mediterranean development of support schemes for solar initiatives and renewable energies ()
DESCRIPTION
Mediterranean Development of Support Schemes for Solar Initiatives and Renewable Energies (http://www.med-desire.eu). Giuseppe Creanza, ARTI, Regional Agency for Technology and InnovationTRANSCRIPT
![Page 1: Mediterranean Development of Support Schemes for Solar Initiatives and Renewable Energies ()](https://reader033.vdocuments.site/reader033/viewer/2022060200/5599085c1a28abe90f8b480e/html5/thumbnails/1.jpg)
The 5th Project Meeting
Meeting agenda and objectives
Management and coordination issuesGiuseppe Creanza - ARTI-Regione Puglia
![Page 2: Mediterranean Development of Support Schemes for Solar Initiatives and Renewable Energies ()](https://reader033.vdocuments.site/reader033/viewer/2022060200/5599085c1a28abe90f8b480e/html5/thumbnails/2.jpg)
Meeting objectives
• Sharing any issue related to WP2 communication activities
• Sharing ideas about WP3 “Capitalization of project results” and WP7 “Awareness raising campaign” and planning the first actions to be implemented
• Sharing the results of WP5 technical mission in Egypt and the status of elaboration/planning of feasibility studies for certification labs and of training for technicians and installers
• Sharing the progress of WP6 activities and planning next steps
• Assessing the progress of Interim Report preparation and any other management and financial issue
![Page 3: Mediterranean Development of Support Schemes for Solar Initiatives and Renewable Energies ()](https://reader033.vdocuments.site/reader033/viewer/2022060200/5599085c1a28abe90f8b480e/html5/thumbnails/3.jpg)
STC meeting agenda
![Page 4: Mediterranean Development of Support Schemes for Solar Initiatives and Renewable Energies ()](https://reader033.vdocuments.site/reader033/viewer/2022060200/5599085c1a28abe90f8b480e/html5/thumbnails/4.jpg)
STC meeting agenda
![Page 5: Mediterranean Development of Support Schemes for Solar Initiatives and Renewable Energies ()](https://reader033.vdocuments.site/reader033/viewer/2022060200/5599085c1a28abe90f8b480e/html5/thumbnails/5.jpg)
Assessing project progress
![Page 6: Mediterranean Development of Support Schemes for Solar Initiatives and Renewable Energies ()](https://reader033.vdocuments.site/reader033/viewer/2022060200/5599085c1a28abe90f8b480e/html5/thumbnails/6.jpg)
Main criticalities
• Process of preparation of Interim Report is proceeding slowly: most of the TODOs agreed in Beirut are still pending
Main achievements
• WP5 activities received a strong push after Beirut meeting
• WP6 consolidated 6.1.a report on benchmarking of financial support mechanisms and started 6.1.b activities
![Page 7: Mediterranean Development of Support Schemes for Solar Initiatives and Renewable Energies ()](https://reader033.vdocuments.site/reader033/viewer/2022060200/5599085c1a28abe90f8b480e/html5/thumbnails/7.jpg)
Main challenges
• Improve forecasting of expenses and individuate needed (major) budget changes
• Carefully plan and organize WP3 capitalization and WP7awareness raising activities, in order to reach the stated quality and numerical targets
• Start organizing WP5 and WP6 training activities (topics, target, location, date) in order to avoid implementation delays and reach the stated result indicators
![Page 8: Mediterranean Development of Support Schemes for Solar Initiatives and Renewable Energies ()](https://reader033.vdocuments.site/reader033/viewer/2022060200/5599085c1a28abe90f8b480e/html5/thumbnails/8.jpg)
Indications from ROM monitoring
• Organize a collective and structured discussion among partners about the possible improvements and changes needed by the project (activities, objectives, indicators, target groups...).
• Organize awareness raising activities as a progression of different actions targeting specific target groups and topics.
• Try to draw the attention of decision makers on the project (e.g. governmental levels dealing with the issues targeted by the project).
• Improve the synergy with the other solar and energy efficiency ENPI projects.
![Page 9: Mediterranean Development of Support Schemes for Solar Initiatives and Renewable Energies ()](https://reader033.vdocuments.site/reader033/viewer/2022060200/5599085c1a28abe90f8b480e/html5/thumbnails/9.jpg)
Main challenges
Indicator Target
Number of targets reached by WP3 and WP7 7 central institutions (50 people)30 local institutions (200 people)500 SMEs10.000 people
Number of participants to disseminationactivities at local level (WP7)
1.000 people (min 30% public sector & 40% private sector)
Increase in positive perception of solar technologies benefits (WP7)
30% increase (2.500 contacts)
Number of business agreements between project stakeholders (WP3)
3 agreements
![Page 10: Mediterranean Development of Support Schemes for Solar Initiatives and Renewable Energies ()](https://reader033.vdocuments.site/reader033/viewer/2022060200/5599085c1a28abe90f8b480e/html5/thumbnails/10.jpg)
Main challenges
Indicator Target
Number of capacity building seminars on certification (WP5) 3 seminars (30 people)
Number of training initiatives on solar technologies (WP5) 4 initiatives (40 people)
Number of web downloads of training material on certification and technologies (WP5)
150 downloads
Number of financial and market stimulus instruments (WP6) 6 instruments
Number of training initiatives on financial instruments (WP6) 3 initiatives (30 people)
Number of training initiatives on solar ordinances (WP6) 3 initiatives (30 people)
![Page 11: Mediterranean Development of Support Schemes for Solar Initiatives and Renewable Energies ()](https://reader033.vdocuments.site/reader033/viewer/2022060200/5599085c1a28abe90f8b480e/html5/thumbnails/11.jpg)
Next meetings
Type of meeting Location and date Notes
SC#5, TSC#6 Alexandria – February 2015
TSC#7 Beirut – May 2015
SC#6, TSC#8, Capitalization#2 Alexandria – September 2015
TSC#9, Final Event Tunis – December 2015
![Page 12: Mediterranean Development of Support Schemes for Solar Initiatives and Renewable Energies ()](https://reader033.vdocuments.site/reader033/viewer/2022060200/5599085c1a28abe90f8b480e/html5/thumbnails/12.jpg)
Management and coordination issues
PMR#7 needs to be completed on time and with reliable data and forecasts
Report Applicant MATTM ENEA AAE IAT CIEMAT ANME LCEC NREA
PMR #5 ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔
PMR #6 ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔
✔ Done ✗ Not done Needs revision