Page 1: Mat Foundation Presentation by 2-2,Sec-C,AUST

PRESENTATION ON MAT FOUNDATION

DETAILS OF CONSTRUCTION

CE-200

Compiled By–

Group-03, 2nd Year, 2nd Semester, Section-C, Department of Civil Engineering,

AHSANULLAH UNIVERSITY OF SCIENCE & TECHNOLOGY

Page 2: Mat Foundation Presentation by 2-2,Sec-C,AUST

Contributed By-• Md Abdul Aahad (GL) (12-01-03-104)

• Monisha Podder Puja (12-01-03-110)

• Arafat Chowdhury (12-01-03-116)

• Sabrina Zissan Rafa (12-01-03-124)

• Md. Mahbub Al Muhaimin (12-01-03-129)

• Md. Abu Bakar Siddik (12-01-03-136)

• Sabrina Mehenaz (12-01-03-144)

• Tanvir Alam Khan (12-01-03-149)

• Alamin Bhuiyan Ashraf (12-01-03-154)

• Amit Kumar Baral (11-01-03-016)

Page 3: Mat Foundation Presentation by 2-2,Sec-C,AUST

CONTENTS

• Definition Of Mat Or Raft Foundation

• Reasons For MAT Foundation

• Types Of Mat Or Raft Foundation

• Procedure Flow Chart

• Plan & Sectional View

• Visited Sites

• Constructing A Mat Foundation

• Advantages & Disadvantages

• Conclusion

Page 4: Mat Foundation Presentation by 2-2,Sec-C,AUST

MAT FOUNDATION

• A foundation system in which essentially the entire building is placed on a large

continuous footing.

• Usually large concrete slab supporting many columns.

• Commonly used as foundation for official or commercial spaces, residential

buildings, chimneys & large machinery.

• It is a flat concrete slab, heavily reinforced with steel, which carries the downward

loads of the individual columns or walls.

Page 5: Mat Foundation Presentation by 2-2,Sec-C,AUST

Reasons For Mat Foundation

The spread footings cover over 50% of the foundation area because of large

column loads.

The soil is soft with a low bearing capacity.

When the expenses of deep foundation is higher then raft foundation.

Page 6: Mat Foundation Presentation by 2-2,Sec-C,AUST

TYPES OF MAT

Flat Plate MatTwo-way Beam & SlabFlat Plate Thickened Under

Column

Flat Plate with Pedestals Pile Mat Rigid Frame Mat

Page 7: Mat Foundation Presentation by 2-2,Sec-C,AUST

PROCEDURE FLOW CHART

Soil Test ( For Bearing

Capacity)

Shoring & Water Proofing

Partial Excavation(Depending

upon Depth)

Strutting & Bracing

Full area Excavation

Soil Compaction

BFS & CC or LC layer cover

Retaining Wall

Reinforcement Placing

Casting of CC & Compaction

Curing

Page 8: Mat Foundation Presentation by 2-2,Sec-C,AUST

Sectional Design of a Mat Foundation

Page 9: Mat Foundation Presentation by 2-2,Sec-C,AUST

PCC BED

R C C SLAB

C C

Sectional View

Plan View

COLUMN

MAIN BEAM

SECONDARY

BEAM

MAIN BEAM

Page 10: Mat Foundation Presentation by 2-2,Sec-C,AUST

Visited Sites

Arham Engineers Limited, Uttara, Dhaka

Aine Properties, Mirpur-11, Dhaka

Euro Bangla Real Estate, Mouchak, Dhaka

Page 11: Mat Foundation Presentation by 2-2,Sec-C,AUST

• Bearing capacity of soil;

• Soil classification;

• Ground water level;

• Moisture content;

• Appropriation & depth of Mat.

Soil Test

Page 12: Mat Foundation Presentation by 2-2,Sec-C,AUST

o Shoring is commonly used when installing the foundation;

o Shoring support the surrounding loads until the underground levels of the

building are constructed.

o Can be of 3 types: Pile shore, steel sheet shore and timber shore.

