Page 1: Meeting functional requirements for real-time railway

| |

Ambra Toletti – Marco Laumanns – Peter Grossenbacher – Ulrich Weidmann Conference on Advanced Systems in Public Transport CASPT 2015

23.07.2015 Ambra Toletti et al. 1

Meeting functional requirements for real-time railway traffic management with mathematical models

Page 2: Meeting functional requirements for real-time railway

| |

Cordeau JF, Toth P, Vigo D (1998) A survey of optimization models for train routing and scheduling. Transportation Science 32(4):380–404

Törnquist J (2006) Computer-based decision support for railway traffic scheduling and dispatching: A review of models and algorithms. In: Kroon LG, Möhring RH (eds) 5th Workshop on Algorithmic Methods and Models for Optimization of Railways (ATMOS’05), Schloss Dagstuhl–Leibniz-Zentrum fuer Informatik, Dagstuhl, Germany, OpenAccess Series in Informatics (OASIcs), vol 2, DOI 10.4230/OASIcs.ATMOS.2005.659

Lusby RM, Larsen J, Ehrgott M, Ryan D (2011) Railway track allocation: models and methods. OR Spectrum 33(4):843–883, DOI 10.1007/s00291-009-0189-0

Corman F, Meng L (2013) A review of online dynamic models and algorithms for railway traffic control. In: Intelligent Rail Transportation (ICIRT), 2013 IEEE International Conference on, pp 128–133, DOI 10.1109/ICIRT.2013.6696281

Cacchiani V, Huisman D, Kidd M, Kroon L, Toth P, Veelenturf L, Wagenaar J (2014) An overview of recovery models and algorithms for real-time railway rescheduling. Transportation Research Part B: Methodological 63(0):15 – 37, DOI 10.1016/j.trb.2014.01.009

23.07.2015 Ambra Toletti et al. 2

Literature reviews

Page 3: Meeting functional requirements for real-time railway

| | 23.07.2015 Ambra Toletti et al. 3

Modelling needs assumptions… A farmer has some chickens who don't lay

any eggs. The farmer calls a physicist to help. The physicist does some calculation and says "I have a solution but it only works for spherical chickens in a vacuum!".

Page 4: Meeting functional requirements for real-time railway

| |

Introduction and motivation Functional requirements Mathematical models Meeting functional requirements with mathematical

models Conclusion and outlook

23.07.2015 Ambra Toletti et al. 4

Contents

Page 5: Meeting functional requirements for real-time railway

| |

Infrastructure Rolling Stock Operations

23.07.2015 Ambra Toletti et al. 5

Functional requirements from real-time traffic management

Page 6: Meeting functional requirements for real-time railway

| |

Infrastructure Rolling Stock Operations

23.07.2015 Ambra Toletti et al. 6

Functional requirements from real-time traffic management

Page 7: Meeting functional requirements for real-time railway

| | 23.07.2015 Ambra Toletti et al. 7

Example: Railway network of the Railway operations laboratory (EBL) at the ETH Zurich

Source: archive of the institute for transport planning and systems (IVT)

Page 8: Meeting functional requirements for real-time railway

| | 23.07.2015 Ambra Toletti et al. 7

Example: Railway network of the Railway operations laboratory (EBL) at the ETH Zurich

Source: archive of the institute for transport planning and systems (IVT)

Page 9: Meeting functional requirements for real-time railway

| | 23.07.2015 Ambra Toletti et al. 7

Example: Railway network of the Railway operations laboratory (EBL) at the ETH Zurich

Source: archive of the institute for transport planning and systems (IVT)

Macroscopic representation of the entire network

Page 10: Meeting functional requirements for real-time railway

| | 23.07.2015 Ambra Toletti et al. 10

Example: Railway network of the Railway operations laboratory (EBL) at the ETH Zurich

Source: archive of the institute for transport planning and systems (IVT)

Page 11: Meeting functional requirements for real-time railway

| | 23.07.2015 Ambra Toletti et al. 10

Example: Railway network of the Railway operations laboratory (EBL) at the ETH Zurich

Source: archive of the institute for transport planning and systems (IVT)

Microscopic representation of station Ypslikon

Page 12: Meeting functional requirements for real-time railway

| | 23.07.2015 Ambra Toletti et al. 12

Functional requirements from real-time traffic management

Infrastructure Rolling Stock Operations Macroscopic Microscopic

Page 13: Meeting functional requirements for real-time railway

| | 23.07.2015 Ambra Toletti et al. 12

Functional requirements from real-time traffic management

Infrastructure Rolling Stock Operations Macroscopic Mesoscopic Microscopic

Page 14: Meeting functional requirements for real-time railway

| | 23.07.2015 Ambra Toletti et al. 12

Functional requirements from real-time traffic management

Infrastructure Rolling Stock Operations Macroscopic Mesoscopic Microscopic

Functional requirement (Radtke 2014) ”the microscopic infrastructure is not only suitable but even mandatory for exact running time calculation, timetable construction, possession planning and railway operational simulation, conflict detection and resolution.”

