CURRICULUM VITAE MECHANICAL ENGINEER PERSONAL DATA Name Arshad Mehmood Father Name Shahpal Khan Date of Birth 15-04-1987 Marital status Single Religion Islam Nationality Pakistani CNIC.No 81203-1404829-3 Passport no SEO158291 Mobile# 00966-0534171551 Email id [email protected] CERTIFICATES OF REGISTRATION : 1) Pakistan Engineering Council (PEC) Registration # MECH/24554 2) Saudi Engineering Council (SCE)I.D No: (134908) CAREER OBJECTIVES To gain as much practical knowledge as possible and to use my skills and abilities efficiently. To utilize and enhance my capabilities, knowledge and skills in a viable manner for the benefit of the organization that encourages innovation and creativeness in the job process. QUALIFICATION BSC Mechanical Engineering (C GPA 3.96,88%) (University of Azad Jammu & Kashmir) DAE Mechanical ( K.R.L Institute of Technology, Kahuta) PK. ( ,78%) COMPANY NAME /PROJECT NAME / JOB TITLE/POSITION/WORK DESCRIPTION

Upload: arshad-mehmood

Post on 10-Feb-2017

221 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Mechanical Project Enginner CV

CURRICULUM VITAE

MECHANICAL ENGINEER

PERSONAL DATA

Name Arshad MehmoodFather Name Shahpal KhanDate of Birth 15-04-1987Marital status SingleReligion IslamNationality PakistaniCNIC.No 81203-1404829-3Passport no SEO158291Mobile# 00966-0534171551Email id [email protected]

CERTIFICATES OF REGISTRATION:1) Pakistan Engineering Council (PEC) Registration # MECH/245542) Saudi Engineering Council (SCE)I.D No: (134908) CAREER OBJECTIVES

To gain as much practical knowledge as possible and to use my skills and abilities efficiently. To utilize and enhance my capabilities, knowledge and skills in a viable manner for the benefit of the organization that encourages innovation and creativeness in the job process.

QUALIFICATION

BSC Mechanical Engineering (C GPA 3.96,88%) (University of Azad Jammu & Kashmir) DAE Mechanical ( K.R.L Institute of Technology, Kahuta) PK. ( ,78%) COMPANY NAME /PROJECT NAME / JOB TITLE/POSITION/WORK DESCRIPTION

SAUDI TECHNICAL GROUP OF COMPANIES:

Prince Moshin Hospital Reheabilition Project Ul-Ulha KSA (Ministry Of Health KSA). June 2013 To Present……

Senior Mechanical Project Engineer.Familiar Engineering standards and procedures and applicable National and

Page 2: Mechanical Project Enginner CV

International codes and standard as SMACNA /ASHRAE.

Attend meetings with main contractors and discuss with site issues, planning and solve site problems. Give presentation to update work status.

Responsibilities: Submitting Materials, Drawing to Consultant, also checking Design and Capacities of Mechanical system and Guiding the designers according to Site Installation and Specification, Schedules, Classes and Capacities and follow the International, ASTM, ANSI, SAMACNA,ASHARE Standards. Reviewing the quality documentations(procedures, drawings ,material specifications ).

a. and other quality related documents submitted by contractor) pertaining to HVACb. activities.

Responsible for following Mechanical System Installation: Site Work Installation: Check Quantities and Making Order for Material Purchaser: Quality Control Inspector:

1- HVACs System: Installation, Test And Commissioning Of Main Hospital, and also related buildings Duct Fittings Guage 24,22, as per International Standards, Chill & Hot Water Black Steel pipe Sch 40, Two Way Control System, Wield Joint, DRV Valves, Air Handling Units, Package Air Units, Post Treatment Units, Fan Coil Units, Chillers, Extract Fans, According To ASTM and SAMCANA , ASHARI.

2- Installation and testing Commissioning of HVAC Variable Speed Drive Pumps, Primary and Secondary sets with Pneumatic Pressure Vessels..

3- Installation and testing Commissioning of HVAC Air Cooled Screw Type Chillers 600 tons four Pieces three working one stand by all Piping, Water Balancing, DRV Valves, Accessories, BMS Control System.

4- Installation and testing Commissioning of HVAC Air Handling Units, Post Treatment Units, Fresh Air Intake Units With Duct Accessories(Filters,Hepa Filters,Bag Filters, Sound Atenventor, Dampers, Fire Dampers, MOTORIZED Damper) Piping ,Valves, Two Way Control with Variable Speed Control System, Hot Water, Chill Water, Steam Humidifier, BMS Control Systems.

