PhDuke GARY R. PETERSONOEPower' Vice President
McGuire Nuclear StationA Duke Energy Company
Duke PowerMGO1VP 12700 Hagers Ferry RoadHuntersville, NC 28078-9340
704 875 5333
704 875 4809 fax
grpeters@duke-energy. corn
January 5, 2004
U. S. Nuclear Regulatory CommissionWashington, D.C. 20555
ATTENTION: Document Control Desk
Subject: McGuire Nuclear Station Units 1 and 2Docket Nos. 50-369 and 50-370Inservice Inspection (ISI) Pressure Test PlanThird Ten-Year Interval Plan
Reference: Letter from Mr. G.R. Peterson of Duke Energy tothe NRC, dated December 18, 2003 (McGuire Units1 and 2 Third Ten-Year Interval ISI Plan)
As discussed in the referenced letter, the ISI program forMcGuire Units 1 and 2 was revised in accordance with10CFR50.55a(g) (4) (ii). The referenced letter included theattachments "General Requirements" and ISI ExaminationListing and Schedulen for both units pertaining to the thirdinspection interval. Attached to this letter are Revision 1and Revision 0 of the "Third Inspection Interval ISIPressure Test Plan' for Unit 1 and Unit 2, respectively.These documents complete the transmittal of the Units 1 and2 "Third Ten-Year Interval ISI Plan" to the NRC.
Section 9 in the ISI Pressure Test Plans" identifies thefollowing relief requests requiring NRC review and approvalpursuant to 10CFR 50.55a(a) (3) (i): (1) Relief Request 03-001, "Request to consolidate relief requests filed under the1995 Edition/1996 Addenda", (2) Relief Request 03-003,"Request to use Code Case N-566-2 for Unit 2, and (3)Relief Request 02-003, "Request to use corrected ASME Coderequirement for Class 3 pressure tests". These reliefrequests are currently being developed and will be submittedto the NRC in the near future.
www. duke-energy. corn
U.S. Nuclear Regulatory CommissionJanuary 5, 2004Page 2
Questions should be directed to Norman T. Simms, McGuireLicensing and Compliance, at (704) 875-4685.
Sincerely,
G.R. Peterson
Attachments
U.S. Nuclear Regulatory CommissionJanuary 5, 2004Page 3
cc w/ att:
Mr. R.E. Martin, Project Manager (addressee only)Office of Nuclear Reactor RegulationU. S. Nuclear Regulatory CommissionOne White Flint North, Mail Stop O-8G911555 Rockville PikeRockville, MD 20852-2738
cc w/o att:
Mr. L.A. ReyesRegional Administrator, Region IIU. S. Nuclear Regulatory CommissionAtlanta Federal Center61 Forsyth Street, SW, Suite 23T85Atlanta, Georgia 30323
J.B. BradySenior NRC Resident InspectorMcGuire Nuclear Station
ATTACHMENTS
Duke Energy CorporationMcGuire Nuclear Station
Unit 1
THIRD INSPECTION INTERVALINSERVICE INSPECTIONPRESSURE TEST PLAN
Revision I
Plant Location: 12700 Hagers Ferry RoadHuntersville, North Carolina 28078-9340
Commercial Service Date: December 1, 1981
Third Interval Start Date: December 1, 2002
Owner: Duke Power Company526 South Church St.Mail Code EC07JCharlotte, N. C. 28201-1006
Start Date End Date
12/01/201112/01/2002 12/01/2004 12/01/2008
1st Period 2nd Period 3rd Period
Refueling Outage 1(EOC 15)
Refueling Outage 2(EOC 16)
Refueling Outage 3(EOC 17)
Refueling Outage 4(EOC 18)
Refueling Outage 5(EOC 19)
Refueling Outage 6(EOC 20)
Refueling Outage 7(EOC 21)
Date /11/°3
Date
Date Il zkc
Date I-R-17J 3
Duke Energy CorporationMcGuire Unit I - 3fd Ten-Year IntervalInservice Inspection Pressure Test Plan
J.M. Boughman(704) 382-5112
jmboughmeduke-energy.com
SUMMARY OF REVISION 1 CHANGES
SECTION DESCRIPTION
All This entire plan has been revised to meet the requirements of the 1998 Edition/2000 Addenda of theASME Boiler & Pressure Vessel Code, Section XI.
1 Added Code Case N-566-2.
4 Class 2, Examination Category C-H Item Numbers have been consolidated into one ASME Item Number.
5 Class 3, Examination Category D-B Item Numbers have been consolidated into one ASME Item Number.
7 Added reference for exempt boundary drawings listed in Section 12.
8 Added clarification for the examination frequency for Risk Informed segments that receive a pressure test.
9 Added Relief Request Numbers 01-008, 02-001, & 03-001.
11 Incorporated Plan Addenda MI-PT-001, M1-PT-002, Ml-PT-003, M1-PT-004, M1-PT-005, Ml-PT-006,& MI-PT-007.
12 Added clarification for drawing reviews and added exempt category with associated drawings to boundarydrawing list.
Duke Energy CorporationMcGuire Unit I - 3fd Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision IPage I of 15
TABLE OF CONTENTS
SECTION TITLE
1 Applicable Codes and Standards for Inservice Inspection Pressure Testing
2 Inspection Methods and Procedures to be Used for Inservice Inspection Pressure Testing
3 Description of Inservice Inspection Pressure Testing Plan for ISI Class I Items
4 Description of Inservice Inspection Pressure Testing Plan for ISI Class 2 Items
5 Description of Inservice Inspection Pressure Testing Plan for ISI Class 3 Items
6 System Boundaries Subject to Examination
7 Components Exempt From Pressure Test Examination
8 Description of Examination Schedules
9 Requests for Relief From ASME Code Requirements
10 Risk-Informed Segments Associated With Pressure Testing
11 Examination Zone Listing & Associated Flow Diagrams
12 Boundary Drawing and System Listing
Duke Energy CorporationMcGuire Unit I - 3d Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision IPage 2 of 15
[ 1 1 Applicable Codes and Standards for Inservice Inspection Pressure Testing
This document constitutes the inservice inspection pressure testing plan and schedules for the third inspectioninterval for McGuire Unit 1. All pressure retaining components classified as ISI Class 1, 2, and 3 have beenreviewed to determine the inservice inspection pressure test examination requirements.
Inservice inspection pressure testing activities for McGuire Unit I shall be performed in accordance withProgram B of the 1998 Edition of ASME Section XI, through the 2000 Addenda.
The NRC revised the pressure and temperature hold time requirements in Tide 10, Code of Federal Regulations,Part 50.55a (b)(2)(xx), published January 1, 2003. When performing system leakage tests in accordance withIWA-5213(a), a 10-minute hold time after attaining test pressure is required for Class 2 and Class 3 componentsthat are not in use during normal operating conditions, and no hold time is required for the remaining Class 2and Class 3 components provided that the system has been in operation for at least 4 hours for insulatedcomponents or 10 minutes for uninsulated components.
The following Code Cases may be used for the Pressure Testing Program at McGuire Unit 1:
Code Case:
N-566-2
Brief Discription:
"Corrective Action for Leakage Identified at Bolted Connections" (This code case isapproved for use by Request for Relief Serial No. 02-001)
Duke Energy CorporationMcGuire Unit 1 - 3" Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision 1Page 3 of 15
1 2 |Inspection Methods and Procedures to be used for Inservice Inspection Pressure Testing l
VT-2 visual examinations shall be conducted to locate evidence of leakage from pressure retaining componentsduring the conduct of a system pressure test.
Pressure testing and associated VT-2 visual examinations shall be performed using the latest revision ofprocedure QAL-15 "ISI Visual Examination, VT-2".
The following Duke Power procedures and directives shall be used to control pressure testing inserviceinspection activities, Inservice Inspection Pressure Testing Plans, Pressure Test Database Management System,and Inservice Inspection Pressure Test Reports:
Procedure No: Title:
NSD-300
NSD-701
NSD-702
NSD-800
QA-520
QA-522
QA-524
QAL-5
QAL-15
ASME Section XI Program
Records Management
Document Management
Software and Data Quality Assurance (SDQA) Program
Preparation and Distribution of Inservice Inspection Reports
Preparation and Implementation of the Inservice InspectionPressure Testing Plans
ISI Pressure Testing Process
Control Of Preservice And Inservice Inspection Activities
ISI Visual Examination, VT-2
Description of Inservice Inspection Pressure Testing Plan for ISI Class I Items
Pressure testing of ISI Class 1 items shall be performed in accordance with the requirements of Articles IWA-5000, IWB-2000, and IWB-5000 of Section XI. ISI Class I systems that are required to be pressure tested shallbe divided into isolable areas (to the extent practical). These areas represent specific pressure testing zones(hereafter referred to as examination zones).
Examination Categories and Requirements:
The examination categories and item numbers shall be those listed in Table IWB-2500-1 of Section XI. Eachexamination zone may include various Section XI categories and item numbers.
Duke Energy CorporationMcGuire Unit I - 3 d Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision IPage 4 of 15
Category B-P, All Pressure Retaining Components
The Class 1 System Leakage Test (IWB-5220) is conducted at a pressure not less than the pressurecorresponding to 100% rated reactor power. The test pressure and temperature shall be attained at a rate inaccordance with the heat-up limitations specified for the system. The Class I system leakage test is requiredprior to plant startup following each reactor refueling outage.
The pressure-retaining boundary during the system leakage test conducted at or near the end of each inspectioninterval shall extend to all Class 1 pressure-retaining components within the system boundary. This test isrequired only once during a ten-year interval.
IWB-2500-1 Item Component To Be Examined Comments
B15.10
B15.20
B15.30
Reactor Vessel
Pressure Retaining Boundary
Pressurizer
Pressure Retaining Boundary
Steam Generators
Pressure Retaining Boundary
Heat Exchangers
Pressure Retaining Boundary
Piping
Pressure Retaining Boundary
Pumps
B15.40
B 15.50
B15.60 Pressure Retaining Boundary
Valves
Pressure Retaining BoundaryB 15.70
Description of Inservice Inspection Pressure Testing Plan for ISI Class 2 Items
Pressure testing of ISI Class 2 items shall be performed in accordance with the requirements of Articles IWA-5000, IWC-2000, and IWC-5000 of Section XI. ISI Class 2 systems that are required to be pressure tested shallbe divided into isolable areas (to the extent practical). These areas represent specific examination zones.
Duke Energy CorporationMcGuire Unit I - 3rd Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision IPage of 15
Examination Categories and Requirements:
The examination categories and item numbers shall be those listed in Table IWC-2500-1 of Section XI. Eachexamination zone may include various Section XI categories and item numbers.
Category C-B, Pressure Retaining Nozzle Welds In Vessels
When nozzle-to-shell (or head) welds (to be examined by NDE methods) are inaccessible, the telltale hole in thereinforcing plates shall receive a VT-2 visual examination for evidence of leakage while the vessel is undergoingthe System Pressure Test as required by Category C-H.
IWC-2500-1 Item Component To Be Examined Comments
C2.30 Nozzles With Reinforcing Plate inVessels > 1/2 in. Nominal Thickness
C2.33 Nozzle-to-Shell (Nozzle to Head orNozzle to Nozzle) Welds When Insideof Vessel is Inaccessible
Category C-H, All Pressure Retaining Components
The Class 2 System Leakage Test (IWC-5220) is conducted at the system pressure obtained while the system, orportion of the system, is in service performing its normal operating function or at the system pressure developedduring a test conducted to verify system operability. The Class 2 leakage test is required once in each inspectionperiod.
IWC-2500-1 Item Comnonent To Be Examined Comments
C7.10 Pressure Retaining Components
s 5 1Description of Inservice Inspection Pressure Testing Plan for ISI Class 3 Items
Pressure testing of ISI Class 3 items shall be performed in accordance with the requirements of Articles IWA-5000, IWD-2000, and IWD-5000 of Section X1. ISI Class 3 systems that are required to be pressure tested shallbe divided into isolable areas (to the extent practical). These areas represent specific examination zones.
Examination Categories and Requirements:
The examination categories and item numbers shall be those listed in Table WD-2500-1 of Section XI. Eachexamination zone may include various Section XI categories and item numbers.
Category D-B, All Pressure Retaining Components
The Class 3 System Leakage Test (IWD-5221) is conducted at the system pressure obtained while the system, orportion of the system, is in service performing its normal operating function or at the system pressure developedduring a test conducted to verify system operability. The Class 3 leakage test is required once in each inspectionperiod.
Duke Energy CorporationMcGuire Unit I - 3d Ten-Year Interval Revision IInservice Inspection Pressure Test Plan Page 6 of 15
IWD-2500-1 Item
D2.10
Component to be Examined
Pressure Retaining Components
Comments
D2.20 Pressure Retaining Components No hydro test required. See Requestfor Relief serial number 01002,revision 1.
6 | System Boundaries Subject to Examination
Unless otherwise noted, systems designated as ISI Class A are equivalent to ASME Class 1, those designated asISI Class B are equivalent to ASME Class 2, and those designated as ISI Class C are equivalent to ASME Class3.
The following color codes, shown on electronic pressure testing boundary drawings, are used to represent theboundaries subject to pressure testing:
Red = ISI Class AYellow = ISI Class BGreen = ISI Class CBlue = Components exempt from pressure testing requirementsMagenta = Boundary line showing the extremities of pressure testing examination zonesBlack = Non ISI Class components
All instrumentation taps within the examination boundary shall be examined up to the first isolation valve off theprocess pipe.
7~ I Components Exempt From Pressure Test Examination
Components shown color-coded as blue on electronic pressure testing boundary drawings represent theboundaries that are exempted from pressure testing requirements.
Boundary drawings that are exclusively for showing pressure testing exemptions are listed in Section 12 of thisdocument. The following are examples of pressure test exemptions:
* Non pressure retaining portion of Reactor Coolant Pumps.
• Open ended portions of ISI Class 2 and 3 discharge piping (this does not apply to repair pressure testing).
* ISI Class 2 and ISI Class 3 portions of systems that do not support the safety function beyond the firstnormally closed valve (including relief valves or valves capable of automatic closure).
* Containment penetrations where the piping and isolation valves perform a containment function and thebalance of the piping system is outside the scope of Section XI.
* Systems/components determiined by ISIM as optionally owner classified ISI Class 2 or ISI Class 3 perSection XI, IWA-I 320(e).
