mathews bridge. mathews history open to traffic: april 15, 1953 cost: $11 million fully painted:...

10
Mathews Bridge

Upload: larissa-seeds

Post on 28-Mar-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Mathews Bridge. Mathews History Open to Traffic: April 15, 1953 Cost: $11 Million Fully Painted: 1982 Paint Touch-up: 1995, 2002, 2007 Steel Grating Replaced

Mathews Bridge

Page 2: Mathews Bridge. Mathews History Open to Traffic: April 15, 1953 Cost: $11 Million Fully Painted: 1982 Paint Touch-up: 1995, 2002, 2007 Steel Grating Replaced

Mathews History

• Open to Traffic: April 15, 1953 Cost: $11 Million

• Fully Painted: 1982• Paint Touch-up:

1995, 2002, 2007

• Steel Grating Replaced2007, $12.9 Million

• Paint & Structural Repair2011, $22.7 Million

Page 3: Mathews Bridge. Mathews History Open to Traffic: April 15, 1953 Cost: $11 Million Fully Painted: 1982 Paint Touch-up: 1995, 2002, 2007 Steel Grating Replaced

LOGISTICS

Vertical Clearance: 149.5’Vertical, Water to Low Member =150’Vertical, Deck to Low Member = 21’Deck to Top of High Point on Truss = 100’ Main Channel Width = 700’Water Depths = 16’ to 38’Tides = 2’

Page 4: Mathews Bridge. Mathews History Open to Traffic: April 15, 1953 Cost: $11 Million Fully Painted: 1982 Paint Touch-up: 1995, 2002, 2007 Steel Grating Replaced

Bridge Connections:Bolts and Rivets

Page 5: Mathews Bridge. Mathews History Open to Traffic: April 15, 1953 Cost: $11 Million Fully Painted: 1982 Paint Touch-up: 1995, 2002, 2007 Steel Grating Replaced

.

Page 6: Mathews Bridge. Mathews History Open to Traffic: April 15, 1953 Cost: $11 Million Fully Painted: 1982 Paint Touch-up: 1995, 2002, 2007 Steel Grating Replaced

.

. 6

Page 7: Mathews Bridge. Mathews History Open to Traffic: April 15, 1953 Cost: $11 Million Fully Painted: 1982 Paint Touch-up: 1995, 2002, 2007 Steel Grating Replaced
Page 8: Mathews Bridge. Mathews History Open to Traffic: April 15, 1953 Cost: $11 Million Fully Painted: 1982 Paint Touch-up: 1995, 2002, 2007 Steel Grating Replaced

• Eastbound Traffic: Union Street to the Hart Bridge, Atlantic Blvd to University/Cesery Blvd to Arlington Expressway

• Westbound Traffic: Arlington Expressway to Cesery Blvd/University Blvd to the Hart Bridge to State Street to downtown Jacksonville

Detour Routes

Page 9: Mathews Bridge. Mathews History Open to Traffic: April 15, 1953 Cost: $11 Million Fully Painted: 1982 Paint Touch-up: 1995, 2002, 2007 Steel Grating Replaced

DETOUR ROUTES

Page 10: Mathews Bridge. Mathews History Open to Traffic: April 15, 1953 Cost: $11 Million Fully Painted: 1982 Paint Touch-up: 1995, 2002, 2007 Steel Grating Replaced

FDOT Public Information OfficerMike Goldman(904) 360-5457