5- Installation and testing Commissioning of HVAC Fan Coils Units, Concealed Type and Floor Mounted two way control System Valves, Fittings, BMS Control System.

6- Installation, Test And Commissioning of Steam Boiler System 1600kg/hr, Design Standard BS EN 12953, Boiler Thermal Efficeny 88%, Fire Tubes Three Pass, Wet back,88 Tubes, Shell Boiler, 2 Boiler Set Working one stand by, Design Working Pressure 10 Bar., Automatic Blow down Control System ,Pressure Reducing Bench and Steam Supply for , calorifers, Heat Exchangers, O,R Sterilization, Air Handling Units Humidifier, Kitchen, Laundry Areas, also black steel Steam pipe Sch 80 installation.

7- Installation, Test And Commissioning of Main Hospital Operation Theatres Laminar Air Supply With HEPA Filters.

8- Installation, Test And Commissioning of Heat Exchangers, Calorifers, Condensation Tank.9- Installation, Test And Commissioning of Submersible Pump Set.10- Installation, Test And Commissioning of Package Air Units With all Duct Fittings.11- Installation, Test And Commissioning of FM200 Of Main Hospital Electrical Rooms and

Transformer Areas.12- Installation, Test And Commissioning of Medical Gases pipeline, Medical Machinery,

AGSS,Triplex Compressor System(Medical Compressed Air, Medical Vaccum,Medical Oxygen,

Page 3: Mechanical Project Enginner CV

Nitrous Oxide) piping, Area Vlave Service Units, Bed Head Units for operation theaters and all Patient Wards.

13- Installation, Test And Commissioning of Automatic Kitchen Hood Fire Extinguisher System for Main Building.

14- Installation, Test And Commissioning of Plumbing portable water Reverse Osmic filtration Plant , Pump set and Pvc,Cpvc Pipelining to whole Hospital and Buildings.

15- Installation Testing and Commissioning of Booster Pump Set, Raw Water Pump Set Variable Speed Drive, Irrigation Pump Sets, Central Hot Water Circulating Pump Sets With Pneumatic Pressure Vessels.

16- Installation testing and Commissioning of HVAC Extract Fan Up-Blast and Down Blast 50 PSC.

17- Drainage(Vent,Wc,Soil) and Water Supply Piping Hot and Cold Water Supply for all Hospital Building.

18- Installation and Testing Commissioning Of SEWAGE Treatment Plant.19- Installation, Testing and Commissioning of Fire Fighting Pumps, Electrical Motor, Diesel

Generator, Jockey Pump of Pressure of 11 bar and also SCH 40 Black Steel Piping Groove Lock, Fire Hose Cabinet, Landing Valves, Fire Hydrant..

10 Make the payments of all Mechanical Work(HVAC, Fire fighting,,, Plumbing work ,Medical Gas, Steam Boiler System.) according to B.O.Q. Material installation, material delivery and approve from consultant.

13- Study the catalogs of AHU,FCU,Chillers,Exaust Fans and analyze that all loops of chiller water and Air Handling Units is according to drawings.

13-Mechanical shop drawing reading and make amendments coordinating with teammembers on requirement.

14- Raise RFI of all mechanical system(HVAC ,Fire fighting, STP,LPG, Plumbing work ,Medical Gas, Steam Boiler System) installation. Coordinate with Consultant for inspection and responsible for approve installation.

15- Give the materials purchasing demand. Check the need quantity according with drawings and make the demand quantity of all mechanical systems.

16- Coordination with other departments (Civil, Electrical &Architecture in the line of project).

SAUDI TECHNICAL GROUP OF COMPANIES : King Abdullah Sports City ,Jeddah (saudi Aramco) Janvary 2012 to May 2013 . Mechanical Project Engineer:

Maintain the daily progress report following the execution of work on daily activities. Monitor and coordination with subcontractor for work progress reporting. Study the project in terms of engineering design and check its validity on present

conditions.

Page 4: Mechanical Project Enginner CV

. Reporting to client on daily, weekly and monthly activities. Maintain the quality of work according to National & international standards. Reporting to higher officials on daily, weekly and monthly activities. Coordination with company management for project expanses. Visit sites on daily bases, note discrepancies and inform related one for their removal. Coordination with quality department for quality assurance. Prepare the project equipment plan and their approval from client. Manage the availability of equipment on time. Perform equipment testing check. Coordination with other departments (Civil, Electrical &Architecture in the line of

project). Work under Pressure and in emergency conditions. Attending acceptance with client and fulfill their requirements. Work as team member and team lead.

Preparation of bill of quantities, financial effects and interim payment certificates.

