Memorandum To: Stuart Basham – NCDOT Division 10 Planning Engineer From: RS&H Project Team Subject: U-4714/U-4713A Traffic Forecast Report Date: February 26, 2018 Please find attached the traffic forecast for State Transportation Improvement Program (STIP) Projects U-4714 and U-4713A. These projects fall within the Charlotte Regional Transportation Planning Organization (CRTPO) planning area. The North Carolina Department of Transportation (NCDOT) proposes the following improvements as part of these two projects: » STIP Project U-4713A proposes to construct a two-lane roadway (McKee Road Extension) on new location beginning at the intersection of McKee Road (SR 3440) and Pleasant Plains Road (SR 3448) to tie into E John Street / Old Monroe Road (SR 1009) just north of Morningwood Drive. This project is located in Mecklenburg County, NCDOT Division 10. » STIP Project U-4714 proposes to widen E John Street / Old Monroe Road to a multi-lane facility from Trade Street (SR 3448/3474) in the Town of Matthews to Wesley Chapel- Stouts Road (SR 1377) in the Town of Indian Trail, a total of 6.5 miles. This project is located in Mecklenburg and Union Counties, NCDOT Division 10. This forecast was requested by Stuart Basham, NCDOT Division 10 Planning Engineer, and includes the following scenarios: » 2017 Base Year No Build (BYNB) » 2017 Base Year Build (BYB) » 2040 Future Year No Build (FYNB) (3 Scenarios) » 2040 Future Year Build (FYB) Proposed Improvement 2040 Future Year No Build Forecast Scenarios No Build Conditions No Build Forecast Scenario A No Build Forecast Scenario B McKee Rd Extension (U-4713A) X X Widen E John St / Old Monroe Rd (U-4714) X X

Upload: others

Post on 30-Jan-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

  • Memorandum

    To: Stuart Basham – NCDOT Division 10 Planning Engineer

    From: RS&H Project Team

    Subject: U-4714/U-4713A Traffic Forecast Report

    Date: February 26, 2018

    Please find attached the traffic forecast for State Transportation Improvement Program (STIP)

    Projects U-4714 and U-4713A. These projects fall within the Charlotte Regional Transportation

    Planning Organization (CRTPO) planning area. The North Carolina Department of Transportation

    (NCDOT) proposes the following improvements as part of these two projects:

    » STIP Project U-4713A proposes to construct a two-lane roadway (McKee Road Extension) on new location beginning at the intersection of McKee Road (SR 3440) and Pleasant Plains

    Road (SR 3448) to tie into E John Street / Old Monroe Road (SR 1009) just north of

    Morningwood Drive. This project is located in Mecklenburg County, NCDOT Division 10.

    » STIP Project U-4714 proposes to widen E John Street / Old Monroe Road to a multi-lane facility from Trade Street (SR 3448/3474) in the Town of Matthews to Wesley Chapel-

    Stouts Road (SR 1377) in the Town of Indian Trail, a total of 6.5 miles. This project is

    located in Mecklenburg and Union Counties, NCDOT Division 10.

    This forecast was requested by Stuart Basham, NCDOT Division 10 Planning Engineer, and includes

    the following scenarios:

    » 2017 Base Year No Build (BYNB)

    » 2017 Base Year Build (BYB)

    » 2040 Future Year No Build (FYNB) (3 Scenarios)

    » 2040 Future Year Build (FYB)

    Proposed Improvement

    2040 Future Year No Build

    Forecast Scenarios

    No Build

    Conditions

    No Build

    Forecast

    Scenario A

    No Build

    Forecast

    Scenario B

    McKee Rd Extension (U-4713A) X X

    Widen E John St / Old Monroe Rd (U-4714) X X

  • This forecast was approved by NCDOT Transportation Planning Division on February 21, 2018.

    This is the second traffic forecast for U-4714 and the first forecast for U-4713A. A project level

    traffic forecast was prepared for Project U-4714 on July 22, 2013.

    The following persons were consulted during the development of this forecast:

    NCDOT Transportation Planning Division

    Keith Dixon

    John (Andy) Bailey

    NCDOT PDEA

    Elmo Vance, Jr

    NCDOT Division 10

    Stuart Basham

    NCDOT District 2 – Mecklenburg Co

    Wendy A. Taylor, PE

    NCDOT District 3 – Union Co

    Lee Ainsworth, III, PE

    NCDOT Super Resident Engineer’s Office

    Brian Davis, PE

    CRTPO

    Neil Burke, AICP, PTP

    Union County

    Richard Black

    Crystal Panico

    Brian Matthews

    Town of Matthews

    Kathi Ingrish

    Town of Indian Trail

    Rox H. Burhans

    Town of Stallings

    Lynne Hair

    City of Monroe

    Lisa Stiwinter

    Charlotte DOT

    Tim Gibbs

    Andy Grzymski

    Certain Assumptions were made during the development of this forecast.

    Fiscal Constraint:

    The Metrolina Regional Travel Demand Model 16v1.0 (MRM), adopted in October 2017, was used

    to produce this forecast and included all fiscally constrained projects documented in the CRTPO

    2040 Metropolitan Transportation Plan (MTP) and the NCDOT Current STIP – August 2017 projects

    funded for construction.

    Methodology:

    The traffic forecasts and traffic factor estimates for the 2017 Base Year No Build Conditions were

    developed based on project specific traffic counts and historic Annual Average Daily Traffic (AADT)

    trends projected to 2017.

    The 2040 Future Year No Build Conditions traffic forecasts were estimated by linearly extrapolating

    the 2017 Base Year Conditions traffic forecasts using the growth rates calculated based on the

  • MRM model output, historic traffic and population growth rates, and population and employment

    forecasts regarding projected growth in the study area. Additional development and travel

    pattern changes were taken into consideration for the 2040 FYNB traffic forecasts.

    The 2040 FYNB Scenario A and Scenario B Conditions traffic forecasts were primarily developed

    using the changes in travel patterns obtained by comparing the MRM model output of the 2040

    No Build Conditions to Scenario A and the 2040 Build Conditions to Scenario B.

    The 2017 BYB and 2040 FYB Conditions traffic forecasts were primarily developed using the

    changes in travel patterns obtained by comparing the MRM model output of the respective years’

    No Build and Build Conditions.