Duke Energy CorporationMcGuire Unit 1 - 3d Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision 1Page 7 of 15
I 8 IDescription of Examination Schedules l
All system pressure testing is completed in accordance with the schedule shown in the Section XI Tables for eachexamination category. The examination periods are derived from "Program B" of the Section XI Code.
The ISI Class I Leakage Test zone shall be completed at each refueling. ISI Class 1 Examination Zonerequirements are not scheduled on an outage-by-outage basis given that the examinations are required to becompleted for each refueling outage.
The ISI Class 2 and 3 Leakage Test zones shall be examined once during each inspection period. The ISI Class 2and 3 Leakage Test zones are not scheduled on an outage-by-outage basis given that they are required to be 100percent complete by the end of the inspection period rather than a minimum/maximum percentage eachinspection period.
Examination Zones that contain Risk-Informed Segments shall be examined each refueling cycle. TheseExamination Zones are not scheduled on an outage-by-outage basis given that the examinations are required to becompleted each refueling cycle (approximately once every eighteen months).
1 9 1 Requests for Relief from ASME Code Requirements
Each Request for Relief from a requirement of the Section XI Code specified in this Plan shall be submitted bythe Nuclear Generation Department to the Nuclear Regulatory Commission for approval.
The followin is a listing of the Relief Requests submitted for use at McGuire unit 1:
Serial Date RFR Date SERNumber Description Submitted Approved Comments
01-002 Request to use corrected ASME Code 723/01 12/10/01Revision I requirement for Class 3 pressure tests.
01-005 WCAP-14572, Revision I-NP-A. 6/21/01 6/12/02 Clarification letter dated"Westinghouse Owners Group 7/28/03 issued forApplication of Risk-Informed refueling outage versusMethods to Piping Inservice refueling cycleInspection Topical Report'
01-008 Relief requested from performing 6/21/01 6/12/02 Clarification letter datedvolumetric examinations of High 7/28/03 issued forSafety Significant (HSS) socket welds refueling outage versusidentified in the McGuire Class I and refueling cycle2 RI-IS I program for all damagemechanisms.
02-001 Request to use Code Case N-566-2 5/23/02 8/26/02
03-001 Request to consolidate Relief TBD TBDRequests filed under the1995Edition/1996 Addenda.
Duke Energy CorporationMcGuire Unit I - 3Yd Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision Page 8 of 15
I 10 I Risk-Informed Segments Associated With Pressure Testing l
The Risk-Informed program has identified certain segments that use pressure testing and VT-2 visualexamination to ensure system integrity.
The following is a list of the pressure testing Examination Zones, ISI Boundary Drawings, and Risk-InformedSegments.
Duke Energy CorporationMcGuire Unit I - 3 Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision 1Page 9 of 15
Duke Power Company
McGuire Unit 1Risk-Informed Cross-Reference
Date: 12/16/2003
Zone Number L ISI Boundary Drawing I RI Segment Number
INC-070L-A MC-ISIL-1553-01.00 NC-18
NC-19
NC-20
NC-21
NC-23
NC-86
NC-89
NC-90
MC-ISIL-1553-02.00 NC-054
NC-055NC-056
MC-ISIL-1553-02.01 NC-086
MC-ISIL-155401.00 NV-033A
NV-033B
NV-034A
NV-034B
NV-037
NV-038
NV-041A
NV-041BNV-042A
NV-042B
MC-ISIL-1554-01.01 NV-030A
NV-030B
NV-032ANV-032B
NV-035
NV-036NV-039ANV-039B
NV-040ANV-040B
MC-ISIL-1562-01.00 Nl-068NI-069
NI-070
NI-071I --… ___ I - _____
INV-016L-B MC-ISIL-1554-01.00 NV420H
NV-02OF
NV020GA
MC-ISIL-1554-01.o1 NV-020AD
NV-020B
NV-020CANV-020DNV-020EA
Duke Power Company
McGuire Unit 1Risk-Informed Cross-Reference
Date: 12/1612003
Zone Number ISI Boundary Drawing RI Segment Number
INV-016L-B MC-ISIL-1554-03.00 NV-019AANV-019BNV-019DNV-020ABNV-020ACNV-021ANV-021B
MC-ISIL-1554-03.01 NV-002ABNV-002DNV-011ANV-019AANV-019CNV-019E
MC-ISIL-1562-01.00 NV-0 IA
MC-ISII-1562-03.00 NV-002AB
INV-017L-B MC-IS[I-1554-01.00 NV-028NV-029
MC-ISIL-1554-01.01 NV-026NV-027
MC-ISIL-1554-01.03 NV-026NV-027NV-028NV-029
INV-018L-B MC-ISIL-1554-01.02 NV-080ANV-080BNV-084ANV-084BNV-084C
INV-045L-B MC-ISIL-1554-03.00 NV-002CNV-108ANV-109
INV-051L-B MC-ISIL-1554-03.01 NV-011A
I 11 IExamination Zone Listing & Associated Flow Diagrams l
The Examination Zone number for each pressure test represents an area of a system that shall receive a VT-2visual e xamination. A n Examination Z one terminates at a boundary valve, building interface, or componentinterface and may include several flow diagrams. The Examination Zone includes all pressure retainingcomponents within the scope of the boundary valves/extremity interfaces.
All McGuire Unit I Examination Zone numbers have the same format. The following example is for an ISIClass I Leakage Test zone:
1 NC-070L-A
Class A, B, or C
(L) = Leakage Test
Sequential Number 001-9
System Being Examined
(1) = Unit 1
9
A listing of the Pressure Testing zone numbers, schedules, and associated inspection information is shown on thefollowing pages:
Duke Energy CorporationMcGuire Unit I - 3Td Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision IPage 10 of 15
Date: 09/09/2003
Report Page No. I
Duke Power Company
McGuire Unit 1 - 3rd 10-Year IntervalPressure Testing Examination Zone Report
ZoneNo.
lSIClass
1SICategory
ASMEReq. Req. ItemExamination
ScheduleReq.
Dwg. No. System Test Exam Proc. No.
1NC-070L-A MC-ISIL-1554-01.02 A - - B-P - _ Reactor Coolant (NC) Each Refueling Outage Leakage VT-2 QAL-15 B15.50B15.70
INC-070L-A MC-ISIL-1553-02.00 A - - B-P - - Reactor Coolant (NC) Each Refueling Outage Leakage VT-2 QAL-15 B15.20B15.50B15.70
INC-070L-A MC-ISIL-1553-02.01 A - - B-P - - Reactor Coolant (NC) Each Refueling Outage Leakage VT-2 QAL-15 B15.50B15.70
INC-044L-B MC-ISIL-1553-02.01 - B - - C-H - Reactor Coolant (NC) Once Each Period Leakage VT-2 QAL-1S C7.10
INV-016L-B MC-ISIL-1554-01.00 - B - - C-H - Chemical & Volume Control (NV) Each Refueling Outage Leakage VT-2 QAL-15 C7.10
INC-070L-A MC-ISIL-1554-01.00 A B - B-P C-H - Reactor Coolant (NC) Each Refueling Outage Leakage VT-2 QAL-15 C7.10
INV-017L-B MC-ISIL-1554-01.00 - B - - C-H - Chemical & Volume Control (NV) Each Refueling Outage Leakage VT-2 QAL-15 C7.10
INV-01_6-B MC-ISIL-155-1.01 - a - - C-H - Chemical & Volume Control (NV) Each Refueling Outage Leakage VT-2 OAL-15 C7.10
INV-017L-B MC-ISIL-1554-01.01 - B - - C-H - Chemical & Volume Control (NV) Each Refueling Outage Leakage VT-2 QAL-15 C7.10
1NV-063L-B MC-ISIL-1554-01.01 - B - - C-H - Chemical & Volume Control (NV) Once Each Period Leakage Vr-2 QAL-15 C7.10
INC-070L-A MC-ISIL-1554-01.01 A B - B-P C-H - Reactor Coolant (NC) Each Refueling Outage Leakage VT-2 QAL-15 C7.10
1NV-016L-B MC-ISIL-1554-01.02 - B - - C-H - Chemical & Volume Control (NV) Once Each Period Leakage VT-2 QAL-15 C7.10
INV-017L-B MC-ISIL-1554-01.02 - B - - C-H - Chemical & Volume Control (NV) Once Each Period Leakage Vr-2 QAL-15 C7.10
INV-018L-B MC-ISIL-1554-41.02 - B - - C-H - Chemical & Volume Control (NV) Each Refueling Outage Leakage VT-2 QAL-15 C7.10
1ND-019L-B MC-ISIL-1554-01.02 - B - - C-H - Residual Heat Removal (ND) Once Each Period Leakage vr-2 QAL-15 C7.10
IW-ML-B MC-ISIL-1554-01.02 - B - C-H Chemical & Volume Control (NV) Once Each Period Leakage VT-2 OAL-15 C7.10
Date: 09/09/2003
Report Page No. 2
Duke Power Company
McGuire Unit I - 3rd 10-Year IntervalPressure Testing Examination Zone Report
ZoneNo.
iSIClass
lSICatoryDwg. No. System
ExaminationSchedule
ASMEReq. Req. Req. ItemTest Exam Proc. No.
INV-017L-B MC.ISIL-1554-01.03 - a - - C-H - Chemical & Volume Control (NV) Each Refueling Outage Leakage VT-2 QAL-15 C7.10
INV-016L-B MC-ISIL-1554-02.00 - B - - C-H - Chemical & Volume Control (NV) Once Each Period Leakage VT-2 QAL-15 C7.10
INV-016L-C MC-ISIL-1554-02.00 - - C - - D-B Chemical & Volume Control (NV) Once Each Period Leakage VT-2 QAL-15 D2.10
INV-016L-B MC-ISIL-1554-02.01 - B - - C-H - Chemical & Volume Control (NV) Once Each Period Leakage VT-2 QAL-15 C7.10
INV-016L-B MC-ISIL-1554-03.00 - B - - C-H - Chemical & Volume Control (NV) Each Refueling Outage Leakage VT-2 QAL-15 C7.10
IFW-027L-B MC-ISIL-1554-03.00 - B - - C-H - Refueling Water (FW) Once Each Period Leakage VT-2 QAL-15 C7.10
INV-045L-B MC-ISIL-1554-03.00 - B - - C-H - Chemical & Volume Control (NV) Each Refueling Outage Leakage VT-2 QAL-15 C7.10
1NV.016L-B MC-ISIL-1554-03.01 - B - - C-H - Chemical & Volume Control (NV) Each Refueling Outage Leakage VT-2 QAL-15 C7.10
INV-016L-C MC-ISIL-1554-03.01 - C - - D-B Chemical & Volume Control (NV) Once Each Period Leakage VT-2 QAL-15 D2.10
IFW-027L-B MC-ISIL-1554-03.01 B - - C-H - Chemical & Volume Control (NV) Once Each Period Leakage V-2 QAL-15 C7.10
INW-05L-B MC-ISIL-1554-03.01 - B - - C-H - Chemical & Volume Control (NV) Each Refueling Outage Leakage VT-2 QAL-15 C7.10
INV-016L-B MC-ISIL-1554-05.00 _ B - - C-H - Chemical & Volume Control (NV) Once Each Period Leakage VT-2 QAL-15 C7.10
INV-016L-C MC-ISIL-1554-05.00 - C - - -B Chemical & Volume Control (NV) Once Each Period Leakage VT-2 QAL-15 D2.10
INV-016L-B MC-ISIL-1551-01.00 B - - C-H - Residual Heat Removal (ND) Once Each Period Leakage VT-2 QAL-15 C7.10
IND-019L-B MC-ISIL-1561-01.00 _ B - - C-H - Residual Heat Removal (ND) Once Each Period Leakage VT-2 QAL-15 C7.10
1FW-027L-B MC-ISIL-1561-01.00 - B - - C-H - Residual Heat Removal (ND) Once Each Period Leakage VT-2 QAL-15 C7.10
1FW4270L-B MC-ISIL-156141.00 - B - CH - Residual Heat Removal (ND) Once Each Period Leakage VT2 QAL-15 C7.10
1ND-05OL-8 MC-ISIL-1561-01-00 - Residual Heat Removal (ND) Once Each Period Leakage V`17-2 OAL-15 C7.10
Date: 09/09/2003
Report Page No. 3
Duke Power Company
McGuire Unit I - 3rdi 10-Year IntervalPressure Testing Examination Zone Report
ZoneNo.
IS, I ISIClass CategoryDwg. No. System
ExaminationSchedule
Req.Test
ASMEReq. Req. item
Exam Proc. No.
INC-070L-A MC-ISIL-1561-01.00 A _ _ B-P - _ Reactor Coolant (NC) Each Refueling Outage Leakage VT-2 QAL-15 B15.50B15.70
INC-070L-A MC-ISIL-1562-01.00 A _ _ B-P - - Reactor Coolant (NC) Each Refueling Outage Leakage VT-2 QAL-15 B15.50B15.70
INV-016L-B MC-ISIL-1562-01.00 - B - - C-H - Safety Injection (NI) Each Refueling Outage Leakage VT-2 QAL-15 C7.10
INI-071L-B MC-ISIL-1562-01.00 - B - - C-H - Safety InjectIon (NI) Once Each PerIod Leakage VT-2 QAL-15 C7.10
1NI-021L-B MC-ISIL-1562-02.00 - B - - C-H - Safety Injection (Ni) Once Each Period Leakage VT-2 QAL-15 C7.10
INC-070L-A MC-ISIL-1562-02.00 A - - B-P - - Reactor Coolant (NC) Each Refueflng Outage Leakage VT-2 QAL-15 815.50B15.70
1NC-070L-A MC-ISIL-1562-02.01 A - - B-P - - Reactor Coolant (NC) Each Refueling Outage Leakage VT-2 OAL-15 815.50B15.70
1NI-060L-B MC-ISIL-1562-02.01 - B - - C-H - Safety Injection (NI) Once Each Period Leakage VT-2 QAL-15 C7.10
1NI-021L-B MC-ISIL-1562-02.01 - B - - C-H - Safety Injection (NI) Once Each Period Leakage VT-2 OAL-15 C7.10
IFW-027L-B MC-ISIL-1562-03.00 - B - - C-H - Safety Injection (NI) Once Each Period Leakage VT-2 QAL-15 C7.10
INC-070L-A MC-ISIL-1562-03.00 A - - B-P - - Reactor Coolant (NC) Each Refueling Outage Leakage VT-2 QAL-15 815.50B15.70
IND-019L-B MC-ISIL-1552-03.00 - B - - C-H - Safety Injection (NI) Once Each Period Leakage VT-2 OAL-15 C7.10
INI-053L-B MC-ISIL-1562-03.00 - B - - C-H - Safety Injection (NI) Once Each Period Leakage VT-2 OAL-15 C7.10
INI-ML-B MC-ISIL-1562-03.00 - B - - C-H - Safety InjectIon (NI) Once Each Period Leakage VT-2 OAL-1S C7.10
INI-022L-B MC-ISIL-1562-03.00 - B - - C-H - Safety Injection (NI) Once Each Period Leakage VT-2 OAL-15 C7.10
INI74L-B MC-ISIL-1562-03.00 - B - - C-H - Safety Injection (NI) Once Each Period Leakage VT-2 QAL-15 C7.10
IW-016L-8 MC4SIL-1562-03.00 - - Safety Injection (NI) Each Refueling Outage Lea" V17-2 OAL-15 C7.10
Date: 09/09/2003
Report Page No. 4
Duke Power Company
McGuire Unit I - 3rd 10-Year IntervalPressure Testing Examination Zone Report
ZoneNo.
lSIClass
ISICateoryDwo. No. System
ExaminationSchedule
ASMEReq. Req. Req. ItemTest Exam Proc. No.
