas joint Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
to the main ductwork. competent person. Safety officer
2.7 Properly align and connect the condensate drain
for proper dischage location. The pipe shall have a
U-trap for maintenance purpose.
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : AIR HANDLING UNITS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
2.4 Install the unit switchboard complete with all wiring Electrical hazard. Electrical shock. Provide fire extinguisher Site-coordinator /
and termination to all necessary equipment. Fire explosion. near working area. Safety officer
3.0 AFTER WORK COMPLETE
3.1 Remove all debris. Normal site hazard Normal site risk Use proper PPE. Site-coordinator
3.2 Check ensure no leakage at the chilled water pipes Site-coordinator
connection and install the pipe insulation.
3.3 Turn on the blower and verify the rotation is correct. Site-coordinator
3.4 Applied Magger test for the wiring connection. Electrical shock. Electrical hazard. Provide fire extinguisher Site-coordinator /
Fire explosion. near working area. Safety officer
3.5 Do the test run and ensure there is no leakage in Site-coordinator
supply and return duct connection.
4.0 PREVENTIVE MAINTENANCE
4.1 Air filters are to be cleaned at least four times a year
and in case of major clogging, change the air filters.
4.2 Check and adjust if necesssary the tension and
alignment of the belt.
4.3 Ensure the pulley set screws are properly tightened
and there is no crack on the pulley.
4.4 Turn the blower manually and ensure it is running
smoothly without any excessive bearing noise.
4.5 Check and remove any clogged item/dirt between
coil fins.
4.6 Check voltage, current, wiring and all connection.
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : MECHANICAL VENTILATION FANS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
1.0 GENERAL
1.1 To properly install, operate and maintain the Site-coordinator
Mechanical Ventilation Fans.
Site-coordinator
1.2 To provide carefull testing & commissioning for the
Mechanical Ventilation Fans.
1.3 The delivered mechanical ventilation fans are
normally coupled together with the motor in factory.
1.4 Ensure the foundation or mounting arrangement and Site-coordinator
the duct connections are adequately in accordance
with recognized acceptable engineering practices.
2.0 PHYSICAL WORK
Site-coordinator
2.1 Identify all necessary information from the approved
shop drawing.
2.2 Evaluate site condition to ensure sufficient space for Normal site hazard Expose to mechanical tools Use proper PPE. Site-coordinator /
installation of the fan and it's accersories. injury. Safety officer
2.3 Mechanical ventilation fans generally installed by Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
hung on steel support bracket with either spring competent person. Safety officer
isolator or neoprene pad/elastomer isolating
materials. (except for the wall mounted type fan).
2.4 Install rawl plug/flush anchor to slab soffit. The Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
galvanised steel threaded rods are then joined the competent person. Safety officer
flush angle for hanging the fans with the spring
isolator.
2.5 The fan then shall be lifted up to the selected Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
position by man power unless it is too heavy. competent person. Safety officer
(In this case, chain block shall be used).
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : MECHANICAL VENTILATION FANS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
2.6 Properly align and connect the unit with flexible Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
canvas if the connection is in between ductwork. competent person. Safety officer
2.7 Properly align and connect the unit with fire rated Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
flexible connection if the connection is in between competent person. Safety officer
fire rated ductwork.
2.8 Install the unit starter panel complete with all wiring Electrical hazard. Electrical shock. Provide fire extinguisher Site-coordinator /
and termination to all necessary equipment. Fire explosion. near working area. Safety officer
3.0 AFTER WORK COMPLETE
3.1 Remove all debris. Normal site hazard Normal site risk Use proper PPE. Site-coordinator
3.2 Check and tighten all hold-down (securing) bolts. Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
competent person. Safety officer
3.3 Do the test run and ensure the impeller is in the Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
correct rotation direction. competent person. Safety officer
3.4 Do the test run and ensure there is no leakage in Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
duct connection. competent person. Safety officer
4.0 PREVENTIVE MAINTENANCE
Site-coordinator
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : CHILLED WATER FAN COIL UNITS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
1.0 GENERAL
1.1 To properly install, operate and maintain the Chilled Site-coordinator
Water Fan Coil Units (FCU).
Site-coordinator
1.2 To provide carefull testing & commissioning for the
installed Chilled Water Fan Coil Units.
1.3 FCU shall be delivered complete with blower, blower
motor, coils, insulated casing, drain pan and filter.
2.0 PHYSICAL WORK
Site-coordinator
2.1 Identify all necessary information from the approved
shop drawing.
2.2 Evaluate site condition to ensure sufficient space for Normal site hazard Expose to mechanical tools Site-coordinator /
installation of FCU and it's accersories. injury. Safety officer
2.3 Selected FCU then shift to the designated location Normal site hazard. Normal site risk. Site-coordinator /
using tower crane or mobile crane. Hoisting canvas Safety officer
sling is used at every corner or the FCU to avoid
damage to the panels.