    If we can be of any further assistance on this project, please do not hesitate to contact Tom Kelly

    [email protected] 704.940.4710.

    CC (with Attachments):

    Mike Reese, PE, Congestion Management

    Brenda Moore, PE, CPM, Roadway Design

    Clark Morrison, Pavement Management

    Sean Epperson, PE, Division 10

    Bob Cook, AICP, CRTPO

    Brian Wert, PE, TPD Planning Supervisor

    Elmo Vance, NCDOT PDEA

    Keith Dixon, State Traffic Forecast Engineer

    Traffic Forecasting GIS Support

    mailto:[email protected]

  • DHV DPM

    (d,t)

    Duals, TT-ST's (%)(d,t)

    Direction of D

    PM Peak PeriodPM

    Peak Hour Directional Split (%) D

    Design Hourly Volume (%)DHV

    LEGEND

    No. of Vehicles Per Day in 100's000

    COUNTY:

    PREPARED BY:

    DATE:

    DIVISION:

    WBS: TIP:

    N

    E

    S

    W

    Not To Scale

    RS&H

    10

    39077.1.2

    39078.1.1 / U-4714 / U-4713A

    Union

    Mecklenburg /

    Mecklenburg County, Div 10

    Union County, Div 10

    PROJECTS:

    LOCATIONS:

    Road Widening and McKee Road Extension

    E. John Street / Old Monroe

    Plains Rd at McKee Rd

    Old Monroe Rd at McKee Rd to Pleasant

    - from U-4713A Wesley Chapel-Stouts Rd;

    - from Trade St to U-4714

    February 2018

    SHEET 1 of 3

    DAILY TRAFFIC FORECASTS

    ANNUAL AVERAGE

    NO BUILD CONDITIONSBASE YEAR

    FIGURE 1

    MA

    TC

    HLIN

    E A (See S

    heet 2)

    PM7

    (3, 1)55

    PM

    7(3, 1)

    55

    35

    PM

    8(5, 1)

    55

    45

    2017

    21 50

    22 32PM

    55(3, 1)

    7

    551 27

    868PM

    55

    (2, 1)

    9

    237

    62 84

    31532 3

    228

    70

    17

    8

    111

    PM

    55

    (4, 1)

    8

    9 36

    29

    MATCHLINE B (See Sheet 3)

    64

    651

    PM

    55

    (5, 4)

    8

    621

    642

    PM8

    (4, 3)55

    PM8

    (4, 3)55

    172 211 154 181

    130

    147 28

    848 143

    119

    247183

    111

    PM

    55

    (5, 4)

    8P

    M55

    (5, 4)

    8

    PM55

    (4, 2)7

    PM

    7(3, 1)

    55

    286

    PM7

    (4, 2)55

    7474

    N Tra

    de St

    Buckle

    y W

    ay

    Charles

    S Tra

    de St

    Stallin

    gs R

    dPotter

    Rd

    Ple

    asant Plains R

    d

    Old Monroe Rd

    Old Monroe RdE John St

    W John St E John St

    485

    485

    PM

    60

    (3, 1)

    8

    PM

    7(2, 1)

    65

    Mc

    Kee R

    d

  • DHV DPM

    (d,t)

    Duals, TT-ST's (%)(d,t)

    Direction of D

    PM Peak PeriodPM

    Peak Hour Directional Split (%) D

    Design Hourly Volume (%)DHV

    LEGEND

    No. of Vehicles Per Day in 100's000

    COUNTY:

    PREPARED BY:

    DATE:

    DIVISION:

    WBS: TIP:

    N

    E

    S

    W

    Not To Scale

    RS&H

    10

    39077.1.2

    39078.1.1 / U-4714 / U-4713A

    Union

    Mecklenburg /

    Mecklenburg County, Div 10

    Union County, Div 10

    PROJECTS:

    LOCATIONS:

    Road Widening and McKee Road Extension

    E. John Street / Old Monroe

    Plains Rd at McKee Rd

    Old Monroe Rd at McKee Rd to Pleasant

    - from U-4713A Wesley Chapel-Stouts Rd;

    - from Trade St to U-4714

    February 2018

    PM

    8(2, 1)

    55

    51 PM

    8(2, 1)

    65

    60 48

    3

    SHEET 2 of 3

    DAILY TRAFFIC FORECASTS

    ANNUAL AVERAGE

    NO BUILD CONDITIONSBASE YEAR

    FIGURE 1

    2017

    PM

    55

    (5, 2)

    8

    4 47

    1 1

    55 4

    PM

    8(2, 1)

    60

    16 27

    PM

    55

    (2, 1)

    9

    PM

    55

    (5, 2)

    8

    53 18

    30 55

    PM

    8(3, 1)

    55

    PM

    8(3, 1)

    60

    32

    1723

    48

    4 PM

    8(2, 1)

    55

    35 PM

    8(2, 1)

    55

    29

    21

    5

    36 PM

    60

    (3, 1)

    8

    1620

    1513

    33 PM

    55

    (2, 1)

    9

    181 224 202 227 176 189 175

    182

    196

    142

    179

    102

    PM55

    (4, 2)7

    PM55

    (4, 2)7

    PM55

    (4, 2)8

    PM55

    (6, 2)8

    PM55

    (4, 2)8

    PM55

    (6, 2)8

    Shoppin

    g C

    enter

    Sun V

    alley C

    om

    mons

    Mid

    way Dr

    South F

    ork R

    d

    Old Monroe Rd

    Chestn

    ut

    Ln

    Garm

    on R

    d

    Oaks P

    kw

    y

    Bra

    ndon

    Musta

    ng Dr

    Chapel

    Rd

    Wesle

    y

    Old Monroe Rd Old Charlotte Hwy

    Hig

    h S

    chool

    Dw

    y

    Sun V

    alley

    Sto

    uts R

    d

    Wesle

    y C

    hapel-

    India

    n Trail R

    d S

    Trail R

    d

    Waxha

    w-India

    n

    MA

    TC

    HLIN

    E A (See S

    heet 1)

  • DHV DPM

    (d,t)

    Duals, TT-ST's (%)(d,t)

    Direction of D

    PM Peak PeriodPM

    Peak Hour Directional Split (%) D

    Design Hourly Volume (%)DHV

    LEGEND

    No. of Vehicles Per Day in 100's000

    COUNTY:

    PREPARED BY:

    DATE:

    DIVISION:

