Page 1: Mepl presentation

MECCI Engineers © copy right

MECCI ENGINEERS PVT. LTD.

Skill enhancement @ work solutionsBe a part of Journey to Success

Page 2: Mepl presentation

MECCI Engineers © copy right

SCOPE OF ENGINEERING

JOB OPPORTUNITIES AFTER ENGINEERING

I. Research & DevelopmentII. EPCM SectorIII. In-Plant

Page 3: Mepl presentation

MECCI Engineers © copy right

Research & Development

Scope For Below Engineering Branches:

i. Electrical Engineersii. Mechanical Engineersiii. Instrumentation Engineersiv. Civil Engineersv. Chemical Engineersvi. Computer Science Engineersvii. Information Technology

Page 4: Mepl presentation

MECCI Engineers © copy right

EPCM Sector

The Sector which having group of contractor companies and is a prominent form of contracting agreement in the construction industry. The engineering and construction contractor will carry out the detailed engineering design of the project, procure all the equipment and materials necessary, and then construct to deliver a functioning facility or asset to their clients. Companies that deliver EPC Projects are commonly referred to as EPCM Contractors.“ENGINEERING PROCUREMENT CONSTRUCTION & MANAGEMENT COMPANIES”

Opportunities In EPC SectorProfessionals having opportunity at different level: Feasibility Study FEED DESIGN Engineering Procurement Construction/ Commissioning

Page 5: Mepl presentation

MECCI Engineers © copy right

Clients In EPC Sector

On-Shore Off-Shore Sub-Sea

Refineries Process Head Platforms

Pipeline Projects

Power Plants Flare Head Platforms

FPSO Supporting Accessories

Cement Plants LNG UnitsFertilizers FLNG UnitsPharmaceuticals

FPSO & Etc.

Hydrogen UnitsEthylene Units& Etc.

Page 6: Mepl presentation

MECCI Engineers © copy right

Few Major Indian Client Companies ONGC IOCL HPCL BHART OMAN GAS Reliance Power Ltd. NTPC Jindal Power/ Steels SAIL GAIL Jaypee Cements/ Power & ETC.

Page 7: Mepl presentation

MECCI Engineers © copy right

Few EPC Sector Companies Samsung Engineering Lahmeyer international Pvt. Ltd. Indian Oil Tanking Design Degremont Ltd. Nuberg Engineering Lurgi India Flour Daniel L&T Ltd. Petrofac Valdel Engineering SMS SIEMAG DESEIN Private limited Denso India ltd Conceptia software solutions Bechtel KSJ Technocrat Wood Group KSJ Engineering services Sterling and Wilson Multitax filteration Technofab Multimax Global Economic Advantage Vertex gp of companies Cheema boilers ltd

Esteem Projects Pvt Ltd S k Engineering Mellcon Engineers Ultima Switch Gear Chemline India Ltd Jakson Ltd. S. S. Gas Lab Asia Pvt. Ltd Membrane Engineering Pvt Ltd Aravali Infrapower ltd Creative Oz Air Tecpro Systems Ltd Deeya Energy India Pvt. Ltd Accurate transformers Peekay Farm Equipments I P Ltd Mtekpro Taneja Vidyut Control Private Limited Brisanzia Technologies Pvt Ltd Hitech Bulk handling systems Pvt ltd Sombansi enviro Azure power India pvt ltd Ecotherm Engineers Pvt Ltd Zeus group Bhaskar Power Projects Pvt Ltd ACSION CHEMICALS & SYSTEMS PVT.LTD Ns Terbo Pvt Ltd

Page 8: Mepl presentation

MECCI Engineers © copy right

Coordination b/w Client & EPC1. Clients

EPC 2. Clients

PMC EPC

Page 9: Mepl presentation

MECCI Engineers © copy right

Other Related Sectors:

PMC- “Project Management Consultancy”

PMC stands for Project Management Consultant or Project Management Contract. Under a project management contract an engineering contractor will overlook the EPC Contractors work to ensure compliance with client scope of works.

Other terms for these type of services include Project Management Services (PMS) and Project Management Services Contracts (PMSC).

