marssim revision 2 - environmental protection...

35
MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011 July 26, 2011 Kathryn Snead MARSSIM Workgroup Chair

Upload: buidan

Post on 15-Feb-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

MARSSIM Revision 2Consultation with the SAB-RACJuly 26 2011July 26, 2011Kathryn SneadMARSSIM Workgroup Chair

Page 2: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Consultation on MARSSIM Revision 2

IntroductionsDocument OverviewPlanned RevisionsCollecting CommentsCharge Questionsg

1

Page 3: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Introductions

2

Page 4: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

MARSSIM Workgroup

Independently-chartered Workgroup• Under the ISCORS Umbrella since 2007• Under the ISCORS Umbrella since 2007

Four Federal Agencies• Department of Defense (Air Force Army and Navy• Department of Defense (Air Force, Army, and Navy

representatives)• Department of Energy• Environmental Protection Agency• Nuclear Regulatory Commission

CRCPD Participation

3

Page 5: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Introductions

Chair – Kathryn Snead, EPAChair Emerita – Colleen Petullo, EPA

4

Page 6: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Introductions

EPA POC – Darrell LilesEPA Members – Nidal Azzam, Gene Jablonowski

5

Page 7: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Introductions

NRC POC – George PowersRepresenting NRC – Mark FuhrmannNRC Members – Boby Abu-Eid, John Tomon, yDuane Schmidt

6

Page 8: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Introductions

DOE POC – Alexander WilliamsDOE Members – Carlos Corredor, John Moon

7

Page 9: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Introductions

Army POC – Dave AlberthArmy Members – Jerry Falo, Bob Cherry

8

Page 10: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Introductions

Navy POC – Steve Doremus

9

Page 11: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Introductions

Air Force POC – Ram BhatAir Force Member – Craig Bias

10

Page 12: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Document Overview

11

Page 13: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Document Overview

Family of Three Multi-Agency Documents• MARSSIM – Published 1997, Updated 2001• MARSAME – Published 2009• MARLAP – Published 2004

•Technical Documents - Not Policy

12

Page 14: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Document Overview

•MARSSIM (Multi-Agency Radiation Survey and Site Investigation Manual)

• Covers real property (surface soils and building surfaces)surfaces)

• Provides defensible and rigorous surveys for cleanup, especially Final Status Surveysp, p y y

• Incorporates historical site knowledge and a graded approach to survey effort

• Recommends a two-tiered approach for surveys using scanning and direct measurements or samples

13

p

Page 15: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Document Overview

MARSSIM – Widely UsedNRC Decommissioning SitesDOE, EPA, DoD, and State Cleanup Sites

•Provides an already agreed-upon approach at sites with multi-party cleanup agreements

14

Page 16: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Document Overview

•MARSAME (Multi-Agency Radiation Survey of Materials and Equipment)

• Supplement to MARSSIMP id d f ibl d i di i• Provides defensible and rigorous radiation

surveys for cleanup, operations, or interdiction• Incorporates process knowledge and a gradedIncorporates process knowledge and a graded

approach• Addresses surficial and volumetric contamination

and difficult-to-measure areas

15

Page 17: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Document Overview

•MARLAP (Multi-Agency Radiation Laboratory Analytical Protocols)

• Provides defensible and rigorous protocols for radiation measurements performed in a laboratoryradiation measurements performed in a laboratory setting

• Issued by a separate workgroup (MARLAP y p g p (Workgroup) with specialized knowledge

• Included additional agencies: USGS, DHS, FDA, and NISTand NIST

16

Page 18: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Planned Revisions

17

Page 19: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Planned Revisions

•MARSSIM not updated since 2001• Mostly errata and typos corrected before that date

18

Page 20: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Planned Revisions

• Update treatment of measurement uncertainty• Update measurement methods• Scenario B (“assumed to pass until proven

otherwise”)otherwise )• Increase emphasis on regulator interface during

survey design• User comments (“lessons learned”)• Definitions/terms consistent with related documents• Better discussion of “hotspots” and UMTRCA

standards

19

Page 21: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Planned Revisions

Update treatment of measurement uncertainty• MARSAME and MARLAP in line with the state of

the science regarding measurement uncertaintyComplies with current guidance from ISO and NIST• Complies with current guidance from ISO and NIST

20

Page 22: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Planned Revisions

Update measurement methods• MARSSIM written with the current (~1995)

measurement technology in mindThe state of radiation instrumentation improved• The state of radiation instrumentation improved

• MARSAME includes additional flexibility to take that into account

21

Page 23: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Planned Revisions

Scenario B (“assumed to pass until proven otherwise”)• MARSAME allows the use of Scenario B

Al d i i f MARSSIM• Already in use in some states for MARSSIM

22

Page 24: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Planned Revisions

Increased emphasis on regulator interaction during survey design

23

Page 25: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Planned Revisions

User comments (“lessons learned”)• Both regulators and contractors submitted

comments regarding the useful or confusing parts of MARSSIMMARSSIM

• Ten years of use generated significant lessons learned on both sides

24

Page 26: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Planned Revisions

Definitions/terms consistent with related documents

• User comments led to changes in some key terms for the issuance of MARLAP and MARSAMEfor the issuance of MARLAP and MARSAME

25

Page 27: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Planned Revisions

Better discussions of hotspots and UMTRCA standards• MARSSIM didn’t explicitly address UMTRCA

H di i d• Hotspot discussion underway

26

Page 28: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Public Comments

27

Page 29: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Collecting Public Comments

Collecting public comments• Dedicated e-mail address:

[email protected] address: MARSSIM Workgroup c/o• Physical address: MARSSIM Workgroup, c/o Kathryn Snead, Workgroup Chair, USEPA, 1200 Pennsylvania Avenue, NW, Mail Code 6608J, Washington, D.C. 20460

• Public meeting: February 10, 2010, EPA East Building Conference Room 1117A 1201Building Conference Room 1117A, 1201 Constitution Avenue, NW, Washington, DC

28

Page 30: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Charge Questions

29

Page 31: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Charge Questions

Question #1:

The MARSSIM Workgroup has proposed a gnumber of significant changes to MARSSIM, which if implemented, will result in Revision 2

f th d t Pl t thof the document. Please comment on the applicability and appropriateness of the proposed changesproposed changes.

30

Page 32: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Charge Questions

Question #2:

Does the SAB have any recommendations for yadditional changes or improvements? Why does the SAB believe that these additional h t d?changes are warranted?

31

Page 33: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Charge Questions

Question #3:

The list of changes proposed by the MARSSIM g yWorkgroup represents the Workgroup’s best judgment as to the highest priority changes,

i li it d f i l t tigiven limited resources for implementation. Please comment on the appropriateness of the Workgroup’s prioritization of the changesthe Workgroup s prioritization of the changes selected.

32

Page 34: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

Next Steps

•Updates on the MARSSIM Revisions will be posted to the MARSSIM Workgroup website: http://www.epa.gov/radiation/marssim/

•Feedback on the comments received will be t d t f th F d l R i t N tiposted as part of the Federal Register Notice

announcing the availability of MARSSIM, Revision 2Revision 2.

33

Page 35: MARSSIM Revision 2 - Environmental Protection Agencyyosemite.epa.gov/.../$File/sabracconsultation072611.pdf · MARSSIM Revision 2 Consultation with the SAB-RAC July 26 2011July 26,

34