2.4 Rawl plug/flush anchor are installed to the slab soffit Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
prior istalling the units. The distance between the competent person. Safety officer
rawl plug must be measured and consistent with the
distance between the bracket opening.
2.5 Threaded rod of galvanised steel and is then joint to Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
the rawl plug with 10mm thick neoprene pad. For competent person. Safety officer
FCU with blower motor size bigger than 2 hp, spring
isolator shall be used.
2.6 FCU is then lifted up by manpower with the use Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
of scafolding and fixed to the bracket with double competent person. Safety officer
nuts and washers. The bracket/treaded rod shall be
vertically straight. The FCU shall be slightly tilted
with the drain pipe connection portion slightly lower
to ensure easier flow of condensate water.
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : CHILLED WATER FAN COIL UNITS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
2.7 Threaded rod of galvanised steel and is then joint to Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
the rawl plug with 10mm thick neoprene pad. For competent person. Safety officer
FCU with blower motor size bigger than 2 hp, spring
isolator shall be used.
2.8 Properly align and connect chilled water pipe to the Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
AHU complete with vavle etc. The pipe connection Hotwork hazard. Fire explosion competent person. Safety officer
between the AHU and pipework shall have flexible Provide fire extinguisher
rubber joint/coupling. near working area.
2.9 Properly align and connect the unit's flexible canvas Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
joint (if ducted) to the main supply duct. The return competent person. Safety officer
air (if ducted) duct does not require flexible joints.
2.10 Properly align and connect the condensate drain Normal site hazard. Normal site risk. Site-coordinator /
for proper dischage location. The pipe shall have a
U-trap for maintenance purpose.
2.11 Install the unit starter panel complete with all wiring Electrical hazard. Electrical shock. Provide fire extinguisher Site-coordinator /
and termination to all necessary equipment. Fire explosion. near working area. Safety officer
3.0 AFTER WORK COMPLETE
3.1 Remove all debris. Normal site hazard Normal site risk Use proper PPE. Site-coordinator
3.2 Check ensure no leakage at the chilled water pipes Site-coordinator
connection and install pipe insulation.
3.4 Applied Magger test for the wiring connection. Electrical hazard. Electrical shock. Provide fire extinguisher Site-coordinator /
Fire explosion. near working area. Safety officer
3.5 Do the test run and ensure there is no leakage in Site-coordinator
duct connection (if any).
4.0 PREVENTIVE MAINTENANCE
4.1 Air filters are to be cleaned at least four times a year
and in case of major clogging, change the air filters.
4.2 Check and adjust if necesssary the tension and
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : CHILLED WATER FAN COIL UNITS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
alignment of the belt.
4.3 Check and remove any clogged item/dirt between
coil fins.
4.4 Check voltage, current, wiring and all connection.
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : COOLING TOWERS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
1.0 GENERAL
1.1 To properly install, operate and maintain the Cooling Site-coordinator
Towers.
1.2 To provide carefull testing & commissioning for the Site-coordinator
installed Cooling Towers.
1.3 Cooling Towers shall be delivered in two section
namely blower section and fin section.
2.0 PHYSICAL WORK
Site-coordinator
2.1 Identify all necessary information from the approved
shop drawing.
2.2 Evaluate site condition to ensure sufficient space for Normal site hazard Expose to mechanical tools Use proper PPE and Site-coordinator / Safety
installation of Cooling Towers and it's accersories. injury. proper tools. Officer
Normal site risk
2.3 Cooling Towers then shift to the designated location Normal site hazard Expose to mechanical tools Use proper PPE and Site-coordinator / Safety
using tower crane or mobile crane. Hoisting canvas injury. proper tools. Officer
sling is used to hoist the Cooling Towers. Normal site risk
2.4 Ensure the concrete/casted plinth is ready to receive Normal site hazard Expose to mechanical tools Use proper PPE and Site-coordinator / Safety
the cooling towers. The cooling towers section's then injury. proper tools. Officer
assembled on the plinth. Normal site risk
2.5 The neoprene pad then inserted below each corner Normal site hazard Expose to mechanical tools Use proper PPE and Site-coordinator / Safety
of the cooling tower once it is lower to the concrete injury. proper tools. Officer
plinth. If casted plith is used, spring isolator is used Normal site risk
to replace the neoprene pad.
2.6 Properly align and connect condenser water pipe to Hotwork hazard. Fire explosion Provide fire extinguisher Site-coordinator / Safety
the cooling tower' inlet and outlet pipe complete with . Expose to mechanical tools near working area. Officer
vavle etc. injury. Use proper PPE and
proper tools.
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : COOLING TOWERS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
2.7 Properly align and connect make-up water pipe to Hotwork hazard. Fire explosion Provide fire extinguisher Site-coordinator / Safety
the cooling tower' make up water inlet pipe complete Expose to mechanical tools near working area. Officer
with vavle etc. injury. Use proper PPE and
proper tools.
