![Page 1: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/1.jpg)
May 14, 2014
![Page 2: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/2.jpg)
Policy City of Berkeley/ Project History
Design Site Location
Design Maximum Energy Production Site
Design Passive Strategies
Design Integrated Holistic Form
Construction Contractor and ZNE Building
Construction Photovoltaic System and Roof
Construction Radiant Slab (Heat + Cool)
Construction Natural Ventilation
Construction Day Light
Construction High Performance Envelope
Construction Cost Comparison/ Metrics
Occupancy ZNE Library Photos
Questions
Project Team / Credits
![Page 3: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/3.jpg)
Berkeley Public Library
Main Library and four
branches
1.1 million annual visits
1.76 million checkouts
annually (19.25 per
capita)
140,000 square feet of
conditioned floor space
~$14 million expenditure
budget
~$220,000 annual
energy expenses
3
![Page 4: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/4.jpg)
Policy Drivers
33% CO2 reduction below 2000 levels by 2020
LEED Silver for all construction and renovation
4
City Of Berkeley
Policy Drivers
2009 Climate Action Plan Adopted
33% CO2 reduction below 2000 level by 2020
LEED Silver for all construction and renovation
CoB audit of city buildings
- to achieve these aggressive goals - all new (city owned) buildings would have to be at ZNE
![Page 5: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/5.jpg)
Measure FF –
Berkeley Public Library Bond
$26M bond
authorized by
voters in 2008 for
branch library
improvements
Seismic
ADA
improvements
Physical
space and
operations
improvements
5
![Page 6: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/6.jpg)
Procurement
RFP for West Berkeley
design team in 2009:
Proposal from Harley Ellis
Devereaux/Green Works
Studio
Referenced City
policies
Referenced National
2030 Challenge and CA
NZE Policy
Proposed ZNE building
Proposed leveraging
incremental design
cost
Only team to propose
ZNE strategy
6
![Page 7: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/7.jpg)
Budget Impacts
$7.5 M total budget
$60,000 incremental
ZNE design cost
Offset by PG&E
Savings by
Design
~$250,000 incremental
ZNE capital cost
Initial cost estimates
over budget
Options
Considered CEC
loan
Considered
dropping solar
7
![Page 8: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/8.jpg)
City of Berkeley
Lessons Learned
Climate Action Plan and LEED policy drivers were critical
A Need for Institutional Improvements
Relied too heavily on favorable bid
Policies For Consideration
Life Cycle Cost Analysis requirements
Leverage projected O&M savings into capital budget
Mitigation/Offsets for expansions
8
![Page 9: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/9.jpg)
9
Customer Energy Solutions- Energy Efficiency Programs
ZNE Team Effort
PG&E ZNE Pilot program
Provided design assist grant
It is not meant to cover the entire cost of ZNE analysis
Design effort far exceeded the grant
ZNE are not conventional Title 24 buildings- much greater effort required
Savings By Design
Only for Owner
Design team not eligible if design assist grant provided
There is still effort on the part of design team to document for owner
![Page 10: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/10.jpg)
Policy City of Berkeley/ Project History
Design Site Location
Design Maximum Energy Production Site
Design Passive Strategies
Design Integrated Holistic Form
Construction Contractor and ZNE Building
Construction Photovoltaic System and Roof
Construction Radiant Slab (Heat + Cool)
Construction Natural Ventilation
Construction Day Light
Construction High Performance Envelope
Construction Cost Comparison/ Metrics
Occupancy ZNE Library Photos
Questions
Project Team / Credits
![Page 11: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/11.jpg)
1/2 mile
10 min.
walk
1 mile
20 min.
walk
West Berkeley
Library
Site Location
![Page 12: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/12.jpg)
12
![Page 13: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/13.jpg)
Site Photos- Existing Building
13
![Page 14: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/14.jpg)
Policy City of Berkeley/ Project History
Design Site Location
Design Maximum Energy Production Site
Design Passive Strategies
Design Integrated Holistic Form
Construction Contractor and ZNE Building
Construction Photovoltaic System and Roof
Construction Radiant Slab (Heat + Cool)
Construction Natural Ventilation
Construction Day Light
Construction High Performance Envelope
Construction Cost Comparison/ Metrics
Occupancy ZNE Library Photos
Questions
Project Team / Credits
![Page 15: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/15.jpg)
“Every hour, the sun radiates more energy onto the earth than the entire human population uses in one whole year.”
