  • 8/12/2019 MD1-0-E-182-06-00001-0

    1/6

    0 11.10.2012 Issued for Construction

    A 13-07-2012 Issued for Approval

    REV. DATE DESCRIPTION DSGN CHKD APPD

    PROJECT :

    TWO(2) x 500MW MONG DUONG 1 THERMAL POWER PLANT

    EMPLOYER :

    CONSULTANT :

    CONTRACTOR :

    DESIGNED BY DATE TITLE :

    11.10.2012

    EMERGENCY DIESEL GENERATOR SIZINGCALCULATION

    CHECKED BY DATE

    11.10.2012

    APPROVED BY DATE PROJECT NUMBER DOCUMENT NUMBER REV.

    11.10.2012 ADB/MD1-TPIP/EPC150911 MD1-0-E-182-06-00001 0

    FOR CONSTRUCTION

  • 8/12/2019 MD1-0-E-182-06-00001-0

    2/6

    TWO(2) X 500MW MONG DUONG 1 THERMAL POWER STATION

    Emergency Diesel Generator Sizing Calculation Rev. 0

    MD1-0-E-182-06-00001 i 11.10.2012

    CONTENTS

    1.0 GENERAL ...................................................................................................................... 12.0 REFERENCES ............................................................................................................... 13.0 DESIGN CRITERIA & FORMULA ............................................................................ 14.0 CALCULATION OF EDG SIZING ............................................................................. 35.0 CONCLUSION ............................................................................................................... 4

  • 8/12/2019 MD1-0-E-182-06-00001-0

    3/6

    TWO(2) X 500MW MONG DUONG 1 THERMAL POWER STATION

    Emergency Diesel Generator Sizing Calculation Rev. 0

    MD1-0-E-182-06-00001 1 11-10-2012

    1.0 GENERAL

    This calculation is prepared to determine the capacity of Emergency Diesel Generator (EDG)

    for safe shut down operation and provide power for essential supplies of Mong Duong 1 TPP

    in Vietnam.

    2.0 REFERENCES

    1) Essential Electric Consumer List

    2) IEEE Std. 399-1990 Recommended Practice for Industrial and Commercial PowerSystems Analysis.

    3.0 DESIGN CRITERIA & FORMULA

    3.1 General

    To calculate the capacity of EDG, the following cases are considered:

    Case I : Capacity during shut down of STGs Case II : Capacity for starting the largest motor while in islanded operation

    3.2 Load Profile

    3.2.1 Unit Loads

    Load NameLoadType

    Q'tyRatedPower[kW]

    PowerFactor

    Eff.Duty

    Factor

    Input

    [kW] [kVA]

    STG

    Main Seal Oil Pump M 1 18.5 0.85 0.8 1 23.13 27.21Recirculation Seal Oil Pump M 1 7.5 0.85 0.8 1 9.38 11.03

    Turning Gear M 1 44.7 0.8 0.92 1 48.59 60.73

    Vapor Extractor Motor M 1 5.6 0.85 0.8 1 7.00 8.24

    Gland Exhauster Motor M 1 11.2 0.85 0.8 1 14.00 16.47

    Bearing Pump Motor M 1 150 0.85 1 1 150.00 176.47

    Stator Cooling Pump M 1 45 0.9 0.9 1 50.00 55.56

    BOILER

    AH Support Bearing Oil Pump

    MTRM 2 1.5 0.85 0.8 1 3.75 4.41

    AH Guide Bearing Oil Pump

    MTR

    M 2 1.5 0.85 0.8 1 3.75 4.41

    AH Aux. Drive Motor M 2 11.0 0.85 0.8 0 0.00 0.00

    AH Sector Plate 1 Drive Motor M 2 0.75 0.85 0.8 0.5 0.94 1.10

    AH Sector Plate 2 Drive Motor M 2 0.75 0.85 0.8 0.5 0.94 1.10

    AH Sector Plate 3 Drive Motor M 2 0.75 0.85 0.8 0.5 0.94 1.10

    PA Fan A Lube Oil Pump A

    MTRM 2 3.7 0.85 0.8 1 9.25 10.88

    PA Fan A Lube Oil Pump B

    MTRM 2 3.7 0.85 0.8 0 0.00 0.00

    PA Fan B Lube Oil Pump AMTR

    M 2 3.7 0.85 0.8 1 9.25 10.88

    PA Fan B Lube Oil Pump B

    MTRM 2 3.7 0.85 0.8 0 0.00 0.00

    SA Fan A Lube Oil Pump AMTR

    M 2 2.2 0.85 0.8 1 5.50 6.47

  • 8/12/2019 MD1-0-E-182-06-00001-0

    4/6

    TWO(2) X 500MW MONG DUONG 1 THERMAL POWER STATION

    Emergency Diesel Generator Sizing Calculation Rev. 0

    MD1-0-E-182-06-00001 2 11-10-2012

    Load NameLoadType

    Q'tyRatedPower[kW]

    PowerFactor

    Eff.Duty

    Factor

    Input

    [kW] [kVA]

