master präsentation pal sys-offshore

38
Palfinger Systems Solutions Offshore Access Systems

Upload: benji-george

Post on 20-Jul-2015

22 views

Category:

Business


0 download

TRANSCRIPT

Palfinger Systems Solutions

Offshore Access Systems

➔ Introduction

➔ Offshore systems

Table of Contents

Introduction

Our DNA

➔ Established in 1992

➔ Headquartered in Salzburg, Austria

➔ Engaged in the development and manufacture of innovative access and maintenance systems for

the shipping and offshore industries

➔ Providing proven game changing technologies for easy, safe and fast access during the inspection,

repair and maintenance of offshore Jack Up legs, underdecks and vessel cargo holds, as well as

vessel’s hull treatment

➔ Constantly seeking solutions to meet the needs of the customers

➔ Flexible standard solutions as well as customized applications at the highest level

➔ Solutions are available for purchase or rental, depending on the product

Intro

Reducing the service time – Enhancing utilization & safety

Offshore access systems

➔ IP – Inspection Platform

➔ RC – Rack Crane

➔ JUMP – Jack Up Maintenance Platform

➔ AP - Aerial Platform

➔ UPA – Under Platform Access

➔ Leg Crane

Ship access and hull treatment systems

➔ ITP-4 and ITP-8 – Internal Tank Platform

➔ DC – Deck Crane

➔ HTC - Hull Treatment Carrier

➔ HTC-BT – Bottom Treatment

Portfolio - Overview

Whereabout

Salzburg Austria

Headquarter

WengAustria

Assembly

SingaporePalfinger Entraco System Solutions

Shanghai / Dalian / ShenzhenKS Distribution

RioTop Access Engenharia

Dubai / Abu Dhabi / Doha / BahrainMegarme

HoustonPalfinger Marine

IstanbulMarsis Dis. Ticaret

Viborg / BergenGardit A/S

7

Some of our esteemed Customers

Offshore systems

Getting your rigs back to work in days, instead of weeks

Made to provide safe and efficient access during newbuilding, inspection, repair and

maintenance of offshore structures

Palfinger systems Products - Offshore

Providing easy access to different makes and

models of jack-up-rigs

➔ Time and money saving solution for owners,

yards and subcontractors

➔ Deployable even offshore thus improving

yearly income and profitability with more working

days on location / in operation

➔ Offering a safe, reliable and efficient access, as

well as improved drop object control

➔ For single or opposable racks

➔ Quick set-up time leading to increased

productivity

➔ Greater flexibility to plan maintenance work

without impacting schedules

➔ Installation time ~1 hr

IP - Inspection Platform

Ideal working position

Designed mainly for

➔ Inspection of the leg prior to yard visit

➔ Non destructive testing (NDT)

➔ Changing anodes

➔ Small repairs

➔ Vertical speed 12 m/min

➔ Horizontal reachability 11 m (with AP14)

➔ Payload platform 400 kg + 300 kg in AP14

➔ Diesel driven

➔ Power supply for tools 21 kW

➔ Equipped with AP14 or Knuckle Boom crane

➔ Max. weight of single component 300 kg

➔ Total weight approx. 9 t

IP - Inspection Platform

Providing easy access to different makes and

models of jack-up-rigs

➔ Time and money saving solution for owners, yards and

subcontractors

➔ Extreme savings in set-up and removal time, thus

improving yearly income and profitability with more

working days on location / in operation, or additional

maintenance works that can be carried out

➔ For single or opposable racks

➔ Offering a safe, reliable and efficient access, as well as

improved drop object control

➔ Greater flexibility to plan maintenance work without

impacting schedules

➔ Installation time ~3 hrs

RC - Rack Crane

Designed mainly for:

➔ Checking and repairing of rack teeth, ladders, position

lights

➔ Support larger repairs on the leg

➔ Steel repair works

➔ Vertical speed 2.5 m/min

➔ Reachability 14m with (AP-14)

➔ Payload platform 650 kg + 350 kg in AP14

➔ Diesel driven

➔ Power supply 80kw (45 kW for drive unit and crane,

35 kW for tools)

➔ Max. weight of single component 1,000 kg

RC - Rack Crane

RC - Design & Features

Corn

er to

corn

er dis

tance

Single rack (SR)

Cor

ner t

o co

rner

dista

nce

Opposal rack (OR)