IND-019L-B MCSL-1562-03.01 B - - C-H - Safety Injection (Nt) Once Each Period Leakage VT-2 OAL.-15 C7.10
1NI-022L-B MC-ISIL-1562-03.01 - B - - C-H - Safety Injection (NI) Once Each Period Leakage VT-2 QAL-15 C7.10
1NI-039L-B MC-ISIL-1562-03.01 - B - - C-H - Safety Injection (NI) Once Each Period Leakage VT-2 QAL-15 C7.10
1ND-05L-B MC-ISIL-1562-03.01 - B - - C-H - Safety Injection (NI) Once Each Period Leakage VT-2 QAL-15 C7.10
INC-070L-A MC-ISIL-1562-03.01 A - - B-P - - Reactor Coolant (NC) Each Refueling Outage Leakage VT-2 QAL-15 615.50815.70
IND-019L-B MC4ISIL-1563-01.00 - B - - C-H - Containment Spray (NS) Once Each Period Leakage V1-2 QAL-15 C7.10
1 NS.023L-B MC-ISIL-1563.01.00 - B - - C-H - Containment Spray (NS) Once Each Period Leakage VT-2 QAL-15 C7.10
INS-024L-B MC-ISIL-1563-01.00 - B - - C-H - Containment Spray (NS) Once Each Period Leakage VT-2 QAL-15 C7.10
IFW-027L-B MC-ISIL-1563-01.00 - B - - C-H - Containment Spray (NS) Once Each Period Leakage VT-2 OAL-15 C7.10
1ND-050L-B MC-ISIL-1563-01.00 - B - - C-H - Containment Spray (NS) Once Each Period Leakage VT-2 QAL-15 C7.10
IWL-005L-B MC-ISIL-1565-01.01 - B - - C-H - Liquid Waste Recycle (WL) Once Each Period Leakage VT-2 QAL-15 C7.10
1KF-025L-C MC-ISIL-1570-01.00 - - C - - D-B Spent Fuel Cooling (KF) Once Each Period Leakage VT-2 QAL-15 D2.10
IKF-052L-C MC-ISIL.1570-01.00 - - C - - D-B Spent Fuel Cooling (KF) Once Each Period Leakage VT-2 QAL-15 D2.10
IKF-025L-C MC-ISIL-1570-01.01 - - C - - D-B Spent Fuel Cooling (KF) Once Each Period Leakage VT-2 QAL-15 D2.10
IKF.052L-C MC-ISIL-1570-01.01 - - C - - D-B Spent Fuel Cooling (KF) Once Each Period Leakage VT-2 QAL-15 D2.10
IND-019L-B MC-ISIL-1571-01.00 - B - - C-H - Refueling Water (FW) Once Each Period Leakage VT-2 QAL-15 C7.10
. F -26- _CII- 57.10 B -Rfeig W tr( W ne ahPro ekg T2 O tI 7IFW-026L-B MC-ISIL-1571-01.00 - B - Refueling Water (FW) Once Each Period Leakage Vr-2 OAL-15 C7.10
Date: 09/09/2003
Report Page No. 5
Duke Powe Company
McGuire Unit I - 3rd 10-Year IntervalPressure Testing Examination Zone Report
ZoneNo.
lSIClass
lSICategory
ExaminationSchedule
Req.Test
ASMEReq. Req. Rem
Exam Proc. No.Dwg. No. System
IFW-027L-B MC-ISIL-1571-01.00 - B - - C-H - Refueling Water (FW) Once Each Period Leakage Vr-2 QAL-15 C7.10
1ND-019L-B MC-ISIL-1572-01.00 - B - - C-H - Nuclear Sampling (NM) Once Each Period Leakage Vr-2 QAL-15 C7.10
INM-041L-B MC-ISIL-1572-01.00 - B - - C-H - Nuclear Sampling (NM) Once Each Period Leakage VT-2 QAL-15 C7.10
1NI-021L-B MC-ISIL-1572-01.01 - B - - C-H - Nudear Sampling (NM) Once Each Period Leakage VT-2 QAL-15 C7.10
INM-046L-B MC4SIL-1572-01.01 - B - - C-H - Nuclear Sampling (NM) Once Each Period Leakage VT-2 QAL-15 C7.10
1SM-006L-B MC4SIL-1572-03.00 - B - - C-H - Nuclear Sampling (NM) Once Each Period Leakage VT-2 OAL-15 C7.10
1KC-028L-C MC-ISIL-1573-01.00 - - C - - D-B Component Cooling (KC) Once Each Period Leakage VT-2 QAL-15 D2.10
1KC-029L-C MC-ISIL-1573-01.00 - - C - D- B Component Cooling (KC) Once Each Period Leakage Vr-2 QAL-15 D2.10
1KC-028L-C MC-ISIL-1573-01.01 - - C - - D-B Component Cooling (KC) Once Each PerIod Leakage VT-2 GAL-15 D2.10
1KC-029L-C MC-ISIL-1573-01.01 - - C - - D-B Component Cooling (KC) Once Each Period Leakage VT-2 QAL-15 D2.10
IRN-030L-C MC-ISIL-1573-01.01 - - C - - D-B Component Cooling (KC) Once Each Period Leakage VT-2 GAL-15 D2.10
1RN-031L-C MC-ISIL-1573-01.01 - - C - - D-B Component Cooling (KC) Once Each Period Leakage VT-2 OAL-15 D2.10
1KC-003L-B MC-ISIL-1573-03.01 - B - - C-H - Component Cooling (KC) Once Each Period Leakage VT-2 QAL-15 C7.10
IRN-030L-C MC-ISIL-1574-01.00 - - C - - D-B Nuclear Service Water (RN) Once Each Period Leakage VT-2 QAL-15 D2.10
IRN-031L-C MC-ISIL-1574-01.00 - - C - - D-B Nudear Service Water (RN) Once Each Period Leakage Vr-2 AL-15 D2.10
1RN-030L-C MC-ISIL-1574-01.01 - - C - - D-B Nuclear Service Water (RN) Once Each Period Leakage VT-2 QAL-15 D2.10
IRN-03IL-C MC-ISIL-1574-01.01 - - C D-B Nuclear Service Water (RN) Once Each Perlod Leakage Vr-2 OAL-15 D2.10
Date: 09/09/2003
Report Page No. 6
Duke Power Company
McGuire Unit I - 3rd 1 0-Year IntervalPressure Testing Examination Zone Report
ASMEReq. Req. ItemZone
No.lSI
ClasslSI
CategoryExamination
ScheduleReq.
Dwg. No. System Test Exam Proc. No.
IRN-03_L-C MC4S[L-1574-02.00 - - C - D-B Nuclear Service Water (RN) Once Each Period Leakage V-2 OAL-15 D2.10
1RN-030L-C MC-ISIL-1574-02.01 - - C - - D-B Nuclear Service Water (RN) Once Each Period Leakage Vr-2 QAL-15 D2.10
1RN-031L.C MC-ISIL-1574-03.00 - - C - - D-B Nudear Service Water (RN) Once Each Period Leakage VT-2 QAL-15 D2.10
IRN-038L-C MC-ISIL-1574-03.00 - - C - - D-B Nudear Service Water (RN) Once Each Period Leakage VT-2 QAL-15 D2.10
IRN-03IL-C MC-ISIL-1574-03.01 - - C - - D-B Nuclear Service Water (RN) Once Each Period Leakage VT-2 QAL-15 D2.10
IRN-061L-C MC-ISIL-1574-03.01 - - C - - D-B Nudear Service Water (RN) Once Each Period Leakage VT-2 QAL-15 D2.10
IRN-004L-B MC-ISIL-1574.04.00 - B - - C-i - Nuclear Service Water (RN) Once Each Period Leakage VT-2 QAL-15 C7.10
1RN-030L-C MC-ISIL-1574-04.00 - - C - - D-B Nuclear Service Water (RN) Once Each Period Leakage Vr-2 QAL-15 D2.10
1BB-96L-B MC-ISIL-1580-01.00 - B - - C-H - Steam Generator Blowdown Once Each Period Leakage VT-2 QAL-15 C7.10Recycle (88)
1WZ-047L-C MC-ISIL-1581-01.00 - - C - - D-B Groundwater Drainage (WZ) Once Each Period Leakage VT-2 QAL-15 D2.10
1WZ-048L-C MC-ISIL-1581-01.00 - - C - - D-B Groundwater Drainage (WZ) Once Each Period Leakage VT-2 QAL-15 D2.10
IWZ-073L-C MC-ISIL-1581-01.00 - - C - - D-B Groundwater Drainage (WZ) Once Each Period Leakage VT-2 QAL-15 D2.10
1CA-032L-B MC-ISIL-158441.00 - B - - C-H - Steam Generator Wet Layup Once Each Period Leakage VT-2 QAL-15 C7.10Redrculation (BW)
1SM-006L-B MC-iSIL-1591-01.01 - B - - C-H - Feedwater (CF) Once Each Period Leakage Vr-2 QAL-15 C7.10
1CA-032L-B MC-ISIL-1591-01.01 - B - - C-H - Feedwater (CF) Once Each Period Leakage VT-2 QAL-15 C7.10
1 C A -0 0 6 L -B M C -I S I L -1 5 9 2 -0 1 .0 0 - B - C -H A u x f l l a r y F e e d w a t e r ( C A ) O n c e E a c h P e r i o d L e a k a g e V T -2 Q A L -1 5 C 7 .1 0~ ~ ~ ~ICA-M-13 MC-ISIL-1592-01.00 - - C-H Auxiliary Feedwater (CA) Once Each Period Leakage Vr-2 OAL-15 C7.10
Date: 09/09/2003
Report Page No. 7
Duke Power Company
McGuire Unit 1 - 3rd 10-Year IntervalPressure Testing Examination Zone Report
ASMEReq. Req. omZone
No.lSI
Class1SI
CatoryExaminatlon
ScheduleReq.
Dwg. No. System Test Exam Proc. No.
1CA-032L-B MC-ISIL-1592-01.00 - B - - C-H - Auxiliary Feedwater (CA) Once Each Period Leakage VT-2 QAL-15 C7.10
1CA-054L-C MC-ISIL-1592-01.00 - - C - - D-B Auxiliary Feedwater (CA) Once Each Period Leakage VT-2 QAL-15 D2.10
ICA-055L-C MC-ISIL-1592-01.00 - - C - - D-B Auxiliary Feedwater (CA) Once Each Period Leakage VT-2 OAL-15 D2.10
ICA-056L-C MC-ISIL-1592-01.00 - - C - - D-B Auxiliary Feedwater (CA) Once Each Period Leakage VT-2 QAL-15 D2.10
1CA-57L-C MC-ISIL-1592-01.00 - - C - - D-B Auxiliary Feedwater (CA) Once Each Period Leakage VT-2 QAL-15 D2.10
1CA-058L-C MC-ISIL-1592-01.00 - - C - - D0- Auxiliary Feedwater (CA) Once Each Period Leakage VT-2 QAL-15 D2.10
ICA-059L-C MC-ISIL-1592-01.00 - - C - - D-B Auxiliary Feedwater (CA) Once Each Period Leakage VT-2 OAL-15 D2.10
1CA-030L-C MC-ISIL-1592-01.01 - - C - - D-B Auxiliary Feedwater (CA) Once Each Period Leakage VT-2 GAL-15 D2.10
1CA-033L-C MC-ISIL-1592-01.01 - - C - - D-B Auxiliary Feedwater (CA) Once Each Perlod Leakage VT-2 QAL-15 D2.10
1CA-034L-C MC-ISIL-1592-01.01 - - C - - D-B Auxiliary Feedwater (CA) Once Each Period Leakage VT-2 QAL-15 D2.10
ICA-038L-C MC-ISIL-1592-01.01 - - C - - D-B Auxiliary Feedwater (CA) Once Each Period Leakage VT-2 QAL-15 D2.10
1CA-054L-C MC-ISIL-1592-01.01 - - C - - D-B Auxilar Feedwater (CA) Once Each Period Leakage VT-2 GAL-15 D2.10
1CA-055L-C MC-ISIL-1592-01.01 - - C - - D-B Auxiliary Feedwater (CA) Once Each Period Leakage VT-2 GAL-15 D2.10
1CA-056L-C MC-ISIL-1592-01.01 - - C - - D-B Auxiliary Feedwater (CA) Once Each Pefiod Leakage VT-2 QAL-15 D2.10
1SM-006L-B MC-ISIL-1593-01.00 - B - - C-H - Main Steam (SM) & Vent To Once Each Period Leakage VT-2 OAL-15 C7.10
Atmoshphere (SV)
1SM-036L-B MC-ISIL-1593-01 .00 - B - Main Steam (SM) & Vent To
Atmoshphere (SV)Once Each Period Leakage VT-2 QAL-15 C7.10
Date: 09/09/2003
Report Page No. 8
Duke Power Company
McGuire Unit I - 3rd 10-Year IntervalPressure Testing Examination Zone Report
.