    WBS: TIP:

    N

    E

    S

    W

    Not To Scale

    RS&H

    10

    39077.1.2

    39078.1.1 / U-4714 / U-4713A

    Union

    Mecklenburg /

    Mecklenburg County, Div 10

    Union County, Div 10

    PROJECTS:

    LOCATIONS:

    Road Widening and McKee Road Extension

    E. John Street / Old Monroe

    Plains Rd at McKee Rd

    Old Monroe Rd at McKee Rd to Pleasant

    - from U-4713A Wesley Chapel-Stouts Rd;

    - from Trade St to U-4714

    February 2018

    SHEET 3 of 3

    DAILY TRAFFIC FORECASTS

    ANNUAL AVERAGE

    NO BUILD CONDITIONSBASE YEAR

    FIGURE 1

    2017

    431

    48 2

    48 73PM

    8(3, 1)

    60PM

    8(3, 1)

    60

    118

    MATCHLINE B (See Sheet 1)

    12

    PM

    55

    (2, 1)

    9

    34

    22

    170 17016

    3448

    24

    148

    PM9

    (2, 1)55

    PM

    60

    (3, 1)

    8

    PM

    55

    (4, 1)

    8

    PM9

    (2, 1)55

    848

    180

    PM9

    (2, 1)55

    PM8

    (3, 1)55

    444 535

    PM9

    (3, 1)55

    93 93

    143

    45

    128

    121

    163

    848

    837

    PM

    55

    (5, 4)

    8P

    M55

    (5, 4)

    8

    PM

    55

    (2, 1)

    9P

    M55

    (2, 1)

    9

    PM9

    (2, 1)55

    1616

    Weddington Rd

    Ple

    asant Plains R

    d

    Potter

    Rd

    Pleasant Plains Rd

    Weddington Rd

    Pla

    ntation R

    d

    Mc

    Kee R

    d

    485

    485

    87 169

    127118

  • DHV DPM

    (d,t)

    Duals, TT-ST's (%)(d,t)

    Direction of D

    PM Peak PeriodPM

    Peak Hour Directional Split (%) D

    Design Hourly Volume (%)DHV

    LEGEND

    No. of Vehicles Per Day in 100's000

    COUNTY:

    PREPARED BY:

    DATE:

    DIVISION:

    WBS: TIP:

    N

    E

    S

    W

    Not To Scale

    RS&H

    10

    39077.1.2

    39078.1.1 / U-4714 / U-4713A

    Union

    Mecklenburg /

    Mecklenburg County, Div 10

    Union County, Div 10

    PROJECTS:

    LOCATIONS:

    Road Widening and McKee Road Extension

    E. John Street / Old Monroe

    Plains Rd at McKee Rd

    Old Monroe Rd at McKee Rd to Pleasant

    - from U-4713A Wesley Chapel-Stouts Rd;

    - from Trade St to U-4714

    February 2018

    SHEET 1 of 3

    DAILY TRAFFIC FORECASTS

    ANNUAL AVERAGE

    FIGURE 2

    MA

    TC

    HLIN

    E A (See S

    heet 2)

    PM7

    (3, 1)55

    PM

    7(3, 1)

    55

    63

    PM

    8(5, 1)

    55

    PM

    8(3, 1)

    60

    45

    2017

    21

    22 70PM

    55(3, 1)

    7

    12 26

    890PM

    55

    (2, 1)

    9

    416 50330 4

    327

    62

    20

    7

    PM

    55

    (4, 1)

    8

    1 44

    51

    MATCHLINE B (See Sheet 3)

    34

    590

    PM

    55

    (5, 4)

    8

    645

    563

    PM8

    (4, 3)55

    PM8

    (4, 3)55

    260 402 241 284

    110

    154 38

    853

    183

    PM

    55

    (5, 4)

    8P

    M55

    (5, 4)

    8

    PM55

    (4, 2)7

    PM

    7(3, 1)

    55

    385

    PM7

    (4, 2)55

    7474

    N Tra

    de St

    Buckle

    y W

    ay

    Charles

    S Tra

    de St

    Stallin

    gs R

    dPotter

    Rd

    Ple

    asant Plains R

    d

    Old Monroe Rd

    Old Monroe RdE John St

    W John St E John St

    485

    485

    143

    84

    115 118

    121

    97

    99

    23115

    167

    BUILD CONDITIONSBASE YEAR

    143 220

    PM

    7(2, 1)

    65

    Mc

    Kee R

    d

    PM

    55

    (2, 1)

    8

    Mc

    Kee R

    d E

    xt

    assumed to be constructed.

    Only STIP Projects U-4714 and U-4713A are

    :2017 Base Year Build Conditions

  • DHV DPM

    (d,t)

    Duals, TT-ST's (%)(d,t)

    Direction of D

    PM Peak PeriodPM

    Peak Hour Directional Split (%) D

    Design Hourly Volume (%)DHV

    LEGEND

    No. of Vehicles Per Day in 100's000

    COUNTY:

    PREPARED BY:

    DATE:

    DIVISION:

    WBS: TIP:

    N

    E

    S

    W

    Not To Scale

    RS&H

    10

    39077.1.2

    39078.1.1 / U-4714 / U-4713A

    Union

    Mecklenburg /

    Mecklenburg County, Div 10

    Union County, Div 10

    PROJECTS:

    LOCATIONS:

    Road Widening and McKee Road Extension

    E. John Street / Old Monroe

    Plains Rd at McKee Rd

    Old Monroe Rd at McKee Rd to Pleasant

    - from U-4713A Wesley Chapel-Stouts Rd;

    - from Trade St to U-4714

    February 2018

    PM

    8(2, 1)

    55

    67 PM

    8(2, 1)

    65

    66 64

    3

    SHEET 2 of 3

    DAILY TRAFFIC FORECASTS

    ANNUAL AVERAGE

    FIGURE 2

    2017

    PM

    55

    (5, 2)

    8

    1 66

    1 1

    59 6

    PM

    8(2, 1)

    60

    37 21

    PM

    55

    (2, 1)

    9

    PM

    55

    (5, 2)

    8

    46 1

    59 40

    PM

    8(3, 1)

    55

    PM

    8(3, 1)

    60

    6

    2323

    56

    4 PM

    8(2, 1)

    55

    36 PM

    8(2, 1)

