Page 1: MATERIAL PLANNING PROCESS

05/02/2023 1

INTEGATED BUSINESS PROCESSES WITH ERP

SYSTEMS

PRESENTED BY:NEHA GAUTAM(15609076)

MATERIAL PLANNING PROCESS

Page 2: MATERIAL PLANNING PROCESS

05/02/2023 2

INTRODUCTION

Material planning is concerned with answering three basic questions:(1) What materials are required(2) How many are required (3) When are they required?

Objective:To balance the demand for materials with the supply of materials so that an appropriate quantity of materials is available when they are needed.

Figure 8-1: A basic material planning process

Page 3: MATERIAL PLANNING PROCESS

05/02/2023 3

MASTER DATA

Master data includes:• Bill of material• Product routing• Material master• Product group.

Procurement Type - indicates whether a material is produced in-house via the production process or obtained externally via the procurement process, both, or none.

Figure 8-2: Material master data for material planning

Figure 8-3: Consumption-based planning

MRP type specifies the production control technique used in planning.• Consumption-based planning,• Materials requirement planning2 (MRP)• Master production scheduling (MPS).

MATERIAL MASTER Data related to MRP and work schedulingdivided into four views.

Page 4: MATERIAL PLANNING PROCESS

05/02/2023 4

Master production scheduling (MPS), which utilizes a process similar to MRP but focuses exclusively on the requirements for the top-level items in the BOM.

Figure 8-5: MRP vs. MPS

Scheduling Times• In-house production time• Setup time• Processing time• Interoperation time• Planned delivery time• GR (goods receipt) processing time.

Planning Time FenceCompanies establish a period of time in which the ERP system is not allowed to automatically change procurement proposals.

Lot Size Key- A lot size is the quantity of material that is specified in the procurement proposals generated by the material planning process.

Page 5: MATERIAL PLANNING PROCESS

05/02/2023 5

• Bill of Material(BOM) identifies the materials needed to produce a finished good.• Availability check group defines the strategy the system uses to determine whether a

quantity of material will be available on a specific date. The most common method, called available-to-promise (ATP)

• Strategy group specifies the high-level planning strategy used in production. Production planning strategies fall into three broad categories: make-to-stock, make-to-order, and assemble-to-order.

• Consumption Modeo When a CIR consumes PIRs, it reduces the quantity of PIRs by the quantity of the CIR.

This process is called consumption.o In backward consumption, customer requirements consume PIRs that are dated prior to

the time of the customer requirements.o In forward consumption, customer requirements consume PIRs that occur after the date

of the CIR.o The consumption period indicates the number of days, before or after, from the CIR that

PIRs can be consumed.• PRODUCT GROUPS- products are aggregated into groups. A proportion factor is a measure of

how much the item influences the product group.

Page 6: MATERIAL PLANNING PROCESS

05/02/2023 6

Figure 8-7: GBI product groups

Figure 8-9: The material planning process

• The first step in the process is sales and operations planning (SOP).

• SOP is a forecasting and planning tool that businesses use to enter or generate a sales forecast.

• SOP creates a production plan at the product group level.

• Requirements must be translated into PIRs for the individual materials in the product group (Disaggregation).

• The PIRs for the individual materials are then transferred to demand management, where they are revised and refined.

• MRP, creates specific procurement proposals.

MATERIAL PLANNING PROCESS

Page 7: MATERIAL PLANNING PROCESS

05/02/2023 7

STEP ONE: SALES AND OPERATIONS PLANNING

Figure 8-10: Elements of the SOP step

Figure 8-11: Data in the SOP step

• SOP is triggered when the organization wishes to revise its production plan.

• In standard planning a company uses predefined planning models.

• With flexible planning a company uses tools to develop more complex planning models that contain far greater levels of detail.

DataMost critical data are a sales plan, existing inventory levels, and inventory requirements.

Page 8: MATERIAL PLANNING PROCESS

05/02/2023 8

Tasks• The tasks in the sales and operations planning step include creating the sales

plan, specifying inventory requirements, and creating a production plan.• The interface to complete the tasks in SOP is a simple-to-use spreadsheet-like

tool.

Figure 8-12: Standard SOP planning table

Page 9: MATERIAL PLANNING PROCESS

STEP TWO : DISAGGREGATION

• This step translates the plans into the plans for the finished goods in the product group hierarchy.

Figure 8.13 ELEMENTS OF THE DISAGGREGATION STEP

05/02/2023 9

Page 10: MATERIAL PLANNING PROCESS

STEP THREE : DEMAND MANAGEMENT

It calculates revised PIRs for the materials using the PIRs from SOP (after disaggregation), actual customer orders (CIRs) from the fulfillment process, and data from the material master regarding planning strategies.

Figure 8.14 ELEMENTS OF THE DEMAND MANAGEMENT STEP

05/02/2023 10

Page 11: MATERIAL PLANNING PROCESS

STEP FOUR : MATERIAL REQUIREMENT PLANNING

• It calculates the net requirements for materials and creates procurement proposals—to make or buy the necessary materials—that ensure that the organization will have sufficient material available to cover its requirements.

Figure 8.15 ELEMENTS OF THE MATERIAL REQUIREMENT PLANNING STEP

05/02/2023 11

Page 12: MATERIAL PLANNING PROCESS

Tasks in the MRP step. These steps are performed automatically by MRP.

05/02/2023 12

Page 13: MATERIAL PLANNING PROCESS

REPORTING

Important tools that convey information about the planning situation:

• the stock/requirements list,

• the MRP list, and

• the planning result report.

05/02/2023 13

Page 14: MATERIAL PLANNING PROCESS

CHAPTER SUMMARY

Material planning is one of the most complex processes in an organization. The main objective of material planning is to balance the supply of materials with the demand so that a sufficient supply of materials are available when they are needed. Material planning is concerned with answering three basic questions:(1) What materials are required; (2) how many are required; and (3) when are they required?

Material Planning Process

a) SOP

b) Disaggregation

c) Demand Management

d) Material Planning Process

Reporting in material planning is limited to relatively few reports but includes three important tools to obtain information about the planning situation: the stock/requirements list, the MRP list, and the planning result report.

05/02/2023 14

Page 15: MATERIAL PLANNING PROCESS

THANK YOU

05/02/2023 15