PROJECTS MADE IN MARINE ENGINEER CORP, BRANCH VERACRUZ
YEAR 2013GENERAL AND PROJECT MANAGER: NELSON AGUIRRE B.
MR AGUIRRE IS A CHILEAN NAVAL ELECTRICAL ENGINEER (RETIRED OFFICER OF CHILEAN NAVY), PLANNER AND LEADER OF WORKING TEAM, WITH 25 YEARS WORKING IN THE CHILEAN NAVY. EXPERIENCE IN PLANNING, COORDINATION, SUPERVISION AND CONTROL OF WORKS, WORKING IN THE DIRECTION AND PLANNING OF LOGISTIC PROCESSES AND MANAGEMENT.
PATROL VESSEL “TABOGA”LOA : 31.2 MTSBEAM: 7.31 MTSDWT : 167 TONS
PATROL VESSEL “TABOGA” AFTER ARRIVE TO SHIPYARD
STARTING THE SANDBLASTING
SANDBLASTING COMPLETE(WITH NEW PILOT HOUSE)
DISMANTLING THE OLD PILOT HOUSE
OLD PILOT HOUSE
MAKING THE NEW PILOT HOUSE
REPLACING PART OF THE SHELL PLATE
VERIFYING DEFLECTION OF THE TAIL SHAFT
REPLACING BOTH PROPELLERS FOR NEW ONES, ACCORDING WAS DESIGNED
PAINTING THE WHOLE VESSEL
UNDOCKING MANEUVERING
PATROL VESSEL “TABOGA” READY TO SAIL
PASSENGER VESSEL “PACIFIC QUEEN”LOA : 36.84 MTSBEAM: 7.74 MTS
PACIFIC QUEEN, ARRIVING TO SHIPYARD
CONDITION OF THE HULL AT THE ARRIVING
RENWING PART OF THE SHELL PLATE
REPAIRING VALVES
REPAIRING THE LINE SHAFT
REPAIRING AND POLISHING PROPELLERS
UNDOCKING MANEUVERING OF PACIFIC QUEEN
LANDING CRAFT “GENERAL ESTEBAN HUERTAS”LOA : 38 MTSBEAM: 11 MTSDWT : 313 TONS
GENERAL DEL “ESTEBAN HUERTAS” ARRIVING TO SHIPYARD
CONDITION OF HATCHES
DISALIGNMENT OF SHAFT LINE IN PORT AND STARBOARD SIDE.THE STRUT AND STERN TUBE, WAS MACHINED
REPLACING PIPE IN BAD CONDITION
BASES OF WINCH AND CRANE IN BAD CONDITION, WAS MADE NEW.
REPLACING THE MAIN ENGINES AND GENERATORS
REPLACING MORE THAN 38 TONS OF STEEL, FROM THE HULL AND MAIN DECK
REPLACING MORE THAN 38 TONS OF STEEL, FROM THE HULL AND MAIN DECK
NEW KEEL COOLERS WERE MADE
STEEL REPLACED
STEEL REPLACED
STEEL REPLACED
DISMANTLING THE OLD STRUCTURE
NEW STRUCTURE FINISHED
INSIDE OF THE STRUCTURE, BEFORE TO STAR WORKING
INSIDE AFTER TO FINISH
UNDOCKING MANEUVERING
BARGE INTERCOASTAL “IMI 102”LOA : 54.86 MTSBEAM: 16.4 MTSDWT : 1,063 TONS
BARGE ARRIVING TO SHIPYARD
CONDITION OF THE HULL BEFORE TO START WORKING
WASHING WITH H.P WATERJET
AFTER TO WASH THE BARGE
REPLACING STEEL PLATE
REPLACING STEEL PLATE
COMPLETE SANDBLASTING SA 2
PAITING THE WHOLE BARGE
CLEANING INSIDE THE TANKS
BARGE, PAITED AND FINISHED
UNDOCKING MANEUVERING
SUPPLY VESSEL “CÉBACO BAY”LOA : 29.6 MTSBEAM: 7.9 MTSDWT : 86 TONS
ARRIVING TO SHIPYARD
CONDITION OF THE HULL BEFORE TO START WORKING
SCRAPPING THE HULL
CONDITION OF THE VESSEL AFTER TO WASH WITH H.P. WATERJET
MAKING SANDBLASTING
PAINTING THE WHOLE VESSEL
STEEL WORK
MAKING NEW EXPANSION TANKS FOR THE MAIN ENGINES
FINISHING THE JOB
UNDOCKING MANEUVERING