2.8 Properly align and connect the cooling tower's drain Hotwork hazard. Fire explosion Provide fire extinguisher Site-coordinator / Safety
pipe to respective dischage location. Expose to mechanical tools near working area. Officer
injury. Use proper PPE and
proper tools.
2.9 Install the unit switchboard complete with all wiring Electrical hazard. Electrical shock. Provide fire extinguisher Site-coordinator /
and termination to all necessary equipment. Fire explosion. near working area. Safety officer
3.0 AFTER WORK COMPLETE
3.1 Remove all debris. Normal site hazard Normal site risk Use proper PPE. Site-coordinator
3.2 Check ensure no leakage at the condenser water Site-coordinator
pipes connection.
3.4 Applied Magger test for the wiring connection. Electrical hazard. Electrical shock. Provide fire extinguisher Site-coordinator /
Fire explosion. near working area. Safety officer
3.5 Do the test run and ensure there is no leakage in Site-coordinator
cooling towers sealent/joint.
4.0 PREVENTIVE MAINTENANCE
Site-coordinator
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : AIR COOLED SPLIT UNITS FOR SITE CABIN.
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
1.0 GENERAL
1.1 To properly install, operate and maintain the Air Site-coordinator
Cooled Split Units (ACSU) for Site Cabin.
1.3 ACSU are to be delivered complete with indoor blower Site-coordinator
unit and outdoor condensing units.
2.0 PHYSICAL WORK
2.2 Evaluate site condition to ensure sufficient space for Normal site hazard Expose to mechanical tools Use proper PPE. Site-coordinator /
installation of ACSU and it's accersories. injury. Safety officer
2.3 ACSU then shift to the designated location Normal site hazard Normal site risk. Use proper PPE. Site-coordinator
using manpower.
2.4 The attached wall plate are first removed from it's Normal site hazard Expose to mechanical tools Use proper PPE and Site-coordinator
back and then placed at the cabin wall using their injury. proper tools.
screws.
2.5 Routed the rerigerant pipe properly to the planned Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
position, together with the drain hose and electrical Normal site hazard Expose to mechanical tools competent person. Safety officer
cables using vinly tape. injury. Use proper PPE and
proper tools.
2.6 Then fitted the indoor unit to the wall plate using Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
manpower with the use of scafolding if necessary. competent person. Safety officer
2.8 Mounted the outdoor unit in a strong level flat surface Hotwork hazard. Fire explosion Provide fire extinguisher Site-coordinator / Safety
(a/c latch,balcony,ground floor etc). Alternatively, unit Normal site hazard Expose to mechanical tools near working area. Officer
can be hung by using suitable fix brackets. Then injury. Use proper PPE and
connect the refrigerant pipes to the unit. proper tools.
2.9 Route the condensate drain hose to proper discharge Normal site hazard Normal site risk Use proper PPE. Site-coordinator
location.
2.10 Install the unit starter complete with wiring and Electrical hazard. Electrical shock. Provide fire extinguisher Site-coordinator /
termination to the unit. Fire explosion. near working area. Safety officer
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : AIR COOLED SPLIT UNITS FOR SITE CABIN.
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
3.0 AFTER WORK COMPLETE
3.1 Remove all debris. Normal site hazard Normal site risk Use proper PPE. Site-coordinator
3.2 Check ensure no leakage at the refrigerant pipe Site-coordinator
connection and install pipe insulation.
3.4 Applied Magger test for the wiring connection. Electrical hazard. Electrical shock. Provide fire extinguisher Site-coordinator /
Fire explosion. near working area. Safety officer
4.0 PREVENTIVE MAINTENANCE
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : AIR COOLED SPLIT UNITS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
1.0 GENERAL
1.1 To properly install, operate and maintain the Air Site-coordinator
Cooled Split Units (ACSU).
1.2 To provide carefull testing & commissioning for the Site-coordinator
Air Cooled Split Units.
1.3 ACSU shall be delivered complete with indoor blower
unit and outdoor condensing units.
2.0 PHYSICAL WORK
2.1 Identify all necessary information from the approved Site-coordinator
shop drawing.
2.2 Evaluate site condition to ensure sufficient space for Normal site hazard Expose to mechanical tools Site-coordinator /
installation of ACSU and it's accersories. injury. Safety officer
2.3 Selected ACSU then shift to the designated location Normal site hazard Normal site risk. Use proper PPE. Site-coordinator
using manpower.
2.4 For wall mounted units, the attached wall plate are Normal site hazard Expose to mechanical tools Use proper PPE and Site-coordinator
first removed from it's back and then placed at the injury. proper tools.
wall using the screws which supplied together with
the unit.
