Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR Tim Roberts, City of Colorado Springs. Integrating Assessment of the Economic Benefits of Transportation Improvements in Project-Level Alternatives Analysis. 1. Fillmore Street: Interstate 25 to Centennial Blvd. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR

INTEGRATING ASSESSMENT OF THE ECONOMIC BENEFITS OF TRANSPORTATION IMPROVEMENTS IN PROJECT-LEVEL ALTERNATIVES ANALYSIS

Meiwu An, Pikes Peak Area Council of GovernmentsMaureen Paz de Araujo, HDRTim Roberts, City of Colorado Springs

Page 2: Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR

PROJECT OVERVIEW

1. Fillmore Street: Interstate 25 to Centennial Blvd

2. Fillmore/Chestnut/Interstate 25 Intersection

Page 3: Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR

Fillmore Street experiences significant congestion and queuing during peak periods

Traffic flows will increase in the future

Morning and evening peak hour queuing extends far up the “Hill”

Page 4: Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR

Pavement condition and inadequate shoulders are unsafe for pedestrians and bicyclists

rough pavement surface and lack of sidewalk is daunting to pedestrians and bicyclists

Steep grades, narrow shoulders and …

Page 5: Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR

I-25 EA Approved Interchange ConceptSingle Point Urban Interchange (SPUI)

Today’s Signals

Page 6: Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR

What Are the Project Benefits?

Improves Traffic Operations Helps boost economic development opportunities

along the corridor Constructs missing infrastructure Enhances transit operations and facilities Minor reduction in Vehicle Miles Traveled

Page 7: Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR

ALTERNATIVES

Page 8: Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR
Page 9: Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR
Page 10: Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR

Alternative 3

Page 11: Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR
Page 12: Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR

Benefit Estimate Congestion reduction: vehicle hour traveled(VHT)

savingsComparison between no-action and alternative scenarioRegional VHT differenceTraffic operational improvement

Conversion to dollar benefitsCategorize VHT savings by truck/car, on-clock/other trip Input to TREDIS (Transportation Economic Development

Impact Software)

Page 13: Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR

Benefit Cost Analysis Project benefits

Travel time savings for road usersVehicle operation cost savings for road usersEnvironment benefits for public (air quality)Reduced travel time variability

Project costDesign Right-of-way acquisitionConstruction costsMaintenance costs

Page 14: Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR

Benefit Cost Analysis Travel time saving for road users

Value of time by trip purposeVehicle occupancyCar and Truck variables

Accident cost savings (not included)Reduce potential for accidentsReduce cost to users

Page 15: Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR

Alternatives

Vehicle Operating Cost Savings

Time & ReliabilitySavings

Value of Personal Time Savings

Logistics Cost Savings

Environment Benefits

Total Cost

Benefit Cost Ratio

Alternative 1 N/A N/A N/A N/A N/A N/A N/A

Alternative 2 6.5 4.6 60.6 0.1 0.3 16.2 4.46

Alternative 3 2.4 1.7 22.0 0.1 0.1 7.1 3.66

Alternative 4 5.8 4.1 54.1 0.1 0.3 9.2 7.00

BCA Results

Analysis Period: 2015-2035

Page 16: Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR

Proposed Action

Easily be integrated with CDOT’s Preferred Alternative Signalized intersection with the realigned Chestnut

Street requires raising of Fillmore Street Coordinate with CDOT to acquire necessary Right-of-

Way (2 Gas Stations) Feedback from Parker Street residents has been in

support of the cul-de-sac Minimum of 3 Parker Street homes as part of acquisition

Page 17: Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR

Conclusion Public/social investment TDM and traffic operation analysis Delay savings benefit The results consistent with

expectations Technical information is one measure

Page 18: Meiwu An, Pikes Peak Area Council of Governments Maureen Paz de Araujo, HDR

Questions & Discussion

Thank you