Project Name Project Activity Financial Year Allocation Status
Bulanda primary school Fittings and finishes of three classrooms
2013/14 1,000,000 completed
Mungakha primary school Plastering and painting of four classrooms
2013/14 500,000 completed
Itete primary school Construction of 1 classroom 2013/14 700,000 completed
Namamali muslim primary school
Construction of 1 classroom 2013/14 700,000 completed
Munami primary school Repair of damaged walls and roof of 2 classrooms
2013/14 500,000 completed
Bulimbo primary school Repair of damaged walls and roof of 4 classrooms
2013/14 700,000 completed
Bukosia primary school Construction of 1 classroom 2013/14 800,000 completedLubanga primary school Repair of damaged floors, windows
and roof of 4 classrooms2013/14 700,000 completed
Suwo primary school Walling and floor plastering of two semi permanent classrooms
2013/14 500,000 completed
Muberi Primary School Fittings and finishes of 2 classrooms 2013/14 800,000 completed
Mayoni township Primary School
Roofing,fittings and finishes of 3 classrooms
2013/14 1,000,000 completed
Nyambula Primary School Construction of 1 classroom 2013/14 700,000 completedWamukoya Muslim Primary School
Construction of a classroom 2013/14 700,000 completed
Chibanga Primary School Fittings and finishes of 4 classrooms 2013/14 600,000 completed
PROJECT IMPLEMENTATION STATUS AS AT MAY 2016MATUNGU NG-CDF
Ikulumwoyo Primary School Roofing,Fittings and finishes of two classrooms
2013/14 800,000 completed
Namanga Primary School Construction of 1 classroom 2013/14 500,000 completedNamalenje Primary School Construction of a classroom 2013/14 600,000 completedMalanga Primary School Construction of a classroom 2013/14 700,000 completedBusombi primary school Fittings and finishes of two classrooms 2013/14 400,000 completed
Namalasire Secondary School Roofing, fittings and finishes of administration block
2013/14 1,000,000 completed
Munami secondary school Construction of 1 classroom 2013/14 700,000 completedMirere secondary sch1ool Fittings and finishes for multipurpose
hall and kitchen2013/14 600,000 completed
Lubanga Secondary Sc2hool Construction of a library 2013/14 900,000 completed
Lunganyiro girls Second3ary School
Fittings and finishes for twin laboratory
2013/14 700,000 completed
Eshirumbwe secondary s4chool
Construction of a science lab 2013/14 1,000,000 completed
Ngairwe Secondary school Fittings and finishes of a twin lab 2013/14 800,000 completedEshikhondi Secondary School Construction of two classrooms 2013/14 700,000 completed
Koyonzo girls Secondary School
Fittings and finishes of science lab 2013/14 1,000,000 completed
Ebusambe Secondary School Construction of 1 classroom 2013/14 800,000 completed
Makokhwe Secondary School Construction of 1 classroom 2013/14 800,000 completed
Mungakha Secondary School Construction of 2 classrooms 2013/14 1,000,000 completed
Matungu SDA Secondary school
Construction of 1 classroom 2013/14 700,000 completed
Namulungu Secondry School Repair of damaged floors, walls and roof of 5 classrooms
2013/14 1,300,000 completed
Namamba Secondary School fittings and finishes for a library 2013/14 500,000 completedBusombi muslim Secondary School
fittings & finishes of a twin laboratory 2013/14 600,000 completed
Makunda muslim Secondary School
Fittings and finishes of a D/hall and kitchen
2013/14 1,000,000 completed
Bulimbo girls Secondary School Construction of 1 unit staff house 2013/14 700,000 completed
Ejinja mixed Secondary School Finishes for twin laboratory and administration block
2013/14 600,000 completed
Itete secondary school Construction of 1 classroom 2013/14 600,000 completedEshibanze secondary school Construction of 1 classroom 2013/14 700,000 completedEmakale secondary school Construction of 1 classroom 2013/14 700,000 completedEmanane secondary school Fittings and finishes of 3 classrooms 2013/14 700,000 completed
Namberekeya secondary school Fittings and finishes of 3 classrooms @ 300,000/- and construction of 1 classroom @ 700,000/-
2013/14 1,000,000 completed
Mungakha Secondary school Purchase of Labaratory equipment 2013/14 296,544 purchased and delivered
Matungu SDA secondary school Purchase of Labaratory equipment 2013/14 296,544 purchased and delivered
Lutasio secondary school Purchase of Labaratory equipment 2013/14 296,544 purchased and delivered
Bulimbo girls secondary school Purchase of Labaratory equipment 2013/14 296,544 purchased and delivered
Mungakha secondary school Purchase of text books 2013/14 350,000 purchased and delivered
Matungu sda secondary school Purchase of text books 2013/14 350,000 purchased and delivered
Lutasio secondary school Purchase of text books 2013/14 350,000 purchased and delivered
Bulimbo girls secondary school Purchase of text books 2013/14 350,000 purchased and delivered
St Charles Khalaba secondary school
puchase of a 51 seater bus 2013/14 7,000,000 purchased
Mirere Health centre Construction of a prefabricated staff unit
2013/14 750,000 Project Reallocated
Lubanga Health centre Construction of a prefabricated staff unit
2013/14 750,000 Project Reallocated
Mungungu Health Centre Construction of a prefabricated staff unit
2013/14 745,000 Project Reallocated
Namulungu Health centre Construction of a prefabricated staff unit
2013/14 745,000 completed
Khalaba health centre Construction of a prefabricated staff unit
2013/14 742,759 completed
Lunganyiro Heath centre Construction of a prefabricated staff unit
2013/14 750,000 Project Reallocated
Monitoring & Evaluation projects M&E and capacity building 2013/14 2,192,627 completed
Administration & Recurrent staff salaries, committee expenses and operational costs
2013/14 4,385,254 completed
Emergency Supporting of urgent, unforeseen need for expenditure.