2.5 Routed the rerigerant pipe properly to the required Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
position, together with the drain hose and electrical Normal site hazard Expose to mechanical tools competent person. Safety officer
cables using vinly tape. Insulation tube is used at injury. Use proper PPE and
every wall panetration. proper tools.
2.6 Then fitted the indoor unit to the wall plate using Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
manpower with the use of scafolding if necessary.. competent person. Safety officer
2.7 For ceilling exposed units,galvanised steel threaded Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
rod is used to hung the unit at the required location. competent person. Safety officer
2.8 ACSU is lifted up by manpower with the use of Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
scafolding and fixed to the bracket with double nuts Normal site hazard Expose to mechanical tools competent person. Safety officer
and washers. The bracket/treaded rod shall be injury. Use proper PPE and
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : AIR COOLED SPLIT UNITS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
vertically straight. The ACSU shall be slightly tilted proper tools.
with the drain pipe connection portion slightly lower
to ensure easier flow of condensate water.
2.9 Routed the rerigerant pipe properly to the required Hotwork hazard. Fire explosion Provide fire extinguisher Site-coordinator / Safety
position, together with the drain hose and electrical Expose to mechanical tools near working area. Officer
cables using vinly tape. Insulation tube is used at injury. Use proper PPE and
every wall panetration. proper tools.
2.8 Mounted the outdoor unit in a strong level flat surface Hotwork hazard. Fire explosion Provide fire extinguisher Site-coordinator / Safety
(a/c latch,balcony,ground floor etc). Alternatively, unit Expose to mechanical tools near working area. Officer
can be hung by using suitable fix brackets. Then injury. Use proper PPE and
connect the refrigerant pipes to the unit. proper tools.
2.9 Route the condensate drain hose to proper discharge Normal site hazard Normal site risk Use proper PPE. Site-coordinator
location.
2.10 Install the unit starter panel complete with wiring and Electrical hazard. Electrical shock. Provide fire extinguisher Site-coordinator /
termination to the unit. Fire explosion. near working area. Safety officer
3.0 AFTER WORK COMPLETE
3.1 Remove all debris. Normal site hazard Normal site risk Use proper PPE. Site-coordinator
3.2 Check ensure no leakage at the refrigerant pipe Site-coordinator
connection and install pipe insulation.
3.4 Applied Magger test for the wiring connection. Electrical hazard. Electrical shock. Provide fire extinguisher Site-coordinator /
Fire explosion. near working area. Safety officer
4.0 PREVENTIVE MAINTENANCE
Site-coordinator
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : DUCTWORKS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
1.0 GENERAL
1.1 To properly install all ductwork in accordance with Site-coordinator
SMACNA recommendations.
1.2 To provide carefull testing & commissioning for the Site-coordinator
installed ductworks.
1.3 Fabrication in factory are to be based on measurement Site-coordinator
from approved shop drawings.
1.4 Final adjustment are to be measured at site for offsets Site-coordinator
or transitions to suit the application and to avoid
clashing with other trade.
1.5 All ducts protruding through walls and floors and Site-coordinator
exposed to view are to be provided with a neat
galvanized steel frame fixed to ducts and to walls
or floor as appropriate.
1.6 Where ducts extend beyond external walls or roofing Site-coordinator
they were to be flushed with fully welded or soldered
joints and completely weather proof.
1.7 Ductwork with minimum 25 mm thick are to be Site-coordinator
wrapped with 32 kg/m3 density fiberglass backed
with reinforced aluminum foil. For ductwork below the
roof and in non air-conditioned space, the insulation
are to be minimum 50 mm thickness, 32 kg/m3
density fiberglass back with reinforced aluminum foil.
1.8 All ductwork unless acoustically/ internally lined,
are to be externally insulated Site-coordinator
1.9 During installation, open duct ends are to be covered Site-coordinator
with a plastic or tarpaulin to prevent ingress of
unwanted materials.
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : DUCTWORKS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
2.0 PHYSICAL WORK
Site-coordinator
2.1 Identify all necessary information from the approved
shop drawing.
2.2 Evaluate site condition to confirm(with marking) the Normal site hazard Normal site risk Site-coordinator
route of duct and to ensure sufficient space for
installation work.
2.3 Rawl plug are installed to slab soffit along confirmed Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
route of ductwork. Then, hanger rod are fastened to Normal site hazard Expose to mechanical tools competent person. Safety officer
the rawl plug .Ensure the hanger rod are vertically injury. Use proper PPE and
straight. proper tools.
2.4 Angle bar will then be fastened onto these hangging Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
rods with double nuts and washers to form a base Normal site hazard Expose to mechanical tools competent person. Safety officer
or platform for ducting. injury. Use proper PPE and
proper tools.
2.5 Fabricated duct will then shifted to the site using Normal site hazard Normal site risk Site-coordinator
manpower.