Solar Access Analysis
15
![Page 16: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/16.jpg)
Solar Access – Optimum Roof Height
16
![Page 17: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/17.jpg)
Renewable On-site Energy Supply
17
![Page 18: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/18.jpg)
Policy City of Berkeley/ Project History
Design Site Location
Design Maximum Energy Production Site
Design Passive Strategies
Design Integrated Holistic Form
Construction Contractor and ZNE Building
Construction Photovoltaic System and Roof
Construction Radiant Slab (Heat + Cool)
Construction Natural Ventilation
Construction Day Light
Construction High Performance Envelope
Construction Cost Comparison/ Metrics
Occupancy ZNE Library Photos
Questions
Project Team / Credits
![Page 19: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/19.jpg)
19
![Page 20: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/20.jpg)
Plug Load Analysis
Baseline
Existing Building
Room Electricity Lighting
System Fans Heat Generation (Gas)
Chiller (Elec) DHW (Gas)
Ave
rag
e k
W P
ow
er
Dra
w
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
West Berkeley Branch Library
Other Equipment(Literacy Program)
Staff Computers(Literacy Program)
Public Computers(Literacy Program)
A/V Equipment
IT Room
Other StaffEquipment (Library)
Staff Computers(Library)
Service Desk
Public Computers(Library)
Plug loads
Annual Energy Consumption (kBtu/sf)
20
![Page 21: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/21.jpg)
Daylight Modeling
Day Lighting Design
Tools
Daysim- annual
daylighting analysis
with weather data
Radiance –
illuminance maps
based on specific
times
Use the right tool
Daysim was more
user friendly in early
design phases
Floor Plan – Overcast Sky JUNE 21
Analysis Grid
06-21 Clear 1200 Falloffs
Value Range: 0.00-200 fc
Building Section
21
![Page 22: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/22.jpg)
94%
Area with no views
Area with views 94%
Non-regularly occupied areas
Interior Glazing
Views & Daylighting
22
![Page 23: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/23.jpg)
Natural Ventilation Analysis
Natural Ventilation –
Computational Fluid
Dynamics (CFD) Studies
Fluent (Ansys
Airpak)
Various ceiling
configurations and
shapes were
analyzed
CFD analysis
indicated - horizontal
ceiling plane works
as well as a sloped
ceiling
Comfort Verification
Studies – Additional
CFD analysis was
done during late
design for
verification purposes
23
![Page 24: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/24.jpg)
Floor Plan – Ventilation Systems
24
![Page 25: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/25.jpg)
25
![Page 26: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/26.jpg)
26
![Page 27: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/27.jpg)
Whole Building Energy Analysis
Reduce building energy
consumption
before
designing for renewables
27
![Page 28: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/28.jpg)
Policy City of Berkeley/ Project History
Design Site Location
Design Maximum Energy Production Site
Design Passive Strategies
Design Integrated Holistic Form
Construction Contractor and ZNE Building
Construction Photovoltaic System and Roof
Construction Radiant Slab (Heat + Cool)
Construction Natural Ventilation
Construction Day Light
Construction High Performance Envelope
Construction Cost Comparison/ Metrics
Occupancy ZNE Library Photos
Questions
Project Team / Credits
![Page 29: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/29.jpg)
29
![Page 30: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/30.jpg)
Solar Thermal Collectors
Waste Collection/
Recycling
FSC DreamDex
Wood Fence
After Hours Events
Entry/ Exit
Zoning Required
Roof Height
Setback
PV Panels Wind Chimney
Integral Sun
Shades
Low Flow
Planter
Entry
Composite
Cement Panels
-RainScreen
FSC Wood
Trellis
FSC DreamDex
Rain Screen Siding
Bicycle
Parking
Operable Skylights
Between PV
TPO Roof
Low Flow
Planter
Integrated Forms
30
![Page 31: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/31.jpg)
Interior View –Schematic Design
31
![Page 32: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/32.jpg)
University Avenue View
32
![Page 33: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/33.jpg)
Policy City of Berkeley/ Project History
Design Site Location
Design Maximum Energy Production Site
Design Passive Strategies
Design Integrated Holistic Form
Construction Contractor and ZNE Building
Construction Photovoltaic System and Roof
Construction Radiant Slab (Heat + Cool)
Construction Natural Ventilation
Construction Day Light
Construction High Performance Envelope
Construction Cost Comparison/ Metrics
Occupancy ZNE Library Photos
Questions
Project Team / Credits
![Page 34: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/34.jpg)
Public Low Bid
Public Procurement –
Lessons Learned
Few Built ZNE public
Buildings
FEAR of unknown is a
hurdle
Recall early days of
LEED with 30%
premium projects
Costs Estimates may
not be reflective of true
costs
There are ZNE and
then there are ZNE
projects
HED relied on proven
and reliable technology
Passive Design has
been around for
centuries
34
![Page 35: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/35.jpg)
Public Low Bid
Public Procurement –
Lessons Learned
Public Low Bid
Requirement
Limited Number of
General Contractors
with ZNE Experience
Has to be a
Collaborative
Process
Project Kick Off is
Key
PM/CM/PA/Builder/
Client Relationship is
Crucial
PA Needs to Educate
PA Needs to
Collaborate and
Develop Trust
COMMUNICATION!