2013/14 3,564,466 Fully utilized
Bursary Scheme, Mocks & Exams.
bursary awards to needy students & facilitation of mocks & exams.
2013/14 10,000,000
Marinda primary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Eshibanze secondary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Namalenje primary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Namamba primary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Khalaba primary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Kholera primary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Mukunyuku primary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Ngairwe primary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Indanglasia primary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Lunganyiro primary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Nanyeni primary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Mungore primary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Kadima primary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Mwira secondary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Kholera secondary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Namulungu secondary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Namamba secondary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Khalaba secondary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Matungu SDA seondary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Namalasire secondary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Ngairwe secondary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Indangalasia secondary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Lunganyiro secondary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Eshikhondi secondary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Munami secondary school purchase of seedlings & cost of tree planting activities
2013/14 56,221 completed
Mirere secondary school purchase of seedlings & cost of tree planting activities
2013/14 56,226 completed
Strategic plan Preparation of a constituency strategic plan
2013/14 1,500,000 completed
Constituency Website Setting up a constituency website 2013/14 500,000 completedMatungu football team purchase of balls, reflectors, weasels,
plastics,uniforms and boots2013/14 324,832 purchased
Matungu volley ball team Purchase of volleyballs, volleyball nets and players' kits
2013/14 487,248 purchased
Matungu netball team Purchase of netball kits, netballs and players' kits and reflectors
2013/14 324,832 purchased
Matungu rugby team Purchase of rugby balls and players kits
2013/14 324,839 purchased
Tito’s home-Nanyeni river road-5km
Bush clearing, drainage and culvert opening
2013/14 200,000 completed
Harambee-Shiyabo road Bush clearing, drainage and culvert opening
2013/14 200,000 completed
Eshirumbwe-Asravima road-5km
Bush clearing, drainage and culvert opening
2013/14 200,000 completed
Panyako-Namasanda road-5km
Bush clearing, drainage and culvert opening
2013/14 200,000 completed
Omondi market-River nzoia road-5km
Bush clearing, drainage and culvert opening
2013/14 200,000 completed
Kholera school-soweto road5km
Bush clearing, drainage and culvert opening
2013/14 200,000 completed
Mundindi-Nyapwaka road Bush clearing, drainage and culvert opening
2013/14 200,000 completed
Nabwerekeya-Musango road-5km
Bush clearing, drainage and culvert opening
2013/14 200,000 completed
Shikhondi-Mungungu road Bush clearing, drainage and culvert opening
2013/14 200,000 completed
Nanyeni school-Nanyeni chief’s office-5km
Bush clearing, drainage and culvert opening
2013/14 200,000 completed
Khalaba-Busombi road-5km Bush clearing, drainage and culvert opening
2013/14 200,000 completed
Lutasio-buloga road-5km Bush clearing, drainage and culvert opening
2013/14 200,000 completed
Koyonzo-Moco office-itete road-5km
Bush clearing, drainage and culvert opening
2013/14 200,000 completed
Emakale market-Emachinga road-5km
Bush clearing, drainage and culvert opening
2013/14 200,000 completed
Lunganyiro-mukunyuku road-5km
Bush clearing, drainage and culvert opening
2013/14 200,000 completed
Indangalasia –Omondi market road-5km
Bush clearing, drainage and culvert opening
2013/14 200,000 completed
Lubanga market-Nyapwaka river road-5km
Bush clearing, drainage and culvert opening
2013/14 200,000 completed
Mirere-nandwa road-5km Bush clearing, drainage and culvert opening
2013/14 200,000 completed
Nandwa-lunganyiro road-5km Bush clearing, drainage and culvert opening
2013/14 200,000 completed
Sitende-Anabuchana road-5km
Bush clearing, drainage and culvert opening
2013/14 200,000 completed
Makokha market-osiero junction road-7km
Bush clearing, drainage and culvert opening
2013/14 300,000 completed
Munami-Eburiya road-5km Bush clearing, drainage and culvert opening
2013/14 300,000 completed
Mungakha-Namalasire road-5km
Bush clearing, drainage and culvert opening
2013/14 300,000 completed
Namayiakalo river-Lubanga health centre road-15km
Bush clearing, drainage and culvert opening
2013/14 800,000 completed
Nyapwaka-Shikhondi road-5km
Bush clearing, drainage and culvert opening
2013/14 300,000 completed
Emanani-Emurambe road-7km
Bush clearing, drainage and culvert opening
2013/14 300,000 completed
Nanyeni chief’s office –mwira road-10km
Bush clearing, drainage and culvert opening
2013/14 500,000 completed
Lunganyiro-Mungore road-15km
Bush clearing, drainage and culvert opening
2013/14 800,000 completed
Mungungu-Nanyeni primary school road-18km
Bush clearing, drainage and culvert opening
2013/14 800,000 completed
Koyonzo-Ngairwe road-16km Bush clearing, drainage and culvert opening
2013/14 800,000 completed
Makhwari ACK church-Namayiakalo River-14km
Bush clearing, drainage and culvert opening
2013/14 800,000 completed
Adminstration Staff salaries, committee expenses and operational costs
2014/15 7,018,065 Fully utilized
Monitoring and Evaluation Projects M&E and capacity building 2014/15 3,509,033 Fully utilized
Audit Fee Payment of Audit Fee to KENAO 2014/15 500,000 not yet paid Bursary/CATs/Mocks Bursary awards to needy students &
facilitation of mocks & exams. 2014/15 15,000,000 Fully utilized
Emergency Supporting of urgent, unforeseen need for expenditure.