ZoneNo.
lSIClass
lSICategory
ExaminationSchedule
ASMEReq. Req. Req. HomTest Exam Proc. No.Dwg. No. System
ISM-037L-B MC-ISIL-1593-01.00 - B - - C-H - Main Steam (SM) & Vent To Once Each Period Leakage VT-2 QAL-15 C7.10
Atmoshphere (SV)
ISA.035L-B MC-ISIL-1593-01.02 - B - - C-H - Main Stm To Aux. Equip (SA) & Once Each Period Leakage VT-2 QAL-15 C7.10
Turb Exh (TE)
ISA-035L-C MC-ISIL-1593-01.02 - - C - - D-B Main Stm To Aux. Equip (SA) & Once Each Period Leakage VT-2 QAL-15 D2.10
Turb Exh (E)
1SM-036L-B MC-ISIL-1593-01.02 - B - - C-H - Main Stm To Aux. Equip (SA) & Once Each Period Leakage VT-2 QAL-15 C7.10
Turb Exh (TE)
ISM-006L-B MC-ISIL-1593-01.03 - B - - C-H - Main Steam (SM) & Vent To Once Each Period Leakage VT-2 QAL-15 C7.10
Atmosphere (SV)
ISM-036L-B MC-ISIL-1593-01.03 - B - - C-H - Main Steam (SM) & Vent To Once Each Period Leakage VT-2 OAL-15 C7.10
Atmosphere (SV)
ISM-037L-B MC-ISIL-1593-01.03 - B - - C-H - Main Steam (SM) & Vent To Once Each Period Leakage VT-2 QAL-15 C7.10
Atmosphere (SV)
IRV-002L-B MC-ISIL-1604-03.00 - B - - C-H - Containment Ventilation Cooling Once Each Period Leakage VT-2 CAL-15 C7.10
Water (RV)
IRN-030L-C MC-ISIL-1604-03.00 - - C - - D-B Containment Ventilation Cooling Once Each Period Leakage VT-2 CAL-15 D2.10
Water (RV)
1KD-015L-C MC-ISIL-1609-01.00 - - C - - D-B Diesel Gen. Engine Cooling Once Each Period Leakage VT-2 CAL-15 D2.10
Water (KD)
IRN-030L-C MC-ISIL-1609-01 .00 - C D-B Diesel Gen. Engine Cooling
Water (KD)Once Each Period Leakage VT-2 CAL-15 D2.10
Date: 09/09/2003
Report Page No. 9
Duke Power Company
McGuire Unit 1 - 3rd 10-Year IntervalPressure Testing Examination Zone Report
ZoneNo.
lSIClass
lSICategory
ASMEReq. Req. ItemExaminatfon
ScheduleReq.
Dwg. No. System Test Exam Proc. No.
1KD-014L-C MC-ISIL-1609-01.01 - - C - - D-B Diesel Gen. Engine Cooling Once Each Period Leakage VT-2 QAL-15 D2.10Water (KD)
1RN-031L-C MC-ISIL-1609-01.01 - _ C - - D-B Diesel Gen. Engine Cooling Once Each Period Leakage VT-2 QAL-15 D2.10Water (KD)
1LD-009L-C MC-ISIL-1609-02.00 - _ C - - D-B Diesel Gen. Engine Lube Oil Once Each Period Leakage VT-2 QAL-15 D2.10(LD)
1LD011L-C MC-ISIL-1609-02.00 - - C - - D-B Diesel Gen. Engine Lube Oil Once Each Period Leakage Vr-2 QAL-15 D2.10(LD)
1LD-01L-C MC-ISIL-1609.02.01 - C - - D-B Diesel Gen. Engine Lube Oil Once Each Period Leakage VT-2 QAL-15 D2.10(LD)
1FD-00L-C MC-ISIL-1609-02.01 - _ C - - D-B Diesel Gen. Engine Lube Oil Once Each Period Leakage VT-2 QAL-15 D2.10(LD)
1FD-007L-C MC-ISIL-1609-03.00 - C - - D-B Diesel Gen. Engine Fuel Oil (FD) Once Each Period Leakage VT-2 QAL-15 D2.10
IFD-008L-C MC-ISIL-1609-03.01 - -C - - D- Diesel Gen. Engine Fuel Oil (FD) Once Each Period Leakage VT-2 QAL-15 D2.10
ICA-032L-B MC-ISIL-1617-01.00 - B - - C-H - Conventional Chemical Addition Once Each Period Leakage VT-2 QAL-15 C7.10(YA)
IYA-043L-B MC-ISIL-1617-01.00 - B - - C-H - Conventional Chemical Addition Once Each Period Leakage VT-2 QAL-15 C7.10(YA)
1YC-066L-C MC-ISIL-1618-01.00 - - C - - D-B Control Area Chilled Water (YC) Once Each Period Leakage VT-2 QAL-15 D2.10
1YC-067L-C MC-ISIL-1618-01.00 _ _ C - - D-B Control Area Chilled Water (YC) Once Each Period Leakage Vr-2 QAL-15 D2.10
IYC-066L-C MC-ISIL-1618-02.00 _ C -- DB Control Area Chilled Water (YC) Once Each Period Lee" VT-2 OAL-15 D2.10
Date: 09/09/2003
Report Page No. 10
Duke Power Comnpany
McGuire Unit I - 3rd 10-Year IntervalPressure Testing Examination Zone Report
ASMEReq. Req. ItemZone
No.ISI
ClasslSI
CategoryExaminatlon
ScheduleReq.
Dwg. No. System Test Exam Proc. No.
IYC-067L-C MC-ISIL-1618-02.00 - - C - D-B Control Area Chilled Water (YC) Once Each Period Leakage V`1T-2 QAL-15 D2.10
1YC-066L-C MC-ISIL1618-04.00 - - C - - D-B Control Area Chilled Water (YC) Once Each Period Leakage VT-2 QAL-15 D2.10
1YC-067L-C MC-ISIL-1618.04.00 - - C - - D-B Control Area Chilled Water (YC) Once Each Period Leakage VT-2 QAL-15 D2.10
1RN-03L-C MC-ISIL-2574-01 .01 - - C - - D-B Nuclear Service Water (RN) Once Each Period Leakage VT-2 QAL-15 D2.10
IRN-030L-C MC-ISIL-2574-01.01 - - C - - D-B Nuclear Service Water (RN) Once Each Period Leakage VT-2 QAL-15 D2.10
IRN-031L-C MC-ISIL-2574-04.01 - - C - - D-B Nuclear Service Water (RN) Once Each Period Leakage VT-2 QAL-15 D2.10
IRN-031L-C MC-ISIL-2604-03.00 - - C - - D-B Containment Ventilation Cooling Once Each Period Leakage VT-2 QAL-15 D2.10
Water (RV)
1NC-070L-A MC-ISIL-1553-01.00 A B - B-P C-H - Reactor Coolant (NC) Each Refueling Outage Leakage VT-2 QAL-15 C7.10
1NC-078L-B MC-ISIL-1553-04.00 - B - - C-H - Reactor Coolant (NC) Once Each Period Leakage VT-2 QAL-15 C7.10
INV-079L.-B MC-ISIL-1554-01.03 - B - - C-H - Chemical & Volume Control (NV) Once Each Period Leakage VT-2 QAL-15 C7.10
1NB-081L-B MC-ISIL-1556-03.00 - B - - C-H - Boron Recycle (NB) Once Each Period Leakage VT-2 QAL-15 C7.10
IVX-094L-B MC-ISIL-1557-01.00 - B - - C-H - ContAlr Return Exch & Once Each Period Leakage VT-2 QAL-15 C7.10
Hydrogen Skimmer (VX)
1NF-082L-B MC-ISIL-1558-04.00 - B - - C-H - Ice Condenser Refrigeration Once Each Period Leakage VT-2 QAL-15 C7.10
(NF)
INI-083L-B MC-ISIL-1562-02.00 - B - - C-H - Safety Injection (NI) Once Each Period Leakage VT-2 QAL-15 C7.10
1NI-095L-B MC4SIL-1562-04.00 - B - Safety Injection (NI) Once Each Period Leakage V`17-2 OAL-15 C7.10
Date: 09/09/2003
Report Page No. 11
Duke Power Company
McGuire Unit I - 3rd 10-Year IntervalPressure Testing Examination Zone Report
ZoneNo.
lSIClass
IS'Category
ASMEReq. Req. ItemExamination
ScheduleReq.
Dwa. No. System Test Exam Proc. No.
IVE-097L-B MC-ISIL-1564-01.00 - B - - C-H - Annulus Ventilation (VE) Once Each Period Leakage VT-2 QAL-15 C7.10
1WL-84L-B MC-ISIL-1565-01.00 - B - - C-H - Llquld Waste Recycle (WL) Once Each Period Leakage VT-2 QAL-15 C7.10
IWL-085L-B MC-ISIL-1565-01.01 - B - - C-H - Lquid Waste Recycle (WL) Once Each Period Leakage Vr-2 QAL-15 C7.10
1WL-086L-B MC-ISIL-1565-07.00 - B - - C-H - Lquid Waste Recycle (WL) Once Each Period Leakage VT-2 QAL-15 C7.10
1FW-087L-B MC-ISIL-1571-01.00 - B - - C-H - Refuellng Water (FW) Once Each Period Leakage VT-2 QAL-15 C7.10
IBB-098L-B MC4SIL-1572-03.00 - B - - C-H - Nuclear Sampling (NM) Once Each Period Leakage VT-2 QAL-15 C7.10
IKC-088L-B MC-ISIL-1573-04.00 - B - - C-H - Component Cooling (KC) Once Each Period Leakage VT-2 QAL-15 C7.10
IVP-099L-B MC-ISIL-1576-01.00 - B - - C-H - Containment Purge Ventilation Once Each Period Leakage VT-2 QAL-15 C7.10(VP)
IBB-098L-B MC4SIL-1580-01.00 - B - - C-H - Steam Generator Blowdown Once Each Period Leakage VT-2 QAL-15 C7.10(BB)
1BB-098L-B MC-ISIL-1584"01.00 - B - - C-H - Steam Generator Wet Layup Once Each Period Leakage VT-2 QAL-15 C7.10(BW)
1RF-094L-B MC-ISIL-1599-02.02 - B - - C-H - Fire Protection (RF) Once Each Period Leakage VT-2 QAL-15 C7.10
1YM-095L-B MC-ISIL-1601-02.04 - B - - C-H - Makeup Demineralzed Water Once Each Period Leakage VT-2 QAL-15 C7.10(YM)
IRV-089L-B MC-ISIL-1604-03.00 - B - - C-H - Containment Ventilation Cooling Once Each Period Leakage VT-2 QAL-15 C7.10
Water (RV)
IVI-OWL-B MC-ISIL-1605-01.02 - B - C-H - Instrument Air (VI) Once Each Period Leakage VT-2 OAL-15 C7.10
Date: 09/09/2003
Report Page No. 12
Duke Power Conpany
McGuire Unit I - 3rd 10-Year IntervalPressure Testing Examination Zone Report
ISI ExaminationCategory I System Schedule
ZoneNo.
lSIClass
ASMEReq. Req. Req. ItemTest Exam Proc. No.Dwg. No.
IVl-09L-B MC-SIL-1605-01 .03 - B - - C-H - Instrument Air (VI) Once Each Period Leakage VT-2 OAL-15 C7.10
1VI-091L-B MC-ISIL-1605-01.14 - B - - C-H - Instrument Air (VI) Once Each Period Leakage VT-2 QAL-15 C7.10
IV1-091L-B MC-ISIL-1605-01.17 - B - - C-H - Instrument Air (VI) Once Each Period Leakage VT-2 QAL-15 C7.10
1V1-092L-B MC-ISIL-1605-02.02 - B - - C-H - Station Air (VS) Once Each Period Leakage VT-2 QAL-15 C7.10
IVB-093L-B MC-ISIL-1605-03.01 - B - - C-H - Breathing Air (VB) Once Each Period Leakage VT-2 QAL-15 C7.10
1NC-077L-B MC-ISIL-1553-02.01 - B - - C-H - Reactor Coolant (NC) Once Each Period Leakage VT-2 QAL-15 C7.10
1RN-031L-C MC-ISIL-2574-03.00 _ C - - D-B Nuclear Service Water (RN) Once Each Period Leakage Vr-2 OAL-15 D2.10
1 12 | Boundary Drawing and System Listing l
The pressure testing examination boundaries are identified on color coded electronic drawings (modified systemflow diagrams) and stored in the Nuclear Electronic Document Library (NEDL). "As Built" system flowdiagram revisions are reviewed to see if the revision had any impact on the pressure testing boundaries. Theseflow diagram revisions are incorporated into the Inservice Inspection pressure testing boundary drawings asnecessary. Some flow diagram revisions do not affect the pressure testing boundaries; therefore, the pressuretesting boundary drawings are not required to be revised. For this reason, there may be a difference between thenumeric revision level listed on the flow diagram versus the revision level of the flow diagram referenced on thepressure testing boundary drawing. "As Built" flow diagram revisions are published subsequent tomodifications that are made to a system. The timeliness of these "As Built" flow diagram revisions are not on aregulated schedule; therefore, subsequent boundary drawing revisions cannot be performed on a regulatedschedule. The latest revision of the pressure testing boundary drawing can be retrieved from NEDL.
The following is a list of the system flow diagrams that contain ASME Section XI Class 1, 2, or 3 components.Each drawing has been reviewed for applicable system pressure testing requirements. In addition to the ISIclass, the listing contains those flow diagrams that are exempted from pressure testing requirements for McGuireUnit 1.