Page 10: Mepl presentation

MECCI Engineers © copy right

“Licensor Company”

The Company who is responsible for defining the technology for Process Plant Engineering

Page 11: Mepl presentation

MECCI Engineers © copy right

EPCM

EPCM (engineering, procurement, and construction management) is a common form of contracting arrangement for very large projects within the infrastructure, mining, resources and energy industries. In an EPCM arrangement, the client selects a head contractor who manages the whole project on behalf of the client. The EPCM contractor coordinates all design, procurement and construction work and ensures that the whole project is completed as required and in time. The EPCM contractor may or may not undertake actual site work.

An EPCM contract is a natural progression for an EPC contractor as, if one is able to do an EPC of a project, then getting a bigger EPCM job is advantageous. It helps to tap the already present competencies while ensuring better control over the project. Also, the value of the project managed through an EPCM contract is far greater than the individual EPC contracts.

Normally, an EPCM contractor completes the basic work such as site surveys, getting clearances from authorities, doing the basic engineering and preparing the site for the subcontractors. Subcontractors are chosen by the EPCM company, but they have an agreement directly with the final customer (investor).

Page 12: Mepl presentation

MECCI Engineers © copy right

EPIC “Engineering Procurement Installation Commissioning”

EPIC stands for Engineering Procurement Installation Commissioning is typically a Lump Sum Turn Key (LSTK) type Contract integrating the responsibility going from the conception to the final acceptance of one or more elements of a production system. It can be awarded for all, or part, of a field development.

LSTK “Lumpsum Turnkey” LSTK stands for Lump Sum Turn Key. This is a contractual

agreement in which a fixed price is agreed for the execution of a project or part of a project. Once the final development is completed a finished functioning asset is handed over to the client, hence the term "Turn Key" which effectively means ready to operate.

Page 13: Mepl presentation

MECCI Engineers © copy right

An owner decides for an EPC contract for reasons that include:

Reduced stress for owner easy work and growth of the company. Single point of contact for owner simplifies communications. Ready availability of post-commissioning services Ensures quality and reduces practical issues faced in other ways Owner protected against changing prices for materials, labour, etc. Cost is known at the start of the projectBesides the plant sitting, in an EPC contract the

owner defines: Scope and the specifications of the plant Quality Project duration Cost The cost (the price to be paid to the EPCC) is negotiated and

finalised and paid in mutually agreed instalments.

Page 14: Mepl presentation

MECCI Engineers © copy right

EPC Top Management

CEO

ADMINISTRATION HUMAN RESOURCEPLANNING/ ESTIMATION ENGINEERING MGMT. QHSE PROCESS ENGINEERINGENGINEERING

CIVIL ENGINEERING MECHANICAL ENGINEERING

I. MECHANICAL EQUIPMENT DESIGNII. PIPING DESIGNIII. HVAC

ELECTRICAL ENGINEERING INSTRUMENTATION ENGINEERING

Page 15: Mepl presentation

MECCI Engineers © copy right

Functions In Detailed Engineering• Engineering Functions• Initiation• Implementation• Planning & Programming• Estimating -> Request for Quote• Valuation• Design

Procurement Functions• Purchasing• Expediting• Receiving• Invoicing• Reconciliation

Construction Functions• Construction Schedule• On-site Material Handling• Construction Activities• On-site Client Communications• Valuation & Cash flow• Closing

Page 16: Mepl presentation

MECCI Engineers © copy right

LEVEL OF DESIGNATION IN ENGINEERING DEPT. LEVEL MIN. QUALIFICATION

HOD “HEAD OF THE DEPT.” B.Tech/B.E. or Above

Principal Engineer B.Tech/B.E.

Sr. ENGINEER B.Tech/B.E.

ENGINEER/ DESIGNER B.Tech/B.E.