2014/15 5,400,259 Fully utilized
Sports Organizing and running of football, netball, rugby, athletics & indoor sports tournaments.
2014/15 2,339,355 Fully utilized
Suwo Primary school Walling and floor plastering of two classrooms
2014/15 800,000 completed and in use
Mungore Primary school Fittings and finishes of classrooms 2014/15 500,000 ongoing Namayiakalo Primary school Renovations of classrooms 2014/15 700,000 ongoing
Nyapwaka Primary school Construction of (1) one classrooms - Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.
2014/15 700,000 ongoing
Bulanda Primary school Construction of (1) one classrooms - Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.
2014/15 1,000,000 ongoing
Mungakha Primary school Fittings and finishes of classrooms 2014/15 500,000 ongoing Namanga Primary school Fittings and finishes of classrooms 2014/15 1,000,000 ongoing Namalasire Primary school Renovations of classrooms 2014/15 500,000 completed and
in use
Mukunyuku Primary school Renovations of classrooms 2014/15 300,000 completed and in use
Namamali Muslim Primary school
Fittings and finishes of classrooms 2014/15 700,000 completed and in use
Muberi Primary school Fittings and finishes of classrooms 2014/15 500,000 completed and in use
Ngairwe Primary school Renovations of classrooms 2014/15 500,000 completed and in use
Koyonzo Primary school Renovations of classrooms 2014/15 500,000 completed and in use
Ejinja Primary school Renovations of classrooms 2014/15 500,000 completed and in use
Indangalasia Primary school Renovations of classrooms 2014/15 500,000 completed and in use
Eshirumbwe Primary school Renovations of classrooms 2014/15 800,000 completed and in use
Ebutaliko Primary school Renovations of classrooms 2014/15 800,000 completed and in use
Nyambula Primary school Construction of (1) one classrooms - Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.
2014/15 800,000 completed and in use
Itete Primary school Fittings and finishes of classrooms 2014/15 500,000 completed and in use
Munanga Primary school Fittings and finishes of classrooms 2014/15 300,000 completed and in use
Eshikhondi Primary school Fittings and finishes of classrooms 2014/15 600,000 ongoing Ikulumwoyo Primary school Fittings and finishes of classrooms 2014/15 800,000 ongoing
Namalenje Primary school Fittings and finishes of classrooms 2014/15 600,000 ongoing Bulimbo Primary school Fittings and finishes of classrooms 2014/15 500,000 ongoing Eshibanze Primary school Renovations of classrooms 2014/15 800,000 completed and
in use
Makunda Muslim Primary school
Renovations of classrooms 2014/15 500,000 completed and in use
Wamukoya Muslim Primary school
Fittings and finishes of classrooms 2014/15 500,000 ongoing
Bulonga Primary school Fittings and finishes of classrooms 2014/15 300,000 completed and in use
Marinda Primary school Renovations of classrooms 2014/15 500,000 completed and in use
Chibanga Primary school Construction of (1) one classrooms - Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.
2014/15 800,000 ongoing
Khalaba Primary school Renovations of classrooms 2014/15 500,000 completed and in use
Busombi Muslim Primary school
Renovations of classrooms 2014/15 500,000 completed and in use
Ebusambe Primary school Renovations of classrooms 2014/15 500,000 completed and in use
Kandai Primary school Fittings and finishes of classrooms 2014/15 1,000,000 completed and in use
Malanga Primary school Fittings and finishes of classrooms 2014/15 600,000 completed and in use
Namamba Primary school Renovations of classrooms 2014/15 800,000 completed and in use
Makokhwe Primary school Fittings and finishes of classrooms 2014/15 200,000 completed and in use
Emakale Primary school Renovations of classrooms 2014/15 300,000 completed and in use
Bukosia Primary school Fittings and finishes of classrooms 2014/15 1,000,000 ongoing Matungu SDA Primary school Renovations of classrooms 2014/15 500,000 ongoing
Matungu Special school Construction of (1) one classrooms - Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.