Radtke A (2014) Infrastructure modelling. In: Hansen IA, Pachl J (eds) Railway Timetabling and Operations, 2nd edn, Eurail press, Hamburg, Germany, chap 3, pp 47–63.

Page 15: Meeting functional requirements for real-time railway

| | 23.07.2015 Ambra Toletti et al. 12

Functional requirements from real-time traffic management

Infrastructure Rolling Stock Operations Macroscopic Mesoscopic Microscopic

Functional requirement (Radtke 2014) ”the microscopic infrastructure is not only suitable but even mandatory for exact running time calculation, timetable construction, possession planning and railway operational simulation, conflict detection and resolution.”

Radtke A (2014) Infrastructure modelling. In: Hansen IA, Pachl J (eds) Railway Timetabling and Operations, 2nd edn, Eurail press, Hamburg, Germany, chap 3, pp 47–63.

Page 16: Meeting functional requirements for real-time railway

| |

Infrastructure Rolling Stock Operations

23.07.2015 Ambra Toletti et al. 16

Functional requirements from real-time traffic management

Page 17: Meeting functional requirements for real-time railway

| |

23.07.2015 Ambra Toletti et al. 17

Example: Speed limits on consecutive sections

Page 18: Meeting functional requirements for real-time railway

| |

Maximal speed

23.07.2015 Ambra Toletti et al. 17

Example: Speed limits on consecutive sections

Page 19: Meeting functional requirements for real-time railway

| |

Maximal speed

23.07.2015 Ambra Toletti et al. 17

Example: Speed limits on consecutive sections

Page 20: Meeting functional requirements for real-time railway

| |

Maximal speed Realizable speed

23.07.2015 Ambra Toletti et al. 17

Example: Speed limits on consecutive sections

Page 21: Meeting functional requirements for real-time railway

| |

Infrastructure Rolling Stock Operations Maximal speed Realizable speed

23.07.2015 Ambra Toletti et al. 21

Functional requirements from real-time traffic management

Page 22: Meeting functional requirements for real-time railway

| |

Infrastructure Rolling Stock Operations Maximal speed Realizable speed Length

23.07.2015 Ambra Toletti et al. 21

Functional requirements from real-time traffic management

Page 23: Meeting functional requirements for real-time railway

| |

Infrastructure Rolling Stock Operations Maximal speed Realizable speed Length

23.07.2015 Ambra Toletti et al. 21

Functional requirements from real-time traffic management

Page 24: Meeting functional requirements for real-time railway

| |

Infrastructure Rolling Stock Operations

23.07.2015 Ambra Toletti et al. 25

Functional requirements from real-time traffic management

Page 25: Meeting functional requirements for real-time railway

| |

Infrastructure Rolling Stock Operations

23.07.2015 Ambra Toletti et al. 25

Functional requirements from real-time traffic management

Monitoring

Page 26: Meeting functional requirements for real-time railway

| |

Infrastructure Rolling Stock Operations

23.07.2015 Ambra Toletti et al. 25

Functional requirements from real-time traffic management

Monitoring Punctuality

Page 27: Meeting functional requirements for real-time railway

| |

Infrastructure Rolling Stock Operations

23.07.2015 Ambra Toletti et al. 25

Functional requirements from real-time traffic management

Monitoring Punctuality Infrastructure

Page 28: Meeting functional requirements for real-time railway

| |

Infrastructure Rolling Stock Operations

23.07.2015 Ambra Toletti et al. 25

Functional requirements from real-time traffic management

Monitoring Punctuality Infrastructure Rolling Stock

Page 29: Meeting functional requirements for real-time railway

| |

Infrastructure Rolling Stock Operations

23.07.2015 Ambra Toletti et al. 25

Functional requirements from real-time traffic management

Monitoring Punctuality Infrastructure Rolling Stock Staff

Page 30: Meeting functional requirements for real-time railway

| |

Infrastructure Rolling Stock Operations

23.07.2015 Ambra Toletti et al. 25

Functional requirements from real-time traffic management

Monitoring Punctuality Infrastructure Rolling Stock Staff

Page 31: Meeting functional requirements for real-time railway

| |

Infrastructure Rolling Stock Operations

23.07.2015 Ambra Toletti et al. 31

Functional requirements from real-time traffic management

Monitoring Punctuality Infrastructure Rolling Stock Staff

Intervention

Functional requirement (Corman and Meng 2013) Actions considered by rescheduling: re-timing an event (e.g. the arrival at or the

departure from a station); re-ordering trains on a shared infrastructure; local re-routing (e.g. platform change); global re-routing; re-servicing.

