Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR Tim Roberts, City of Colorado Springs. Integrating Assessment of the Economic Benefits of Transportation Improvements in Project-Level Alternatives Analysis. 1. Fillmore Street: Interstate 25 to Centennial Blvd. - PowerPoint PPT PresentationTRANSCRIPT
INTEGRATING ASSESSMENT OF THE ECONOMIC BENEFITS OF TRANSPORTATION IMPROVEMENTS IN PROJECT-LEVEL ALTERNATIVES ANALYSIS
Meiwu An, Pikes Peak Area Council of GovernmentsMaureen Paz de Araujo, HDRTim Roberts, City of Colorado Springs
PROJECT OVERVIEW
1. Fillmore Street: Interstate 25 to Centennial Blvd
2. Fillmore/Chestnut/Interstate 25 Intersection
Fillmore Street experiences significant congestion and queuing during peak periods
Traffic flows will increase in the future
Morning and evening peak hour queuing extends far up the “Hill”
Pavement condition and inadequate shoulders are unsafe for pedestrians and bicyclists
rough pavement surface and lack of sidewalk is daunting to pedestrians and bicyclists
Steep grades, narrow shoulders and …
I-25 EA Approved Interchange ConceptSingle Point Urban Interchange (SPUI)
Today’s Signals
What Are the Project Benefits?
Improves Traffic Operations Helps boost economic development opportunities
along the corridor Constructs missing infrastructure Enhances transit operations and facilities Minor reduction in Vehicle Miles Traveled
ALTERNATIVES
Alternative 3
Benefit Estimate Congestion reduction: vehicle hour traveled(VHT)
savingsComparison between no-action and alternative scenarioRegional VHT differenceTraffic operational improvement
Conversion to dollar benefitsCategorize VHT savings by truck/car, on-clock/other trip Input to TREDIS (Transportation Economic Development
Impact Software)
Benefit Cost Analysis Project benefits
Travel time savings for road usersVehicle operation cost savings for road usersEnvironment benefits for public (air quality)Reduced travel time variability
Project costDesign Right-of-way acquisitionConstruction costsMaintenance costs
Benefit Cost Analysis Travel time saving for road users
Value of time by trip purposeVehicle occupancyCar and Truck variables
Accident cost savings (not included)Reduce potential for accidentsReduce cost to users
Alternatives
Vehicle Operating Cost Savings
Time & ReliabilitySavings
Value of Personal Time Savings
Logistics Cost Savings
Environment Benefits
Total Cost
Benefit Cost Ratio
Alternative 1 N/A N/A N/A N/A N/A N/A N/A
Alternative 2 6.5 4.6 60.6 0.1 0.3 16.2 4.46
Alternative 3 2.4 1.7 22.0 0.1 0.1 7.1 3.66
Alternative 4 5.8 4.1 54.1 0.1 0.3 9.2 7.00
BCA Results
Analysis Period: 2015-2035
Proposed Action
Easily be integrated with CDOT’s Preferred Alternative Signalized intersection with the realigned Chestnut
Street requires raising of Fillmore Street Coordinate with CDOT to acquire necessary Right-of-
Way (2 Gas Stations) Feedback from Parker Street residents has been in
support of the cul-de-sac Minimum of 3 Parker Street homes as part of acquisition
Conclusion Public/social investment TDM and traffic operation analysis Delay savings benefit The results consistent with
expectations Technical information is one measure