2014/15 1,000,000 ongoing
Lubanga Primary School Rehabilitation of classrooms - replacement of window panes, repair of roofs, repair of floors, verandah face -lifting &painting.
2014/15 837,931 completed and in use
Munami Secondary school Construction of new teachers house. 2014/15 1,500,000 ongoing
Namberekeya Secondary school
Fittings and finishes of classrooms 2014/15 1,500,000 completed and in use
Lubanga Secondary school Fittings and finishes of classrooms 2014/15 1,000,000 completed and in use
Lung’anyiro girls Secondary school
Fittings and finishes of classrooms 2014/15 1,200,000 completed and in use
Mungakha Secondary school Fittings and finishes of classrooms 2014/15 1,200,000 completed and in use
Namalasire Secondary school Fittings and finishes of classrooms 2014/15 1,300,000 completed and in use
Koyonzo mixed Secondary school
Construction of new teachers house. 2014/15 1,000,000 completed and in use
Koyonzo girls Secondary school
Fittings and finishes of classrooms 2014/15 800,000 ongoing
Ejinja mixed Secondary school Fittings and finishes of classrooms 2014/15 800,000 completed and in use
Ngairwe Secondary school Fittings and finishes of classrooms 2014/15 800,000 ongoing Indangalasia Secondary school Construction of new teachers house.
(Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes)
2014/15 1,500,000 completed and in use
Eshirumbwe Secondary school Fittings and finishes of classrooms 2014/15 800,000 completed and in use
Itete Secondary school Fittings and finishes of classrooms 2014/15 1,000,000 ongoing
Eshikhondi Secondary school Fittings and finishes of classrooms 2014/15 1,000,000 ongoing
Namulungu Secondary school Fittings and finishes of classrooms 2014/15 1,300,000 ongoing
Mukhweya Secondary school Fittings and finishes of classrooms 2014/15 300,000 completed and in use
Bulimbo girls Secondary school Construction of new teachers house. (Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes)
2014/15 1,200,000 ongoing
Eshibanze Secondary school Fittings and finishes of classrooms 2014/15 1,000,000 completed and in use
Makunda Secondary school Fittings and finishes of classrooms 2014/15 1,000,000 completed and in use
Kholera Secondary school Renovations of classrooms 2014/15 400,000 ongoing Busombi Secondary school Fittings and finishes of classrooms 2014/15 1,000,000 ongoing Ebusambe Secondary school Fittings and finishes of classrooms 2014/15 1,000,000 ongoing
Makokhwe Secondary school Fittings and finishes of classrooms 2014/15 1,100,000 ongoing
Emanani Secondary school Fittings and finishes of classrooms 2014/15 800,000 completed and in use
Emakale Secondary school Fittings and finishes of classrooms 2014/15 800,000 completed and in use
Matungu SDA secondary school
Fittings and finishes of classrooms 2014/15 1,200,000 ongoing
St. Gabriels Mirere Secondary school
Purchase of 51 seater schools bus 2014/15 7,500,000 purchased and delivered
St. Maurice Mwira secondary school
Purchase of 37 seater schools bus –Co-funded by PTA/CDF
2014/15 3,500,000 purchased and delivered
Indangalasia Secondary school Purchase of Labaratory equipment 2014/15 305,940 purchased and delivered
Khabukoshe Secondary school Purchase of Labaratory equipment 2014/15 305,940 purchased and delivered
Munami Secondary School Purchase of Labaratory equipment 2014/15 305,940 purchased and delivered
Lung’anyiro girls secondary school
Purchase of Labaratory equipment 2014/15 305,940 purchased and delivered
Namulungu Secondary school Purchase of text books 2014/15 300,000 purchased and delivered
Makunda Muslim secondary school
Purchase of text books 2014/15 300,000 purchased and delivered
Iteete Secondary school Purchase of text books 2014/15 300,000 purchased and delivered
Lubanga Secondary school Purchase of text books 2014/15 300,000 purchased and delivered
Musamba Youth Polytechnic Fittings and finishes of classrooms & workshops
2014/15 700,000 ongoing
Harambee Market Divisional police offices.
Construction of new police offices. (Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes)
2014/15 1,200,000 completed and in use
Kholera Ward Planting of trees, waste management, developing and implementation of environmental awareness creation programmes.
2014/15 467,871 complete
Namamali Ward Planting of trees, waste management, developing and implementation of environmental awareness creation programmes.
2014/15 467,871 complete
Khalaba ward Planting of trees, waste management, developing and implementation of environmental awareness creation programmes.
2014/15 467,871 complete
Mayoni Ward Planting of trees, waste management, developing and implementation of environmental awareness creation programmes.
2014/15 467,871 complete
Koyonzo Ward Planting of trees,waste management, developing and implementation of environmental awareness creation programmes.