    55

    29

    21

    6

    36 PM

    60

    (3, 1)

    8

    1620

    1719

    42 PM

    55

    (2, 1)

    9

    284 349 299 323 270 252 184

    161

    213

    127

    188

    111

    PM55

    (4, 2)7

    PM55

    (4, 2)7

    PM55

    (4, 2)8

    PM55

    (6, 2)8

    PM55

    (4, 2)8

    PM55

    (6, 2)8

    Shoppin

    g C

    enter

    Sun V

    alley C

    om

    mons

    Mid

    way Dr

    South F

    ork R

    d

    Old Monroe Rd

    Chestn

    ut

    Ln

    Garm

    on R

    d

    Oaks P

    kw

    y

    Bra

    ndon

    Musta

    ng Dr

    Chapel

    Rd

    Wesle

    y

    Old Monroe Rd Old Charlotte Hwy

    Hig

    h S

    chool

    Dw

    y

    Sun V

    alley

    BUILD CONDITIONSBASE YEAR

    India

    n Trail R

    d S

    Sto

    uts R

    d

    Wesle

    y C

    hapel-

    Trail R

    d

    Waxha

    w-India

    n

    MA

    TC

    HLIN

    E A (See S

    heet 1)

    assumed to be constructed.

    Only STIP Projects U-4714 and U-4713A are

    :2017 Base Year Build Conditions

  • DHV DPM

    (d,t)

    Duals, TT-ST's (%)(d,t)

    Direction of D

    PM Peak PeriodPM

    Peak Hour Directional Split (%) D

    Design Hourly Volume (%)DHV

    LEGEND

    No. of Vehicles Per Day in 100's000

    COUNTY:

    PREPARED BY:

    DATE:

    DIVISION:

    WBS: TIP:

    N

    E

    S

    W

    Not To Scale

    RS&H

    10

    39077.1.2

    39078.1.1 / U-4714 / U-4713A

    Union

    Mecklenburg /

    Mecklenburg County, Div 10

    Union County, Div 10

    PROJECTS:

    LOCATIONS:

    Road Widening and McKee Road Extension

    E. John Street / Old Monroe

    Plains Rd at McKee Rd

    Old Monroe Rd at McKee Rd to Pleasant

    - from U-4713A Wesley Chapel-Stouts Rd;

    - from Trade St to U-4714

    February 2018

    SHEET 3 of 3

    DAILY TRAFFIC FORECASTS

    ANNUAL AVERAGE

    FIGURE 2

    2017

    530

    17 6

    34PM

    8(3, 1)

    60PM

    8(3, 1)

    60

    MATCHLINE B (See Sheet 1)

    14

    PM

    55

    (2, 1)

    9

    34

    20

    153 15328

    2927

    34

    149

    PM9

    (2, 1)55

    PM

    60

    (3, 1)

    8

    PM

    55

    (4, 1)

    8

    PM9

    (2, 1)55

    853

    159

    PM9

    (2, 1)55

    PM8

    (3, 1)55

    423 525

    PM9

    (3, 1)55

    45

    109

    153

    853

    843

    PM

    55

    (5, 4)

    8P

    M55

    (5, 4)

    8

    111 126

    167

    PM9

    (2, 1)55

    1616

    Weddington Rd

    Ple

    asant Plains R

    d

    Potter

    Rd

    Pleasant Plains Rd

    Weddington Rd

    Pla

    ntation R

    d

    Mc

    Kee R

    d

    485

    485

    853

    91 91 81

    97

    16

    159

    80

    3325

    BUILD CONDITIONSBASE YEAR

    Mc

    Kee R

    d E

    xt

    167

    PM

    55

    (2, 1)

    8P

    M55

    (2, 1)

    8

    assumed to be constructed.

    Only STIP Projects U-4714 and U-4713A are

    :2017 Base Year Build Conditions

  • DHV DPM

    (d,t)

    Duals, TT-ST's (%)(d,t)

    Direction of D

    PM Peak PeriodPM

    Peak Hour Directional Split (%) D

    Design Hourly Volume (%)DHV

    LEGEND

    No. of Vehicles Per Day in 100's000

    COUNTY:

    PREPARED BY:

    DATE:

    DIVISION:

    WBS: TIP:

    N

    E

    S

    W

    Not To Scale

    RS&H

    10

    39077.1.2

    39078.1.1 / U-4714 / U-4713A

    Union

    Mecklenburg /

    Mecklenburg County, Div 10

    Union County, Div 10

    PROJECTS:

    LOCATIONS:

    Road Widening and McKee Road Extension

    E. John Street / Old Monroe

    Plains Rd at McKee Rd

    Old Monroe Rd at McKee Rd to Pleasant

    - from U-4713A Wesley Chapel-Stouts Rd;

    - from Trade St to U-4714

    February 2018

    SHEET 1 of 3

    DAILY TRAFFIC FORECASTS

    ANNUAL AVERAGE

    FIGURE 3

    MA

    TC

    HLIN

    E A (See S

    heet 2)

    PM

    7(3, 1)

    55

    41

    PM

    8(5, 1)

    55

    PM

    8(3, 1)

    60

    56

    2040

    34 46

    34 26PM

    55(3, 1)

    7

    701 30

    1167PM

    55

    (2, 1)

    9

    264 32135 6

    236

    84

    21

    11

    124PM

    65

    (2, 1)

    7

    PM

    55

    (4, 1)

    8

    8 48

    22

    MATCHLINE B (See Sheet 3)

    950

    PM

    55

    (5, 4)

    8

    835

    864

    PM8

    (4, 3)55

    PM8

    (4, 3)55

    231 235 162 202

    144

    164 31

    1142 176

    117

    PM

    55

    (5, 4)

    8P

    M55

    (5, 4)

    8

    PM55

    (3, 1)7

    PM55

    (4, 2)7

    PM

    7(3, 1)

    55

    292

    PM7

    (4, 2)55

    7474

    N Tra

    de St

    Buckle

    y W

    ay

    Charles

    S Tra

    de St

    Stallin

    gs R

    dPotter

    Rd

    Ple

    asant Plains R

    d

    Old Monroe Rd

    Old Monroe RdE John St

    W John St E John St

    485

    485

    NO BUILD CONDITIONSFUTURE YEAR

    76

    218 356

    147 95

    Mc

    Kee R

    d

    86

    constructed.