35
![Page 36: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/36.jpg)
Coordination
Quick turn around on RFIs/
Submittals
Be Flexible
Work as a Team to Identify
Savings and Opportunities
Concepts that apply to all
projects 36
![Page 37: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/37.jpg)
Policy City of Berkeley/ Project History
Design Site Location
Design Maximum Energy Production Site
Design Passive Strategies
Design Integrated Holistic Form
Construction Contractor and ZNE Building
Construction Photovoltaic System and Roof
Construction Radiant Slab (Heat + Cool)
Construction Natural Ventilation
Construction Day Light
Construction High Performance Envelope
Construction Cost Comparison/ Metrics
Occupancy ZNE Library Photos
Questions
Project Team / Credits
![Page 38: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/38.jpg)
Unseen But Important
-Roof
Basis of Design/
Performance
requirements
PV Subs want to
Install Off the Rack
Systems
Be Aware of System
Conflicts
PA Needs to Resolve
Issues, Find Solutions
and Be Aware of ZNE
at all times
Integrated Designs
Are Not Friendly
Towards Field
Changes
Lessons In The Field
38
![Page 39: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/39.jpg)
39
![Page 40: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/40.jpg)
PV & Solar Thermal
Learning curve
Not your standard
electrical/
mechanical room
Plan for issues in the
field where Design
Build systems are
concerned
Structure needs to
have factored in
design loads
PV emergency shut
off -within 10’ of Main
Switch Gear (MSB)
Clearances?
Lessons In The Field
40
![Page 41: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/41.jpg)
PV & Solar Thermal
Do not exceed
zoning height
limitations
Low slope roofs –
HED detailed for
stanchions.
Standard wood curbs
preferred by subs
can impede flow and
affect collector plate
angles
Stanchions allow for
future technology,
reroofing, ease of
maintenance.
Lessons In The Field
41
![Page 42: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/42.jpg)
PV & Solar Thermal
Structure needs to
be conservative to
accommodate solar
thermal
Review of submittals
from joist and solar
thermal should be
concurrent
Solar hot water tank
loads max capacity
structural loads
Collector plate dead
and live loads
Scrutinize the
performance,
efficiency and
proposed angles of
collectors in
submittals
Lessons In The Field
42
![Page 43: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/43.jpg)
Policy City of Berkeley/ Project History
Design Site Location
Design Maximum Energy Production Site
Design Passive Strategies
Design Integrated Holistic Form
Construction Contractor and ZNE Building
Construction Photovoltaic System and Roof
Construction Radiant Slab (Heat + Cool)
Construction Natural Ventilation
Construction Day Light
Construction High Performance Envelope
Construction Cost Comparison/ Metrics
Occupancy ZNE Library Photos
Questions
Project Team / Credits
![Page 44: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/44.jpg)
Radiant Floors
Radiant Slab
Triple Wall Radiant
Tubing
4” of Radiant Concrete
Slab
2” of Rigid Insulation
Engineer has to check
manifold design and
tubing layout to ensure
proper zoning
Template Layout is
important to avoid
punctures after slab is
poured
Educating the other
subcontractors is KEY
Install protection plates
under doors or locations
of other elements
needing penetration
44
![Page 45: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/45.jpg)
Radiant Floors
Radiant Slab
Tight Urban Site provided
no laydown space.