2014/15 467,871 complete
Namasanda Health Centre Fittings and finishes of wards and offices.
2014/15 1,000,000 ongoing
Ochango –Lutumbi river crossing (9000x2500x1500)
Double lines 900mm diameter culverts
2014/15 986,500 complete
Ebulosi –Eshikufu/Lairi river crossing (9000x2500x1500)
Double lines 900mm diameter culverts
2014/15 986,500 complete
Nanyeni- Mungungu river crossing (9000x2500x1500)
Double lines 900mm diameter culverts
2014/15 986,500 complete
Musindalo -Mutola river crossing (9000x1800x1500)
Single line 900mm culverts 2014/15 538,500 complete
Mirere -Namusasi river crossing (9000x1800x1500)
Single line 900mm culverts 2014/15 538,500 complete
Nakhakosia river crossing (9000x1800x1500)
Single line 900mm culverts 2014/15 538,500 complete
Bukosia -Khwiteka river crossing (9000x1800x1500)
Single line 900mm culverts 2014/15 538,500 complete
Ywaya jcn- Otuko tumbo- Pius muketi/ Namamil muslim- Nabukhamba (3,5km)
Site clearance & stripping, culverts & drainage works, earth works and day works.
2014/15 570,690 complete
Peter chunga- Namufweni- Koyonzo market (2.5km)
Site clearance & stripping, culverts & drainage works, earth works and day works.
2014/15 545,250 complete
Rateko market – Namanga (1.5km)
Site clearance & stripping, earth works and day works.
2014/15 227,200 complete
Koyonzo mkt –Koyonzo girls (0.95km)
Bush Clearing, drainage and culvert opening
2014/15 147,660 complete
Matungu jnt. –Green view (1.15km)
Bush Clearing, drainage and culvert opening
2014/15 152,660 complete
Sayangwe pri. –Itete mkt (1.0km)
Site clearance & stripping, culverts & drainage works, earth works and day works.
2014/15 301,050 complete
Omoto –Namberekeya (0.95km)
Bush Clearing, drainage and culvert opening
2014/15 147,660 complete
Elnino –Wangenge (1.0km) Bush Clearing, drainage and culvert opening
2014/15 156,800 complete
Lunganyiro –Shisari pefa church (1.5km)
Site clearance & stripping, works, earth works and day works.
2014/15 227,200 complete
Munami –Makhwari ACK- Lubanga clinic (2.5km)
Site clearance & stripping, culverts & drainage works, earth works and day works.
2014/15 545,250 complete
Bulanda pri –Munami mkt (1.5km)
Site clearance & stripping, culverts & drainage works, earth works and day works.
2014/15 366,450 complete
Tomas –Ochieng Omanyo –Camlus (1.5km)
Site clearance & stripping, works, earth works and day works.
2014/15 227,200 complete
Wetaba River –Mayoni ACK church (1.5km)
Site clearance & stripping, works, earth works and day works.
2014/15 227,200 complete
Kings out reach church –Kholera river (1.0km)
Bush Clearing, drainage and culvert opening
2014/15 156,800 complete
Koyonzo mkt –Mosque/ Namalasire (2.0km)
Site clearance & stripping, works, earth works and day works.
2014/15 268,200 complete
Chebukube mkt – Ngairwe (1.0km)
Bush Clearing, drainage and culvert opening
2014/15 156,800 complete
Dadira area –Nyambula primary (2.0km)
Site clearance & stripping, works, earth works and day works.
2014/15 194,800 complete
Ebukananachi –Mabonga village (2.5km)
Site clearance & stripping, works, earth works and day works.
2014/15 541,250 complete
Namalenge pri –Ebukananachi/ Namulungu stream (2.0km)
Site clearance & stripping, culverts & drainage works, earth works and day works.
2014/15 256,850 complete
Panyako –Pefa/ Makutano (0.95km)
Bush Clearing, drainage and culvert opening
2014/15 147,660 complete
Shiyabo –Khalaba river (2.5km)
Site clearance & stripping, works, earth works and day works.
2014/15 485,250 complete
Indangalasia pri –Lunaabo (1.75km)
Site clearance & stripping, culverts & drainage works, earth works and day works.
2014/15 200,200 complete
Mungore jcn-Mirere (2.7 km) Site clearance & stripping, culverts & drainage works, earth works and day works.
2014/15 636,420 complete
Adminstration Staff salaries, committee expenses and operational costs
2015/16 7,441,819 ongoing
Monitoring and Evaluation Projects M&E and capacity building 2015/16 3,720,909 ongoing
Audit Fee Payment of Audit Fee to KENAO 2015/16 500,000 Funds not Disbursed
Bursary/CATs/Mocks Bursary awards to needy students & facilitation of mocks & exams.
2015/16 18,000,000 ongoing
Emergency Supporting of urgent, unforeseen need for expenditure.
2015/16 5,767,647 ongoing
Sports Organizing and running of football, netball, rugby, athletics & indoor sports tournaments.