Corman F, Meng L (2013) A review of online dynamic models and algorithms for railway traffic control. In: Intelligent Rail Transportation (ICIRT), 2013 IEEE International Conference on, pp 128–133, DOI 10.1109/ICIRT.2013.6696281

←Breaking connections, cancelling trains, skipping or adding stops

Page 32: Meeting functional requirements for real-time railway

| |

Continuous time Event Scheduling Problem (ESP); Alternative Graph (AG); Flexible Path (FP).

Discrete time Arc Packing Problem (APP) and its

weak version (APP’); Path Packing Problem (PPP); Arc Configuration Problem (ACP); Path Configuration Problem (PCP); Resource Tree Conflict Graph

(RTCG) and Tree Conflict Graph (TCG);

Resource Conflict Graph (RCG); REFormulated Simultaneous train

Rerouting and Rescheduling (REF-SRR).

23.07.2015 Ambra Toletti et al. 32

Mathematical models

Page 33: Meeting functional requirements for real-time railway

| |

Continuous time Event Scheduling Problem (ESP); Alternative Graph (AG); Flexible Path (FP).

Discrete time Arc Packing Problem (APP) and its

weak version (APP’); Path Packing Problem (PPP); Arc Configuration Problem (ACP); Path Configuration Problem (PCP); Resource Tree Conflict Graph

(RTCG) and Tree Conflict Graph (TCG);

Resource Conflict Graph (RCG); REFormulated Simultaneous train

Rerouting and Rescheduling (REF-SRR).

23.07.2015 Ambra Toletti et al. 32

Mathematical models

Page 34: Meeting functional requirements for real-time railway

| |

Continuous time Discrete events: 𝑣𝑣𝑆𝑆𝑧𝑧 Times: 𝑡𝑡𝑆𝑆𝑧𝑧 ≥ 0 Fixed routes

- Train run:

Discrete time

23.07.2015 Ambra Toletti et al. 34

Mathematical models

Page 35: Meeting functional requirements for real-time railway

| |

Continuous time Discrete events: 𝑣𝑣𝑆𝑆𝑧𝑧 Times: 𝑡𝑡𝑆𝑆𝑧𝑧 ≥ 0 Fixed routes

- Train run:

Discrete time

23.07.2015 Ambra Toletti et al. 34

Mathematical models

𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐: minimum running time 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐: maximum running time 𝑐𝑐𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷: minimum dwell time 𝑐𝑐𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷: maximum dwell time 𝑐𝑐𝑃𝑃𝑃𝑃𝑃𝑃𝑃𝑃: earliest time* 𝑐𝑐𝑃𝑃𝑃𝑃𝑃𝑃𝑃𝑃: latest time 𝑐𝑐𝑂𝑂𝑣𝑣𝐷𝐷𝑂𝑂𝑃𝑃𝐷𝐷𝐷𝐷/ 𝑐𝑐𝑂𝑂𝑣𝑣𝐷𝐷𝑂𝑂𝑃𝑃𝐷𝐷𝐷𝐷 :

minimum/maximum running time from the departure from the first station v to the arrival at destination

* Sometimes referred to as passing constraints

Page 36: Meeting functional requirements for real-time railway

| |

Continuous time Discrete events: 𝑣𝑣𝑆𝑆𝑧𝑧 Times: 𝑡𝑡𝑆𝑆𝑧𝑧 ≥ 0 Fixed routes

- Train run:

- Interactions

Discrete time

23.07.2015 Ambra Toletti et al. 36

Mathematical models

𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐: minimum connection time 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐: maximum connection time 𝑐𝑐𝐷𝐷𝐷𝐷𝐷𝐷/ 𝑐𝑐𝐷𝐷𝐷𝐷𝐷𝐷 : minimum/maximum

time separation**

** usually defined for ESP only

Page 37: Meeting functional requirements for real-time railway

| |

ESP

AG

23.07.2015 Ambra Toletti et al. 37

Mathematical models

Page 38: Meeting functional requirements for real-time railway

| |

Continuous time Discrete events: 𝑣𝑣𝑆𝑆𝑧𝑧 Times: 𝑡𝑡𝑆𝑆𝑧𝑧 ≥ 0 With routing: 𝑥𝑥𝑆𝑆𝑧𝑧 ∈ {0,1}