Everything is stored within
the building.
Slab pours had to be
carefully phased/
coordinated to allow
materials to be relocated
6” concrete curbs at all
interior partitions
Curb cutouts need to be
planned for manifolds and
for construction access-
cherry pickers, etc.
45
![Page 46: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/46.jpg)
46
![Page 47: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/47.jpg)
Policy City of Berkeley/ Project History
Design Site Location
Design Maximum Energy Production Site
Design Passive Strategies
Design Integrated Holistic Form
Construction Contractor and ZNE Building
Construction Photovoltaic System and Roof
Construction Radiant Slab (Heat + Cool)
Construction Natural Ventilation
Construction Day Light
Construction High Performance Envelope
Construction Cost Comparison/ Metrics
Occupancy ZNE Library Photos
Questions
Project Team / Credits
![Page 48: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/48.jpg)
Wind Chimney
Natural Ventilation
Interior of chimney
has to be lined with
acoustic board
Provide for access
to service and
maintain
Patrons standard
comment is usually
about how quiet the
building is
CFD studies were
worth it. No
discomfort reported
48
![Page 49: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/49.jpg)
Wind Chimney
Natural Ventilation
Operable windows
are tied to BMS
Some manual
operable windows
provided at staff
offices
Window actuator
looks like a handle –
one operable
window at standard
height broken by
patron
Runtal missed at
one automatic
window
49
![Page 50: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/50.jpg)
50
![Page 51: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/51.jpg)
Runtal Radiators
Runtal Radiators
Provides preheating
of fresh air in the
winter
Long lead time 6-8
weeks
Concerns about
appearance and
community
perception
Standard Runtal
heights are limited
HED worked with
fabricator to
increase spacing
between fins and
revised pressure
and flow design
51
![Page 52: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/52.jpg)
52
![Page 53: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/53.jpg)
Policy City of Berkeley/ Project History
Design Site Location
Design Maximum Energy Production Site
Design Passive Strategies
Design Integrated Holistic Form
Construction Contractor and ZNE Building
Construction Photovoltaic System and Roof
Construction Radiant Slab (Heat + Cool)
Construction Natural Ventilation
Construction Day Light
Construction High Performance Envelope
Construction Cost Comparison/ Metrics
Occupancy ZNE Library Photos
Questions
Project Team / Credits
![Page 54: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/54.jpg)
54
![Page 55: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/55.jpg)
Day Light
Skylights
Abundance of light-
covered up skylights
during construction
Note the Roxul- rock
wool insulation
Note the radiant
tubing layout over
rigid insulation
Layout of floor
boxes
Note the
construction lights
55
![Page 56: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/56.jpg)
Day Light
Skylights
Both fixed and
operable
Operable skylight
controls were
difficult to get to
communicate with
BMS
Value engineering
exercise had
removed integral
blinds- added back
during construction
Skylight blinds have
solar cell- self
powered and
automatic
56
![Page 57: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/57.jpg)
Quality of Light
57
![Page 58: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/58.jpg)
Policy City of Berkeley/ Project History
Design Site Location
Design Maximum Energy Production Site
Design Passive Strategies
Design Integrated Holistic Form
Construction Contractor and ZNE Building
Construction Photovoltaic System and Roof
Construction Radiant Slab (Heat + Cool)
Construction Natural Ventilation
Construction Day Light
Construction High Performance Envelope
Construction Cost Comparison/ Metrics
Occupancy ZNE Library Photos
Questions
Project Team / Credits
![Page 59: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/59.jpg)
Cement Composite Panel Rain Screen
High Performance
Rain Screen System
14 Week Lead time
from Switzerland –
No comparable local
product
HED arranged for
contractor to obtain
manufacturer
certification
HED revised details
to reduce steel
furring use by 30%
Reduced material
use, errors, labor and
possibility for
breakage during
installation
59
![Page 60: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/60.jpg)
Cement Composite Panel Rain Screen
Attention to detail at
intersections of
different assemblies
Crucial during field
work
Care on the part of
the GC is just as
important
Shout out to Paul
Ubaldi- WBB Site
superintendent/
carpenter
60
![Page 61: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/61.jpg)