2015/16 1,000,000 ongoing
Environment environmetal activities 2015/16 1,000,000 ongoing Lutasio Primary school Renovations of classrooms-
(Reinforcing walls, fixing windows panes/shutters, roofing and floor plastering).
2015/16 700,000 ongoing
Bulimbo Primary school Renovations of classrooms-(Reinforcing walls, fixing windows panes/shutters, roofing and floor plastering).
2015/16 500,000 complete and in use
Shiyabo Primary school Renovations of classrooms 2015/16 700,000 Funds not Disbursed
Lung’anyiro Primary school Renovations of classrooms-(Reinforcing walls, fixing windows panes/shutters, roofing and floor plastering).
2015/16 700,000 Funds not Disbursed
Namayiakalo Primary school Renovations of classrooms-(Reinforcing walls, fixing windows panes/shutters, roofing and floor plastering).
2015/16 700,000 Funds not Disbursed
Ngairwe Primary school Renovations of classrooms-(Reinforcing walls, fixing windows panes/shutters, roofing and floor plastering).
2015/16 600,000 Funds not Disbursed
Ejinja Primary school Renovations of classrooms-(Reinforcing walls, fixing windows panes/shutters, roofing and floor plastering).
2015/16 700,000 Funds not Disbursed
Ebutaliko Primary school Renovations of classrooms-(Reinforcing walls, fixing windows panes/shutters, roofing and floor plastering).
2015/16 700,000 Funds not Disbursed
Nyapora Primary school Renovations of classrooms-(Reinforcing walls, fixing windows panes/shutters, roofing and floor plastering).
2015/16 700,000 Funds not Disbursed
Namalenje Primary school Renovations of classrooms-(Reinforcing walls, fixing windows panes/shutters, roofing and floor plastering).
2015/16 700,000 Funds not Disbursed
Ebubambula Primary school Renovations of classrooms-(Reinforcing walls, fixing windows panes/shutters, roofing and floor plastering).
2015/16 700,000 Funds not Disbursed
Sayangwe Primary school Renovations of classrooms-(Reinforcing walls, fixing windows panes/shutters, roofing and floor plastering).
2015/16 700,000 Funds not Disbursed
Matungu SDA Primary school Renovations of classrooms-(Reinforcing walls, fixing windows panes/shutters, roofing and floor plastering).
2015/16 500,000 complete and in use
Koyonzo Primary school Renovations of classrooms-(Reinforcing walls, fixing windows panes/shutters, roofing and floor plastering).
2015/16 700,000 Funds not Disbursed
St Paul Ejinja Primary school Renovations of classrooms-(Reinforcing walls, fixing windows panes/shutters, roofing and floor plastering).
2015/16 700,000 Funds not Disbursed
Eshikhondi Primary school Renovations of classrooms-(Reinforcing walls, fixing windows panes/shutters, roofing and floor plastering).
2015/16 500,000 Funds not Disbursed
Musango Primary school Construction of (1) one classrooms - Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.
2015/16 700,000 Funds not Disbursed
Suwo Primary school Construction of (1) one classrooms - Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.
2015/16 700,000 Funds not Disbursed
Lubanga Primary school Construction of (1) one classrooms - Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.
2015/16 700,000 Funds not Disbursed
Bulanda Primary school Construction of (1) one classrooms - Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.
2015/16 700,000 Funds not Disbursed
Namamali Muslim Primary school
Construction of (1) one classrooms - Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.
2015/16 700,000 Funds not Disbursed
Namanga Primary school Completion of classrooms(Roofing, fittings and painting)
2015/16 400,000 Funds not Disbursed
Muberi Primary school Construction of (1) one classrooms - Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.
2015/16 700,000 Funds not Disbursed
Ikulumwoyo Primary school Construction of (1) one classrooms - Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.
2015/16 700,000 Funds not Disbursed
Nyambula Muslim Primary school
Construction of (1) one classrooms - Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.
2015/16 700,000 Funds not Disbursed
Chibanga Muslim Primary school
Construction of (1) one classrooms - Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.
2015/16 700,000 Funds not Disbursed
Bukosia Primary school Construction of (1) one classrooms - Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.
2015/16 700,000 Funds not Disbursed
Wamukoya Muslim Primary school
Construction of (1) one classrooms - Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.
2015/16 700,000 Funds not Disbursed
Malanga Primary school Construction of (1) one classrooms - Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.
2015/16 700,000 ongoing
Kandai Primary school Completion of classrooms (Roofing, fittings and painting)
2015/16 500,000 Funds not Disbursed
Emurabe Primary school Construction of staffroom(Setting out, foundation laying, walling, floor slab casting, roofing, plaster work)
2015/16 700,000 Funds not Disbursed
Nanyeni Primary school Construction of staffroom(Setting out, foundation laying, walling, floor slab casting, roofing, plaster work)
2015/16 700,000 Funds not Disbursed
Matungu Special school Completion of classrooms(Roofing, fittings and painting)
2015/16 400,000 Funds not Disbursed
Nyapwaka Primary school Construction of staffroom(Setting out, foundation laying, walling, floor slab casting, roofing, plaster work)
2015/16 700,000 Funds not Disbursed
Koyonzo Special school Construction of New classroom(Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.)