2.6 The fabricated duct is then lifted up by manpower Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
with the use of scafolding and fixed to the angle bar. Normal site hazard Expose to mechanical tools competent person. Safety officer
The main ductwork will be fixed first, followed by injury. Use proper PPE and
branch connections, then flexible duct which will then proper tools.
connect to the air outlets.
2.7 Properly align and connect straight duct using exact Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
joint according to SMCNA requirement. Normal site hazard Expose to mechanical tools competent person. Safety officer
injury. Use proper PPE and
proper tools.
2.8 Properly align and connect duct at offset points using Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
exact joint according to SMCNA requirement. Normal site hazard Expose to mechanical tools competent person. Safety officer
injury. Use proper PPE and
proper tools.
2.9 Properly align and connect duct at transition points Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
using exact joint according to SMCNA requirement. Normal site hazard Expose to mechanical tools competent person. Safety officer
injury. Use proper PPE and
proper tools.
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : DUCTWORKS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
2.10 Install bends, tees, damper offsets, flexible Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
connection take-off and similar fittings necessary to Normal site hazard Expose to mechanical tools competent person. Safety officer
complete the ductwork system for the balancing and injury. Use proper PPE and
full operation of the air distribution system. proper tools.
3.0 AFTER WORK COMPLETE
3.1 Remove all debris. Normal site hazard Normal site risk Site-coordinator
3.2 Visually check the workmanship at each joint of Normal site hazard Normal site risk Site-coordinator
the installed ducting.
3.3 Applied air leaking test for the installed ducting. Normal site hazard Normal site risk Site-coordinator
3.4 Adjust the air outlet dampers to distribution the Normal site hazard Normal site risk Site-coordinator
design quantity of air into the designed space.
4.0 PREVENTIVE MAINTENANCE
Site-coordinator
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : WATER PUMPS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
1.0 GENERAL
1.1 To properly install, operate and maintain the Pumps. Site-coordinator
1.2 To provide carefull testing & commissioning for the Site-coordinator
installed Pumps.
1.3 Pumps are to be delivered properly coupled with Site-coordinator
electric motor.
1.4 Pumps and electric motors are to be labbelled with Site-coordinator
identification tag including capacity and motor kW
information.
1.5 Pumps inlet and outlet connection are to be capped Site-coordinator
before any installation works.
2.0 PHYSICAL WORK
Site-coordinator
2.1 Identify all necessary information from the approved
shop drawing.
2.2 Evaluate site condition to ensure sufficient space for Normal site hazard Expose to mechanical tools Site-coordinator /
installation of the pumps and it's accersories. injury. Safety officer
2.3 Pumps then shift to the designated location using Normal site hazard. Expose to mechanical tools Use proper PPE and Site-coordinator / Safety
tower crane or mobile crane. Hoisting canvas sling is injury. proper tools. Officer
used to hoist the pumps.
2.4 Ensure the concrete/casted plinth is ready to receive Normal site hazard. Expose to mechanical tools Use proper PPE and Site-coordinator / Safety
the pumps. The pumps are then assembled on the injury. proper tools. Officer
plinth. Ensure motor and pumps shaft are joined
together with flexible coupling.
2.5 The neoprene pad then inserted below each corner Normal site hazard. Expose to mechanical tools Use proper PPE and Site-coordinator / Safety
of the pump once it is lower to the concrete plinth. injury. proper tools. Officer
If casted plith is used, spring isolator is used to
replace the neoprene pad.
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : WATER PUMPS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
2.6 Properly align and connect condenser/chilled water Hotwork hazard. Fire explosion Provide fire extinguisher Site-coordinator / Safety
pipe to the pump's inlet and outlet pipe complete with Normal site hazard. Expose to mechanical tools near working area. Officer
all necessary fittings and vavles. Ensure the pipe injury. Use proper PPE and
connection is using flexible joints to minimized the proper tools.
vibration transmission.
2.7 Install the unit switchboard complete with all wiring Electrical hazard. Electrical shock. Provide fire extinguisher Site-coordinator /
and termination to all necessary equipment. Fire explosion. near working area. Safety officer
3.0 AFTER WORK COMPLETE
3.1 Remove all debris. Normal site hazard Normal site risk Site-coordinator
3.2 Check ensure no leakage at the pump assemble and Normal site hazard Normal site risk Site-coordinator
at pipes connection.
3.4 Applied Magger test for the wiring connection. Electrical hazard. Electrical shock. Provide fire extinguisher Site-coordinator /
Fire explosion. near working area. Safety officer
4.0 PREVENTIVE MAINTENANCE
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : WATER PUMPS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
1.0 GENERAL
1.1 To properly install, operate and maintain VAV Boxes. Site-coordinator
1.2 To provide carefull testing & commissioning for the Site-coordinator
installed VAV Boxes.
1.3 VAV Boxes are to be fully factory assemble, Site-coordinator
complete with the DDC controller, actuator and
accessories.