Roxul Rock Wool Insulation
3x8 wood studs @
24” on center
Wood is thermally
efficient vs. steel stud
Minimal thermal
transfer
7 ¼” of wall cavity
filled with rock wool
insulation = R30
2 layers of Roxul in
roof/ ceiling =R41
5 week lead time
from Canada
Good acoustic
performance, high
thermal performance,
fire protection,
moisture and mold
resistant and does
not sag over time
Great hygrothermal
performance
61
![Page 62: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/62.jpg)
DreamDex Wood Siding
1” x 6” Radiata pine
siding impregnated
with resin
FSC, dense, mold
and insect resistant,
weathers well –
alternative to tropical
hardwoods
Designed as a rain
screen system
Appears to be
performing well
Dreamdex is
restructuring –
product unavailable
City purchased
available stock at
start of construction
and kept off site
HED worked with
contractor to avoid
wastage
62
![Page 63: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/63.jpg)
63
![Page 64: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/64.jpg)
Policy City of Berkeley/ Project History
Design Site Location
Design Maximum Energy Production Site
Design Passive Strategies
Design Integrated Holistic Form
Construction Contractor and ZNE Building
Construction Photovoltaic System and Roof
Construction Radiant Slab (Heat + Cool)
Construction Natural Ventilation
Construction Day Light
Construction High Performance Envelope
Construction Cost Comparison/ Metrics
Occupancy ZNE Library Photos
Questions
Project Team / Credits
![Page 65: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/65.jpg)
True Costs Comparisons
65
![Page 66: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/66.jpg)
Energy Dashboard
http://westenergy.berkeley-public.org/berkeley-west-branch-library/
66
![Page 67: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/67.jpg)
Trending Data
Energy Tracking
Building appears to
be on track for ZNE
performance
PG&E and building
meters are not in
sync.
Ongoing trouble
shooting.
No flow meters
Pe
rmis
sio
n t
o
op
era
te P
V
Tro
ub
le s
ho
ot
so
lar
the
rma
l
Ongoing
construction
(flush out)
Bu
ild
ing
occ
up
ied
5/1/2014
67
Dashboard PV
Jan 7KWh
Feb 3.6 KWh
Mar 6.5 KWh
Apr 8 KWh
May 1.8 KWh to date, May 6th
![Page 68: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/68.jpg)
Policy City of Berkeley/ Project History
Design Site Location
Design Maximum Energy Production Site
Design Passive Strategies
Design Integrated Holistic Form
Construction Contractor and ZNE Building
Construction Photovoltaic System and Roof
Construction Radiant Slab (Heat + Cool)
Construction Natural Ventilation
Construction Day Light
Construction High Performance Envelope
Construction Cost Comparison/ Metrics
Occupancy ZNE Library Photos
Questions
Project Team / Credits
![Page 69: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/69.jpg)
69
![Page 70: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/70.jpg)
70
![Page 71: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/71.jpg)
71
![Page 72: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/72.jpg)
72
![Page 73: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/73.jpg)
73
![Page 74: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/74.jpg)
74
![Page 75: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/75.jpg)
75
![Page 76: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/76.jpg)
Policy City of Berkeley/ Project History
Design Site Location
Design Maximum Energy Production Site
Design Passive Strategies
Design Integrated Holistic Form
Construction Contractor and ZNE Building
Construction Photovoltaic System and Roof
Construction Radiant Slab (Heat + Cool)
Construction Natural Ventilation
Construction Day Light
Construction High Performance Envelope
Construction Cost Comparison/ Metrics
Occupancy ZNE Library Photos
Questions
Project Team / Credits
![Page 77: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/77.jpg)
Policy City of Berkeley/ Project History
Design Site Location
Design Maximum Energy Production Site
Design Passive Strategies
Design Integrated Holistic Form
Construction Contractor and ZNE Building
Construction Photovoltaic System and Roof
Construction Radiant Slab (Heat + Cool)
Construction Natural Ventilation
Construction Day Light
Construction High Performance Envelope
Construction Cost Comparison/ Metrics
Occupancy ZNE Library Photos
Questions
Project Team / Credits
![Page 78: May 14 2014 - New Buildings Institutenewbuildings.org/sites/default/files/WestBerkeleyCaseStudySm.pdfBerkeley Public Library Main Library and four branches 1.1 million annual visits](https://reader034.vdocuments.site/reader034/viewer/2022042103/5e80140c36f74024e76a2ab0/html5/thumbnails/78.jpg)
78