2015/16 700,000 Funds not Disbursed
Namasanda Sec school Construction of new classrooms. (Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.)
2015/16 1,300,000 ongoing
Lutasio Secondary school Construction of new classrooms. (Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.)
2015/16 1,300,000 ongoing
Namulungu Muslim Sec School Construction of new classrooms. (Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.)
2015/16 1,300,000 Funds not Disbursed
Shiyabo Secondary school Construction of new classrooms. (Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.)
2015/16 1,300,000 ongoing
Koyonzo mixed Secondary school
Completion of teachers house(Roofing, fittings and painting)
2015/16 900,000 Funds not Disbursed
Munami Secondary school Completion of teachers house(Roofing, fittings and painting)
2015/16 900,000 Funds not Disbursed
Bulimbo girls Secondary school Completion of teachers house (Roofing, fittings and painting)
2015/16 700,000 Funds not Disbursed
Namamba Secondary school Completion of twin lab(Roofing, fittings and painting)
2015/16 900,000 Funds not Disbursed
Khabukoshe Secondary school Completion of twin lab(Roofing, fittings and painting)
2015/16 900,000 Funds not Disbursed
Indangalasia Secondary school Renovation of classrooms-(Reinforcing walls, fixing windows panes/shutters, roofing and floor plastering
2015/16 800,000 Funds not Disbursed
Koyonzo Girls Secondary school Completion of classes(Roofing, fittings and painting)
2015/16 500,000 Funds not Disbursed
St Stephens Namulungu ACK Secondary school
Renovation of classrooms-(Reinforcing walls, fixing windows panes/shutters, roofing and floor plastering
2015/16 800,000 Funds not Disbursed
Khalaba Secondary school Construction of students dormitory(Setting out, foundation laying, walling, floor slab casting)
2015/16 900,000 ongoing
Eshirumbwe Secondary school Completion of classrooms(Roofing, fittings and painting)
2015/16 800,000 Funds not Disbursed
Eshibanze Secondary school Completion of classrooms(Roofing, fittings and painting)
2015/16 700,000 Funds not Disbursed
Matungu SDA Secondary school
Completion of classrooms(Roofing, fittings and painting)
2015/16 800,000 ongoing
Emanani Secondary school Completion of classrooms(Roofing, fittings and painting)
2015/16 800,000 Funds not Disbursed
Emakale Secondary school Completion of classrooms(Roofing, fittings and painting)
2015/16 800,000 Funds not Disbursed
Makokhwe Secondary school Completion of classrooms(Roofing, fittings and painting)
2015/16 700,000 Funds not Disbursed
Ebusambe Secondary school Completion of classrooms(Roofing, fittings and painting)
2015/16 900,000 ongoing
Namberekeya Secondary school Completion of classrooms(Roofing, fittings and painting)
2015/16 800,000 Funds not Disbursed
Lung’anyiro Girls Secondary school
Completion of classrooms(Roofing, fittings and painting)
2015/16 900,000 Funds not Disbursed
Mungakha Secondary school Completion of classrooms(Roofing, fittings and painting)
2015/16 900,000 Funds not Disbursed
Lubanga secondary school Completion of classrooms(Roofing, fittings and painting)
2015/16 1,000,000 Funds not Disbursed
Namalasire secondary school Completion of classrooms(Roofing, fittings and painting)
2015/16 800,000 Funds not Disbursed
Ngairwe secondary school Completion of classrooms(Roofing, fittings and painting)
2015/16 900,000 Funds not Disbursed
Eshikhondi secondary school Completion of classrooms(Roofing, fittings and painting)
2015/16 900,000 Funds not Disbursed
Itete secondary school Completion of classrooms(Roofing, fittings and painting)
2015/16 800,000 Funds not Disbursed
St Stephens Namulungu ACK Purchase of 51 seater schools bus 2015/16 7,500,000 Funds not Disbursed
St Josephs Indangalasia Purchase of 51 seater schools bus 2015/16 7,500,000 Funds not Disbursed
Mwira secondary school Payment of outstanding balance for Purchase of schools bus.
2015/16 1,000,000 complete
St James Namamba secondary school
Purchase of Laboratory equipment 2015/16 300,000 purchased to be delivered
St Stephens Namulungu ACK Secondary school
Purchase of Laboratory equipment 2015/16 300,000 purchased to be delivered
Lubanga Secondary School Purchase of Laboratory equipment 2015/16 300,000 purchased to be delivered
Makunda Muslim secondary school
Purchase of Laboratory equipment 2015/16 300,000 purchased to be delivered
Kholera secondary school Purchase of Laboratory equipment 2015/16 300,000 purchased to be delivered
Namasanda Secondary school Purchase of text books 2015/16 250,000 purchased to be delivered
Namulungu Muslim secondary school
Purchase of text books 2015/16 250,000 purchased to be delivered
Lutasio Secondary school Purchase of text books 2015/16 250,000 purchased to be delivered
Mungakha Secondary school Purchase of text books 2015/16 250,000 purchased to be delivered
Shiyabo Secondary school Purchase of text books 2015/16 250,000 purchased to be delivered
Harambee police offices. Construction of second phase of police post. (Setting out, foundation laying, walling, floor slab casting, roofing, plaster work, fittings & finishes.)