    and the Chestnut Connector are assumed to be

    but all other fiscally constrained projects in the area

    STIP Projects U-4714 and U-4713A are not built,

    :2040 Future Year No Build Conditions

  • DHV DPM

    (d,t)

    Duals, TT-ST's (%)(d,t)

    Direction of D

    PM Peak PeriodPM

    Peak Hour Directional Split (%) D

    Design Hourly Volume (%)DHV

    LEGEND

    No. of Vehicles Per Day in 100's000

    COUNTY:

    PREPARED BY:

    DATE:

    DIVISION:

    WBS: TIP:

    N

    E

    S

    W

    Not To Scale

    RS&H

    10

    39077.1.2

    39078.1.1 / U-4714 / U-4713A

    Union

    Mecklenburg /

    Mecklenburg County, Div 10

    Union County, Div 10

    PROJECTS:

    LOCATIONS:

    Road Widening and McKee Road Extension

    E. John Street / Old Monroe

    Plains Rd at McKee Rd

    Old Monroe Rd at McKee Rd to Pleasant

    - from U-4713A Wesley Chapel-Stouts Rd;

    - from Trade St to U-4714

    February 2018

    69 PM

    8(2, 1)

    65

    73 59

    4

    SHEET 2 of 3

    DAILY TRAFFIC FORECASTS

    ANNUAL AVERAGE

    FIGURE 3

    2040

    PM

    55

    (5, 2)

    8

    8 27

    1 1

    67 4

    PM

    8(2, 1)

    60

    19 33

    PM

    55

    (2, 1)

    9

    PM

    55

    (5, 2)

    8

    69 18

    42 61

    PM

    8(3, 1)

    55

    PM

    8(3, 1)

    60

    30

    2928

    33

    5 PM

    8(2, 1)

    55

    44 PM

    8(2, 1)

    55

    37

    32

    7

    45 PM

    60

    (3, 1)

    8

    2025

    1816

    41 PM

    55

    (2, 1)

    9

    202 250 248 279 216 232 195

    225

    241

    142

    200

    136

    PM55

    (4, 2)7

    PM55

    (4, 2)7

    PM55

    (4, 2)8

    PM55

    (6, 2)8

    PM55

    (4, 2)8

    PM55

    (6, 2)8

    Shoppin

    g C

    enter

    Sun V

    alley C

    om

    mons

    Mid

    way Dr

    South F

    ork R

    d

    Old Monroe Rd

    Chestn

    ut

    Ln

    Garm

    on R

    d

    Oaks P

    kw

    y

    Bra

    ndon

    Musta

    ng Dr

    Chapel

    Rd

    Wesle

    y

    Sto

    uts R

    d

    Wesle

    y C

    hapel-

    Old Monroe Rd Old Charlotte Hwy

    Hig

    h S

    chool

    Dw

    y

    Sun V

    alley

    NO BUILD CONDITIONSFUTURE YEAR

    72

    PM

    8(3, 1)

    55

    207

    Chestn

    ut

    Connector

    Pro

    posed

    India

    n Trail R

    d S

    PM

    8(3, 1)

    55

    Trail R

    d

    Waxha

    w-India

    n

    101

    MA

    TC

    HLIN

    E A (See S

    heet 1)

    constructed.

    and the Chestnut Connector are assumed to be

    but all other fiscally constrained projects in the area

    STIP Projects U-4714 and U-4713A are not built,

    :2040 Future Year No Build Conditions

  • DHV DPM

    (d,t)

    Duals, TT-ST's (%)(d,t)

    Direction of D

    PM Peak PeriodPM

    Peak Hour Directional Split (%) D

    Design Hourly Volume (%)DHV

    LEGEND

    No. of Vehicles Per Day in 100's000

    COUNTY:

    PREPARED BY:

    DATE:

    DIVISION:

    WBS: TIP:

    N

    E

    S

    W

    Not To Scale

    RS&H

    10

    39077.1.2

    39078.1.1 / U-4714 / U-4713A

    Union

    Mecklenburg /

    Mecklenburg County, Div 10

    Union County, Div 10

    PROJECTS:

    LOCATIONS:

    Road Widening and McKee Road Extension

    E. John Street / Old Monroe

    Plains Rd at McKee Rd

    Old Monroe Rd at McKee Rd to Pleasant

    - from U-4713A Wesley Chapel-Stouts Rd;

    - from Trade St to U-4714

    February 2018

    SHEET 3 of 3

    DAILY TRAFFIC FORECASTS

    ANNUAL AVERAGE

    FIGURE 3

    2040

    537

    59 2

    59PM

    8(3, 1)

    60PM

    8(3, 1)

    60

    145

    MATCHLINE B (See Sheet 1)

    16

    PM

    55

    (2, 1)

    9

    45

    29

    22813

    31

    71

    216

    PM9

    (2, 1)55

    PM

    60

    (3, 1)

    8

    PM

    55

    (4, 1)

    8

    PM9

    (2, 1)55

    1142

    241

    PM9

    (2, 1)55

    PM8

    (3, 1)55

    495 720

    PM9

    (3, 1)55

    176

    56

    157

    148

    219

    1141

    1126

    PM

    55

    (5, 4)

    8P

    M55

    (5, 4)

    8

    127 195

    247

    PM

    55

    (2, 1)

    9P

    M55

    (2, 1)

    9

    PM9

    (2, 1)55

    1616

    Weddington Rd

    Ple

    asant Plains R

    d

    Potter

    Rd

    Pleasant Plains Rd

    Weddington Rd

    Pla

    ntation R

    d

    Mc

    Kee R

    d

    485

    485

    NO BUILD CONDITIONSFUTURE YEAR

    115 115

    39

    1142

    109

    89

    90

    367

    228

    159

    124

    constructed.

    and the Chestnut Connector are assumed to be

    but all other fiscally constrained projects in the area

    STIP Projects U-4714 and U-4713A are not built,

    :2040 Future Year No Build Conditions

  • DHV DPM

    (d,t)

    Duals, TT-ST's (%)(d,t)

    Direction of D

    PM Peak PeriodPM

    Peak Hour Directional Split (%) D

    Design Hourly Volume (%)DHV

    LEGEND

    No. of Vehicles Per Day in 100's000

    COUNTY:

    PREPARED BY:

    DATE:

    DIVISION:

    WBS: TIP:

    N

    E

    S

    W

    Not To Scale

    RS&H

    10

    39077.1.2

    39078.1.1 / U-4714 / U-4713A

    Union

    Mecklenburg /

    Mecklenburg County, Div 10

    Union County, Div 10

    PROJECTS:

    LOCATIONS:

    Road Widening and McKee Road Extension

    E. John Street / Old Monroe

    Plains Rd at McKee Rd

    Old Monroe Rd at McKee Rd to Pleasant

    - from U-4713A Wesley Chapel-Stouts Rd;

    - from Trade St to U-4714

    February 2018

    SHEET 1 of 3

    DAILY TRAFFIC FORECASTS

    ANNUAL AVERAGE

    FIGURE 4

    MA

    TC

    HLIN

    E A (See S

    heet 2)

    2040

    34742 4

    217

    37

    10

    13

    45

    MATCHLINE B (See Sheet 3)

    116

    273

    7474

    N Tra

    de St

    Buckle

    y W

    ay

    Charles

    S Tra

    de St

    Stallin

    gs R

    dPotter

    Rd

    Ple

    asant Plains R

    d

    Old Monroe Rd

    Old Monroe RdE John St

    W John St E John St

    485

    485

    PM

    55

    (2, 1)

    8

    125

    2763

    SCENARIO ANO BUILD CONDITIONS

    FUTURE YEAR

    Mc

    Kee R

    d

    62

    64

    93

    81

    119

    198158

    Mc

    Kee R

    d E

    xt

    Conditions. All other locations remain the same as FYNB.

    changes between FYNB and FYNB Scenario A

    Note: Locations shown are those impacted by the

    Connector are assumed to be constructed.

    projects in the area (including U-4713A) and the propsed Chestnut

    STIP Project U-4714 is not built, but all other fiscally constrained

    : 2040 Future Year No Build Forecast for U-4714 (Scenario A)

  • DHV DPM

    (d,t)

    Duals, TT-ST's (%)(d,t)

    Direction of D

    PM Peak PeriodPM

    Peak Hour Directional Split (%) D

    Design Hourly Volume (%)DHV

    LEGEND

    No. of Vehicles Per Day in 100's000

    COUNTY:

    PREPARED BY:

    DATE:

    DIVISION:

    WBS: TIP:

    N

    E

    S

    W

    Not To Scale

    RS&H

    10

    39077.1.2

    39078.1.1 / U-4714 / U-4713A

    Union

    Mecklenburg /

    Mecklenburg County, Div 10

    Union County, Div 10

    PROJECTS:

    LOCATIONS:

    Road Widening and McKee Road Extension

    E. John Street / Old Monroe

    Plains Rd at McKee Rd

    Old Monroe Rd at McKee Rd to Pleasant

    - from U-4713A Wesley Chapel-Stouts Rd;

    - from Trade St to U-4714

    February 2018

    63

    SHEET 2 of 3

    2040

    5 21

    Shoppin

    g C

    enter

    Sun V

    alley C

    om

    mons

    Mid

    way Dr

    South F

    ork R

    d

    Old Monroe Rd

    Chestn

    ut

    Ln

    Garm

    on R

    d

    Oaks P

    kw

    y

    Bra

    ndon

    Musta

    ng Dr

    Chapel

    Rd

    Wesle

    y

    Old Monroe Rd Old Charlotte Hwy

    Hig

    h S

    chool

    Dw

    y

    Sun V

    alley

    SCENARIO ANO BUILD CONDITIONS

    FUTURE YEAR

    DAILY TRAFFIC FORECASTS

    ANNUAL AVERAGE

    FIGURE 4

    India

    n Trail R

    d S

    Sto

    uts R

    d

    Wesle

    y C

    hapel-

    9862

    197

    Chestn

    ut

    Connector

    Pro

    posed

    Trail R

    d

    Waxha

    w-India

    n

    MA

    TC

    HLIN

    E A (See S

    heet 1)

    198

    Conditions. All other locations remain the same as FYNB.

    changes between FYNB and FYNB Scenario A

    Note: Locations shown are those impacted by the

    Connector are assumed to be constructed.

    projects in the area (including U-4713A) and the propsed Chestnut

    STIP Project U-4714 is not built, but all other fiscally constrained

    : 2040 Future Year No Build Forecast for U-4714 (Scenario A)

  • DHV DPM

    (d,t)

    Duals, TT-ST's (%)(d,t)

    Direction of D

    PM Peak PeriodPM

    Peak Hour Directional Split (%) D

    Design Hourly Volume (%)DHV

    LEGEND

    No. of Vehicles Per Day in 100's000

    COUNTY:

    PREPARED BY:

    DATE:

    DIVISION:

    WBS: TIP:

    N

    E

    S

    W

    Not To Scale

    RS&H

    10

    39077.1.2

    39078.1.1 / U-4714 / U-4713A

    Union

    Mecklenburg /

    Mecklenburg County, Div 10

    Union County, Div 10

    PROJECTS:

    LOCATIONS:

    Road Widening and McKee Road Extension

    E. John Street / Old Monroe

    Plains Rd at McKee Rd

    Old Monroe Rd at McKee Rd to Pleasant

    - from U-4713A Wesley Chapel-Stouts Rd;

    - from Trade St to U-4714

    February 2018

    SHEET 3 of 3

    2040

    748

    31 7

    44

    MATCHLINE B (See Sheet 1)

    35521

    39

    136

    166 PM

    55

    (2, 1)

    8

    1616

    Weddington Rd

    Ple

    asant Plains R

    d

    Potter

    Rd

    Pleasant Plains Rd

    Weddington Rd

    Pla

    ntation R

    d

    Mc

    Kee R

    d

    485

    485

    37

    2326

    PM

    55

    (2, 1)

    8

    46

    SCENARIO ANO BUILD CONDITIONS

    FUTURE YEAR

    DAILY TRAFFIC FORECASTS

    ANNUAL AVERAGE

    FIGURE 4

    Mc

    Kee R

    d E

    xt

    125

    122 122 121

    119

    101160 82

    PM

    55

    (2, 1)

    8

    223 117

    Conditions. All other locations remain the same as FYNB.

    changes between FYNB and FYNB Scenario A

    Note: Locations shown are those impacted by the

    Connector are assumed to be constructed.