MODELLER DIPLOMA

DRAFTMAN ITI

Page 17: Mepl presentation

MECCI Engineers © copy right

SCOPE IN DESIGNATION RELATED BRANCH

PROCESS DEPT. PROCESS DESIGN ENGINEER

CHEMICAL ENGINEERING

CIVIL DEPT. CIVIL & STRUCTURAL ENGINEER

CIVIL ENGINEERING

PIPING/STRESS DEPT. PIPING STRESS ENGINEER

MECHANICAL ENGINEERING

MECHANICAL EQUIPMENT

MECH. EQUIPMENT ENGINEER

MECHANICAL ENGINEERING

HVAC HVAC ENGINEER MECHANICAL ENGINEERING

ELECTRICAL DEPT. ELECTRICAL DESIGN ENGINEER

ELECTRICAL ENGINEERING

INSTRUMENTATION DEPT.

INST. DESIGN ENGINEER

INSTRUMENTATION / ELECTRONICS ENGINEERING

Page 18: Mepl presentation

MECCI Engineers © copy right

WORK FLOW INVOLVEMENT

CLIENT MGMT. CLIENT

DFR EPC

FEED EPC

PROPOSAL EPC

DETAILED ENGINEERING EPC

PROCUREMENT EPC

INSTALLATION/ COMMISSIONING EPC

Page 19: Mepl presentation

MECCI Engineers © copy right

DEFINATIONS DFR “DETAILED FEASIBILITY REPORT” The Feasibility Report constitutes one of the most important steps in the

decision-making process involved with embarking on a project. Approvals from financial institutions and Clients' Managements are based on the viability of the project, and a proper Feasibility Report / Study provides an unbiased and authentic evaluation of this viability.

Essential features of a bankable Report include proper technical basis, accurate cost estimates with back-up quotations from Vendors, appropriate market surveys and realistic financial analyses

FEED “FRONT END ENGINEERING DESIGN”

FEED stands for Front End Engineering Design. The FEED is basic engineering which comes after the Conceptual design or Feasibility study. The FEED design focuses the technical requirements as well as rough investment cost for the project. The FEED can be divided into separate packages covering different portions of the project. The FEED package is used as the basis for bidding the Execution Phase Contracts (EPC, EPCI, etc) and is used as the design basis.Cont….

Page 20: Mepl presentation

MECCI Engineers © copy right

A good FEED will reflect all the clients project specific requirements and avoid significant changes during the execution phase. FEED Contracts usually take around 1 year to complete for larger sized projects. During the FEED phase there is close communication between Project Owners and Operators and the Engineering Contractor to work up the project specific requirements.

Page 21: Mepl presentation

MECCI Engineers © copy right

PROPOSAL

This is the type of quotation which prepared by EPC Companies. It defines process involve to complete the requirement of Client with involving the factors like Quality/Standards, Cost & Estimation, Total Duration of Project & etc.

Finally client will decide a L1 (Lower One) Company after a bid/tender. Who is responsible for Detailed Engineering.

Page 22: Mepl presentation

MECCI Engineers © copy right

Detailed Engineering

Detail Engineering Design (DED) is the essential bridge between the basic engineering design and construction phase of a project in order to convert the ideas into reality. DED involves close coordination and synchronization among various disciplines of engineering, all in house resources for interactive and progressive manner. With having the DED, is vital to the owner flexibility time to execute the project.

A dedicated team of reliable and knowledgeable managers, engineers and designers who are able to provide the complete detail engineering design solution.

Computer aided design techniques are extensively used as design aids to help develop optimum layout & design to assure maximum construction, operational & maintenance convenience, and detailed construction drawings with bill of materials are extracted automatically from the system, ensuring highest degree of accuracy and error-free drawings.

Page 23: Mepl presentation

MECCI Engineers © copy right

PROCUREMENT

WHICH INVOLVES:• Purchasing• Expediting• Receiving• Invoicing• Reconciliation

INSTALLATION/ COMMISSIONING

WHICH INVOLVES:• Construction Schedule• On-site Material Handling• Construction Activities• On-site Client Communications• Valuation & Cash flow• Closing

Page 24: Mepl presentation

MECCI Engineers © copy right

THANKS & REGARDS

MECCI Engineers Pvt. Ltd.Shape Your Core Engineering……..