2015/16 1,500,000 complete
Khalaba Chief’s Centre Renovation of Chiefs centre-(Reinforcing walls, fixing windows panes/shutters, roofing and floor plastering).
2015/16 300,000 ongoing
Mung’ungu Dispensary Fittings and finishes of wards. 2015/16 700,000 ongoingMatungu Sub District Hospital Completion of kitchen(Roofing,
fittings and painting)2015/16 1,500,000 ongoing
Nanyeni- Mungungu river crossing (9000x2500x1500)
Installation of Double lines Double lines 900mm diameter culverts
2015/16 959,500 complete and in use
Musindalo -Mutola river crossing (9000x1800x1500)
Installation of Single line 900mm culvert
2015/16 538,500 complete and in use
Mirere -Namusasi river crossing (9000x1800x1500)
Installation of Single line 900mm culvert
2015/16 538,500 complete and in use
Nakhakosia river crossing (9000x1800x1500)
Installation of Single line 900mm culvert
2015/16 538,500 complete and in use
Bukosia -Khwiteka river crossing (9000x1800x1500)
Installation of Single line 900mm culvert
2015/16 538,500 complete and in use
Ywaya jcn- Otuko tumbo- Pius muketi/ Namamil muslim- Nabukhamba (3,5km)
Site clearance & stripping, culverts & drainage works, earth works and day works.
2015/16 671,800 complete and in use
Peter chunga- Namufweni- Koyonzo market (2.5km)
Site clearance & stripping, culverts & drainage works, earth works and day works.
2015/16 545,250 complete and in use
Rateko market – Namanga (1.5km)
Site clearance & stripping, earth works and day works.
2015/16 227,200 complete and in use
Koyonzo mkt –Koyonzo girls (0.95km)
Bush Clearing, drainage and culvert opening.
2015/16 147,660 complete and in use
Matungu jnt. –Green view (1.15km)
Bush Clearing, drainage and culvert opening.
2015/16 225,790 complete and in use
Sayangwe pri. –Itete mkt (1.0km)
Site clearance & stripping, culverts & drainage works, earth works and day works.
2015/16 301,050 complete and in use
Omoto –Namberekeya (0.95km)
Bush Clearing, drainage and culvert opening.
2015/16 147,660 complete and in use
Elnino –Wangenge (1.0km) Bush Clearing, drainage and culvert opening.
2015/16 156,800 complete and in use
Lunganyiro –Shisari pefa church (1.5km)
Site clearance & stripping, works, earth works and day works.
2015/16 227,200 complete and in use
Munami –Makhwari ACK- Lubanga clinic (2.5km)
Site clearance & stripping, culverts & drainage works, earth works and day works.
2015/16 545,250 complete and in use
Bulanda pri –Munami mkt (1.5km)
Site clearance & stripping, culverts & drainage works, earth works and day works.
2015/16 448,324 complete and in use
Tomas –Ochieng Omanyo –Camlus (1.5km)
Site clearance & stripping, works, earth works and day works.
2015/16 227,200 complete and in use
Wetaba River –Mayoni ACK church (1.5km)
Site clearance & stripping, works, earth works and day works.
2015/16 227,200 complete and in use
Kings out reach church –Kholera river (1.0km)
Bush Clearing, drainage and culvert opening.
2015/16 156,800 complete and in use
Koyonzo mkt –Mosque/ Namalasire (2.0km)
Site clearance & stripping, works, earth works and day works.
2015/16 268,200 complete and in use
Chebukube mkt – Ngairwe (1.0km)
Bush Clearing, drainage and culvert opening.
2015/16 238,674 complete and in use
Dadira area –Nyambula primary (2.0km)
Site clearance & stripping, works, earth works and day works.
2015/16 195,070 complete and in use
Ebukananachi –Mabonga village (2.5km)
Site clearance & stripping, works, earth works and day works.
2015/16 623,124 complete and in use
Namalenge pri –Ebukananachi/ Namulungu stream (2.0km)
Site clearance & stripping, culverts & drainage works, earth works and day works.
2015/16 256,850 complete and in use
Shiyabo –Khalaba river (2.5km)
Site clearance & stripping, works, earth works and day works.
2015/16 485,250 complete and in use
Indangalasia pri –Lunaabo (1.75km)
Site clearance & stripping, culverts & drainage works, earth works and day works.
2015/16 282,074 complete and in use
Khalaba river-Musamba youth Polytechnic-Musamba Mrkt (2.7 km)
Site clearance & stripping, culverts & drainage works, earth works and day works.
2015/16 282,074 complete and in use
Matungu TTI Purchase of land construction of TTI. (10 acres)
2015/16 5,000,000 Funds not Disbursed
CDF Office Renovation works on CDF office- (Fittings, painting, finishing and construction of septic tank)
2015/16 849,942 ongoing
322,132,859 TOTAL