Discrete time

23.07.2015 Ambra Toletti et al. 38

Mathematical models

Page 39: Meeting functional requirements for real-time railway

| |

-Train run:

-Interactions

Continuous time Discrete events: 𝑣𝑣𝑆𝑆𝑧𝑧 Times: 𝑡𝑡𝑆𝑆𝑧𝑧 ≥ 0 With routing: 𝑥𝑥𝑆𝑆𝑧𝑧 ∈ {0,1}

Discrete time

23.07.2015 Ambra Toletti et al. 38

Mathematical models

Page 40: Meeting functional requirements for real-time railway

| |

Continuous time Event Scheduling Problem (ESP); Alternative Graph (AG); Flexible Path (FP).

Discrete time Arc Packing Problem (APP) and its

weak version (APP’); Path Packing Problem (PPP); Arc Configuration Problem (ACP); Path Configuration Problem (PCP); Resource Tree Conflict Graph

(RTCG) and Tree Conflict Graph (TCG);

Resource Conflict Graph (RCG); REFormulated Simultaneous train

Rerouting and Rescheduling (REF-SRR).

23.07.2015 Ambra Toletti et al. 40

Mathematical models

Page 41: Meeting functional requirements for real-time railway

| |

Continuous time Event Scheduling Problem (ESP); Alternative Graph (AG); Flexible Path (FP).

Discrete time Arc Packing Problem (APP) and its

weak version (APP’); Path Packing Problem (PPP); Arc Configuration Problem (ACP); Path Configuration Problem (PCP); Resource Tree Conflict Graph

(RTCG) and Tree Conflict Graph (TCG);

Resource Conflict Graph (RCG); REFormulated Simultaneous train

Rerouting and Rescheduling (REF-SRR).

23.07.2015 Ambra Toletti et al. 40

Mathematical models

Page 42: Meeting functional requirements for real-time railway

| |

Continuous time Action: 𝑃𝑃 Decision: 𝑥𝑥𝑎𝑎𝑧𝑧 ∈ {0,1}

- Train run: Uniqueness and continuity

Decision for a sequence of actions: 𝑥𝑥𝑝𝑝𝑧𝑧 ∈ {0,1} - Train run: uniqueness:

Discrete time

23.07.2015 Ambra Toletti et al. 42

Mathematical models

Page 43: Meeting functional requirements for real-time railway

| |

Continuous time Action: 𝑃𝑃 Decision: 𝑥𝑥𝑎𝑎𝑧𝑧 ∈ {0,1}

- Train run: Uniqueness and continuity

Decision for a sequence of actions: 𝑥𝑥𝑝𝑝𝑧𝑧 ∈ {0,1} - Train run: uniqueness:

Discrete time

23.07.2015 Ambra Toletti et al. 42

Mathematical models

aStart: departures from the first node;

aEnd: arrivals at the last station; aRun: runs; aDwell: dwells in stations; aInfeasibility: infeasibility

Page 44: Meeting functional requirements for real-time railway

| |

Continuous time Action: 𝑃𝑃 Decision: 𝑥𝑥𝑎𝑎𝑧𝑧 ∈ {0,1}

- Conflicts

Decision for a sequence of actions: 𝑥𝑥𝑝𝑝𝑧𝑧 ∈ {0,1} - Conflicts:

Discrete time

23.07.2015 Ambra Toletti et al. 44

Mathematical models

Page 45: Meeting functional requirements for real-time railway

| | 23.07.2015 Ambra Toletti et al. 45

Mathematical models

PPP

Page 46: Meeting functional requirements for real-time railway

| |

Meeting functional requirements with mathematical models

23.07.2015 Ambra Toletti et al. 46

Functional requirements

Matematical Models

?

Page 47: Meeting functional requirements for real-time railway

| | 23.07.2015 Ambra Toletti et al. 47

Page 48: Meeting functional requirements for real-time railway

| |

Models that satisfy all the functional requirements identified exist.

Some models are very similar to each others.

Future work: Develop a model for rescheduling starting from the current existing

models, which already satisfy the functional requirements. Take advantage of the similarity with scheduling models that have

fast solving techniques.

23.07.2015 Ambra Toletti et al. 48

Conclusion and outlook

Page 49: Meeting functional requirements for real-time railway

| | 23.07.2015 Ambra Toletti et al. 49

Questions?

Thank you for your kind attention!