    projects in the area (including U-4713A) and the propsed Chestnut

    STIP Project U-4714 is not built, but all other fiscally constrained

    : 2040 Future Year No Build Forecast for U-4714 (Scenario A)

  • DHV DPM

    (d,t)

    Duals, TT-ST's (%)(d,t)

    Direction of D

    PM Peak PeriodPM

    Peak Hour Directional Split (%) D

    Design Hourly Volume (%)DHV

    LEGEND

    No. of Vehicles Per Day in 100's000

    COUNTY:

    PREPARED BY:

    DATE:

    DIVISION:

    WBS: TIP:

    N

    E

    S

    W

    Not To Scale

    RS&H

    10

    39077.1.2

    39078.1.1 / U-4714 / U-4713A

    Union

    Mecklenburg /

    Mecklenburg County, Div 10

    Union County, Div 10

    PROJECTS:

    LOCATIONS:

    Road Widening and McKee Road Extension

    E. John Street / Old Monroe

    Plains Rd at McKee Rd

    Old Monroe Rd at McKee Rd to Pleasant

    - from U-4713A Wesley Chapel-Stouts Rd;

    - from Trade St to U-4714

    February 2018

    SHEET 1 of 2

    DAILY TRAFFIC FORECASTS

    ANNUAL AVERAGE

    FIGURE 5

    42

    2040

    49729 13

    4256

    11 11 45

    34

    294

    192

    107

    481

    7474

    N Tra

    de St

    Buckle

    y W

    ay

    Charles

    S Tra

    de St

    Stallin

    gs R

    dPotter

    Rd

    Ple

    asant Plains R

    d

    Old Monroe Rd

    Old Monroe RdE John St

    W John St E John St

    485

    485

    SCENARIO BNO BUILD CONDITIONS

    FUTURE YEAR

    114

    MATCHLINE A (See Sheet 2)

    94

    80 82

    Mc

    Kee R

    d

    Conditions. All other locations remain the same as FYB.

    changes between FYB and FYNB Scenario B

    Note: Locations shown are those impacted by the

    Connector are assumed to be constructed.

    projects in the area (including U-4714) and the proposed Chestnut

    STIP Project U-4713A is not built, but all other fiscally constrained

    2040 Future Year No Build Forecast for U-4713A (Scenario B):

  • DHV DPM

    (d,t)

    Duals, TT-ST's (%)(d,t)

    Direction of D

    PM Peak PeriodPM

    Peak Hour Directional Split (%) D

    Design Hourly Volume (%)DHV

    LEGEND

    No. of Vehicles Per Day in 100's000

    COUNTY:

    PREPARED BY:

    DATE:

    DIVISION:

    WBS: TIP:

    N

    E

    S

    W

    Not To Scale

    RS&H

    10

    39077.1.2

    39078.1.1 / U-4714 / U-4713A

    Union

    Mecklenburg /

    Mecklenburg County, Div 10

    Union County, Div 10

    PROJECTS:

    LOCATIONS:

    Road Widening and McKee Road Extension

    E. John Street / Old Monroe

    Plains Rd at McKee Rd

    Old Monroe Rd at McKee Rd to Pleasant

    - from U-4713A Wesley Chapel-Stouts Rd;

    - from Trade St to U-4714

    February 2018

    SHEET 2 of 2

    2040

    345

    69 7

    49

    149

    35714

    32

    68

    192

    163

    150 PM

    55

    (2, 1)

    9

    1616

    Weddington Rd

    Ple

    asant Plains R

    d

    Potter

    Rd

    Pleasant Plains Rd

    Weddington Rd

    Pla

    ntation R

    d

    Mc

    Kee R

    d

    485

    485

    33

    SCENARIO BNO BUILD CONDITIONS

    FUTURE YEAR

    DAILY TRAFFIC FORECASTS

    ANNUAL AVERAGE

    FIGURE 5

    MATCHLINE A (See Sheet 1)

    101

    105

    PM

    55

    (2, 1)

    9

    153

    224 119

    Conditions. All other locations remain the same as FYB.

    changes between FYB and FYNB Scenario B

    Note: Locations shown are those impacted by the

    are constructed.

    projects in the area (including U-4714) and the Chestnut Connector

    STIP Project U-4713A is not built, but all other fiscally constrained

    2040 Future Year No Build Forecast for U-4713A (Scenario B):

  • DHV DPM

    (d,t)

    Duals, TT-ST's (%)(d,t)

    Direction of D

    PM Peak PeriodPM

    Peak Hour Directional Split (%) D

    Design Hourly Volume (%)DHV

    LEGEND

    No. of Vehicles Per Day in 100's000

    COUNTY:

    PREPARED BY:

    DATE:

    DIVISION:

    WBS: TIP:

    N

    E

    S

    W

    Not To Scale

    RS&H

    10

    39077.1.2

    39078.1.1 / U-4714 / U-4713A

    Union

    Mecklenburg /

    Mecklenburg County, Div 10

    Union County, Div 10

    PROJECTS:

    LOCATIONS:

    Road Widening and McKee Road Extension

    E. John Street / Old Monroe

    Plains Rd at McKee Rd

    Old Monroe Rd at McKee Rd to Pleasant

    - from U-4713A Wesley Chapel-Stouts Rd;

    - from Trade St to U-4714

    February 2018

    SHEET 1 of 3

    DAILY TRAFFIC FORECASTS

    ANNUAL AVERAGE

    FIGURE 6

    MA

    TC

    HLIN

    E A (See S

    heet 2)

    PM

    7(3, 1)

    55

    75

    PM

    8(5, 1)

    55

    PM

    8(3, 1)

    60

    56

    2040

    29

    16 72PM

    55(3, 1)

    7

    9013 27

    1181PM

    55

    (2, 1)

    9

    482 51136 4

    380

    65

    8

    15

    107PM

    65

    (2, 1)

    7

    PM

    55

    (4, 1)

    8

    6 50

    54

    MATCHLINE B (See Sheet 3)

    879

    PM

    55

    (5, 4)

    8

    835

    791

    PM8

    (4, 3)55

    PM8

    (4, 3)55

    321 468 284 328

    117

    178 40

    1142 125

    112

    PM

    55

    (5, 4)

    8P

    M55

    (5, 4)

    8

    PM55

    (3, 1)7

    PM55

    (4, 2)7

    PM

    7(3, 1)

    55

    436

    PM7

    (4, 2)55

    7474

    N Tra

    de St

    Buckle

    y W

    ay

    Charles

    S Tra

    de St

    Stallin

    gs R

    dPotter

    Rd

    Ple

    asant Plains R

    d

    Old Monroe Rd

    Old Monroe RdE John St

    W John St E John St

    485

    485

    78

    198 339

    122 69

    Mc

    Kee R

    d

    85

    BUILD CONDITIONSFUTURE YEAR

    120

    3073

    138 PM

    55

    (2, 1)

    8

    Mc

    Kee R

    d E

    xt

    be constructed.