1.4 VAV Boxes are to be labelled or tagged and Site-coordinator
protected with PVC sheet.
1.5 The inlet to the VAV Boxes from the ducting are to Site-coordinator
be using round rigid sheetmetal.The outlet connection
are to be rectengular duct.
2.0 PHYSICAL WORK
Site-coordinator
2.1 Identify all necessary information from the approved
shop drawing.
2.2 Evaluate site condition to ensure sufficient space for Normal site hazard Normal site risk Use proper PPE. Site-coordinator
installation of the VAV Boxes and it's accersories.
2.3 Anchor flush are installed to slab soffit at confirmed Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
location. Then, galvanised threaded rod are fastened Normal site hazard Expose to mechanical tools competent person. Safety officer
to the anchor flush .Ensure the galvanised threaded injury. Use proper PPE and
rod are vertically straight. proper tools.
2.4 VAV Boxes then shift to the designated location Normal site hazard Normal site risk Use proper PPE. Site-coordinator
using manpower.
2.5 The VAV Box is then lifted up by manpower with the Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
use of scafolding and fixed to threaded rods. Normal site hazard Expose to mechanical tools competent person. Safety officer
injury. Use proper PPE and
proper tools.
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : WATER PUMPS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
2.6 Properly align and connect duct at inlet and outlet Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
position using exact joint according to SMCNA Normal site hazard Expose to mechanical tools competent person. Safety officer
requirement. injury. Use proper PPE and
proper tools.
2.6 Install the VAV Box wiring and termination. Electrical hazard. Electrical shock. Provide fire extinguisher Site-coordinator /
Fire explosion. near working area. Safety officer
3.0 AFTER WORK COMPLETE
3.1 Remove all debris. Normal site hazard Normal site risk Site-coordinator
3.2 Visually check the workmanship at each duct joint. Normal site hazard Normal site risk Site-coordinator
3.4 Applied air leaking test for the installed VAV Box. Normal site hazard Normal site risk Site-coordinator
4.0 PREVENTIVE MAINTENANCE
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : AIR HANDLING UNITS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
1.0 GENERAL
1.1 To properly install, operate and maintain the Heat Site-coordinator
Recovery Wheel.
1.2 To provide carefull testing & commissioning for the Site-coordinator
installed HRW.
1.3 HRW are to be delivered complete with blower, blower
motor, coils, insulated casing, hinged access doors
and filters.
2.0 PHYSICAL WORK
Site-coordinator
2.1 Identify all necessary information from the approved
shop drawing.
2.2 Evaluate site condition to ensure sufficient space for Normal site hazard. Expose to mechanical tools Site-coordinator /
installation of HWR and it's accersories. injury. Safety officer
2.3 Selected HWR then shift to the designated location Normal site hazard. Normal site risk. Site-coordinator /
using tower crane or mobile crane. Hoisting canvas Safety officer
sling is used at every corner or the AHU to avoid
damage to the AHU panels.
2.4 The neoprene pad then inserted below each corner
of the AHU once it is lower to the concrete plinth.
2.5 Properly align and connect chilled water pipe to the Hotwork hazard. Fire explosion. Proper grounding for Site-coordinator /
AHU complete with vavle etc. The pipe connection electrical mechinary. Safety officer
between the AHU and pipework shall have flexible Provide fire extinguisher
rubber joint/coupling. near working area.
2.6 Properly align and connect the flexible canvas joint Improper platform erected. Slip from high level. Safe platform erected by Site-coordinator /
to the main ductwork. competent person. Safety officer
2.7 Properly align and connect the condensate drain
for proper dischage location. The pipe shall have a
U-trap for maintenance purpose.
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : AIR HANDLING UNITS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
2.4 Install the unit switchboard complete with all wiring Electrical hazard. Electrical shock. Provide fire extinguisher Site-coordinator /
and termination to all necessary equipment. Fire explosion. near working area. Safety officer
3.0 AFTER WORK COMPLETE
3.1 Remove all debris. Normal site hazard Normal site risk Use proper PPE. Site-coordinator
3.2 Check ensure no leakage at the chilled water pipes Site-coordinator
connection and install the pipe insulation.
3.3 Turn on the blower and verify the rotation is correct. Site-coordinator
3.4 Applied Magger test for the wiring connection. Electrical shock. Electrical hazard. Provide fire extinguisher Site-coordinator /
Fire explosion. near working area. Safety officer
3.5 Do the test run and ensure there is no leakage in Site-coordinator
supply and return duct connection.
4.0 PREVENTIVE MAINTENANCE
4.1 Air filters are to be cleaned at least four times a year
and in case of major clogging, change the air filters.
4.2 Check and adjust if necesssary the tension and
alignment of the belt.
4.3 Ensure the pulley set screws are properly tightened
and there is no crack on the pulley.
4.4 Turn the blower manually and ensure it is running
smoothly without any excessive bearing noise.
