meeting 4

2
Minutes Meeting 4 21/6/2013 Date : 21 st June 2013 (Friday) Time : 12:00 p.m. Purpose of the Meeting: Project Site and Objective Discussion Attendance : 1. Phua Jing Sern 2. Liew Yong Sheng 3. Steven Kwan 4. Khor Seem Leng (Note Taker) 5. Goh Jeng Jhieh (Time Keeper) Agenda Background: Through various pictures of sites collected around the campus’s compound, we voted and concluded that we use the Parking Lot Zone H as our project site. Discussion: Discuss about what building project we should create that suits its surroundings, using minimum space and budget. Conclusion: The team decides to create a one of the kind service and survey has been done and the conclusion is that students are experience the direct weather explosion such as heavy rain and scorching sun and effect their impression towards Taylor’s University Lakeside Campus. To optimize the reputation of Taylor’s university by providing one of a kind transportation service of parking lots use mainly by the students and visitors To provide shelter and transport system against the aggressive weather.

Upload: goh-jeng-jhieh

Post on 14-Jun-2015

36 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Meeting 4

Minutes Meeting 4 21/6/2013

Date : 21st June 2013 (Friday)

Time : 12:00 p.m.

Purpose of the Meeting: Project Site and Objective Discussion

Attendance : 1. Phua Jing Sern

2. Liew Yong Sheng

3. Steven Kwan

4. Khor Seem Leng (Note Taker)

5. Goh Jeng Jhieh (Time Keeper)

Agenda

Background:

Through various pictures of sites collected around the campus’s compound, we voted and concluded that we use the Parking Lot Zone H as our project site.

Discussion:

Discuss about what building project we should create that suits its surroundings, using minimum space and budget.

Conclusion:

The team decides to create a one of the kind service and survey has been done and the conclusion is that students are experience the direct weather explosion such as heavy rain and scorching sun and effect their impression towards Taylor’s University Lakeside Campus.

To optimize the reputation of Taylor’s university by providing one of a kind transportation service of parking lots use mainly by the students and visitors

To provide shelter and transport system against the aggressive weather.

Action:

The team must research on project brief writing and the procedure information needed to be included in.

Closing time : 4:00 p.m.