Shoring

Page 13: Mat Foundation Presentation by 2-2,Sec-C,AUST

Log Shore Pile Shore Steel Shore

Figures of Shoring

Page 14: Mat Foundation Presentation by 2-2,Sec-C,AUST

A layer provided over shoring to

prevent moisture;

Cement mortar or steel sheet layer

over shoring;

Cement mortar layer is extended over

wire mesh.

Water Proofing

Page 15: Mat Foundation Presentation by 2-2,Sec-C,AUST

# Partial & Full Excavation is required

before the Bracing, Strutting, BFS &

Placement of Reinforcement etc…

Earthwork Excavation

Page 16: Mat Foundation Presentation by 2-2,Sec-C,AUST

A horizontal support for the boundary

shores during excavation and

foundation;

Depends on the depth of foundation;

Also known as horizontal shores.

Strutting & Bracing

Page 17: Mat Foundation Presentation by 2-2,Sec-C,AUST

King Post

Strut & Brace

Page 18: Mat Foundation Presentation by 2-2,Sec-C,AUST

Strutting at First & Second Phase

Page 19: Mat Foundation Presentation by 2-2,Sec-C,AUST

Layer of bricks

on the earth

Layer of cement concrete

over BFS.

Page 20: Mat Foundation Presentation by 2-2,Sec-C,AUST

A batch of horizontal reinforcement placing;

Another batch of reinforcement placement to

complete the bottom mesh;

Column rod placement;

Vertical rod (chair) placement over bottom

mesh to hold the upper mesh;

Upper mesh placement.

Placing of Reinforcement

Page 21: Mat Foundation Presentation by 2-2,Sec-C,AUST

Joint Between Column footing & Mat Mesh

Page 22: Mat Foundation Presentation by 2-2,Sec-C,AUST

Placed Reinforcement for Mat Mesh Joint Between the reinforcements

of Column & Mat Mesh

Page 23: Mat Foundation Presentation by 2-2,Sec-C,AUST

Reinforcement Selection

• 60~72.5 Graded

• 12mm~25mm

90°/135° Hook

Chair

Page 24: Mat Foundation Presentation by 2-2,Sec-C,AUST

CLEAR COVER

Page 25: Mat Foundation Presentation by 2-2,Sec-C,AUST

• Start from one end;

• Layer basis casting;

• Side basis casting.

Casting

Page 26: Mat Foundation Presentation by 2-2,Sec-C,AUST

RCC in Mat Mesh Casting in Mat Slab

Page 27: Mat Foundation Presentation by 2-2,Sec-C,AUST

Leveling

After casting the whole Mat area leveling is essential to

be ensured that the thickness of the mat slab is same all

over the area.

Page 28: Mat Foundation Presentation by 2-2,Sec-C,AUST
Page 29: Mat Foundation Presentation by 2-2,Sec-C,AUST

Advantages & Disadvantages

Raft or Mat foundation is economic due to combination of foundation and floor slab.

It requires little excavation.

It can cope with mixed or poor ground condition.

It reduces differential settlement.

Mat foundation requires specific treatment for point loads.

Edge erosion occurs if not treated properly.

Disadvantages

Advantages

Page 30: Mat Foundation Presentation by 2-2,Sec-C,AUST

CONCLUSION

• This presentation is based on the observations on Mat Foundation in

various sites & meeting with concerned Engineers & Workers.

• The principal objective of this Presentation is to learn about Mat

Foundation practically with structural view.

• Besides Mat Foundation we were able to learn other major & minor

parts of a construction.

Page 31: Mat Foundation Presentation by 2-2,Sec-C,AUST
Page 32: Mat Foundation Presentation by 2-2,Sec-C,AUST
Page 33: Mat Foundation Presentation by 2-2,Sec-C,AUST

COPYRIGHT

This presentation is copyright protected by Arafat Chowdhury, department of Civil

Engineering, Ahsanullah University of Science & Technology (AUST), Dhaka,

Bangladesh, 2014.

If you want to present or use these slides for any purposes kindly contact to Arafat

Chowdhury.

Thank you for watching & your precious time !