    Chestnut Connector are assumed to

    All fiscally constrained projects and the

    :2040 Future Year Build Conditions

  • DHV DPM

    (d,t)

    Duals, TT-ST's (%)(d,t)

    Direction of D

    PM Peak PeriodPM

    Peak Hour Directional Split (%) D

    Design Hourly Volume (%)DHV

    LEGEND

    No. of Vehicles Per Day in 100's000

    COUNTY:

    PREPARED BY:

    DATE:

    DIVISION:

    WBS: TIP:

    N

    E

    S

    W

    Not To Scale

    RS&H

    10

    39077.1.2

    39078.1.1 / U-4714 / U-4713A

    Union

    Mecklenburg /

    Mecklenburg County, Div 10

    Union County, Div 10

    PROJECTS:

    LOCATIONS:

    Road Widening and McKee Road Extension

    E. John Street / Old Monroe

    Plains Rd at McKee Rd

    Old Monroe Rd at McKee Rd to Pleasant

    - from U-4713A Wesley Chapel-Stouts Rd;

    - from Trade St to U-4714

    February 2018

    68 PM

    8(2, 1)

    65

    77 88

    4

    SHEET 2 of 3

    DAILY TRAFFIC FORECASTS

    ANNUAL AVERAGE

    FIGURE 6

    2040PM55

    (5, 2)

    8

    5

    1 1

    70 5

    PM

    8(2, 1)

    60

    42 38

    PM

    55

    (2, 1)

    9

    PM

    55

    (5, 2)

    8

    73 3

    53

    PM

    8(3, 1)

    55

    PM

    8(3, 1)

    60

    15

    2544

    31

    5 PM

    8(2, 1)

    55

    44 PM

    8(2, 1)

    55

    37

    32

    7

    45 PM

    60

    (3, 1)

    8

    2025

    2322

    53 PM

    55

    (2, 1)

    9

    328 406 371 402 337 334 210

    190

    269

    121

    215

    144

    PM55

    (4, 2)7

    PM55

    (4, 2)7

    PM55

    (4, 2)8

    PM55

    (6, 2)8

    PM55

    (4, 2)8

    PM55

    (6, 2)8

    Shoppin

    g C

    enter

    Sun V

    alley C

    om

    mons

    Mid

    way Dr

    South F

    ork R

    d

    Old Monroe Rd

    Chestn

    ut

    Ln

    Garm

    on R

    d

    Oaks P

    kw

    y

    Bra

    ndon

    Musta

    ng Dr

    Chapel

    Rd

    Wesle

    y

    Sto

    uts R

    d

    Wesle

    y C

    hapel-

    Old Monroe Rd Old Charlotte Hwy

    Hig

    h S

    chool

    Dw

    y

    Sun V

    alley

    48

    PM

    8(3, 1)

    55

    180

    Chestn

    ut

    Connector

    Pro

    posed

    India

    n Trail R

    d S

    PM

    8(3, 1)

    55

    BUILD CONDITIONSFUTURE YEAR

    Trail R

    d

    Waxha

    w-India

    n

    100

    31 102

    MA

    TC

    HLIN

    E A (See S

    heet 1)

    be constructed.

    Chestnut Connector are assumed to

    All fiscally constrained projects and the

    :2040 Future Year Build Conditions

  • DHV DPM

    (d,t)

    Duals, TT-ST's (%)(d,t)

    Direction of D

    PM Peak PeriodPM

    Peak Hour Directional Split (%) D

    Design Hourly Volume (%)DHV

    LEGEND

    No. of Vehicles Per Day in 100's000

    COUNTY:

    PREPARED BY:

    DATE:

    DIVISION:

    WBS: TIP:

    N

    E

    S

    W

    Not To Scale

    RS&H

    10

    39077.1.2

    39078.1.1 / U-4714 / U-4713A

    Union

    Mecklenburg /

    Mecklenburg County, Div 10

    Union County, Div 10

    PROJECTS:

    LOCATIONS:

    Road Widening and McKee Road Extension

    E. John Street / Old Monroe

    Plains Rd at McKee Rd

    Old Monroe Rd at McKee Rd to Pleasant

    - from U-4713A Wesley Chapel-Stouts Rd;

    - from Trade St to U-4714

    February 2018

    SHEET 3 of 3

    DAILY TRAFFIC FORECASTS

    ANNUAL AVERAGE

    FIGURE 6

    2040

    743

    31 8

    34PM

    8(3, 1)

    60PM

    8(3, 1)

    60

    115

    MATCHLINE B (See Sheet 1)

    16

    PM

    55

    (2, 1)

    9

    45

    29

    21422

    38

    78

    216

    PM9

    (2, 1)55

    PM

    60

    (3, 1)

    8

    PM

    55

    (4, 1)

    8

    PM9

    (2, 1)55

    1142

    227

    PM9

    (2, 1)55

    PM8

    (3, 1)55

    485 710

    PM9

    (3, 1)55

    125

    56

    136

    170

    219

    1141

    1126

    PM

    55

    (5, 4)

    8P

    M55

    (5, 4)

    8

    124 192

    244

    PM

    55

    (2, 1)

    8

    PM9

    (2, 1)55

    1616

    Weddington Rd

    Ple

    asant Plains R

    d

    Potter

    Rd

    Pleasant Plains Rd

    Weddington Rd

    Pla

    ntation R

    d

    Mc

    Kee R

    d

    485

    485

    33

    1142

    48

    87

    345 BUILD CONDITIONSFUTURE YEAR

    97 97

    138

    PM

    55

    (2, 1)

    8

    23 27

    Mc

    Kee R

    d E

    xt

    153

    218

    99

    111

    be constructed.

    Chestnut Connector are assumed to

    All fiscally constrained projects and the

    :2040 Future Year Build Conditions