System (as listed in drawing title block) Boundary ISI Class ISI Class ISI Class AlDrawing 1 2 3 Exempt
Reactor Coolant (NC) MC-ISIL-1553-01.00 X X
Reactor Coolant (NC) MC-ISIL1553-02.00 X
Reactor Coolant (NC) MC-ISIL-1553-02.01 X X
Reactor Coolant (NC) MC-ISIL-1553-04.00 X
Chemical & Volume ControlV MC-ISIL-1554-01.00 X X
Chemical & Volume Control (NV) MC-ISIL-1554-01.01 X X
Chemical & Volume Control (NV) MC-ISIL-1554-01.02 X X
Chemical & Volume Control (NV) MC-ISIL-15S4-01.03 X
Chemical & Volume Control (NV) MC-ISIL-1554-02.00 X X
Chemical & Volume Control (NV) MC-ISIL-1554-02.01 X
Chemical & Volume Control (NV) MC-ISIL1554-03.00 X
Chemical & Volume Control (NV) MC-ISIL-1554-03.01 X X
Chemical & Volume Control (NV) MC-ISIL1554-04.00 X
Chemical & Volume Control (NV) MC-ISIL1554-05.00 X X
Duke Energy CorporationMcGuire Unit 1 - 3 rd Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision 1Page II of 15
System (as listed in drawing title block) Flow Diagram ISI Class ISI Class ISI Class Al1 2 3 Exempt
Boron Thermal Regeneration (NR) MC-ISIL-1555-01.00 X
Boron Thernal Regeneration (NR) MC-ISIL-1555-02.00 X
Boron Recycle (NB) MC-ISIL-1556-01.00 X
Boron Recycle (NB) MC-ISIL-1556-01.01 X
Boron Recycle (NB) MC-ISIL-1556-02.00 X
Boron Recycle (NB) MC-ISIL-1556-02.01 X
Boron Recycle (NB) MC-ISIL-1556-03.00 X
Cont Air Return Exch & Hydrgn Skimmer MC-ISIL-1557-OL.00 X(VX)
Ice Condenser Refrigeration NF) MC-ISIL-1558-04.00 X
Residual Heat Removal ND) MC-ISIL-1561-01.00 X X
Safety Injection (NI) MC-ISIL-1562-01.00 X X
Safety Injection (Nl) MC-ISIL-1562-02.00 X X
Safetv Iniection (Nl) MC-ISIL-1562-02.01 X X
Safety Injection (NI) MC-ISIL1562-03.00 X X
Safety Injection (NI) MC-ISIL-1562-03.00 X X
Safety Injection (NI) MC-ISIL-1562-04.00 X
Containment Spray (NS) MC-ISIL-1563-01.00 X
Annulus Ventilation (VE) MC-ISIL-1564-01.00 X
Liquid Waste Recycle (WL) MC-ISIL-1565-01.00 X
Liquid Waste Recycle (WL) MC-ISIL-1565-01.01 X
Liquid Waste Recycle (WL) MC-ISIL-1565-02.00 X
Liquid Waste Recycle (WL) MC-ISIL-1565-02.01 X
Liquid Waste Monitor and Disposal (WM) MC-ISIL-1565-06.00 X
Liquid Waste Recycle (WL) MC-ISIL-1565-07.00 X
Nuclear Solid Waste Disposal (WS) MC-ISIL-1566-01.00 X
Duke Energy CorporationMcGuire Unit I - 3rd Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision IPage 12 of 15
System (as listed In drawing title block) Flow Diagram ISI Class ISI Class ISI Class AD1 2 3 Exempt
Nuclear Solid Waste Disposal (WS) MC-ISIL-1566-01.01 X
Waste Gas (WG) MC-ISIL-1567-01.00 X
Waste Gas (WG) MC-ISIL-1567-02.00 X
Waste Gas (WG) MC-ISIL-1567-02.01 X
Waste Gas (WG) MC-ISIL-1567-03.00 X
Waste Gas (WG) MC-ISIL-1567-03.01 X
Waste Gas (WG) MC-ISIL-1567-04.00 X
Spent Fuel Cooling (KF) MC-ISIL-1570-01.00 X
Spent Fuel Cooling (KF) MC-ISIL-1570-01.01 X
Refueling Water (FW) MC-ISIL-1571-01.00 X
Nuclear Sampling (NM) MC-ISIL-1572-01.00 X
Nuclear Sampling (NM) MC-ISIL-1572-01.01 X
Nuclear Sanpling (NM) MC-ISIL-1572-02.00 X
Nuclear Sanpling (NM) MC-ISIL-1572-03.00 X
Component Cooling (KC) MC-ISIL-1573-01.00 X
Component Cooling (KC) MC-ISIL-1573-01.01 X
Component Cooling (KC) MC-ISIL-1573-02.00 X
Component Cooling (KC) MC-ISIL-1573-02.01 X
Component Cooling (KC) MC-ISIL-1573-02.02 X
Component Cooling (KC) MC-ISIL-1573-03.00 X
Component Cooling (KC) MC-ISIL-1 573-03.01 X
Component Cooling (KC) MC-ISIL- 573-04.00 X
Nuclear Service Water (RN) MC-ISIL-1574-01.00 X
Nuclear Service Water (RN) MC-ISIL-1574-01.01 X
Nuclear Service Water (RN) MC-ISIL-1574-02.00 X
Nuclear Service Water (RN) MC-ISIL-1574-02.01 X
Duke Energy CorporationMcGuire Unit 1 - 3rd Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision 1Page 13 of 15
System (as listed in drawing title block) Flow Diagram ISI Class ISI Class ISI Class A1 2 3 Exempt
Nuclear Service Water (RN) MC-ISIL-1574-03.00 X
Nuclear Service Water (RN) MC-ISIL-1574-03.01 X
Nuclear Service Water (RN) MC-ISIL-1574-04.00 X X
Containment Purge Ventilation (VP) MC-ISIL-1576-01.00 _ X
Steam Generator Blowdown Recycle (BB) MC-ISIL-1580-0.00 X
Groundwater Drainage (WZ) MC-ISIL-1581-01.00 X
Steam Generator Wet Layup Recirc (BW) MC-ISIL-1584-01.00 X
Containment Air Release and Addition (VQ) MC-ISIL-1585-01.00 X
Feedwater (CF) MC-ISIL-1591-01.01 X
Auxiliary Feedwater (CA) MC-ISIL-1592-01.00 X X
Auxiliary Feedwater (CA) MC-ISIL-1592-01.01 X
Main Steam (SM) & Vent To Atmosphere MC-ISIL-1593-01.00 X
Main Stm To Aux Equip (SA) & Turb Exh MC-ISIL-1593-01.02 X X(TE)
Main Steam (SM) & Vent To Atmosphere MC-ISIL-1593-01.03 X(Sy) __ _ _ _ __ _ _ _
Fire Protection (RF) MC-ISIL-1599-02.02 X
Makeup Demineralized Water (YM) MC-ISIL-1601-02.04 X
Nitrogen (GN) MC-ISIL-1602-01.02 X
Containment Ventilation Cooling Water (RV) MC-ISIL-1604-03.00 X X
Instrument Air (VI) MC-ISIL-1605-01.02 X
Instrument Air (VI) MC-ISIL-1605-01.03 X
Instrument Air (VI) MC-ISIL-1605-01.13 X
Instrument Air (VI) MC-ISIL-1605-01.14 X
Instrument Air (VI) MC-ISIL-1605-01.17 X
Station Air (VS) MC-ISIL-1605-02.02 X
Duke Energy CorporationMcGuire Unit 1 - 3d Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision 1Page 14 of 15
System (as listed In drawing title block) Flow Diagram ISI Class ISI Class 11SI Class Al1 2 3 Exempt
Breathing Air (VB) MC-ISIL-1605-03.01 . . X
Diesel Gen Engine Cooling Water (KD) MC-ISIL-1609-01.00 X
Diesel Gen Engine Cooling Water (KD) MC-ISIL-1609-01.01 X
Diesel Gen Engine Lube Oil (LD) MC-ISIL-1609-02.00 X
Diesel Gen Engine Lube Oil (LD) MC-ISIL-1609-02.01 X
Diesel Gen Engine Fuel Oil (FD) MC-ISIL-1609-03.00 X
Diesel Gen Engine Fuel Oil (FD) MC-ISIL-1609-03.01 X
Diesel Gen Starting Air (VG) MC-ISIL-1609-04.00 X
Diesel Generator Room Sump Pump (WN) MC-ISIL-1609-07.00 X
Conventional Chemical Addition (YA) MC-ISIL-1617-01.00 X
Control Area Chilled Water (YC) MC-ISIL-1618-01.00 X
Control Area Chilled Water (YC) MC-ISIL-1618-02.00 X
Control Area Chilled Water (YC) MC-ISIL-1618-04.00 X
Nuclear Service Water (RN) MC-ISIL-2574-01.01 X
Nuclear Service Water (RN) MC-ISIL-2574-04.00 X
Containment Ventilation Cooling Water (RV) MC-ISIL-2604-03.00 X
Duke Energy CorporationMcGuire Unit I - 3d Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision 1Page 15 of S
Duke Energy CorporationMcGuire Nuclear Station
Unit 2
THIRD INSPECTION INTERVALINSERVICE INSPECTIONPRESSURE TEST PLAN
Revision 0
Plant Location: 12700 Hagers Ferry RoadHuntersville, North Carolina 28078-9340
Commercial Service Date: March 1, 1984
Third Interval Start Date: March 1, 2004
Owner: Duke Energy Corporation526 South Church StMail Code EC07JCharlotte, N. C. 28201-1006
Start Date End Date
3/01/2004 3/01/2007 3/01/2011 3/01/2014
Ist Period 2nd Period 3rd Periodt fr
Refueling Outage I(EOC 16)
Refueling Outage 2(EOC 17)
Refueling Outage 3(EOC 18)
Refueling Outage 4(EOC 19)
Refueling Outage 5(EOC 20)
Refueling Outage 6(EOC 21)
Refueling Outage 7(EOC 22)
Prepared By:
Reviewed By:
Q;-^40
( )tvn-,, -..,
Date lZti 103
Date _______
Approved By:
ANII Review:
--::e Date 1Ialca
Date |i-1i7- 3
Duke Energy CorporationMcGuire Unit 2- 3 rd Ten-Year IntervalInservice Inspection Pressure Test Plan
J.M. Boughman(704) 382-5112
jmboughmnduke-energy.com
SUMMARY OF CHANGES
SECTION DESCRIPTION
All This entire plan has been revised to separate the pressure test plan from the NDE plan and to be used asa stand alone inservice inspection plan for the third 10-year interval system pressure testing requirementsat McGuire unit 2. This revision meets the requirements of the 1998 Edition/2000 Addenda of theASME Boiler & Pressure Vessel Code, Section XI.
Duke Energy CorporationMcGuire Unit 2 - 3 d Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision 0Page I of 14
TABLE OF CONTENTS
SECTION TITLE
I Applicable Codes and Standards for Inservice Inspection Pressure Testing
2 Inspection Methods and Procedures to be Used for Inservice Inspection Pressure Testing
3 Description of Inservice Inspection Pressure Testing Plan for ISI Class 1 Items
4 Description of Inservice Inspection Pressure Testing Plan for ISI Class 2 Items
5 Description of Inservice Inspection Pressure Testing Plan for ISI Class 3 Items
6 System Boundaries Subject to Examination
7 Components Exempt From Pressure Test Examination
8 Description of Examination Schedules
9 Requests for Relief From ASME Code Requirements
10 Risk-Informed Segments Associated With Pressure Testing
11 Examination Zone Listing & Associated Flow Diagrams
12 Boundary Drawings and System Listing
Duke Energy CorporationMcGuire Unit 2 - 3fd Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision 0Page 2 of 14
| ii |Applicable Codes and Standards for Inservice Inspection Pressure Testing l
This document constitutes the inservice inspection pressure testing plan and schedules for the third inspectioninterval for McGuire Unit 2. All pressure retaining components classified as ISI Class 1, 2, and 3 have beenreviewed to determine the inservice inspection pressure test examination requirements.
Inservice inspection pressure testing activities for McGuire Unit 2 shall be performed in accordance withProgram B of the 1998 Edition of ASME Section XI, through the 2000 Addenda.
The NRC revised the pressure and temperature hold time requirements in Title 10, Code of Federal Regulations,Part 50.55a (b)(2)(xx), published January 1, 2003. When performing system leakage tests in accordance withIWA-5213(a), a 10-minute hold time after attaining test pressure is required for Class 2 and Class 3 componentsthat are not in use during normal operating conditions, and no hold time is required for the remaining Class 2and Class 3 components provided that the system has been in operation for at least 4 hours for insulatedcomponents or 10 minutes for uninsulated components.
The following Code Cases may be used for the Pressure Testing Program at McGuire Unit 2:
Code Case:
N-566-2
Brief Discription:
"Corrective Action for Leakage Identified at Bolted Connections"
Duke Energy CorporationMcGuire Unit 2 - 3 Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision 0Page 3 of 14
2 Inspection Methods and Procedures to be used for Inservice Inspection Pressure Testing l
VT-2 visual examinations shall be conducted to locate evidence of leakage from pressure retaining componentsduring the conduct of a system pressure test.
Pressure testing and associated VT-2 visual examinations shall be performed using the latest revision ofprocedure QAL-15 "ISI Visual Examination, VT-2".
The following Duke Energy procedures and directives shall be used to control pressure testing inserviceinspection activities, Inservice Inspection Pressure Testing Plans, Pressure Test Database Management System,and Inservice Inspection Pressure Test Reports:
Procedure No: Title:
NSD-300
NSD-701
NSD-702
NSD-800
QA-520
QA-522
QA-524
QAL5
QAL-15
ASME Section Xl Program
Records Management
Document Management
Software and Data Quality Assurance (SDQA) Program
Preparation and Distribution of Inservice Inspection Reports
Preparation and Implementation of the Inservice InspectionPressure Testing Plans
ISI Pressure Testing Process
Control Of Preservice And Inservice Inspection Activities
ISI Visual Examination, VT-2
-De s Description of Inservice Inspection Pressure Testing Plan for ISI Class 1 Items |
Pressure testing of ISI Class 1 items shall be performed in accordance with the requirements of Articles IWA-5000, IWB-2000, and IWB-5000 of Section XI. ISI Class 1 systems that are required to be pressure tested shallbe divided into isolable areas (to the extent practical). These areas represent specific pressure testing zones(hereafter referred to as examination zones).
Examination Categories and Requirements:
The examination categories and item numbers shall be those listed in Table IWB-2500-1 of Section XI. Eachexamination zone may include various Section XI categories and item numbers.
Duke Energy CorporationMcGuire Unit 2 - 3r Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision 0Page 4 of 14
Category B-P, All Pressure Retaining Components
The Class I System Leakage Test (IWB-5220) is conducted at a pressure not less than the pressurecorresponding to 100% rated reactor power. The test pressure and temperature shall be attained at a rate inaccordance with the heat-up limitations specified for the system. The Class I system leakage test is requiredprior to plant startup following each reactor refueling outage.