Site surveillance to check the construction work and give comments if necessary

according to standards. Familiarization with overall construction scope of work. To prepare request for inspection for client inspection for completed activities. Highlighting all discrepancies detected during monitoring inspection and informing the same to QC Manager.

SAUDI TECHNICAL GROUP OF COMPANIES : King Abdullah Petroleum Studies & Research Center (Saudi Aramco ) Riyadh,KSA Mechanical Site Engineer : June 2011 to Jan 2012

Familiar Engineering standards and procedures and applicable national and International codes and standard as SMACNA. Raising violation/INCR against construction if any non conformance find at site. Taking immediate remedial to clear inspection log book comments. Closing the violation and INCR in case of compliance with standards on LBE. Duct installation, alignment according to Aramco standards. Duct leakage inspection, smoke test, light test, according to Aramco standards. Fire fighting installation, have knowledge of Aramco standards. Have experience of Plumbing and sanitary installation. Air balancing of the whole building as per design.

Page 5: Mechanical Project Enginner CV

Analysis the problem of Air balancing and maintainence to meet the design requirement.

Chill water piping installation setting of flow according to design of air balancing. Chill water pump room installation setting and testing the pressure. Chiller installation, compressor installation, compressor capacity according to load,

Evaporator, coils testing, condenser tank and coils calibration, refrigerants types, Behavior & characteristics.

Chiller maintenance experience. Having a knowledge of BMS controllers like VAV,CAV,VFD. Familiar with the installation of AHU,FCU,ERU,Chiller & EHC . Having a experience of elevator controllers .

SAUDI TECHNICAL GROUP OF COMPANIES:

Group Of Colleges RAFAH Society Colleges Project (K.S.A Ministry Of Education). Mechanical Site Engineer :

Join first site from Saudi Technical Group Of Companies..

TESLA TECHNOLOGIES COMPANIES ISLAMABAD Section manager : Deals in production and export Engineering products to UK .Production of Cng kits,Dispensor, Hose section, Automobile parts.

Production of water immersion heater ,CNC machines fabrication,automotive production according to IS.

RESPONSIBILITIES: To cover daily production 1000 pcs daily. Maintain quality.To manage the inventory record raw materials and also deal to labour to control cost factor. Manage to produce product with quality and time.

Page 6: Mechanical Project Enginner CV

AL RAUF AIR CONDITIONING COMPANY LAHORE . Mechanical Site Engineer : Installation of central Hvac system.compressors,centrifugal and reciprocating,chillers,chill water pipes cast iron,low cabon steel,pumps,cooling towers,AHU,control system. Ducting installation(round and square)VAV,VCD,insulation,cladding,alignment,fixtures,grills,wall registers.

Year season maintenance program compressors bearings, lubricant change, chiller refrigerant testing, expansion valve cleaning, chill water insulation,AHU cleaning, filter trays cleaning. Ducting cleaning,testing,alignment checking.

HABIB RAFIQUE CONSTRUCTION COMPANY ISLAMABAD : Mechanical Site Engineer Trainee Engineer.

Hvac,Piping installation section engineer install ac units according to drawing,window packet, central AC,installation of chillers,compressors

temperature control system control, manufacturing of duct square or triangular. Installation of piping multi storey buildings also management the labor daily installation.

TOYOTA MOTORS AZAD KASHMIRS (I.C ENGINES AUTOMOBILES PARTS) ECONOMIA AGECO PVT ISLAMABD. Trainee Engineer. Installation of Ac units in different hotels,hospitals, manufacturing of ac units in factory.Production of wind and solar turbine.

COMPUTER SKILLS

Good command over using MS Office including MS Word, MS Power Point MS Excel.Good command over using Pro-E Engineering, AutoCAD.Good command over using the internet.

FINAL YEAR PROJECT

HYDRAULIC OPERATED RADIAL WIND POWER PLANT Low speed wind turbine starting 3m/s wind velocity and radial Rotor maximum wind attack of wind .Low economical cost . Specially design for hilly and AZAD KASHMIRE rural areas for lighting purpose.

INDUSTRIAL VISITS

HMC: Heavy Mechanical Complex Taxila.KSB pump: Hazara Road, Hassanabdal.RASTGAR: RASTGAR Engineering Company (Pvt) Limited

Page 7: Mechanical Project Enginner CV

Islamabad. Mangle Hydro Power Plant.

OTHER SKILLS

Leader, Team Member, Communicator, Motivator.Good in written and spoken Urdu and English.Social and have good administration skills.

HOBBIES

Play volley Ball Watching geographic channel