Rack-p

ost-

depth

Guiding-width

Guiding-width

Rack-width

Rack-w

idth

Rack-p

ost-

depth

A

A

G

F

C

C

D

E

B

B

HH KJ

A Pin-wheel-drive (PWD) E Guiding opposal rack J Width-adapter

B PWD-housing F Support-unit single rack K Depth-adapter

C Gear G Support-unit opposal rack

D Guiding single rack H Corner-module

JUMP - Jack Up Maintenance Platform

Providing easy access to different makes and

models of jack-up-rigs

➔ Time and money saving solution for owners, yards

and subcontractors

➔ Extreme savings in set-up and removal time

improving yearly income and profitability with more

working days on location / in operation, and/or

additional maintenance works that can be carried out

➔ For single or opposable racks

➔ Offering a safe, reliable and efficient access, as well

as improved drop object control

➔ Optional enclosure

o protecting the environment from paint, grit and

other substances used

o guaranteeing a weather-independent working

environment

JUMP - Jack Up Maintenance Platform

➔ Designed mainly for support large repairs on the leg,

steel repair works, for works requiring an enclosure

(blasting and painting)

➔ Installation time 10 - 20 hrs (depending on JUMP type)

➔ 40 - 50% saving in worktime for surface treatments

like UHP blasting and painting, up-to 80% saving for

steel works like changing of anodes

➔ Vertical speed 2.5 m/min

➔ Operation up-to 75 km/h wind-speed

➔ Diesel driven

➔ Power supply 80kw (45 kW for drive unit and crane,

35 kW for tools)

➔ Max. weight of single component 1,000 kg

➔ Configuration can include telescopic crane, aerial

platform, crew transport, material transport, ancillary

power

Max payload

JUMP-1 4,000 kg

JUMP-2 6,200 kg

JUMP-3 9,000 kg

JUMP-4 10,400 kg

JUMP - Jack Up Maintenance Platform

JUMP-01 JUMP-02 JUMP-03

JUMP-03 with Enclosure

JUMP - Types

JUMP-04 with Enclosure

Specification:

1/3 or 1/4 - open system

Equipped with 1 bridge

Without enclosure

Equipped with Aerial Platforms and Cranes

Equipped with 2 Corner- Supply Rescue Platforms

Jump-01 Jump-02

Specification:

2/4 - open system

Equipped with 2 bridges

Without enclosure

Equipped with Aerial Platforms and Cranes

Equipped with 2 Corner- Supply Rescue Platforms

JUMP - Types

JUMP - Types

JUMP - Types

JUMP - Design & Features - Modularity

JUMP with Supply/Rescue Platform

JUMP - Design & Features - Modularity

AP14

PK 15500

JUMP - Onboard equipment

Operational reach: horizontal: 11m

vertical: 14m

Payload workman basket: 350 kg, 2 persons & tools

Total weight: 2,700 kg

Operational reach: 10m

Slewing angle: 420°

Safe Working Load: 1.000 kg at 10m max.

outreach in winch mode

AP14 PK15500M

JUMP - Partial enclosures for welding

27

JUMP – Enclosure

Material:

Tarpaulin, 900 g/m², B1, antistatic

Frame made of steel / aluminum construction

Jump-03 Jump-03 with Enclosure

JUMP - Enclosure

Jump-04 Jump-04 with Enclosure

JUMP - Enclosure

JUMP - Installation Sequence

1 2 3 4

5 6 7 8

9 10 11 12

JUMP - Installation Sequence

17 18 19

13 14 15 16

UPA - Under Platform Access

For fast, easy and safe access to difficult areas

➔ Provides access to bracings, lower leg sections,

underside and side shell of jack-ups and semi-

submersibles

➔ Side- and under-floor repair and inspection works

can be executed offshore thus improving yearly

income and profitability with more working days on

location / in operation

➔ Easy to be mounted and repositioned, flexible to be

mounted on any rig

➔ Providing a safe, reliable and efficient access

➔ Flexible to be mounted on any rig (JU-Rig,

submersible, fixed platform)

➔ Installation time ~8 hrs

UPA - Under Platform Access

➔ Horizontal reachability 33 m

➔ Vertical reachability 24 m

➔ Payload 2-man basket 300 kg

➔ Cable remote control

UPA reach

UPA - Under Platform Access

UPC = UPA with a grabber and / or

a winch for doing or supporting

steelworks under construction

Interface Module

1m

2m

3m

6m

Extension pieces

UPA - Framework

Thank you for your attention

Reducing the service time –

Enhancing utilization & safety

• Contact Information

• Benji George• Business Unit Manager – Middle East

• Mobile: +971 (0)564 097702• Email: [email protected]• Tel: +971 (0)4 8135290• #320, European Business Center, Dubai Investment Park, Dubai, UAE• www.palfingersystems.com www.palfingermarine.com www.megarme.com