The pressure-retaining boundary during the system leakage test conducted at or near the end of each inspectioninterval shall extend to all Class I pressure-retaining components within the system boundary. This test isrequired only once during a ten-year interval.
IWB-2500-1 Item Component To Be Examined Comments
Reactor Vessel
B15.10
B15.20
B15.30
Pressure Retaining Boundary
Pressurizer
Pressure Retaining Boundary
Steam Generators
Pressure Retaining Boundary
Heat Exchangers
Pressure Retaining Boundary
Piping
Pressure Retaining Boundary
B15.40
B15.50
Pumps
B15.60 Pressure Retaining Boundary
Valves
Pressure Retaining BoundaryB1 5.70
| 4 | Description of Inservice Inspection Pressure Testing Plan for ISI Class 2 Items l
Pressure testing of ISI Class 2 items shall be performed in accordance with the requirements of Articles IWA-5000, IWC-2000, and IWC-5000 of Section XI. ISI Class 2 systems that are required to be pressure tested shallbe divided into isolable areas (to the extent practical). These areas represent specific examination zones.
Duke Energy CorporationMcGuire Unit 2 - 3 d Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision 0Page 5 of 14
Examination Categories and Requirements:
The examination categories and item numbers shall be those listed in Table IWC-2500-1 of Section XI. Eachexamination zone may include various Section XI categories and item numbers.
Category C-B, Pressure Retaining Nozzle Welds In Vessels
When nozzle-to-shell (or head) welds (to be examined by NDE methods) are inaccessible, the telltale hole in thereinforcing plates shall receive a VT-2 visual examination for evidence of leakage while the vessel is undergoingthe System Pressure Test as required by Category C-H.
IWC-2500-1 Item
C2.30
C2.33
Comnonent To Be Examined
Nozzles With Reinforcing Plate inVessels > 1/2 in. Nominal Thickness
Nozzle-to-Shell (Nozzle to Head orNozzle to Nozzle) Welds When Insideof Vessel is Inaccessible
Comments
Category C-H, All Pressure Retaining Components
The Class 2 System Leakage Test (IWC-5220) is conducted at the system pressure obtained while the system, orportion of the system, is in service performing its normal operating function or at the system pressure developedduring a test conducted to verify system operability. The Class 2 leakage test is required once in each inspectionperiod.
IWC-2500-1 Item Component To Be Examined Comments
C7.10 Pressure Retaining Components
I 5 I Description of Inservice Inspection Pressure Testing Plan for ISI Class 3 Items l
Pressure testing of ISI Class 3 items shall be performed in accordance with the requirements of Articles IWA-5000, IWD-2000, and IWD-5000 of Section XI. ISI Class 3 systems that are required to be pressure tested shallbe divided into isolable areas (to the extent practical). These areas represent specific examination zones.
Examination Categories and Requirements:
The examination categories and item numbers shall be those listed in Table IWD-2500-1 of Section XI. Eachexamination zone may include various Section XI categories and item numbers.
Category D-B, All Pressure Retaining Components
The Class 3 System Leakage Test (IWD-522 1) is conducted at the system pressure obtained while the system, orportion of the system, is in service performing its normal operating function or at the system pressure developed
Duke Energy CorporationMcGuire Unit 2- 3 Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision 0Page 6 of 14
during a test conducted to verify system operability. The Class 3 leakage test is required once in each inspectionperiod.
IWD-2500-1 Item Component to be Examined Comments
D2.10 Pressure Retaining ComponentsNo hydro test required. See Request
D2.20 Pressure Retaining Components for Relief serial number 02-003.
6 System Boundaries Subject to Examination
Unless otherwise noted, systems designated as ISI Class A are equivalent to ASME Class 1, those designated asISI Class B are equivalent to ASME Class 2, and those designated as ISI Class C are equivalent to ASME Class3.
The following color codes, shown on electronic pressure testing boundary drawings, are used to represent theboundaries subject to pressure testing:
Red = ISI Class AYellow = ISI Class BGreen = IS Class CBlue = Components exempt from pressure testing requirementsMagenta = Boundary line showing the extremities of pressure testing examination zonesBlack = Non ISI Class components
All instrumentation taps within the examination boundary shall be examined up to the first isolation valve off theprocess pipe.
I 7~ I Components Exempt From Pressure Test Examination
Components shown color-coded as blue on electronic pressure testing boundary drawings represent theboundaries that are exempted from pressure testing requirements.
Boundary drawings that are exclusively for showing pressure testing exemptions are listed in Section 12 of thisdocument. The following are examples of pressure test exemptions:
* Non pressure retaining portion of Reactor Coolant Pumps.
* Open ended portions of ISI Class 2 and 3 discharge piping (this does not apply to repair pressure testing).
* ISI Class 2 and IS Class 3 portions of systems that do not support the system safety function beyond thefirst normally closed valve (including relief valves or valves capable of automatic closure).
* Containment penetrations where the piping and isolation valves perform a containment function and thebalance of the piping system is outside the scope of Section XI.
• Systems/components determined by ISIM as optionally owner classified ISI Class 2 or ISI Class 3 perSection XI, IWA-1320(e).
Duke Energy CorporationMcGuire Unit 2 - 3 d Ten-Year Interval Revision 0Inservice Inspection Pressure Test Plan Page 7 of 14
I 8 IDescription of Examination Schedules
All system pressure testing is completed in accordance with the schedule shown in the Section XI Tables for eachexamination category. The examination periods are derived from "Program B" of the Section XI Code.
The ISI Class 1 Leakage Test zone shall be completed each refueling. ISI Class I Examination Zonerequirements are not scheduled on an outage-by-outage basis given that the examinations are required to becompleted for each refueling outage.
The ISI Class 2 and 3 Leakage Test zones shall be examined once during each inspection period. The ISI Class 2and 3 Leakage Test zones are not scheduled on an outage-by-outage basis given that they are required to be 100percent complete by the end of the inspection period rather than a minimum/maximum percentage eachinspection period.
Examination Zones that contain Risk-Infonned Segments shall be examined each refueling cycle. TheseExamination Zones are not scheduled on an outage-by-outage basis given that the examinations are required to becompleted each refueling cycle (approximately once every eighteen months).
| 9 |Requests for Relief from ASME Code Requirements l
Each Request for Relief from a requirement of the Section Xl Code specified in this Plan shall be submitted bythe Nuclear Generation Department to the Nuclear Regulatory Commission for approval.
The following is a listing of the Requests for Relief submitted for use at McGuire Unit 2:
Serial Date RFR Date SERNumber Description Submitted Approved Comments
01-005 WCAP-14572, Revision I-NP-A. 6/26/01 6/12/02 Clarification letter dated'Westinghouse Owners Group 7/28/03 issued forApplication of Risk-informed refueling outage versusMethods to Piping Inservice refueling cycleInspection Topical Report"
01-008 Relief requested from performing 6/26/01 6/12/02 Clarification letter datedvolumetric examinations of High 7/28/03 issued forSafety Significant (HSS) socket welds refueling outage versusidentified in the McGuire Class I and refueling cycle2 RI-IS I program for all damagemechanism.
02-003 Request to use corrected ASME Code TBD TBDrequirement for Class 3 pressure tests. _
03-003 Request to use Code Case N-566-2 TBDTBI)
Duke Energy CorporationMcGuire Unit 2 - 3r Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision 0Page 8 of 14
I 10 I Risk-Informed Segments Associated With Pressure Testing
The Risk-Informed program has identified certain segments that use pressure testing and VT-2 visualexamination to ensure system integrity.
The following is a list of the pressure testing Examination Zones, ISI Boundary Drawings, and associated Risk-Informed Segments.
Duke Energy CorporationMcGuire Unit 2 - 3d Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision 0Page 9 of 14
Duke Power Company
McGuire Unit 2Risk-Informed Cross-Reference
Date: 12/15/2003
Zone Number ISI Boundary Drawing I RI Segment Number
2NC-OOIL-A MC-ISIL-2553-01.00 NC-18
NC-19NC-20
NC-21
NC-23
NC-86
NC-89
NC-90
MC-ISIL2553-02.00 NC-054
NC-055
NC-056
MC-ISIL-2553-02.01 NC-086
MC-ISIL-2554-01.00 NV-033A
NV-033B
NV-034ANV-034B
NV-037NV-038
NV-041A
NV-041BNV-042A
NV-042B
MC-ISIL-2554-01.01 NV-030A
NV-030B
NV-032ANV-032B
NV-035NV-036
NV-039ANV-039B
NV-040ANV-040B
MC-ISIL-2562-01.00 NI-068Nl-069
NE-070
NI-071
2ND-009L-B MC-ISIL-2561-01.00 ND-008C
ND-009C
2NI-061 L-B MC-ISIL-2562-Ol.00 NI-063B
2NV-003L-B MC-ISIL-255401.00
MC-ISIL-2554-01.03
NV-028
NV-029
NV-026
NV-027
Duke Power Company
McGuire Unit 2Risk-Informed Cross-Reference
Date: 12/15/2003
Zone Number ISI Boundary Drawing RI Segment Number
2NV-003L-B NV-028NV-029
2NV-004L-B MC-ISl-2554-01.01 NV-020AD
MC-ISIL-2554-03.00 NV-019AANV-019ABNV-019ADNV-019BNV-019DNV-020AANV-020ABNV-020AENV-021ANV-021B
MC-ISIL-2554-03.01 NV-002ABNV-002DNV-01IANV-019AANV-019CNV-019E
MC-ISIL-2562-1.OO NV-0lIA
MC-ISIL-2562-03.00 NV-002AB
2NV-005L-B MC-ISIL-2554-01.02 NV-080ANV-080BNV-084ANV-084BNV-084C
2NV-006L-B MC-ISIL-25543.00 NV-002CNV-108ANV-109
2NV-OI IL-B MC-ISIL-2554-"3.01 NV-0 IA
I 11 IExamination Zone Listing & Associated Flow Diagrams l
The Examination Zone number for each pressure test represents an area of a system that shall receive a VT-2visual examination. An Examination Zone terminates at a boundary valve, building interface, or componentinterface and may include several flow diagrams. The scope of each Examination Zone includes all pressureretaining components within the perimeter of the Examination Zone.
All McGuire Unit 2 Examination Zone numbers have the same format The following example is for an ISIClass I Leakage Test zone:
2NC-001 L-A
T T T L Class A, B, or CI... (L) = Leakage Test
Sequential Number 001-999
System Being Examined
(2) = Unit 2
A listing of the Pressure Testing zone numbers, schedules, and associated inspection information is shown on thefollowing pages:
Duke Energy CorporationMcGuire Unit 2 - 3d Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision 0Page 10 of 14
Duke Power Company
Date: 12/17/2003 McGuire Unit 2 - 3rdReport Page No. 1 Pressure Testing Examination Zone Report
iSICategoryZone
No.lSI
ClassDwg. No. B-P I C-H D-B System Outage ScheduleReq.Test
Req. Req. PeriodExam Proc. Schedule
ASMEItemNo.
2BB-04OL-B MC-ISIL-2580-01.00 - B - X - Steam Generator Blowdown 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10Recycle (BB)
2BB-074L-B MC-ISIL-2572-03.00 - B - - X - Steam Generator Blowdown 16 17 18 19 20 21 22 Leakage Vr-2 QAL-15 1st 2nd 3rd C7.10Recyde (BB)
2BB-074L-B MC-ISIL-2580-01.00 - B - - X - Steam Generator Blowdown 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10Recyde (BB)
2BB-074L-B MC-ISIL-2584-01.00 - B - - X - Steam Generator Blowdown 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10Recycle (BB)
2CA-033L-C MC-ISIL-1574-01.00 - - C - - X Nudear Service Water (RN) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
2CA-033L-C MC-ISIL-2592-01.01 - C - - X Auxiliary Feedwater (CA) 16 17 18 19 20 21 22 Leakage VT-2 GAL-I5 1st 2nd 3rd D2.10
2CA-033L-C MC-ISIL-2574-02.00 - - C - - X Auxiliary Feedwater (CA) 16 17 18 19 20 21 22 Leakage Vr-2 QAL-15 1st 2nd 3rd D2.10
2CA.033L-C MC-ISIL-2574-03.00 -- C - - X Auxiliary Feedwater (CA) 16 17 18 19 20 21 22 Leakage VT-2 OAL-15 1st 2nd 3rd D2.10
2CA.034L-C MC-ISIL-2592-01.01 - - C - - X Auxiliary Feedwater (CA) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
2CA-035L-C MC-ISIL-2592-01.01 - - C - - X Auxiliary Feedwater (CA) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
2CA-036L-C MC-ISIL-2592-01.00 - C - - X Auxiliary Feedwater (CA) 16 17 18 19 20 21 22 Leakage VT-2 GAL-15 1st 2nd 3rd 02.10
2CA-036L-C MC-ISIL-2592-01.01 - - C - - X Auxiliary Feedwater (CA) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
2CA-037L-C MC-ISIL-2592-01.00 - - C - - X Auxiliary Feedwater (CA) 16 17 18 19 20 21 22 Leakage VT-2 GAL-15 1st 2nd 3rd D2.10
2CA-037L-C MC-ISIL-2592-01.01 - - C - _ X Auxiliary Feedwater (CA) 16 17 18 19 20 21 22 Leakage VT-2 GAL-15 1st 2nd 3rd D2.102CA-037L-C MC-ISilk2592-01.00 - - C _ _ X Auxilary Feedwater (CA) 16 17 18 19 20 21 22 Leakage VT-2 GAL-I5 1st 2nd 3rd D2.10
2CA-03OL-C MC-ISIL-2592-01.00 - - C X Auxiliary Feedwater (CA) 16 17 18 19 20 21 22 Leaks" VT-2 OAL-15 Ist 2nd 3rd D2.10
Date: 1217/2003
Report Page No. 2
Duke Power Company
McGuire Unit 2 - 3rdPressure Testing Examination Zone Report
ZoneNo.