    SA Fan A Lube Oil Pump BMTR

    M 2 2.2 0.85 0.8 0 0.00 0.00

    SA Fan B Lube Oil Pump A

    MTR M 2 2.2 0.85 0.8 1 5.50 6.47SA Fan B Lube Oil Pump BMTR

    M 2 2.2 0.85 0.8 0 0.00 0.00

    BFP

    Lube Oil Pump for Feed WaterPump

    M 1 18 0.87 0.91 1 19.78 22.74

    STACK

    Ground Floor Lighting NM 1 0.8 1 1 1 0.80 0.80Platforms Lighting NM 1 1.2 1 1 1 1.20 1.20Aircraft Warning Lights NM 1 7.2 1 1 1 7.20 7.20PDP (internal) NM 1 2.4 1 1 1 2.40 2.40Ladders Lighting NM 1 1.2 1 1 1 1.20 1.20Emergency Lights NM 1 1.6 1 1 1 1.60 1.60PDP (internal) NM 1 2.4 1 1 1 2.40 2.40Stack Spare (20%) NM 1 3.4 1 1 1 3.36 3.36

    I.D FAN

    I.D Fan Lube Oil Pump Motor M 4 3.7 0.75 0.87 1 17.01 22.68

    I.D Fan Fluid CouplingActuator

    M 4 1.2 0.75 0.87 0.5 2.76 3.68

    Sum of Motor Load 381.47 451.63

    Sum of Non-Motor Load 20.16 20.16

    Sum of All Load 401.63 471.79

    Notes: 1. Load type: M (Motor load), NM (Non-motor load)2. Input power[kW]: Qty x Rated Power x Duty Factor / Efficiency3. Input power[kVA]: Qty x Rated Power x Duty Factor / Efficiency / Power Factor4. Duty factor: Continuous (1), Intermittent (0.5), Stand-by (0)

    3.2.2 DC & UPS, BOP Loads

    Load NameLoadType

    Q'tyRatedPower[kW]

    PowerFactor

    Eff.Duty

    Factor

    Input

    [kW] [kVA]

    ELEC

    DC UPS for Power Plant NM 1 250 1 1 1 250.00 250.00DC UPS for Cooling Water NM 1 20 1 1 1 20.00 20.00

    WT

    Potable Water Pump A M 1 22 0.85 0.8 1 23.91 28.81

    Potable Water Pump B M 1 22 0.85 0.8 0 0 0

    HVAC

    Precision Air Conditioner NM 1 11 1 1 1 11.00 11.00

    Air Cooled Water Chiller NM 1 116 1 1 1 116.00 116.00

    Chilled Water Pump M 1 19 1 1 1 19.00 19.00

    CHLORINATION

    Absortion tower blower A M 1 11 0.85 0.89 1 12.36 14.54

    Circulating pump_A M 1 5.5 0.88 0.89 1 6.25 7.10

  • 8/12/2019 MD1-0-E-182-06-00001-0

    5/6

    TWO(2) X 500MW MONG DUONG 1 THERMAL POWER STATION

    Emergency Diesel Generator Sizing Calculation Rev. 0

    MD1-0-E-182-06-00001 3 11-10-2012

    Sum of Motor Load 61.52 69.45

    Sum of Non-Motor Load 397.00 397.00

    Sum of All Load 458.52 466.45

    Notes: 1. Load type: M (Motor load), NM (Non-motor load)

    2. Input power: Qty x Rated Power x Duty Factor / Efficiency3. Input power[kVA]: Qty x Rated Power x Duty Factor / Efficiency / Power Factor4. Duty factor: Continuous (1), Intermittent (0.5), Stand-by (0)

    4.0 CALCULATION OF EDG SIZING

    4.1 Calculation for Case I

    The capacity required for continuous operation during shutdown of STG Unit is calculated by

    the following formula;

    Where,

    PG1 : Generator capacity [kVA]

    pfG : Generator power factor (0.85)

    P : Output of load [kW]

    : Efficiency of load

    a : Coefficienct considering load factor, demand factor, margin of capacity, etc

    (Motor: 0.9, Non-motor: 1.0)

    4.2 Calculation for Case II

    The EDG shall also be capable of starting the largest motor (Bearing pump motor for STG

    Unit 1, 150kW or 176.47kVA) as the remaining loads are running;

    Where,

    PG2 : Generator capacity [kVA]

    0W : Summation of operating load [kVA] (938.25-176.47=761.77kVA)

    Lcos : Power factor during starting of the largest motor (0.25)

    K : Overload capacity of generator (1.1)

    ][82.95985.0

    1)}16.417(1)99.442(9.0{

    ][1........3

    3

    2

    2

    1

    11

    kVA

    kVApf

    PPPPPGGn

    n

    ][27.973

    1.1

    )25.029.1235(77.761

    ][]cos[ max0

    2

    kVA

    kVAK

    QWPG

    LL

    ][29.123585.0

    ]][1507][

    ][7max kVA

    kWkVA

    pf

    kWinputQ

    L

    L

  • 8/12/2019 MD1-0-E-182-06-00001-0

    6/6

    TWO(2) X 500MW MONG DUONG 1 THERMAL POWER STATION

    Emergency Diesel Generator Sizing Calculation Rev. 0

    MD1-0-E-182-06-00001 4 11-10-2012

    5.0 CONCLUSION

    ITEM

    DESCRIPTION

    CALCULATED

    CAPACITY

    SELECTED

    CAPACITY

    CAPACITY WITH

    20% MARGIN

    Emergency Diesel

    Generator

    PG1: 959.82kVAPG2: 973.27kVA 1167.92kVA

    PG2: 973.27kVA

    Based on the calculated capacities and considering sufficient margin, the rated capacity of

    both EDG Unit 1 & 2 will be selected as 1200kVA at 0.85PF.