4.5 Check and remove any clogged item/dirt between
coil fins.
4.6 Check voltage, current, wiring and all connection.
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : WATER PUMPS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
1.0 GENERAL
1.1 To properly install Trunking in accordance to BS 729, Site-coordinator
BS 4678, BS 6946 and BS 7671
1.2 Separate trunking are to be installed for normal and
essential supply.
1.3 Slab shall be skin coated before trunking installation
started.
2.0 PHYSICAL WORK
Site-coordinator
2.1 Identify all necessary information from the approved
shop drawing.
2.2 Evaluate site condition for routing identification. Normal site hazard Expose to mechanical tools Site-coordinator /
2.3 Pumps then shift to the designated location using
tower crane or mobile crane. Hoisting canvas sling is
used to hoist the pumps.
2.4 Ensure the concrete/casted plinth is ready to receive
the pumps. The pumps are then assembled on the
plinth. Ensure motor and pumps shaft are joined
together with flexible coupling.
2.5 The neoprene pad then inserted below each corner
of the pump once it is lower to the concrete plinth.
If casted plith is used, spring isolator is used to
replace the neoprene pad.
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : WATER PUMPS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
2.6 Properly align and connect condenser/chilled water
pipe to the pump's inlet and outlet pipe complete with
all necessary fittings and vavles. Ensure the pipe
connection is using flexible joints to minimized the
vibration transmission.
2.7 Install the unit switchboard complete with all wiring
and termination to all necessary equipment.
3.0 AFTER WORK COMPLETE
3.1 Remove all debris. Normal site hazard Normal site risk Site-coordinator /
3.2 Check ensure no leakage at the pump assemble and Safety officer
at pipes connection.
3.4 Applied Magger test for the wiring connection.
4.0 PREVENTIVE MAINTENANCE
Site-coordinator
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : WATER PUMPS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
1.0 GENERAL
1.1 To properly install, operate and maintain the Pumps. Site-coordinator
1.2 To provide carefull testing & commissioning for the
installed Pumps.
1.3 Pumps shall be delivered properly coupled with
electric motor.
1.4 Pumps and electric motors shall be labbelled with
identification tag including capacity and motor kW
information.
1.5 Pumps inlet and outlet connection shall be capped
before any installation works.
2.0 PHYSICAL WORK
Site-coordinator
2.1 Identify all necessary information from the approved
shop drawing.
2.2 Evaluate site condition to ensure sufficient space for Normal site hazard Expose to mechanical tools Site-coordinator /
installation of the pumps and it's accersories. injury. Safety officer
2.3 Pumps then shift to the designated location using
tower crane or mobile crane. Hoisting canvas sling is
used to hoist the pumps.
2.4 Ensure the concrete/casted plinth is ready to receive
the pumps. The pumps are then assembled on the
plinth. Ensure motor and pumps shaft are joined
together with flexible coupling.
2.5 The neoprene pad then inserted below each corner
of the pump once it is lower to the concrete plinth.
If casted plith is used, spring isolator is used to
replace the neoprene pad.
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : WATER PUMPS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
2.6 Properly align and connect condenser/chilled water
pipe to the pump's inlet and outlet pipe complete with
all necessary fittings and vavles. Ensure the pipe
connection is using flexible joints to minimized the
vibration transmission.
2.7 Install the unit switchboard complete with all wiring
and termination to all necessary equipment.
3.0 AFTER WORK COMPLETE
3.1 Remove all debris. Normal site hazard Normal site risk Site-coordinator /
3.2 Check ensure no leakage at the pump assemble and Safety officer
at pipes connection.
3.4 Applied Magger test for the wiring connection.
4.0 PREVENTIVE MAINTENANCE
Site-coordinator
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : WATER PUMPS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
1.0 GENERAL
1.1 To properly install, operate and maintain the Pumps. Site-coordinator
1.2 To provide carefull testing & commissioning for the
installed Pumps.
1.3 Pumps shall be delivered properly coupled with
electric motor.
1.4 Pumps and electric motors shall be labbelled with
identification tag including capacity and motor kW
information.
1.5 Pumps inlet and outlet connection shall be capped
before any installation works.
2.0 PHYSICAL WORK
Site-coordinator
2.1 Identify all necessary information from the approved
shop drawing.
2.2 Evaluate site condition to ensure sufficient space for Normal site hazard Expose to mechanical tools Site-coordinator /
installation of the pumps and it's accersories. injury. Safety officer
2.3 Pumps then shift to the designated location using
tower crane or mobile crane. Hoisting canvas sling is
used to hoist the pumps.
2.4 Ensure the concrete/casted plinth is ready to receive
the pumps. The pumps are then assembled on the
plinth. Ensure motor and pumps shaft are joined
together with flexible coupling.
2.5 The neoprene pad then inserted below each corner
of the pump once it is lower to the concrete plinth.
