Page 1: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

MATERIALS MATERIALS CERTIFICATION CERTIFICATION

PROCESS PROCESS

Step by StepStep by Step

Page 2: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Step by StepStep by Step

Navigation stepsNavigation steps Screen shots of key windowsScreen shots of key windows Start off in SiteManagerStart off in SiteManager Material Certification Process Utility Material Certification Process Utility

IndexIndex Run Reports for a contractRun Reports for a contract Material Certification LetterMaterial Certification Letter

Page 3: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager
Page 4: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager
Page 5: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Before we begin…..Before we begin…..

Material Certification Process??Material Certification Process??

• Collection of reportsCollection of reports• Microsoft Access QueriesMicrosoft Access Queries

Summaries of issues related to material sampling and testing activities on a contract.

Page 6: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

What Reports are available?What Reports are available?

Material Certification LetterMaterial Certification Letter Summary of Failing SamplesSummary of Failing Samples Summary of materials on items Summary of materials on items

accepted by Small Quantityaccepted by Small Quantity Summary of Independent AssuranceSummary of Independent Assurance Other Summaries – Looks for errors Other Summaries – Looks for errors

or documentation problems or documentation problems concerning SiteManager Materials.concerning SiteManager Materials.

Page 7: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Let’s Get Started…..Let’s Get Started…..

1.

Page 8: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

In SiteManager….In SiteManager….

Page 9: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Materials Certification Process Materials Certification Process Utility IndexUtility Index

Page 10: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager
Page 11: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Materials Certification Process Utility IndexMaterials Certification Process Utility Index

Link to the Policies and ProceduresLink to the Policies and Procedures The Material Certification LetterThe Material Certification Letter Correction ReportsCorrection Reports Attachments to the Mat’l Cert. LetterAttachments to the Mat’l Cert. Letter Additional ToolsAdditional Tools

Page 12: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Start with……Start with……

Page 13: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager
Page 14: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Contract Specific:Contract Specific:Audit Concern Indicator ReportAudit Concern Indicator Report

Print this

Page 15: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

First Indicator to Look at:First Indicator to Look at:Pending Change Orders?Pending Change Orders?

Approval of a change order can affect Material Sampling & Testing Requirements:

Page 16: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Correction ReportsCorrection Reports

(9) Un-authorized Samples(9) Un-authorized Samples (8) Incomplete templates – (8) Incomplete templates – (“No Data Templates” indicator.)(“No Data Templates” indicator.)

Identify and correct any missing documentation in sample records.

Page 17: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Unauthorized Samples?Unauthorized Samples?

Page 18: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Un-authorized Samples ReportUn-authorized Samples Report

Page 19: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Select Contract….Select Contract….

Page 20: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Review Report……Review Report……

Page 21: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Fix Un-authorized samplesFix Un-authorized samples

Complete any Residency samples Complete any Residency samples (or void them out if not needed)(or void them out if not needed)

Contact Materials Division, if they Contact Materials Division, if they still have any unreported samples.still have any unreported samples.

Re-run the Audit indicator report and Re-run the Audit indicator report and verify column 9 is now un-checked.verify column 9 is now un-checked.

Page 22: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

No Data in Templates?No Data in Templates?

Page 23: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

No Data in Templates Report…No Data in Templates Report…

Page 24: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Additional Info….Additional Info….

Policy & Procedure 1302.1GPolicy & Procedure 1302.1G ““No Data in Key Contract Test No Data in Key Contract Test

Templates Report”Templates Report”

“A review of this report prior to issuance of the Material Certification Letter should focus on the following issues:

•The indicator may not remain on the final Materials Certification Letter

•Sample records are to be revised and appropriate test results added to remove this indicator from the Materials Certification Letter”

Page 25: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Review so far….Review so far….

No pending change orders.No pending change orders. All correction reports are fixed:All correction reports are fixed:

• No unauthorized samplesNo unauthorized samples• No empty templatesNo empty templates

Page 26: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Next: Next: What Reports do we need to Attach What Reports do we need to Attach

to Material Certification Letter ?to Material Certification Letter ?