IS'Class
lSICategory
B-P I C-H I D-BDwg. No. System Outage ScheduleReq.Test
Req. Req. PeriodASMEItemNo.Exam Proc. Schedule
2CA-038L-C MC.ISIL-2592-01.01 - - C - - X Auxiliary Feedwater (CA) 16 17 18 19 20 21 22 Leakage Vr-2 QAL-15 1st 2nd 3rd D2.10
2CA-039L-C MC-ISIL-2592-01.00 - - C - _ X Auxiliary Feedwater (CA) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
2CA-04_L-B MC-SIL-2592-01.00 - B - - X - Auxiliary Feedwater (CA) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2CA-04IL-C MC-ISIL-2592-01.00 - - C - - X Auxiliary Feedwater (CA) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd 02.10
2CA-042L-C MC-ISIL-2592-01.00 - - C - - X Auxiliary Feedwater (CA) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
2CA-043L-B MC-ISIL-2584-01.00 - B - - X - Auxiliary Feedwater (CA) 16 17 18 19 20 21 22 Leakage Vr-2 QAL-15 1st 2nd 3rd C7.10
2CA-043L-B MC-ISIL-2591-01.01 - B - - X - Auxiliary Feedwater (CA) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.1Q
2CA-043L-B MC-ISIL-2592-01.00 - B - - X - Auxiliary Feedwater (CA) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2CA-043L-B MC-ISIL-2617-01.00 - B - - X - Auxiliary Feedwater (CA) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2FD-055L-C MC-ISIL-2609-03.00 - - C - - X Diesel Gen. Engine Fuel Oil 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10(FD)
2FD-056L-C MC-ISIL-2609-03.01 - - C - - X Diesel Gen. Engine Fuel Oil 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10(FD)
2FW-007L-8 MC-ISIL-2554-03.00 - B - - X - Refueling Water (FW) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2FW-007L-B MC-ISIL-2554-03.01 - B - - X - Refueling Water (FW) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2FW-007L-B MC-ISIL-2561-01.00 - B - - X - ResidualHeat Removal(ND) 16 17 18 19 20 21 22 Leakage VT-2 OAL-15 1st 2nd 3rd C7.10
2FW-007L-B MC-ISIL-2562-03.00 - B - _ X - Refueling Water (FW) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2FW-007L-B MC-ISIL-2562-03.00 - B - X Refueling Water (FW) 16 17 18 19 20 21 22 Leakage vr-2 QAL-15 1st 2nd 3rd C7.102FW-007L-B MC-ISIL-2563-01.00 - X Refueling Water (FW) 16 17 IS 19 20 21 22 Leakage Vr-2 OAL-15 Ist 2nd 3rd C7.10
Date: 12/17/2003
Report Page No. 3
Duke Powr Company
McGuire Unit 2 - 3rdPressure Testing Examination Zone Report
lSIZoneNo.
ISIClass
CategoryR-P I C-H I MR
Req. Req. Req. PeriodTest Exam Proc. Schedule
ASMEItemNo.Dwa. No. System Outage Schedule
2FW-007L-B MC-ISIL-2571-01.00 - B - - X - Refueling Water (FW) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2KC-02_L-C MC-ISIL-2573-01.00 - - C - - X Component Cooling (KC) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
2KC.028L-C MC-ISIL-2573-01.01 - - C - - X Component Cooling (KC) 16 17 18 19 20 21 22 Leakage Vr-2 QAL-15 1st 2nd 3rd D2.10
2KC-029L-C MC-ISIL-2573-01.00 - - C - - X Component Cooling (KC) 16 17 18 19 20 21 22 Leakage Vr-2 QAL-15 1st 2nd 3rd D2.10
2KC-029L-C MC-ISIL-2573-01.01 - - C - - X Component Cooling (KC) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
2KD-049L-C MC-ISIL-2609-01.00 - - C - _ X Diesel Gen. Engine Cooling 16 17 18 19 20 21 22 Leakage vr-2 QAL-15 1st 2nd 3rd D2.10Water (KD)
2KD-05OL-C MC-ISIL-2609-01.01 - - C - - X Diesel Gen. Engine Cooling 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10Water (KD)
2KF-022L-C MC-ISIL-2570-01.00 - - C - - X Spent Fuel Cooling (KF) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
2KF-22L-C MC-ISIL-2570-01.01 - - C - - X Spent Fuel Cooling (KF) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
2KF-023L-C MC-ISIL-2570-01.00 - - C - - X Spent Fuel Cooling (KF) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
2KF-023L-C MC-ISIL-2570-01.01 - - C - _ X Spent Fuel Cooling (KF) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
2LD-051L-C MC-ISIL-2609-02.00 - - C - _ X Diesel Gen. Engine Lube Oil 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10(LD)
2LD-052L-C MC-ISIL-2609-02.00 - - C - X Diesel Gen. Engine Lube Oil 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10(LD)
2LD-053L-C MC-ISIL-2609..02.01 -- C X Diesel Gen. Engine Lube Oil(LD)
16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
Date: 12117/2003
Report Page No. 4
Duke Power Company
McGuire Unit 2 - 3rdPressure Testing Examination Zone Report
lSIZoneNo.
lSIClass
Ca"orya-P I r-H I D-a
Req. Req. Req. PeriodTest Exam Proc. Schedule
ASMEitemNo.Dwg. No. System Oute Schedule
2LD-054L-C MC-ISIL-2609-02.01 - - C _ - X DieselGen.EngineLubeOil 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10(LD)
2NC-OOIL-A MC-ISIL-2553-01.0 A B - X X - Reactor Coolant (NC) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd B15.10815.30B15.50815.60B15.70C7.10
2NC-001L-A MC-ISIL-2553-02.00 A B - X X Reactor Coolant (NC) 16 17 18 19 20 21 22 Leakage Vr-2 QAL-15 1st 2nd 3rd B15.201 8~~~~~~~~~~~~~~~~~~~~~~~~~~~~15.50
2NC-001L-A MC-ISIL-2553-02.01 A - - X _ ReactorCoolant(NC) 16 17 18 19 20 21 22 Leakage Vr-2 QAL-15 1st 2nd 3rd B15.50
2NC-OOIL-A MC-ISIL-2554-01.00 A B - X X - ReactorCoolant(NC) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd B15.50815.60,B15.70C7.10
2NC-OOIL-A MC-ISIL-2554-01.01 A B - X _ - Reactor Coolant (NC) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd B15.50BIS.608 15.70
7.10
2NC-OOIL-A MC-ISIL-2554-01.02 A - - X - - ReactorCoolant(NC) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd B15.50B15.70
2NC-OOIL-A MC-ISIL-2561-01.00 A - - X - - ReactorCoolant(NC) 16 17 18 19 20 21 22 Leakage Vr-2 QAL-15 1st 2nd 3rd 815.50815.70
2NC-OO1L-A MC-ISIL-2562-01.00 A - - X - - Reactor Coolant (NC) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd 815.50815.70
2NC-001IL.A MC-ISIL-2562-02.00 A - - X - Reactor Coolant (NC) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd 815.50815.70
2NC-OOIL-A MC-ISIL-2562-02.01 A - - X - Reactor Coolant (NC) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd 815.50815.70
2NC-OOIL-A MC-ISIL-2562-03.00 A - - X Reactor Coolant (NC) 16 17 18 19 20 21 22 Leakage VT-2 OAL-15 1st 2nd 3rd B15.50B15.70
Date: 12117/2003
Report Page No. 5
Duke Power Company
McGuire Unit 2 - 3rdPressure Testing Examination Zone Report
ISIZoneNo.
1SIClass
CategoryB-P I C-H I D-BDwg. No. System Outage Schedule
Req.Test
Req. Req. PerlodExam Proc. Schedule
ASMEttemNo.
- I
2NC-OO1L1-A MC. SIL-2562-03.01 A - - Reactor Coolant (NC) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd B15.50B15.70
2ND-009L-B MC-ISIL-2554-01.02 - B -
2ND-009L-B MC-ISIL-2561-1.00 - B -
2ND409L-B MC-ISIL-2562-03.00 - B -
2ND-09L-B MC-ISIL-2562-03.01 - B -
2ND-009L-B MC-ISIL-2563-01.00 - B -
2ND-009L-B MC-ISIL-2571-01.00 - B -
2ND-09L-B MC-ISIL-2572-01.00 - -8 -
2ND-01OL-B MC-ISIL-2561-01.00 - B -
2ND-41L0-B MC-ISIL-2562-03.01 - B -
2ND-OIOL-B MC-ISIL-2563-01.00 - B -
2NI-012L-B MC-ISIL-2562-02.00 - B -
2NI-012L-B MC-ISIL-2572-01.01 - B -
2NI-013L-B MC-ISIL-2562-02.01 - B -
2NI-013L-B MC-ISIL-2572-01.01 - B -
2NI-014L-B MC-ISIL-2562-02.01 - B -
Residual Heat Removal (ND) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3d C7.10
Residual Heat Removal (ND) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
Residual Heat Removal (ND) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
Residual Heat Removal (ND) 16 17 18 19 20 21 22 Leakage VT-2 OAL-15 15t 2nd 3rd C7.10
Residual Heat Removal (ND) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
Residual Heat Removal (ND) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
Residual Heat Removal (ND) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
Residual Heat Removal (ND) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
Residual Heat Removal (ND) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
Residual Heat Removal (ND) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
Safety Injection (Nl) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
Safety Injecton (NI) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
Safety Injection (NI) 16 17 18 19 20 21 22 Leakage VT-2 OAL-15 Ist 2nd 3rd C7.10
Safety Injection (NI) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
Safety Injection (NI) 16 17 18 19 20 21 22 Leakage VT-2 OAL-15 1st 2nd 3rd C7.10
Safety Injection (Ni) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.102N1-014L-B MC-ISIL-2562-03.00 - -
Date: 1217/2003
Report Page No. 6
Duke Power Company
McGuire Unit 2 - 3rdPressure Testing Examination Zone Report
ZoneNo.
lSIClass
IS'Category
Dwg. No. B-P C-H D-B System Outage ScheduleReq.Test
Req. Req. PeriodExam Proc. Schedule
ASMEhemNo.
2N_-015L-_ MC-ISIL-2562-03.00 - B - X Safety Injection (N) 16 17 18 19 20 21 22 Leakage VT-2 QAL.15 1st 2nd 3rd C7.10
2NI-016L-B MC-ISIL-2562-03.00 - B - - X _ Safety Injection (NI) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2NI-017L-B MC-ISIL-2562-03.01 - B - - X _ Safety Injection (NI) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2NI-017L-B MC-ISIL-2562-03.00 - B - - X - Safety Injection (NI) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2NI-018L-B MC-ISIL-2562-03.01 - B - - X _ Safety Injecion (NI) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2NI-0601L-B MC-ISIL-2562-03.00 - B - - X _ Safety Injection (NI) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2Nf-06IL-B MC-ISIL-2562-01.00 - B - - X _ Safety Injection (NI) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2NI-062L-B MC-ISIL-2562-01.00 - B - - X _ Safety Injecton (NI) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2NM-026L-B MC-ISIL-2572-01.01 - B - _ X - Nuclear Sampling (NM) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2NM-027L-B MC-ISIL-2572-03.00 - B - _ X - Nuclear Sampling (NM) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2NW019L-B MC-ISIL-2573-01.00 - B - _ X - ContainmentSpray (NS) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2NS-020L-B MC-ISIL-2563-01.00 - B - _ X - Containment Spray (NS) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2NV-003L-B MC-ISIL-2554-01.00 - B - _ X - Chemical&VolumeControl 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2NV-003L-B MC-ISIL-2554-01.02 - B - _ X - Chemical & Volume Control 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10(NV)
2NV-003L-B MC-ISIL-2554-01.03 - B - X Chemical & Volume Control(NV)
16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st- 2nd 3rd C7.10
Date: 12/17/2003
Report Page No. 7
Duke Powr Company
McGuire Unit 2 - 3rdPressure Testing Examination Zone Report
ZoneNo.
lSIClass
lSICategory
B-P C-H DBReq. Req. Req. Period
ASMEItemNo.Dwg. No. System Outage Schedule Test Exam Proc. Schedule
2NV-003L-B MC-ISIL-2554-01.01 - B- - X - Chemical &Volume Control 18 17 16 19 20 21 22 Leakag VT.2 QAL.15 1st 2nd 3rd C7.10(NV)
2NV-004L-B MC-ISIL-1554-05.00 - B - - X - Chemical &Volume Control 16 17 18 19 20 21 22 Leakage VT-2 QAL.15 1st 2nd 3rd C7.10(NV)
2NV.004L-B MC-ISIL.2554-01.00 - - - X - Chemical & Volume Control 16 17 18 19 20 21 22 Leakage VT-2 OAL-15 1st 2nd 3rd C7.10(NV)
2NV.004L-8 MC-ISIL-2554-01.01 - B - - X - Chemical &Volume ontrol 16 17 18 19 20 21 22 Leakag V`1-2 QAL-15 1st 2nd 3rd C7.10
2NV-004L-B MC-ISIL.2554-01 .02 - B - - X - Chemical & Volume Control 16 17 18 19 20 21 22 Leakage VT-2 QlAL-15 1st 2nd 3rd C7.10(NV)
2NV.004L-B MC-ISIL-2554-02.00 - B - - X - Chemical & Volume Control 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10(NV)
2NV-004L-B MC-iSiL-2554-02.1 - B - - X - Chemical & Volume Control 16 17 18 19 20 21 22 Leakage V`1-2 QAL-15 1st 2nd 3rd C7.10(NV)
2NV-004L-B MC-ISIL-2554-03.00 - B - - X - Chemical & Volume Control 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10(NV)
2NV.004L-B MC-ISIL-2554.03.01 - B - - X - Chemical & Volume Control 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10(NV)
2NV004L-B MC.ISIL-2561-01.00 - B - - X - Residual Heat Removal (ND) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2NV-004L-B MC-ISIL-2562-01.00 - B - - X - Chemical & Volume Control 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10(NV)
,
2NV.004L-B MC-ISIL.2562-03.00 - x Chemical & Volume Control 16 17 18 19 20 21 22(NV)
Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
Date: 12117/2003
Report Page No. 8
Duke Power Company
McGuire Unit 2 - 3rdPressure Testing Examination Zone Report
ZoneNo.
lSIClass
1SICategory
ASMEReq. Req. Req. Period ItemTest Exam Proc. Schedule No.Dwa. No. R-P C-H I -B System Outaue Schedule
2NV-004L-C MC-ISIL-1554-05.00 - - C - _ X Chemical & Volume Control 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10(NV)
2NV-004L-C MC-ISIL-2554-02.00 - - C - - X Chemical & Volume Control 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10(NV)
2NV-004L-C MC-ISIL-2554-03.01 - - C - - X Chemical & Volume Control 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10(NV)
2NV004L-C MC4SIL-2554-05.00 - - C - - X Chemical & Volume Control 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10(NV)
2NV-005L-B MC-ISIL-2554-01.02 - B - - X - Chemcal & Volume Control 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10(NV)
2NV-006L-B MC-ISIL-2554-03.00 - B - - X - Chemical & Volume Control 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10(NV)
2NV-008L-B MC-ISIL-2554-01.02 - B - - X - Chemicll&VolumeControl 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10(NV)
2NV-OIIL-B MC-ISIL-2554-03.01 - B - - X - Chemical&Volume Control 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10(NV)
2RN-03_L-C MC-ISIL-1574-01.01 - - C - - X NudearServlceWater(RN) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd 02.10
2RN-030L-C MC-ISIL-1574.02.0 - - C - - X Nuclear ServIce Water (RN) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
2RN-030L-C MC-ISIL-2573-01.01 - - C - - X NuclearServiceWater(RN) 16 17 18 19 20 21 22 Leakage Vr-2 QAL-15 1st 2nd 3rd D2.10
2RN-030L-C MC-ISIL-2574-01.01 - - C _ - X NudearServiceWater(RN) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
2RN-030L-C MC-ISIL-2574-02.00 - - C _ X Nuclear Service Water (RN) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd 02.102RN-03OL-C MC4SIL-2574-02.00 - - C X Nuclear Service Water (RN) 16 17 1 1 20 21 22 Leaks" VT-2 OAL-15 Ist 2nd 3rd D2.10
Date: 12/17/2003
Report Page No. 9
Duke Power Company
McGuire Unit 2 - 3rdPressure Testing Examination Zone Report
ZoneNo.
lSIClass
1SICategory
B-P I C-H I D-BDwg. No. System Outage ScheduleReq.Test
Req. Req. PeriodExam Proc. Schedule
ASMEitemNo.
