Master plan for Natore Paurashava (2010-2030) Structure Plan, Urban Area Plan and Ward Action Plan Preparation of Master Plan for Natore Paurashava is a great initiative for District Towns Infrastructure Development Project (DTIDP) under Local Government Engineering Department. This Master plan will serve as a guideline for the future infrastructure development of Natore Paurashava together with land use control, effective management of the services facilities. This will also ensure planned physical, social and economic development of Natore Paurashava. The Master Plan comprises of three stages and tires in a hierarchical order. These are: i. Structure Plan for 20 years ii. Urban Area Plan for 10-15 years iii. Ward Action Plan for 5 years For the preparation of Master Plan LGED engaged consulting firm Sheltech (Pvt.) Ltd. For the Preparation of Master Plan, the Consultants have completed the most essential tasks such as consultation with the Paurashava & different stake-holders at different stages, collection of all mouza maps, digitization of maps, demarcation of Paura boundary, different types of Engineering Surveys, Socio-economic, Traffic & Transport studies, formal public hearing, final consultation with the Paurashava and stake- holders. The entire works for the preparation of Master Plan have been completed through participatory planning approach with the Paurashava and related stake-holders. Site Area: 14.85 sq.km. Location: Natore Paurashava, Rajshahi Division. Client: Natore Paurashava/ Local Government Engineering Department

Upload: abdullah-al-masud

Post on 20-Feb-2017

151 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Master Plan of Natore Pourashava

Master plan for Natore Paurashava (2010-2030)

Structure Plan, Urban Area Plan and Ward Action Plan

Preparation of Master Plan for Natore Paurashava is a great initiative for

District Towns Infrastructure Development Project (DTIDP) under Local

Government Engineering Department. This Master plan will serve as a

guideline for the future infrastructure development of Natore Paurashava

together with land use control, effective management of the services

facilities. This will also ensure planned physical, social and economic

development of Natore Paurashava. The Master Plan comprises of three

stages and tires in a hierarchical order. These are:

i. Structure Plan for 20 years

ii. Urban Area Plan for 10-15 years

iii. Ward Action Plan for 5 years

For the preparation of Master Plan LGED engaged consulting firm Sheltech

(Pvt.) Ltd. For the Preparation of Master Plan, the Consultants have

completed the most essential tasks such as consultation with the

Paurashava & different stake-holders at different stages, collection of all

mouza maps, digitization of maps, demarcation of Paura boundary, different

types of Engineering Surveys, Socio-economic, Traffic & Transport studies,

formal public hearing, final consultation with the Paurashava and stake-

holders. The entire works for the preparation of Master Plan have been

completed through participatory planning approach with the Paurashava and

related stake-holders.

Site Area: 14.85 sq.km. Location: Natore Paurashava, Rajshahi Division.

Client: Natore Paurashava/ Local Government Engineering Department