If casted plith is used, spring isolator is used to
replace the neoprene pad.
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : WATER PUMPS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
2.6 Properly align and connect condenser/chilled water
pipe to the pump's inlet and outlet pipe complete with
all necessary fittings and vavles. Ensure the pipe
connection is using flexible joints to minimized the
vibration transmission.
2.7 Install the unit switchboard complete with all wiring
and termination to all necessary equipment.
3.0 AFTER WORK COMPLETE
3.1 Remove all debris. Normal site hazard Normal site risk Site-coordinator /
3.2 Check ensure no leakage at the pump assemble and Safety officer
at pipes connection.
3.4 Applied Magger test for the wiring connection.
4.0 PREVENTIVE MAINTENANCE
Site-coordinator
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : WATER PUMPS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
1.0 GENERAL
1.1 To properly install, operate and maintain the Pumps. Site-coordinator
1.2 To provide carefull testing & commissioning for the
installed Pumps.
1.3 Pumps shall be delivered properly coupled with
electric motor.
1.4 Pumps and electric motors shall be labbelled with
identification tag including capacity and motor kW
information.
1.5 Pumps inlet and outlet connection shall be capped
before any installation works.
2.0 PHYSICAL WORK
Site-coordinator
2.1 Identify all necessary information from the approved
shop drawing.
2.2 Evaluate site condition to ensure sufficient space for Normal site hazard Expose to mechanical tools Site-coordinator /
installation of the pumps and it's accersories. injury. Safety officer
2.3 Pumps then shift to the designated location using
tower crane or mobile crane. Hoisting canvas sling is
used to hoist the pumps.
2.4 Ensure the concrete/casted plinth is ready to receive
the pumps. The pumps are then assembled on the
plinth. Ensure motor and pumps shaft are joined
together with flexible coupling.
2.5 The neoprene pad then inserted below each corner
of the pump once it is lower to the concrete plinth.
If casted plith is used, spring isolator is used to
replace the neoprene pad.
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : WATER PUMPS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
2.6 Properly align and connect condenser/chilled water
pipe to the pump's inlet and outlet pipe complete with
all necessary fittings and vavles. Ensure the pipe
connection is using flexible joints to minimized the
vibration transmission.
2.7 Install the unit switchboard complete with all wiring
and termination to all necessary equipment.
3.0 AFTER WORK COMPLETE
3.1 Remove all debris. Normal site hazard Normal site risk Site-coordinator /
3.2 Check ensure no leakage at the pump assemble and Safety officer
at pipes connection.
3.4 Applied Magger test for the wiring connection.
4.0 PREVENTIVE MAINTENANCE
Site-coordinator
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : WATER PUMPS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
1.0 GENERAL
1.1 To properly install, operate and maintain the Pumps. Site-coordinator
1.2 To provide carefull testing & commissioning for the
installed Pumps.
1.3 Pumps shall be delivered properly coupled with
electric motor.
1.4 Pumps and electric motors shall be labbelled with
identification tag including capacity and motor kW
information.
1.5 Pumps inlet and outlet connection shall be capped
before any installation works.
2.0 PHYSICAL WORK
Site-coordinator
2.1 Identify all necessary information from the approved
shop drawing.
2.2 Evaluate site condition to ensure sufficient space for Normal site hazard Expose to mechanical tools Site-coordinator /
installation of the pumps and it's accersories. injury. Safety officer
2.3 Pumps then shift to the designated location using
tower crane or mobile crane. Hoisting canvas sling is
used to hoist the pumps.
2.4 Ensure the concrete/casted plinth is ready to receive
the pumps. The pumps are then assembled on the
plinth. Ensure motor and pumps shaft are joined
together with flexible coupling.
2.5 The neoprene pad then inserted below each corner
of the pump once it is lower to the concrete plinth.
If casted plith is used, spring isolator is used to
replace the neoprene pad.
-
SAFE WORK METHOD STATEMENT
PROJECT : BANK NEGARA MALAYSIA
ITEM : WATER PUMPS FOR AIR CONDITIONING SERVICES
ITEM JOB STEPS/METHODOLOGY HAZARD RISK CONTROLS RESPONSIBLE PERSON
2.6 Properly align and connect condenser/chilled water
pipe to the pump's inlet and outlet pipe complete with
all necessary fittings and vavles. Ensure the pipe
connection is using flexible joints to minimized the
vibration transmission.
2.7 Install the unit switchboard complete with all wiring
and termination to all necessary equipment.
3.0 AFTER WORK COMPLETE
3.1 Remove all debris. Normal site hazard Normal site risk Site-coordinator /
3.2 Check ensure no leakage at the pump assemble and Safety officer
at pipes connection.
3.4 Applied Magger test for the wiring connection.
4.0 PREVENTIVE MAINTENANCE
Site-coordinator