mediterranean hot spot investment programme: project preparation and implementation facility

13
Mediterranean Hot Spot Investment Programme: Project Preparation and Implementation Facility (MeHSIP-PPIF) SWIM Second Steering Committee Meeting 17-18 October 2012, Brussels, Belgium Ms. Rugile Balzekaite, EIB

Upload: tovah

Post on 13-Jan-2016

44 views

Category:

Documents


0 download

DESCRIPTION

Mediterranean Hot Spot Investment Programme: Project Preparation and Implementation Facility (MeHSIP-PPIF) SWIM Second Steering Committee Meeting 17-18 October 2012, Brussels, Belgium Ms. Rugile Balzekaite, EIB. Structure of Presentation. Section A: Horizon 2020 - context - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Mediterranean Hot Spot Investment Programme: Project Preparation and Implementation Facility

Mediterranean Hot Spot Investment Programme:Project Preparation and Implementation Facility

(MeHSIP-PPIF)

SWIM Second Steering Committee Meeting 17-18 October 2012, Brussels, Belgium

Ms. Rugile Balzekaite, EIB

Page 2: Mediterranean Hot Spot Investment Programme: Project Preparation and Implementation Facility

Structure of PresentationStructure of Presentation

• Section A: Horizon 2020 - context

• Section B: MeHSIP-PPIF - programme

• Section C: Synergies - opportunities

Page 3: Mediterranean Hot Spot Investment Programme: Project Preparation and Implementation Facility

SECTION A –

HORIZON 2020 - context

Page 4: Mediterranean Hot Spot Investment Programme: Project Preparation and Implementation Facility

2

Page 5: Mediterranean Hot Spot Investment Programme: Project Preparation and Implementation Facility

Horizon 2020Horizon 2020 Geographic coverage:

IPA: Albania, Bosnia and Herzegovina, Croatia, FYR Macedonia, Montenegro, Serbia, Turkey and Kosovo

ENPI South: Algeria, Egypt, Israel, Jordan, Lebanon, Libya, Morocco, Occupied Palestine Territory, Syria and Tunisia

Components of Horizon 2020 Initiative:1. Investment Component (EIB - MeHSIP-PPIF)

2. Capacity Building Component (EC – CB/MEP)

3. Review, Monitoring and Research Component (EEA / SEIS)

MeHSIP-PPIF

Page 6: Mediterranean Hot Spot Investment Programme: Project Preparation and Implementation Facility

SECTION B –

MeHSIP-PPIF - programme

Page 7: Mediterranean Hot Spot Investment Programme: Project Preparation and Implementation Facility

Pipeline Evolution & MeHSIP-PPIFPipeline Evolution & MeHSIP-PPIFHorizon 2020 Pipeline:

currently 88 projects (planned, ongoing or completed) mostly originating from NAPs

currently 38 projects (€2.79bn) yet to secure funding/financing

Page 8: Mediterranean Hot Spot Investment Programme: Project Preparation and Implementation Facility

Country Sector State of Progress Impact Investment cost (EUR)

LebanonAl-Ghadir

WW Feasibility study expected to be completed before end of 2012

Loan appraisal Q1 2013

Serving 1M PE and protecting coastal stretch of more than 60 KM

100 M

TunisiaLake Bizerte

INT Feasibility study (draft) completed

Loan appraisal before end of 2012

Eliminating pollution sources from SW, WW, IE to Med Sea

65 M

JordanAl-Ekaider

SW Feasibility study (draft) completed

Loan appraisal before end of 2012

2nd biggest landfill in the country - serving 1M pollution

35 M

EgyptKafr El-Sheikh

WW Feasibility study expected to be completed before end of 2012

Loan appraisal Q1 2013

Serving 450,000 PE and reducing direct discharge to Med Sea

120 M

Page 9: Mediterranean Hot Spot Investment Programme: Project Preparation and Implementation Facility

Projects Score CardProjects Score Card

1 2 3 4 5 6 7 8 9

Project part of H2020 Pipeline

Project Fact Sheet prepared

Pre-feasibility study prepared

Inception&/orDiagnostic

ValuationOfOptions

ESIAPrepared Loan

Agreement signed

Loan Agreement signed

TenderingProcess

Feasibility Study

Country Preparation Score Card (1 to 9)Status: Sept 2012

EGYPT

JORDAN

LEBANON

TUNISIA

Page 10: Mediterranean Hot Spot Investment Programme: Project Preparation and Implementation Facility

Progress on WAVE 1 ProjectsProgress on WAVE 1 Projects

MeHSIP-PPIF

Project Identification and pipeline

Analysis

Phase I Phase II

Define Scope for Wave 1 Projects

10 months 18 - 24 months

Prepare Tender

Documents for

Implementation

Today

Conduct Feasibility

Studies

Consultations with:•Gov Counterpart•IFIs•EIB•EU

•Approval of Feasibility Study•Appraisal•Loan Ratification

36 - 48 months

Project Implementation

END of MeHSIP-PPIF

A B C D E

8

Page 11: Mediterranean Hot Spot Investment Programme: Project Preparation and Implementation Facility

SECTION C –

Synergies with SWIM - opportunities

Page 12: Mediterranean Hot Spot Investment Programme: Project Preparation and Implementation Facility

Possible Synergies with SWIM

1. Capacity Building / Training– strengthening public sector capacity to mobilise depollution investments

– private sector participation - to protect the investment

– policy level

2. MeHSIP-PPIF monitoring assignment– provision of technical verification and documentation of best or bad

practices on implementing/operating depollution investments projects

3. Visibility / Communication1. preparation of a paper setting out "best practices" of SWIM and MeHSIP-

PPIF

2. organisation of a regional conference

Page 13: Mediterranean Hot Spot Investment Programme: Project Preparation and Implementation Facility

Thank you for your attention

22/02/2011