Material Audit concern indicator reportMaterial Audit concern indicator report

- OR -- OR -

Material Certification LetterMaterial Certification Letter

Look at the………

Page 27: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Screen shot: a portion of the material cert letter.

- OR -

Page 28: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Small Quantities ReportSmall Quantities Report

Screen shot: a portion of the material cert letter.

Screen shot: from Material audit concern indicator report

- OR -- OR -

Page 29: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Select the Select the Small Quantities ReportSmall Quantities Report

Page 30: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Example: Example: Small Quantity ReportSmall Quantity Report

Page 31: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Small Quantity Acceptance:Small Quantity Acceptance:

Policy and Procedure 1302.1APolicy and Procedure 1302.1A ““Small Quantities Acceptance Report”Small Quantities Acceptance Report”

“Anyone responsible for printing or viewing this report, and/or anyone responsible for issuing a Material Certification Letter or auditing a contract shall be familiar with the information in the quick reference guide (QRG);” LINK

Page 32: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Small Quantity QRGSmall Quantity QRG

Do not use this method when you are actually conducting Sampling and Testing on a material. For Example:

1. to avoid the last sample 2. multiple tests on a material 3. Failing materials

Page 33: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Small Quantity QRGSmall Quantity QRG

Step by step instructionsStep by step instructions Screen shots of key pointsScreen shots of key points

Page 34: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Fail and Accepted ItemsFail and Accepted Items

Page 35: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Select: Select: Failed and Accepted ReportFailed and Accepted Report

Page 36: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Example: Example: Failed & Accepted ReportFailed & Accepted Report

Page 37: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Failed & Accepted ReportFailed & Accepted Report

Review Policy 1302.1BReview Policy 1302.1B ““Failed and Accepted Materials Failed and Accepted Materials

Report”Report”“A review of this report prior to issuance of the Material Certification Letter should focus on the following issues:

•The indicator may remain on the final Materials Certification Letter with this report attached as the required documentation, however: •Remarks should be included indicating what failed, and the basis for acceptance.•The correct material quantity should be indicated•Proper authorization should be indicated. (see additional discussion)•Use of material listed as Failed & Accepted should be within the guidelines and policies established in the Residency and Division.”

Page 38: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

IAS Does Not CompareIAS Does Not Compare

No report needed for this indicator.

Page 39: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

IAS Does Not Compare Example:IAS Does Not Compare Example:

Page 40: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

IAS Does Not Compare Review:IAS Does Not Compare Review:

Policy 1302.1EPolicy 1302.1E ““IAS Does Not compare fav. Report”IAS Does Not compare fav. Report”

“A review of this report prior to issuance of the Material Certification Letter should focus on the following issues:

•The indicator may remain on the final Materials Certification Letter with this report attached as the required documentation, however: •Remarks (General by IAS) should indicate what did not compare

•Remarks (Disposition by Residency) should indicate how the non-comparison was addressed”

Page 41: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Select: Select: Final Outstanding ItemsFinal Outstanding Items

Page 42: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Example: Example: Final Outstanding ItemsFinal Outstanding Items

Page 43: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Select: Select: Final Sampling ChecklistFinal Sampling Checklist

Page 44: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Final Sampling ChecklistFinal Sampling Checklist

Page 45: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Sample/Test Modifications IndicatorSample/Test Modifications Indicator

Page 46: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Sample/Test Modifications IndicatorSample/Test Modifications Indicator

Page 47: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Additional ToolsAdditional Tools

Contract Sample summary report:Contract Sample summary report:• Can be ran anytime.Can be ran anytime.• No filters – shows all project No filters – shows all project

samples.samples. Failed Materials Report:Failed Materials Report: Sample status = FailsSample status = Fails

Page 48: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Material Certification LetterMaterial Certification Letter

Material Cert Process Utility IndexMaterial Cert Process Utility Index Select Contract and PrintSelect Contract and Print Review the indicatorsReview the indicators Verify (look at the indicators):Verify (look at the indicators):

• No unauthorized samples existNo unauthorized samples exist• No material test templates are blankNo material test templates are blank

Attach necessary ReportsAttach necessary Reports Signed & Sealed by Resident Engr.Signed & Sealed by Resident Engr.

Page 49: MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager

Questions ???Questions ???