2RN-030L-C MC-ISIL-2574-02.01 - - C _ - X Nudear Service Water (RN) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
2RN-030L-C MC-ISIL-2609-01.00 - - C _ - X NuclearServiceWater(RN) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
2RN-031L-C MC-ISIL-1574-_1.01 - - C X Nudear Service Water (RN) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd 02.10
2RN-031L-C MC-ISIL-1574-03.00 - - C _ - X Nudear Service Water (RN) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
2RN-031L-C MC-ISIL-2573-01.01 - - C _ - X NuclearServiceWater(RN) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
2RN-031L-C MC-ISIL-2574-01.01 - - C _ _ X Nudear Service Water (RN) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
2RNO_3IL-C MC-ISIL-2574-03.00 - - C X Nuclear Service Water (RN) 16 17 15 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd 02.10
2RN-031L-C MC-ISIL-2574-03.01 - - C _ X Nuclear Service Water (RN) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
2RN-031L-C MC-ISIL-2609-01.01 - - C - _ X Nuclear Service Water (RN) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
2RN-044L-B MC-ISIL-2574-04.00 - B - - X - Nucear Service Water (RN) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2RV-048L-B MC-ISIL-2604-03.00 - B - - X - Containment Ventilation 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
Cooling Water (RV)
2SA-047L-B MC-ISIL-2593-01.02 - B - - X - Main Steam Supply Aux 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10Equip (SA)
2SA-047L-C MC-ISIL-2593-01.02 - - C - - X Main Steam Supply Aux 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd D2.10
Equip (SA)
2SM-04OL-B MC-ISIL-2591-01.01 - B - _ X _ Main Steam (SM) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2SM-04OL-B MC-ISIL-2593-01.00 - - X Main Seam (SM) 16 17 18 19 20 21 22 Leakage Vr-2 QAL-15 Ist 2nd 3rd C7.10
Date: 12/1712003
Report Page No. 10
Duke Power Company
McGuire Unit 2 - 3rdPressure Testing Examination Zone Report
ZoneNo.
ISIClass
islCategory
B-P I C-H I D-BReq. Req. Req. PeriodTest Exam Proc. Schedule
ASMEItemNo.Dwg. No. System Outage Schedule
2SM-040L-B MC-ISIL-2593-01.03 - B - - X Main Steam (SM) 16 17 18 19 20 21 22 Leakage VT-2 AL-15 1st 2nd 3rd C7.10
2SM-045L-B MC-ISIL-2593-01.00 - B - - X - Main Steam (SM) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2SM.045L-B MC-ISIL-2593_01.02 - B - - X Main Steam (SM) 16 17 18 19 20 21 22 Leakage VT-2 AL-15 1st 2nd 3rd C7.10
2SM-045L-B MC-ISIL-2593-01.03 - B - - X _ Main Steam (SM) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2SM-046L-B MC-ISIL-2593-01.02 - B - - X _ Main Steam (SM) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2SM.046L-B MC-ISIL-2593-01.03 - B - - X - Main Steam (SM) 16 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
2WN-064L-C MC-ISIL-2609-07.00 - - C - - X Diesel Generator Room 16 17 18 19 20 21 22 Leakage Vr-2 QAL-15 1st 2nd 3rd D2.10
Sump Pump (WN)
2YA-M6L-B MC-ISIL-2617-01.00 - B - X Convention ChemicalAddition (YA)
18 17 18 19 20 21 22 Leakage VT-2 QAL-15 1st 2nd 3rd C7.10
| 12 |Boundary Drawings and System Listing l
The pressure testing examination boundaries are identified on color coded electronic drawings (modified systemflow diagrams) and stored in the Nuclear Electronic Document Library (NEDL). "As Built" system flowdiagram revisions are reviewed to see if the revision had any impact on the pressure testing boundaries. Theseflow diagram revisions are incorporated into the Inservice Inspection pressure testing boundary drawings asnecessary. Some flow diagram revisions do not affect the pressure testing boundaries; therefore, the pressuretesting boundary drawings are not required to be revised. For this reason, there may be a difference between thenumeric revision level listed on the flow diagram versus the revision level of the flow diagram referenced on thepressure testing boundary drawing. "As Built' flow diagram revisions are published subsequent tomodifications that are made to a system. The timeliness of these "As Built" flow diagram revisions are not on aregulated schedule; therefore, subsequent boundary drawing revisions cannot be performed on a regulatedschedule. The latest revision of the pressure testing boundary drawing can be retrieved from NEDL.
The following is a list of the system flow diagrams that contain ASME Section XI Class 1, 2, or 3 components.Each drawing has been reviewed for applicable system pressure testing requirements. In addition to the ISIclass, the listing contains those flow diagrams that are exempted from pressure testing requirements for McGuireUnit 2.
System (as listed in drawing title block) Flow Diagram ISI ISI ISI AlClass I Class 2 Class 3 Exempt
Reactor Coolant (NC) MC-ISIL-2553-01.00 X X =_=
Reactor Coolant (NC) MC-ISIL-2553-02.00 X X =_=
Reactor Coolant (NC) MC-ISIL-2553-02.01 X X =
Reactor Coolant (NC) MC-ISIL-2553-04.00 X X
Chemical & Volume Control (NV) MC-ISIL-2554-01.00 X X
Chemical & Volume Control (NV) MC-ISIL-2554-0l.01 X X
Chemical & Volume Control (NV) MC-ISIL-2554-01.02 X X
Chemical & Volume Control (NV) MC-ISIL-2554-01.03 X
Chemical & Volume Control (NV) MC-ISIL-2554-02.00 X X
Chemical & Volume Control (NV) MC-ISIL-2554-02.01 X
Chemical & Volume Control (NV) MC-ISIL-2554-03.00 X
Chemical & Volufme Control (NV) MC-ISIL-2554-03.01 X X
Chemical & Volume Control (NV) MC-ISIL-2554-04.00 X X X
Chemical & Volume Control (NV) MC-ISIL-2554-05.00 X
Boron Thermal Regeneration (NR) MC-ISIL-2555-01.00 X X
Duke Energy CorporationMcGuire Unit 2 - 3P Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision 0Page 11 of 14
System (as listed In drawing title block) Flow Diagram ISI ISI ISI All_______________ Class 1 Class 2 Class 3 Exempt
Boron Thermal Regeneration (NR) MC-ISIL-2555-02.00 X X X
Boron Recycle (NB) MC-ISIL-2556-03.00 X X X
Containment Air Return Exchange & MC-ISIL-2557-01.00 X XHydrogen Skimmner (VX)-
Ice Condenser Refrigeration (NF) MC-ISIL-2558-04.00 X X
Residual Heat Removal (ND) MC-ISIL-2561-01.00 X X
Safety Injection (Nl) MC-ISIL-2562-01.00 X X
Safety Injection (Nl) MC-ISIL-2562-02.00 X X
Safety Injection (NI) MC-ISIL-2562-02.01 X X
Safety Injection (NI) MC-ISIL-2562-03.00 X X
Safety Injection (NI) MC-ISIL-2562-03.01 X X
Safety Injection (NI) MC-ISIL-2562-04.00 X X
Containnent Spray (NS) MC-ISIL-2563-01.00 X =
Annulus Ventilation (VE)- MC-ISIL-2564-01.00 X I X
Liquid Waste Recycle (WL) MC-ISIL-2565-01.00 X X
Liquid Waste Recycle (WL) MC-ISIL-2565-01.01 X X
Liquid Waste Recycle (WL) MC-ISIL-2565-07.00 X X
Spent Fuel Cooling (KF) MC-ISIL-2570-01.00 X
Spent Fuel Cooling (KF) MC-ISIL-2570-01.01 X
Refueling Water (FW) MC-ISIL-2571-01.00 X X
Nuclear Sampling (NM) MC-ISIL-2572-01.00 X
Nuclear Sampling (NM) MC-ISIL-2572-01.01 X X
Nuclear Sampling (NM) MC-ISIL-2572-0200 X X
Nuclear Sampling (NM) MC-ISIL-2572-03.00 X
Component Cooling (KC) MC-ISIL-2573-0i.D0 X
Component Cooling (KC) MC-ISIL-2573-01.01 X
Duke Energy CorporationMcGuire Unit 2 - 3 Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision 0Page 12 of 14
System (as listed in drawing title block) Flow Diagram ISI ISI IS! AllClass 1 Class 2 Class 3 Exempt
Component Cooling (KC) MC-ISIL-2573-02.00 X X
Component Cooling (KC) MC-ISIL-2573-02.01 __ X X
Component Cooling (KC) MC-ISIL-2573-03.00 X X X
Component Cooling (KC) MC-ISIL-2573-03.01 X X
Component Cooling (KC) MC-ISIL-2573-04.00 X X X
Nuclear Service Water (RN) MC-ISIL-2574-01.01 X
Nuclear Service Water (RN) MC-ISIL-2574-02.00 X
Nuclear Service Water (RN) MC-ISIL-2574-02.01 X
Nuclear Service Water (RN) MC-ISIL-2574-03.00 X
Nuclear Service Water (RN) MC-ISIL-2574-03.01 X
Nuclear Service Water (RN) MC-ISIL-2574-04.00 X X
Containment Purge Ventilation (VP) MC-ISIL-2576-01.00 X X
Steam Generator Blowdown Recycle (BB) MC-ISIL-2580-01.00 X
Steam Generator Wet La Recirculation (BW) MC-ISIL-2584-01.00 X
Containment Air Release and Addition (VQ) MC-ISIL-2585-01.00 X X
Feedwater (CF) MC-ISIL-2591-01.01 X
Auxiliary Feedwater (CA) MC-ISIL-2592-01.00 X X
Auxiliary Feedwater (CA) MC-ISIL-2592-01.01 X
Main Steam (SM) & Vent To Atmosphere (SV) MC-ISIL-2593-01.00 X
Main Stm To Aux Equip (SA) & Turb Exh (TE) MC-ISIL-2593-01.02 = X X
Main Steam (SM) & Vent To Atmosphere (SV) MC-ISIL-2593-01.03 X =_=
Nitrogen (GN) MC-ISIL-2602-01.00 X X
Containment Ventilation Cooling Water (RV) MC-ISIL-2604-03.00 X
Instrument Air (VI) MC-ISIL-2605-01.02 X X
Instrument Air (VI) MC-ISIL-2605-01.03 X X
Instrument Air (VI) MC-ISIL-2605-01.13 X X
V
Duke Energy CorporationMcGuire Unit 2 - 3 d Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision 0Page 13 of 14
System (as listed In drawing title block) Flow Diagram ISI ISI ISI AClass I Class 2 Class 3 Exempt
Station Air (VS) MC-ISIL-2605-02.02 X X
Breathing Air (VB) MC-ISIL-2605-03.0i X X
Diesel Gen Engine Cooling Water (KD) MC-ISIL-2609-01.00 X
Diesel Gen Engine Cooling Water(K) MC-ISIL-2609-41.01 X
Diesel Gen Engine Lube Oil (LD) MC-ISIL-2609-02.00 = _= X =
Diesel Gen Engine Lube Oil (LD) MC-ISIL-2609-02.01 X
Diesel Gen Engine Fuel Oil (FD) MC-ISIL-2609-03.00 X
Diesel Gen Engine Fuel Oil (FD) MC-ISIL-2609-03.01 X
Diesel Gen Starting Air (VG) MC-ISIL-2609-04.00 X X
Diesel Gen Sump Pump (WN) MC-ISIL-2609-07.00 X
Conventional Chemical Addition (YA) MC-ISIL-2617-01.00 X
Chemical and Volume Control (NV) MC-ISIL-1554-05.00 X X
Nuclear Service Water (RN) MC-ISIL-1574-01.00 X
Nuclear Service Water (RN) MC-ISIL-1574-01.01 X
Nuclear Service Water (RN) MC-ISIL-1574-02.00 X
Nuclear Service Water (RN) MC-ISIL-1574-03.00 X
Fire Protection (RF) MC-ISIL-l599-02.02 X X
Makeup Dernineralized Water (YM) MC-ISIL-1601-02.04 X X
Duke Energy CorporationMcGuire Unit 2- 3 Ten-Year IntervalInservice Inspection Pressure Test Plan
Revision 0Page 14 of 14